North Eastern Railway & Ors. v. Tripple Engineering Works
The JOdgment of the Court was delivered by D
RANJAN GOGOi, J. 1. The challenge in this appeal is to
order dated 27.06.2012 of the Patna High Court by which a.__
former Chief Justice of the Sikkim High Court had been
appointed as the arbitrator to r~solve the disputes and
differences between the parties to the present proceedings E
arising out of two contracts bearing No. CAO/CON/722 dated
_101.11.1993 and CAO/CON/738 dated 28.04.1994.
2. Both the contracts awarded to the respondent
contractor were terminated on 7 .11.1994. Admittedly, the
General Conditions of Contract of the Railways, which included F
an arbitration clause, governed the parties. After the termination
of the two contracts the respondent-contractor approached the
Patna High Court by means of a writ petition challenging the
terminations. The writ petition was dismissed, which dismissal
was challenged before this Court in SLP(C) No. 17189/1995. G
The said special leave petition was also dismissed leaving
parties to resolve the differences in an appropriate proceeding
i.e. a civil suit or by reference to arbitration, as the case may
be.
A 3. Though a panel of arbitrators as per Clauses 64(3)(a)(ii)
and (iii) of the General Conditions of Contract was appointed
as far back as in the year 1996, till date the award(s) in respect
of the disputes arising out of either of the two contracts is yet
to be passed. According to the appellant-railways, the
s proceedings of arbitration has been completed in respect of
the disputes arising out of Contract No. CAO/CON/722 dated
01.11.1993. Even if the said statement of the appellant-railways
is to be accepted, though no material has been laid in support
thereof, what cannot be denied is the fact that till date the award
c is yet to be passed. Admittedly, the arbitration in respect of the
contract No. CAO/CON/738 dated 28.04.1994 has not even
commenced. This is on account of the fact that in the year 2002
the North Eastern Railway, which had entered into the contracts
with the respondent-contractor, was bifurcated into North
0 Eastern Railway and East Central Railway. As the jurisdiction
in respect of the aforesaid contract No. CAO/CON/738 was to
be exercised by the East Central Railway it appears that the
appellant has disclaimed all responsibility with regard to holding
of arbitration proceedings in respect of the said contract and
at the same time the East Central Railway has not responded
E in any positive manner to the several demands for arbitration
lodged by the contractor.
Insofar as contract No. CAO/CON/722 is concerned,
naturally, both the parties have tried to lay the blame for the
F delay in the process of arbitration on each other and the huge
number of correspondence exchanged in this regard and the
frequent change of the arbitration panel on account of
exigencies of seNice of the panel members (retirement, transfer
etc.) has made it impossible to pinpoint the responsibility in this
G regard on any one of the contracting parties. But what is glaring
is the fact that though the arbitration proceedings in respect of
the said contract No. CAO/CONl722 had commenced as far
back as in the year 1996 the award is yet to see the light of
the day notwithstanding the assertions made by the Union that
H the proceedings have been completed though as already noted,
NORTH EASTERN RAILWAY v. TRIPPLE 1149
ENGINEERING WORKS [RANJAN GOGOi, J.]
no clinching material in this regard has been brought on record; A
not to speak about the award of the arbitrators though such an
award would have been the natural consequence of the
completion of arbitration proceedings. It is in the totality of these
facts that the High Court had thought it proper to travel beyond
the framework of Clauses 64(3)(a)(ii) and (iii) of the General B
Conditions of Contract and appoint a retired Chief Justice as
the arbitrator. ·
4. The correctness of the said decision necessarily has to
be judged in the light of the facts and circumstances
enumerated above. The necessary legal discourse that would C
be required to be gone into to answer the question as posed
above co'uld begin by extracting the provisions of Clauses
64(3){a)(ii) and (iii) of the General Conditions of Contract.
"64(3)(a)(ii) In cases not covered by clause 64(3)(a)(i), D
the Arbitral Tribunal shall consist of a panel of three
Gazette Rly. Officers not below JA grade, as the
arbitrators. For this purpose, the Railway will send a
panel of more than 3 names of Gazetted Rly. Officers of
one or more departments, of the Rly. to the contractor who E
will be asked to suggest to General Manager up to 2
names out of panel for appointment as contractor's
nominee. The General Manager shall appoint at least
one out of them as the contractor's nominee and will, also
simultaneously appoint the balance number of arbitrators F
either from the panel or from outside the panel, duly
indicating the 'presiding arbitrator from amongst the 3
arbitrators so appointed. While nominating the arbitrators
it will be necessary to ensure that one of them is from the
Accounts department. An officer of Selection Grade of the G
Accounts department shall be considered of equal status
to the officers in SA grade of departments of the Railways
for the purpose of appointment of arbitrators.
64(3)(a)(iii) - If one or more of the arbitrators appointed
as above refuses to act as arbitrator, withdraws from his H
A office as arbitrator, or vacates his/their office/offices or isl
are unable or unwilling to perform his functions as
arbitrator for any reason whatsoever or dies or in the
opinion of the General Manager fails to act without undue
delay, the General Manager shall appoint new arbitrator/
B arbitrators to act in his/their place in the same manner
in which the earlier arbitrator/arbitrators had been
appointed. Such re-constituted Tribunal may, at its
discretion, proceed with the reference from the stage at
which it was left by the previous arbitrator(s)".
c From the provisions of the General Conditions of Contract
it is clear that the panel of arbitrators as per the agreement
between the parties necessarily has to be Gazetted Railway
Officers; any vacancy in the panel of arbitrators has to be filled
up in the same manner in which the initial panel is required to
D be constituted.
5. The "classical notion" that the High Court while
exercising its power under Section 11 of the Arbitration &
Conciliation Act, 1996 (hereinafter for short 'the Act') must
E appoint the arbitrator as per the contract between the parties
saw a significant erosion in Ace Pipeline Contracts (P) Ltd.
Vs. Bharat Petroleum Corporation Ltd1• wherein this Court had
taken the view that though the contract between the parties must
be adhered to, deviations therefrom in exceptional
F circumstances would be permissible. A more significant
development had come ..in a decision that followed soon
thereafter in Union of India Vs. Bharat Battery Manufacturing
Co. (P) Ltd2.wherein following a three Judges Bench decision
in Punj Lloyd Ltd. Vs. Petronet MHB Ltd3 . it was held that once
G an aggrieved party files. an application under Section 11 (6) of
the Act to the High Court, the opposite party would lose its right
of appointment of the arbitrator(s) as per the terms of the
1. (2007) s sec 304.
2. c2001i 1 sec 684.
H 3. c2006J 2 sec 638.
NORTH EASTERN RAILWAY v. TRIPPLE 1151
ENGINEERING WORKS [RANJAN GOGOi, J.]
contract. The implication that the Court would be free to deviate A
from the terms of the contract is obvious. The apparent
dichotomy in ACE Pipeline (supra) and Bharat Battery
Manufacturing Co. (P) Ltd. (supra) was reconciled by a three
Judges Bench of this Court in Northern Railway Administration,
Ministry of Railway, New Delhi Vs. Patel Engineering s
Company Umited 4 where the jurisdiction of the High Court
under Section 11 (6) of the Act was sought to be emphasized
by taking into account the expression "to take the necessary
measure" appearing in sub-section (6) of Section 11 and by
further laying down that the said expression has to be read c
alongwith the requirement of sub-section (8) of Section 11 of
the Act. The position was further clarified in Indian Oil
Corporation Limited and Others Vs. Raja Transport Private
Umited 5 .. Paragraph 48 of the report wherein the scope of
\
Section 11 of the Act was summarized may be quoted by 0 reproducing sub-paragraphs (vi) and (vii) herein below.
"(vi) The Chief Justice or his designate 'lthile exercising
power under sub-section (6) of Section 11 shall endeavour
to give effect to the appointment procedure prescribed in
the arbitration clause E
(vii) If circumstances exist, giving rise to justifiable doubts
as to the independence and impartiality of the person
nominated, or if other circumstances warrant appointment
of an independent arbitrator by ignoring the procedure F
prescribed, the Chief Justice or his designate may, for
reasons to be recorded ignore the designated arbitrator
and appoint someone else."
6. The above discussion will not be complete without
reference to the view of this Court expressed in Union of India G
Vs. Singh Builders Syndicate5 wherein the appointment of a
4. (2008) 10 sccc 240.
5. (2009) s sec 520.
s. c2009) 4 sec 523. H
A retired Judge contrary to the agreement requiring appointment
of specified officers was held to be valid on the ground that the
arbitration proceedings had not concluded for over a decade
making a mockery of the process. In fact, in paragraph 25 of
the report in Singh Builders Syndicate (supra) this Court had
B suggested that the government, statutory authorities and
government companies should consider phasing out arbitration
clauses providing for appointment of serving officers and
encourage professionalism in arbitration.
7. A pronouncement of late in Deep Trading Company Vs.
C Indian Oil Corporation and Others7 followed the legal position
laid down in Punj Lloyd Ltd. (supra) which in turn had followed
a two Judges Benlih decision in Datar Switchgears Ltd. Vs.
Tata Finance Ltd8 . . The theory of forfeiture of the rights of a
party under the agreement to appoint its arbitrator once the
D proceedings under Section 11 (6) of the Act had commenced
came to be even more formally embedded in Deep Trading
Company (supra) subject, of course, to the provisions of
Section 11 (8), which provision in any event, had been held in
Norlhern Railway Administration (supra} not to be mandatory,
E but only embodying a requirement of keeping the same in view
at the time of exercise of jurisdiction under Section 11 (6) of the
Act.
8. In the present case Clauses 64(3)(a)(ii) and (iii) of the
F General Conditions of Contract do not prescribe any specific
qualification of the arbitrators that are to be appointed under
the agreement except that they should be railway officers~ As
already noticed, even if the arbitration agreement was· to '
specifically provide for any particular qualification(s) of an
arbitrator the same would not denude the power of the ·court
G acting under Section 11 (6), in an appropriate case to ·dei:>art
therefrom. In Singh Builders Syndicate {supra) penc!ency of
arbitration proceedings for over a decade was found by this
1. (2013) 4 sec 35.
H a. (2000) a sec 151.
NORTH EASTERN RAILWAY v. TRIPPLE 1153
ENGINEERING WORKS [RANJAN GOGOi, J.]
Court to be a mockery of the process. In the present case, A
admittedly the award in respect of disputes and differences
arising out of the contract No. CAO/CON/722 is yet to be
passed. Though the appellant-Railway has in its pleadings
made a feeble attempt to contend that the process of arbitration
arising out of the said Contract has been finalized, no material, B
whatsoever, has been laid before the Court in support thereof.
The arbitration proceedings to resolve the disputes and
differences arising out of Contract No. CAO/CON/738 has not
even commenced. A period of nearly two decades has elapsed
since the contractor had raised his claims for alleged wrongful C
termination of the two contracts. The situation is distressing and
to say the least disturbing. The p9wer of the Court under the
Act has to be exercised to effectuate the remedy provided
thereunder and to facilitate the mechanism contemplated
therein. In a situation where the procedure and process under
the Act has been rendered futile, the power of the Court to D
depart from the agreed terms ofbppointment of arbitrators must
be acknowledged in the light of the several decisions noticed
by us. We are, therefore, of the view that no infirmity muchless
any illegality or failure of justice can be said to be occasioned
by the order passed by the High Court so as to warrant any E
interference. We, therefore, unhesitatingly dismiss this appeal
filed by the appellant-railways. However, in the facts of the case ·
we do not deem it appropriate to burden the appellant with any
costs.
Devika Gujral Appeal dismissed.