Consortium of Titagarh Firema Adler S.P.A. - Titagarh Wagons Ltd. Through Authorized Signatory, Titagarh Towers, 756, Anandapur, E. M. Bypass, Kolkata- 700 07, West Bengal v. Nagpur Metro Rail Corporation Ltd. (nmrcl) Having Its Head Office at Metro House, Bungalow No. 28/2, Anand Nagar, C.K. Naidu Road, Civil Lines, Nagpur Through Its General Manager (procurement) & Anr.
DIPAK MISRA, J. I. Nagpur Metro Rail Corporation Ltd., the
I'' respondent herein, issued a Notice Inviting Tender (NIT) on 25.01.2016
for the work of design, manufacture, supply, testing, commissioning of
69 passenger rolling stock (Electrical Multiple Units) and training of
personnel at Nagpur Metro Rail Project. The said project is being funded
by KfW Development Bank, Germany. As per the clause ITS 35.8 at
all stages of bid evaluation and contract, award would have to be subject
to no-objection from KfW Development Bank.
2. In response to the said NIT, three bidders submitted their bids.
One was found technically disqualified and thus, only the appellant and
the respondent No. 2 remained in contest. Upon opening of financial bid
on29.09.2016, it was found that the appellant had given a bid of Rs. 852
crores whereas the bid of the respondent No. 2 was Rs. 851 crores.
The Director Level Tender Committee of the l" respondent agreed with
G the report of the tender evaluation committee and recommended to accept
the lowest offer of respondent No. 2 and the work order was to be
issued after compliance of certain technical requirements. Before issue
ofworkorder, the appellant filed Writ Petition No. 5818 of2016 before
the High Court contending that respondent No. 2 was not technically
qualified and, therefore, its financial bid could not have been opened.
CONSORTIUM OF TITAGARH FIREMA ADLER S.P.A. v.
NMRCL [DIPAK MISRA, J.]
3. It was contended by the appellant herein before the High Court
that Clause 26 of the tender document prevented a person from getting
any information about the technical qualification of the competitor, till
the contract is awarded, which is arbitrary, unreasonable and violative
of Article 14 of the Constitution; that the respondent No. 2 is not having
the requisite experience as required under the NIT, for it does not meet
the eligibility criteria on its own, but was relying on the experience of its
subsidiary.
4. The Division Bench rejected the contention to go into the legality
or otherwise of clause 26 observing that the appellant had participated in
the tender bid knowing very well that such a clause existed and it was
not open to it to contend that the said clause is onerous and lacks
transparency and, therefore, violative of Article 14 of the Constitution;
and it had challenged the same only after it is found that its financial bid
was higher than that of respondent No. 2. It further observed that the
matter would have been different had the appellant, immediately after
the tender notice was published, challenged the said condition after NIT
was issued. The High Court placing reliance upon the decisions in New
Horizons Ltd. v. Union oflndia 1, Tata Cellular v. Union of India0,
Central Coalfields Ltd. v. SLL-SML (Joint Venture Co11sortium)3 and
Afcons Infrastructure Ltd. v. Nagpur Metro Rail Corporation Ltd. 4
dismissed the writ petition. Be it noted, though the High Court felt that it
could have non-suited the writ petitioner only on the ground that it had
participated in the tender process knowing fully well that stipulation in
nature of the clause 26.1 existed, yet proceeded to address the controversy
and directed the owner to produce the record solely for the further
purpose of being satisfied as to whether the decision making process by
the employer/owner is legally valid or not and further to examine as to
whether the decision arrived at by the owner that the respondent No. 2,
the lowest bidder, possessed requisite experience. After perusing the
entire documents on record, the High Court came to hold that:-
"15. It is to be noted that the tender evaluation committee consists
343
of Chief Project Manager/RS,. General Manager/Procurement, G
Chief Project Manager/Signaling and the General Manager/
Finance. The said Committee has evaluated the documents with
1 (1995) 1 sec 478
'(1994) 6 sec 651
3 2016 (8) SCALE 99: (2016) 8 sec 622
'2016 (8) SCALE 765 H
344
regard to the technical qualification of the petitioner as well as
respondent no.2. The Committee has noted that respondent no.2
was formed in June 2015 by merger of CRC Corporation and
CNR Corporation limited. The documents relating to the merger
has been submitted along with the bid. The Evaluation Committee
has also noted that after the incorporation of the respondent no.2,
upon the merger of CSR Corporation and CNR Corporation,
respondent no.2 was awarded contract for supply of 76 cars for
Naida Metro Project by Delhi Metro Rail Corporation Ltd. The
Committee found that insofar as Clause No.12 is concerned, though
the minimum requirement was that the bidder must have an
experience of total 60 metro cars and out of which 30 cars should
be either stainless steel or aluminium, respondent no.2 was having
an experience of total 594 metro cars and all the cars were of
stainless steel. Insofar as clause 12.1 is concerned, which requires
that out of the number of cars manufactured, there has to be
completed satisfactory revenue operation at least in one country
outside country of origin/manufacturer or in India or at least one
in GS country of 30 metro cars, respondent no.2 was having an
experience of 432 outside country of origin. It could thus be seen
that the perusal of the document placed on record would reveal
that the decision making process of the technical evaluation
committee has been guided by the relevant factors and it cannot
be said that they have not taken into consideration any of the
relevant factors. We are, therefore, of the considered view that
the decision of the technical evaluation committee would fall within
the ambit of'rationality'.
16. It is further to be noted thatthe minutes of the tender evaluation
committee was further placed for approval before the Director
Level Tender Committee consisting of Director (Rolling Stock
and Systems), Director (Projects) and Director (Finance). It could
thus be seen that the matter has not been examined at only one
level of expert committee, but has gone through examination at
two levels of experts."
5. Thereafter, the High Court referred to the authorities mentioned
hereinbefore and appreciated the principles stated therein and eventually
dismissed the Writ Petition.
CONSORTIUM OF TITAGARH FIREMA ADLER S.P.A. v. 345
NMRCL [DIPAK MISRA, J.]
6. It is pertinent to mention that in the course of hearing of the A
matter before the High Court, learned counsel for the writ petitioner
sought permission to withdraw the Writ Petition with further liberty to
approach the High Court after award of the contract. The Court, though
expressed its willingness to grant permission to withdraw the Writ Petition,
it was not inclined to grant liberty as sought by the learned counsel for 8 the petitioner. Simpliciter withdrawing was not accepted and grant of
liberty was insisted upon. Dealing with the said fact, the Division Bench
referred to a passage from Central Coalfields Ltd. (supra) and expressed
thus:-
"24. We find that if we accept the prayer as made by the petitioner,
it will be giving leverage to the petitioner to again approach this
Court and delay the project further. Taking into consideration the
public interest, we have ourselves scrutinised the entire minutes
of the Tender Evaluation Committee and Director Level Committee
to find out as to whether the decision making process, answers
the test as laid down by Their Lordships of the Apex Court. We
have found that the decision making process cannot be termed to
be vitiated on the ground of arbitrariness, irrationality or mala tides.
Accepting the request of the learned senior counsel for the
petitioner would further permit the project to be delayed. Needless
to state that the project is an important project for the city of
Nagpur. In that view of the matter, though the prayer which on
first impression appears to be innocuous, is liable to be rejected."
7. After dismissal of the Writ Petition, an application for review
(M.C.A. [Review] No. 1087 of2016) was filed. The High Court, while
dealing with the application for review, noted the two grounds on which
the review was sought. It is worth reproducing:-
"i. While exercising the principle ofWednesbury reasonableness,
the order in review failed to take into account relevant omission in
the process of scrutiny, like (a) how rate discount cannot be granted
and (b) improper calculation of service tax which renders the
applicant bid lowest.
ii. that there was suppression ofrelevant facts by respondent No.
2 before the authorities."
8. Dealing with the said aspect, the Division Bench held:-
"13. Shri S.G. Aney, learned senior counsel appearing on behalf
of the petitioner, submitted that when an action would fall in the H
346
ambit of malice in law, it may not be necessary to implead the
persons against whom malafides are attributed as a party
respondent. We find that by no stretch of imagination the present
case would fall in the ambit of malice in law. If it is a case of
applicant that the tender processing authorities in order to favour
the respondent No. 2 have deliberately made some omissions or
have committed some malafide act in order to help the respondent
No. 2 to get the contract, then in that event such of the officers of
the respondent No. 1 who are attributed with such an act or
omission, were necessary parties. So also it was necessary for
the petitioner to make specific averments against those individuals.
As already discussed hereinabove, though a specific query was
made in that regard, the learned Senior Counsel appearing on
behalf of the petitioners, as that stage, fairly stated that no .such
malafides are attributed in the memo of petition. In the light of
this factual position, seeking review on the ground that there was
a wrong deliberate evaluation of price bids by respondent No. I
and the same act was malafide in order to favour the respondent
No. 2 and to illegally oust the petitioner, in our view, is an
imagination ofa fertile brain of the draftsman.
14. We further find that the Review Application depicts total non
application of mind. In paragraph No. 6.8 of the application, the
draftsman of the Review Application, has averred that the
respondent No. 2 has not formed any JV /Consortium and as such,
it was not eligible to bid in the tender process. We do hope that
the draftsman of the Review Application understands the basic
distinction between a Joint Venture/Consortium and an
incorporation of a new company after merger of two companies
into one.
15. It is further to be noted that though the memo of petition. runs
into 22 pages, the review application runs into 39 pages. We have
no hesitation to say that the Review Application has been drafted
without application of mind. The rules require that while filing a
Review Application, a lawyer should certify that good grounds
exist for seeking review of the order. We are at pains to say that
in the present case the said certification has been done in the
most casual manner, only to show compliance with the
requirements of the rules."
CONSORTIUM OF TITAGARH FIREMA ADLER S.P.A. v.
NMRCL [DIPAK MISRA, J.]
9. On the basis of the aforesaid analysis, the High Court dismissed
the application for review with costs of Rs. I lakh (Rupees One Lakh).
10. We have heard Dr. Abhishek Manu Singhvi, learned senior
counsel with Ms. Anannya Ghosh, learned counsel for the appellant in
Civil Appeal Nos. 1353-1354 of 2017 and Mr. Raju Ramachandran,
learned senior counsel with Mr. Ramendra Mohan Patnaik, learned
counsel for the appellant in Civil Appeal No. 1355of2017, Mr. Mukul
Rohatgi, learned Attorney General for India, Mr. Gopal Subramaniam,
learned senior counsel with Mr. R.P. Gupta, learned counsel appearing
for the I" respondent, Mr. Shyam Divan, learned senior counsel with
Mr. S.S. Jauhar, learned counsel for the respondent No. 2.
11. Assailing the defensibility of the order passed by the High
Court, learned senior counsel for the appellant submitted that the bid of
the respondent No. 2 is not that of a 'single entity' and it had relied on
the experience of its subsidiaries; that it has not submitted the bid on the
basis of its own experience but on the strength of the experience of the
subsidiaries of the erstwhile parent/original companies, upon the merger
of which respondent No. 2 came into existence, which is not only contrary
to the eligibility and qualification criteria but also to the settled position of
law which provide that unless the subsidiaries are constituents of the
Joint Venture (JV), their experience cannot be taken into consideration
for the purpose of considering the experience of the holding company;
that the respondent No. 2, on a standalone basis, does not possess the
requisite experience as provided under the tender conditions; that the
respondent No. 2 should have given its bid either as a JV or as a
consortium together with its subsidiaries to avail the benefit of the
experience of its subsidiaries; that there is a specific restriction on the
bidder to take the experience of its subsidiaries, which are separate
legal entities, without forming a consortium or JV; that the subsidiaries
of respondent No. 2 are separate and independent legal entities and the
supplies in respect of which experience is claimed by respondent No. 2
were supplies not made by respondent No. 2 but by other independent
legal entities; that respondent No. 2 does not have requisite facilities for
manufacture of the car body on its own and it shall have to sub-contract
the same to its subsidiary companies, which is violative of Clause 4.4 of
the tender conditions of contract. In support of his submissions, learned
senior counsel for the appellant has placed reliance on Ba/want Rai
347
348
Saluja and anotlzer v. Air India Ltd. and otlters5, Roltde and Schwarz
Gmhli and Co. K.G. v. Airport Authority of lndia 6 and Core Projects
and Technologies Ltd. v. State of Bi/1ar and anotlter7•
12. Mr. Gopal Subramaniam, learned senior counsel for the I st
respondent, before placing his submissions, put forth the facts and
canvassed that the project was funded by KfW Development Bank,
Germany and as per clause lB 35.8, all stages of bid evaluation and
contract award would have to be subject to a No Objection from KfW:
that the appellant wrote to the l" respondent seeking amendment to
clause 12.l of Annexure Ill-A (PQ-lnitial filter) i.e. "Operation
Performance" clause according to which, as it then was, the bidder had
to have satisfactorily delivered at least 30 metro cars outside the country
of manufacture or delivered in India and sought inclusion of the condition
that delivery to any of the G8 countries should also be treated as
acceptable; that the request of the appellant was accepted and it became
eligible to bid; that the l ''respondent extended the date of submission of
tender from 141h June to 241h June at the request of the appellant; that all
the bid documents were given to the independent General Consultant of
the I" respondent consisting of Mis. Systra, Mis. RITES, Mis. AECOM
and Mis. Egis for Pre-qualification (PQ) and Technical approval which
held respondent No. 2 as qua! ified and Appraisal and Tender Committee
of the I SI respondent also gave their reports which were forwarded on
29.8.2016 to Ktw Germany for its no-objection; that the bids, which
were made on e-portal which is managed by the Government of
Maharashtra, were opened on 29.9.2016 and the bid of respondent No.
2 was found to be the lowest at Rs.851 crores, whereas the bid of the
appellant was Rs.852 crores; that on 29.9.2016 and 3.10.2016, the
appellant made representations to the I SI respondent stating that
respondent No. 2 was not qualified as a holding company and could not
have claimed benefit of experience of a subsidiary and sought documents
relating to eligibility of respondent No. 2 vis-a-vis its experience; and
that on 4.10.2016 the appellant filed the Writ Petition before the High
Court contending, inter alia, that the appel !ant was not allowed to check
the technical documents of respondent No. 2, clauses 25.1 and.25.3
were not followed, bid -price being so close to the appellant's should
have been re-evaluated and evaluation process and grant of tender in
'(2014) 9 sec 407
6(2014) 207 DLT I
72011 (59) BUR 183
CONSORTIUM OF TITAGARH FIREMA ADLER S.P.A. v. 349
NMRCL [DIPAK MISRA, J.]
favour of respondent No. 2 was ma la fide, which was dismissed by the A
High Court vi de order dated 05.10.2016 holding that the evaluation of
the bid was proper and appellant could not challenge clause 26, which
mandated confidentiality of technical bids till grant of contract.
13. Learned senior counsel would further contend that the
respondent No. 2, being a company owned by Government of People's
Republic of China, it clearly came within the ambit of clause 4.1 of the
bid-document as a 'government-owned entity'. Learned senior counsel
would urge that a single entity can bid for itself and it can consist of its
constituents which are wholly owned subsidiaries and they may have
experience in relation to the project and all the subsidiaries form a
homogenous pool under its immediate control in respect of rights, liabilities,
assets and obligations, that in view of Article 164 of the Articles of
Association of respondent No. 2, its Board of Directors have been
entrusted with the authority and responsibility to discharge all necessary
and essential decisions and functions for the subsidiaries and, therefore,
the experience of respondent No. 2's l 00% wholly owned subsidiaries
ought to be considered as part of the parent company's experience; and
that the term 'government owned entity' includes no bar against· a
government owned entity and its subsidiaries. Learned senior counsel
referred to the history of doctrine oflifting the corporate veil and submitted
that this Court has relaxed the principles governing lifting of corporate
veil and relied on the authorities in State of U.P. v. Renusagar Power
Co. 8 and New Horizom Ltd. (supra). Mr. Gopal Subramanium would
further contend that the bid documents have been thoroughly examined
by the !"respondent and it satisfied itselfofthe capability, ·experience
and expertise of the successful bidder, i.e., respondent No. 2. and the
thorough analysis of the technical qualification of respondent No. 2 is
clear from the report of the independent General Consultant; that the
experience of respondent No. 2 in supplying metro trains across the
world exceeds the appellant's experience by a huge margin; that treating
respondent No. 2 along with its 100% subsidiaries as one entity is
supported by the fact that Delhi Metro Rail Corporation Ltd., which has
on a similarly, if not same, worded bid-document granted the tender to
respondent No. 2, who had also bid there as.a parent company claiming
experience of and execution through I 00% wholly owned subsidiaries;
that there is no bar whatsoever, express or implied, in the tender document
'(I98&J4 sec 59
350
SUPREME COURT REPORTS [2017) 5 S.C.R.
to treat the parent company along with its I 00% wholly owned
subsidiaries as one entity; that the scheme of the bid document is such
that which itself provides that parent company would have to perform
the works under the agreement in case the subsidiary failed and in view
of this, the objections raised by the appellant are hyper-technical. Learned
senior counsel would further submit that this Court has consistently held
that interference by the courts is required only when the decision taken
by the owner is irrational or arbitrary, or is vitiated by bias, favouritism
or malafide. He has placed reliance upon on the authorities inMontecar/o
Ltd. v. NTPC Ltd. 9 , Michigan Rubber (India) Ltd. v. State of
Karnataka'0, Jagdish Manda/ v. State of Orissa & Ors." and Afcons
Infrastructure Ltd. (supra).
14. Mr. Shyam Divan, learned senior counsel for the respondent
No. 2, submitted that the respondent No. 2, being a government entity,
participated in the tender and gave all the details, which were duly
accepted by the respondent No. I and after examining the entire details
of supplies and commissioning of various contracts executed by the
respondent No. 2 and its I 00% wholly owned subsidiaries issued Letter
of Acceptance dated 5.10.2016 in its favour to execute the contract.
Learned senior counsel further submitted that for the purposes of their
experience in the present tender, respondent No. 2 had provided the
details in Form 4.4 Attachment-I to the effect that it had supplied 606
metro cars in the last I 0 years which is much higher than the appellant's
experience which would be beneficial for the project and would further
public interest. Mr. Divan, strongly relied on Article 164 of the Articles
of Association of respondent No. 2, which was submitted along with the
bid, and argued that the Board of Directors of respondent No. 2 has
been entrusted with the complete right to make decisions for the company
including subsidiaries and, therefore, as long as the entity is a government
owned entity, it should include both the parent and its wholly owned
subsidiaries.
15. In reply to the submissions advanced by the respondent No. 1,
Dr. Singhvi, learned senior counsel appearing for the appellant in Civil
Appeal Nos. 1353-1354 of 2017 would submit that Clause 4.1 treats a
government owned entity like any other bidder and does not give any
9 2016 (10) SCALE 50
"(2012) s sec 216
11 (2007) 14 sec 517
CONSORTIUM OF TITAGARH FIREMA ADLER S.P.A. v. 351
NMRCL [DIPAK MISRA, J.]
concession or preferential treatment to it and if a company cannot include
its subsidiaries and count their experience as its own experience for the
purpose of submitting a bid (without forming a consortium/JV), the same
criteria applies to the government owned entity. He further referred to
Clause !TB 43, 43.1to43.4, 39.3, 42.1, 42.2 and Clause 1.14 of the
General Conditions of contract and submitted that in case of award of
work, the joint and several responsibility and liability on all the members
of the proposed JV/consortium in the event of default has to be fixed
and such purpose would be defeated in the event if it is found that
·respondent No. 2, having placed its bid as a single entity, is entitled to
rely upon and surreptitiously include the experience of its subsidiary
companies and it would be impossible to place responsibility and liability
on the subsidiaries in the event the respondent No. 2 or its subsidiaries
default in their obligations under the tender documents. Criticizing the
letter dated 22.6.2016 written by respondent No. 2, it is submitted by
learned counsel for the appellant that the letter is a unilateral
communication to the 1" respondent and does not legally constitute a
binding agreement and in the absence of adherence to prescribed formats
under the tender documents, such a letter has no sanctity and cannot be
treated as a substitute to be a legally valid and binding agreement between
the respondent No. 2 and its subsidiary companies inasmuch as the letter
wrongly states that the experience of its subsidiaries is the experience
of the parent as the holding company owns only shares in its subsidiary
and being the owner of shares does not mean that the holding company
owns the assets, liabilities and experience of the subsidiary and placed
reliance on Mrs. Bacha F. Guzdar, Bombay v. Commissioner of
Income Tax, Bombay' 2•
16. Learned senior counsel would further contend that the
respondent No. 2 has tried to couch within its own ambit, the experience
of six of its subsidiaries and the entity designated by respondent No. 2 as
the entity responsible for completion of work under the present tender
i.e. Mis. CRRC Dalian Co. Ltd. does not have any prior experience at
all, while the remaining five entities/subsidiaries may have had prior
experience; that there is gross and manifest arithmetical error in service
tax payable which results in the appellant's bid being lower than Rs.32.82
crores; that there is suppression of serious material facts by respondent
No. 2 regarding supply of defective metro cars by their subsidiaries in
"AIR 1955 SC 74
352
SUPREME COURT REPORTS [20I7] 5 S.C.R.
Singapore and Hong Kong which had to be recalled and allegation of
payment of kickbacks in Phillipines and these disclosures were required
to be made in terms of Annexure lil of the tender documents, which
would have required the I" respondent to disqualify respondent No. 2
from the tender process.
I 7. To appreciate the rival submissions raised at the Bar certain
relevant conditions from the NIT are required to be appreciated. Clause
4.1 deals with the eligibility criteria. It reads as follows:-
"4. I A bidder may be a firm that is a private entity, a government
owned entity - subject to !TB 4.3 - or any combination of such
entities in the form of a joint venture (JV) under an existing
agreement or with the intent to enter into such an agreement
supported by a letter of intent. In the case of a joint venture, a II
members shall be jointly and severally liable for the execution of
the contract in accordance with the contract terms. The JV shall
nominate a representative who shall have the authority to conduct
all business for and on behalf of any and all the members of the
JV during the bidding process and, in the event the JV is awarded
the contract, during contract execution. Unless specified in the
BOS, there is no limit on the number of members in a JV."
4.3 The Agency's eligibility criteria to bid are described in Section
V - Eligibility criteria and social and environmental responsibility."
18. Placing reliance upon Clause4.1, it is contended by the learned
senior counsel for the appellant that conditions embodied in the said
clause clearly stipulate the conditions precedent to fulfil to earn the status
of a consortium or a Joint Venture and the said postulates provide the
distinctions, as regards the obligations, responsibilities, etc. to be fulfilled
by a bidder who is a "'single entity" and a bidder who is a consortium or
a Joint Venture. For the aforesaid purpose, our attention has been drawn
to Clauses 4.7. 4.8 and 4.11. We have also been invited to peruse the
Clauses 11.3.1.3, 11.3.1.4, 11.3.1.9, 12.2and43.3.
I 9. Clauses I2 and 12.1 being relevant are reproduced below:
"12. Delivery Record
Has the bidder/consortium/joint venture ofits members, individually
or jointly as a member of other consortia/joint venture have
CONSORTIUM OF TITAGARH FIREMA ADLER S.P.A. v. 353
NMRCL [DIPAK MISRA, J.]
experience of and carried out vehicle design, interface (with other A
designated contractors such as signaling, track, traction, etc.)
assembly & supply, testing and commissioning of minimum of total
60 metro (i.e. MRT, LRT, Suburban Railways or High Speed
Railways) cars out of which minimum 30 cars shall be either
stainless steel or aluminium in the last ten (I 0) years.
12.1. Operation Performance
Out of 60 or more cars commissioned in accordance with SN 12
above, have minimum of total 30 metro (i.e. MRT, LRT, Suburban
Railways or High Speed Railways) cars completed satisfactory
revenue operation.
* At least in one country outside the country of origin/
manufacture.
* Or in India
* Or at least in one G8 country viz. Canada, France, Germany,
Italy, Japan, United Kingdom and United States in the last three
(3) years".
20. Relevant portion of Section V -Eligibility criteria and social
and environmental responsibility is extracted below:-
"Bidders that are government-owned enterprises or institutions
may participate only if they can establish that they (i) are legally
and financially autonomous (ii) operate under commercial law.
To be eligible, a government-owned enterprise or institution shall
establish to the Agency's satisfaction, through all relevant
documents, including its Charter and other information the Agency
may request, that it: (i) is a legal entity separate from their
government (ii) does not currently receive substantial subsidies or
budget support; (iii) operates like any commercial enterprise, and,
inter alia, is not obliged to pass on its surplus to their government,
can acquire rights and liabilities, borrow funds and be liable for
repayment of its debts, and can be declared bankrupt."
21. Clause 27 that deals with clarification of bids and Clause 29
that deals with determination of responsiveness, being relevant, are
reproduced below:-
8
354
27. Clarification of Bids
27.1 To assist in the examination, evaluation, and comparison of
the bids, and qualification of the Bidders, the Employer may, at its
discretion, ask any Bidder for a clarification of its bid, given a
reasonable time for a response. Any clarification submitted by a
Bidder that is not in response to a request by the Employer shall
not be considered. The Employer's request for clarification and
the response shall be in writing. No change, including any voluntary
increase or decrease, in the prices or substance of the bid shall be
sought, offered, or permitted, except to confirm the correction of
arithmetic errors discovered by the Employer in the evaluation of
the bids, in accordance with ITB 31.
27 .2 If a Bidder does not provide clarifications of its bid by the
date and time set in the Employer's request for clarification, its
bid may be rejected.
D 29. Determination of Responsiveness
29.1 The Employer's determination of a bid's responsiveness is
to be based on the contents of the bid itself, as defined in !TB 11.
29.1.1 General Evaluation: Priorto the detailed evaluation of Bids,
the Employer will determine whether each Bid:
• has been properly signed; and
• has been accompanied by a valid Bid Security; and
• meets the Qualification (Initial Filter) Evaluation Criteria -
The Employer will evaluate the eligibility and acceptability
F based on Initial Filter criteria indicated in these documents.
The technical proposals of only those Bidders, who qualify in
the Initial Filter evaluation, will be evaluated.
• Signed copy of Statement of Integrity, Eligibility and Social
and Environmental Responsib ii ity
A 'NO' answer to any of the above items will disqualify the Bid/
Bidder.
29.l.2 Evaluation of Technical Package: The Employer will
evaluate the technical proposal to determine the technical suitability
and acceptability as per Works Requirements - General
CONSORTIUM OF TITAGARH FIREMA ADLER S.P.A. v. 355
NMRCL [DIPAK MISRA, J.]
Specifications and Technical Specifications of only such Bidders A
who qualify based on BOS !TB 29.1.1 above.
The Technical Proposal as submitted in accordance with BOS
ITB Para 11.3.1 (including its relevant sub-paras) shall be evaluated
for its conformity with the general and technical requirements as
per Par 2, Sections VIl-A and VII-B, as well as against the back B
of the parameters provided in Partl, Annexure IV-C.
Furthermore, the adequacy and appropriateness of the Bidder's
responses to the related requirements in Part I shall be evaluated.
29.2 A substantially responsive bid is one that meets the
requirements of the bidding documents without material deviation, c
reservation, or omission. A material deviation, reservation, or
omission is one that,
(a) if accepted, would:
(i) Affect in any substantial way, the scope, quality, or
performance of the Works specified in the contract; or 0
(ii) Limit in any substantial way, inconsistent with the bidding
documents, the employer's rights or the bidder's
obligations under the proposed contract; or
(b) if rectified, would unfairly affect the competitive position of E
other bidders presenting substantially responsive bids.
29.2. l Evaluation of qualifying conditions: Bids that include
qualifications which:
1. seek to shift to the Employer, another government agency or
another contractor all or part of the risk and/or liability allocated F
to the Contractor in the Bidding Documents; or
2. which includes a deviation from the Bidding Documents which
would render the Works, or any part thereof, unfit for their intended
purpose; or
3. fails to fulfill the eligibility criteria as mentioned in SN 12, 12.1
and 13 of "(A) FILTER OF APPLICANTS - CHECKLIST of
INITITAL FILTER EVALUATION CRITERIA"; or
356
SUPREME COURT REPORTS (2017] 5 S.C.R.
' 4. which fails to commit to the date specified for the completion
of the Works as specified under Key Dates 6 and 9 under Section
IX. Particular Conditions (PC) Part A - Contract Data 'Table:
Summary of Sections'
will be deemed non-conforming and shall be rejected.
29.3 The Employer shall examine the technical aspects of the bid
submitted in accordance with ITB 16, in particular, to confirm
that all requirements of Section VII, Works Requirements have
been met without any material deviation, reservation or omission.
29.4 Bids which are:
• not fulfilling the General Evaluation Criteria as per ITB 29. l. I
above,
• not substantially responsive as per !TB 29.2 above
• having material deviation or reservation as per !TB 29 .2 above
• not fulfilling the qualifying condjtions as per !TB 29.2. I above,
and
• not fulfilling the Employer's Requirements - General
Specification and Technical Specification as per !TB 29.1.2
above will be deemed non-conforming and shall be rejected
by the Employer, and shall not be al lowed subsequently to be
made responsive by correction or withdrawal of the
nonconforming deviation or reservation.
29.5 If any Bid is rejected, pursuant to !TB 29.4 above, the
Financial Package of such Bidder shall be returned unopened.
29.6 Bidders may note that pursuant to their qualification in the
'Initial Filter Evaluation Criteria' and 'Technical Evaluation' as
per !TB 29.4 above, in case the Bidder(applies to each individual
member in case of a Joint Venture/Consortium) is debarred/
blacklisted by Government oflndia/State Government/Government
undertaking after the due date of submission of Bid but before
opening of financial package by NMRCL, they shall inform the
same to NMRCL in writing within 5 working days of issue of
such debarment, failing which it will be considered that the Bidder
has willfully concealed the information and the Bidder shall be
CONSORTIUM OF TITAGARH FIREMA ADLER S.P.A. v.
NMRCL [DIPAK MISRA, J.)
solely responsible for al'l implications that may arise in accordance
with the conditions of this Bid. Any such debarment will result in
disqualification of the Bidder and the Financial Package of such
Bidder shall be returned unopened."
22. As the learned senior counsel has also stressed upon Clause
4.11 of the Technical Proposal, we think it apt to extract the relevant
part of the said clause:-
"l. A notarized copy of Consortium Agreement relating to the
composition of the bidder shall be submitted, if a bidder is a
consortium. Should the bidder be an entity established or to be
established to bid for this contract, details of the shareholders'
agreement or proposed shareholders' agreement shall be supplied
together with the percentage participation and percentage equity
in the agreements.
2. The contractual arrangements and copies of agreements in
relation thereto must, as a minimum, provide information on all
members or participants involved, their respective participation in
the Bid, the management structure, ownership and control of the
members or participants comprising the bidder and the name of
the lead member who would have overall lead management
responsibility for the Works, the registered addresses of all parties
and the names of their respective senior partners, chairmen or
managing directors as appropriate. Such agreements should also
reflect the joint and several liabilities of the members to the
Employer in the vent that the contract is awarded to them and
provide "deadlock" provisions in the event that decisions of the
Consortium cannot be reached by unanimous agreement."
23. As the uncurtained facts would reveal, on 17.02.2016 the
357
appellant wrote to the I" respondent seeking amendment to the "operation
performance clause", i.e., Clause 12. l of the Annexure III-A (PQ-lnitial
Filter). According to the said Clause, the bidder is required to have
satisfactorily delivered at least 30 metro cars outside the country of G
manufacture or delivered in India. The amendment that was sought
related to inclusion of the condition that delivery to any of the GS countries
should also be treated as acceptable. Such an amendment was for the
appellant's merged entity, which gave it the requisite experience, had
manufactured and delivered metro cars only in GS countries. The request
358
SUPREME COURT REPORTS (2017] 5 S.C.R.
of the appellant was accepted by the employer and supply to any of the
G8 countries was included as permissible. That apart, the appellant's
request seeking extension of time to bid was also acceded to and
accordingly time was extended and final date of submission was declared
to be 08.07.2016. The time that was fixed at 4 p.m. was extended till 7
p.m. at the request made by the appellant. The purpose of narrating
these aspects is only to highlight that the allegations of mala fide are
farther from the truth.
24. The core issue, as we perceive, pertains to acceptance of the
technical bid of the respondent No. 2 by the I" respondent and we are
required to address the same solely on the touchstone of eligibility criteria
regard being had to the essential -€Onditions. The decision on other
technical aspects, as we are advised at present, is best left to the experts.
We do not intend to enter into the said domain though a feeble attempt
has been made on the said count.
25. The anchored submission by the learned senior counsel for
the appellant is thatthe respondent No. 2 does not really fulfil the eligibility
criteria but the 1 '' respondent, for some unfathomable reason, has
deliberately closed its eyes to the fact that has been projected and adroitly
conferred the status of single entity on the 2"d respondent.
26. What is urged before this Court is that the respondent No. 2
E could not have been regarded as a single entity and, in any case, it could
not have claimed the experience of its subsidiaries because no consortium
or joint venture with its subsidiaries was formed. With regard to
relationship of holding and subsidiary companies, we have been
commended to the authorities in Ba/want Rai Saluja (supra) and also
F the judgment of the Delhi High Court in Roltde and Schwarz .Gmblt
and Co. K.G. (supra). The essential submission is that respondent No.
2 as the owner of the subsidiary companies including their assets and
liabilities, cannot claim their experience and there is necessity to apply
the principle of "lifting the corporate veil", as has been laid down in
Renusagar Power Co. (supra) and Life Insurance Corporation of
G India v. Escorts Ltd. and others13 • It is also argued that the Government
owned entity cannot be treated differently, for a Government owned
entity is distinct from the Government and, forthe said purpose, inspiration
has been drawn from the authority in Western Coalfields Limited v.
"(I 986) 1 sec 264
CONSORTIUM OF TITAGARH FIREMA ADLER S.P.A. v.
NMRCL [DIPAK MISRA, J.]
Special Area Development Authority, Korba and anotlter 14 • It has
also been urged that when the tender has required a particular thing to
be done, it has to be done in that specific manner, for the law envisages
that where a power is given to do a certain thing in a certain way, the
thing must be done in that way or not at all. For the aforesaid purpose,
inspiration has been drawn from the authority in Central Coalfields
Ltd. (supra) wherein reliance has been placed on Nazir Ahmad v. King
Emperor 15 •
27. Before we proceed to deal with the concept of single entity
and the discretion used by the I" respondent, we intend to deal with role
of the Court when the eligibility criteria is required to be scanned \Ind
perceived by the Court. In Montecarlo Ltd. (supra), the Court referred
to TATA Cellular (supra) wherein certain principles, namely, the modern
trend pointing to judicial restraint on administrative action; the role of the
court is only to review the manner in which the decision has been taken;
the lack of expertise on the part of the court to correct the administrative
decision; the conferment of freedom of contract on the Government
which recognizes a fair play in the joints as a necessary concomitant for
an administrative body functioning in an administrative sphere or quasi
administrative sphere, were laid down. It was also stated in the said
case that the administrative decision must not only be tested by the
application ofWednesbury principle ofreasonableness but also must be
free from arbitrariness not affected by bias or actuated by mala tides.
The two-Judge Bench took note of the fact that in Jagdislt Manda/
(supra) it has been held that, ifthe decision relating to award of contract
is bona fide and is in public interest, courts will not, in exercise of power
of judicial review, interfere even if a procedural aberration or error in
assessment or prejudice to a tenderer, is made out. The decisions in
Master Marine Services (P) Ltd. v. Metcalfe & Hodgkinson (P)
Ltd. and a11other16, B.S.N. Joshi & Sons Ltd. v. Nair Coal Services
Ltd. and otlzers17 and Michigan Rubber (India) Ltd. (supra) have
been referred to. The Court quoted a passage from A/cons
Infrastructure Ltd. (supra) wherein the principle that interpretation
placed to appreciate the tender requirements and to interpret the
documents by owner or employer unless mala fide or perverse in
"(1982) 1sec125
15 AIR 1936 PC 253
"(2005) 6 sec 138
11 (2006) 11 sec 548
359
360
understanding or appreciation is reflected, the constitutional Courts should
not interfere. It has also been observed in the said case that it is possible
that the owner or employer of a project may give an interpretation to the
tender documents that is not acceptable to the constitutional Courts but
that by itself is not a reason for interfering with the interpretation given.
After referring to the said authority, it has been ruled thus:
"24. We respectfully concur with the aforesaid statement of law.
We have reasons to do so. In the present scenario, tenders are
floated and offers are invited for highly complex technical subjects.
It requires understanding and appreciation of the nature of work
and the purpose it is going to serve. It is common knowledge in
the competitive commercial field that technical bids pursuant to
the notice inviting tenders are scrutinized by the technical experts
and sometimes third party assistance from those unconnected with
the owner's organization is taken. This ensures objectivity. Bidder's
expertise and technical capability and capacity must be assessed
by the experts. In the matters of financial assessment, consultants
are appointed. It is because to check and asceftain that technical
ability and the financial feasibility have sanguinity and are workable
and realistic. There is a multi-prong complex approach; highly
technical in nature. The tenders where public largesse is put to
auction stand on a different compartment. Tender with which we
are concerned, is not comparable to any scheme for allotment.
This arena which we have referred requires technical expertise.
Parameters applied are different. Its aim is to achieve high degree
of perfection in execution and adherence to the time schedule.
But, that does not mean, these tenders wi II escape scrutiny of
judicial review. Exercise of power of judicial review would be
called for if the approach is arbitrary or malafide or procedure
adopted is meant to favour one. The decision making process
should clearly show that the said maladies are kept at bay, But
where a decision is taken that is manifestly in consonance with
the language of the tender document or subserves the purpose
for which the tender is floated, the court should follow the principle
of restraint. Technical evaluation or comparison by the court would
be impermissible. The principle that is applied to scan and
understand an ordinary instrument relatable to contract in other
spheres has to be treated differently than interpreting and
CONSORTIUM OF TITAGARH FIREMA ADLER S.P.A.· v. 361
NMRCL [DIPAK MISRA, J.]
appreciating tender documents relating to technical works and A
projects requiring special skills. The owner should be allowed to
carry out the purpose and there has to be allowance of free play
in the joints."
28. In Tamil Nadu Generation and Distribution Corporation
Ltd. (TANGEDCO) rep. by its Chairman & Managing Director and B
another v. CSEPDI-Trishe Consortium, rep. by its Managing
Director and anotfter18, the Court, after referring to Jagdish Manda/
(supra) and taking note of the complex fiscal evaluation and other aspects,
held:
"36 .... At this juncture we are obliged to say that in a complex
fiscal evaluation the Court has to apply the doctrine of restraint.
Several aspects, clauses, contingencies, etc. have to be factored.
These calculations are best left to experts and those who have
knowledge and skills in the field. The financial computation involved,
the capacity and efficiency of the bidder and the perception of
feasibility ofcompletion of the project have to be left to the wisdom
of the financial experts and consultants. The courts cannot really
enter into the said realm in exercise of power of judicial review.
We cannot sit in appeal over the financial consultant's assessment.
Suffice it to say, it is neither ex facie erroneous nor can we perceive
as flawed for being perverse or absurd."
29. In Reliance Telecom Ltd. and another v. Union of India
and another19, the Court referred to the authority in Asia Foundation
& Construction Ltd. v. Trafalgar House Construction (I) Ltd. and
otllers20 wherein it has been observed that though the principle of judicial
review cannot be denied so far as exercise of contractual powers of
Government bodies are concerned, but it is intended to prevent
arbitrariness or favouritism and it is exercised in the larger public interest
or if it is brought to the notice of the court that in the matter of award of
a contract power has been exercised for any collateral purpose.
Thereafter, the Court in Reliance Telecom Ltd. (supra) proceeded to
state thus:
"75 .... In the instant case, we are unable to perceive any
arbitrariness or favouritism or exercise of power for any collateral
18 2016 (10) SCALE 69
19 2017 (I) SCALE 453
20(1997) 1sec738
362 SUPREME COURT REPORTS [20 I 7] S S.C.R.
A purpose in the NIA. In the absence of the same, to exercise the
power of judicial review is not warranted. In the case at hand, we
think, it is a prudent decision once there is increase of revenue
and expansion of the range of serv~ce."
And again:
"76. It needs to be stressed that in the matters relating to complex
auction procedure having enormous financial ramification,
interference by the Courts based upon any perception which is
thought to be wise or assumed to be fair can lead to a situation
which is not warrantable and may have unforeseen adverse impact.
It may have the effect potentiality of creating a situation of fiscal
imbalance. In our view, interference in such auction should be on
the ground of stricter scrutiny when the decision making process
commencing from NIA till the end smacks of obnoxious
arbitrariness or any extraneous consideration which is perceivable."
30. The learned counsel for the appellants invited our attention to
the authority in W.B. Electricity Board v. Pmel Engineering Co. Ltd.2'
wherein it has been ruled:
"24 .... The appellant, Respondents I to 4 and Respondents 10
and 11 are all bound by the ITB which should be complied with
scrupulously. In a work of this nature and magnitude where bidders
who fulfil prequalification alone are invited to bid, adherence to
the instructions cannot be given a go-by by branding it as a pedantic
approach, otherwise it will encourage and provide scope for
discrimination, arbitrariness and favouritism which are totally
opposed to the rule of law and our constitutional values. The very
purpose of issuing rules/instructions is to ensure their enforcement
lest the rule of law should be a casualty. Relaxation or waiver of
a rule or condition, unless so provided under the JTB, by the State
or its agencies (the appellant) in favour of one bidder would create
justifiable doubts in the minds of other bidders, would impair the
rule of transparency and fairness and provide room for
manipulation to suit the whims of the State agencies in picking
and choosing a bidder for awarding contracts as in the case of
distributing bounty or charity. In our view such approach should
always be avoided. Where power to relax or waive a rule or a
H 21 (2001)2 sec 451
CONSORTIUM OF TITAGARH FIREMA ADLER S.P.A. v. 363
NMRCL [DIPAK MISRA, J.]
condition exists under the rules, it has to be done strictly in A
compliance with the rules. We have, therefore, no hesitation in
concluding that adherence to the !TB or rules is the best principle
to be followed, which is also in the best public interest.
x x x x x
31 .... Thae Project undertaken by the appellant is undoubtedly
for the benefit of the public. The mode of execution of the work
of the Project should also ensure that the public interest is best
served. Tenders are invited on the basis of competitive bidding
for execution of the work of the Project as it serves dual purposes.
On the one hand it offers a fair opportunity to all those who are
interested in competing for the contract relating to execution of
the work and, on the other hand it affords the appellant a choice
to select the best of the competitors on a competitive price without
prejudice to the quality of the work. Above all, it eliminates
favouritism and discrimination in awarding public work,:; to
contractors .... Merely because a bid is the lowest the requirements
of compliance with the rules and conditions .... "
st
31. Having stated this, we have to see, how the 1 respondent
has perceived the offer of the respondent No. 2 in the backdrop of the
tender conditions. It is not in dispute that the project in question has
been funded by KfW Development Bank, Germany and as per Clause
!TB 35.8, it is necessary at all stages of bid evaluation and contract
award has to be subject to no-objection from KfW Development Bank.
Emphasis has been laid on the approach of the High Court which has
taken note of the fact that the respondent No. 2 had been awarded the
tender by the Delhi Metro Rail Corporation. It has also been highlighted
that the papers relating to the financial bid along with report were
forwarded to KfW which gave its no-objection. Be it noted, the appellants
have been quite critical about the acceptance of the offer and the 1st
respondent has given a numberofreasons to justify the same. As indicated
earlier, we are only concerned with the eligibility criteria and not with
the fiscal aspect.
32. Respondent No. 2. as is evident, is a company owned by the
People's Republic of China and, therefore, it comes within the ambit of
Clause 4.1 of the bid document as a Government owned entity. We
have already reproduced the said clause in earlier part of the judgment.
364
As perceived by the 1st respondent, a single entity can bid for itself and
it can consist of its constituents which are wholly owned subsidiaries
and they may have experience in relation to the project. That apart, as is
understood by the said respondent, where the singular or unified entity
claims that as a consequence of merger, all the subsidiaries form a
homogenous pool under its immediate control in respect of rights, liabilities,
assets and obligations, the integrity of the singular entity as owning.such
rights, assets and liabilities cannot be ignored and must be given effect.
While judging the eligibility criteria of the second respondent, the l ''
respondent has scanned Article 164 of the Articles of Association of the
respondent No. 2 which are submitted along with the bid from which it is
evincible that the Board of Directors of the respondent No. 2 has been
entrusted with the authority and responsibility to discharge all necessary
and essential decisions and functions for the subsidiaries as well.
According to the 1st respondent, the term "Government owrted entity"
would include a government owried entity and its subsidiaries and there
D can ~e no matter of doubt that the identity of the entities as belonging to
the Government when established can be treated as a Government owned
entity and the experience claimed by the parent of the subsidiaries can
be taken into consideration. Learned senior counsel for the 1st respondent
has drawn our attention to the ''lifting of corporate veil" principle or
doctrine of "piercing the veil" and in that context, reliance has been
placed on Litt/ewoods Mail Order Stores, Ltd. v. McGregor22, DHN
Food Distributors Ltd. a11d others v. London Boro11gh of Tower
Hamlets 23 and Harold Holdsworth & Co. (Wakefield) Ld. v.
Caddies24• Learned senior counsel has also placed reliance upon the
principles stated in Re11usagar Power Co. (supra) that"'have been
reiterated in New Horizons Ltd. (supra). In the written submission tiled
on behalf of the 1" respondent, the relevant paragraphs from Re1111sagar
Power Co. (supra) have been copiously quoted. It is also urged that in
the current global economic regime the multinational corporations conduct
their business through their subsidiaries and, therefore, there cannot be
a hyper-technical approach that eligibility of the principal cannot be taken
cognizance of when it speaks of the experience of the subsidiaries. It is
also contended by Mr. Subramaniam that in the context of fraud or evasion
of legal obligations, the doctrine of"piercing the veil" or "lifting of the
22 (1969)3AllER855
23 ( 1976) 3 All ER 462
H "(1955) I WLR 352
CONSORTIUM OF TITAGARH FIREMA ADLER S.P.A. v.
NMRCL [DIPAK MISRA, J.]
corporate veil" can be applied but the said principle cannot be taken
recourse to in a matter of the present nature.
" 33. With regard to the satisfaction of the 1 respondent, it has
been highlighted before us that the said respondent had thoroughly
examined the bid documents and satisfied itself about of the capability,
experience and expertise of the respondent No. 2 and there has been a
thorough analysis of the technical qualification of the respondent No. 2
by the independent General Consultant and the reports of the Appraisal st .
and Tender Committee of the I respondent and also the no-objection
has been received from KfW Development Bank, Germany which is
funding the entire project. Narrating the experience of the respondent
No. 2, it has been stated in the written submission filed on behalf of the
1st respondent:
"36. That it is further clear from the record that besides being the
lowest bidder, the experience of R 2 in supplying Metro Trains
across the world exceeds the Petitioner's experience by a huge
margin. Where for clause 12, R 2 has shown a figure of 594
Metro Cars, Petitioner has shown only 72 Dirs~ and for clause
12.1 where R 2 has shown 432 Cars, Petitioner has again shown
only 72 Cars. This vast experience of R 2 would be beneficial for
the project and would further public interest.
37. That R 1 without any malice, or malafide has treated R 2
along with its I 00% subsidiaries as one entity. This understanding
of the clause has been at the ends of both pa11ies viz. R I and R
2, who were ad idem vis-ii-vis the eligibility of the parent company
to bid using the experience and executing the contract through its
various 100% wholly owned subsidiaries.
38. That the above understanding of R 1 of treating R 2 along
with its I 00% subsidiaries is supported by the understanding of
the Delhi Metro Rail Corporation Ltd., which has on a similarly, if
not same, worded bid-document granted the tender/agreement to
R 2, which had even there bid as a parent company claiming
experience of and execution through 100% wholly owned
subsidiaries.
39. That moreover, there is no bar, whatsoever, express or implied,
in the tender document to treat the parent company along with its
100% wholly owned subsidiaries as one entity. Therefore, the
365
366
scope of judicial review should be limited in adjudging the decision
taken by R 1 in the best interest of the project, and thereby, the
public.
40. That arguendo, no project, whatsoever, has been caused to
the project or to other bidders including the Petitioner by the above
understanding of the tender conditions by R 1. It is humbly
submitted that R 2 fulfilled all the technical requirements. The
bid-document itself provided for bidding as a consortium, and did
not require in such a case fulfilment of any material condition,
which if not fulfilled would prejudice any parties or the projyct.
Moreover, the scheme of the bid-document is such that it itself
provides for a Parent Company Guarantee. According to this
Parent Company Guarantee Form, a parent company would have
to perform the works under the agreement in case the subsidiary
failed. Therefore, tne objections raised by the Petitioner are hyper-
technical and have been raised only to stall the project once it
was found to be unsuccessful."
34. As is noticeable, there is material on record that the respondenr
. No. 2, a Government company, is the ownerofthe subsidiary companies
and subsidiary companies have experience. The 1st respondent, as it
appears, has applied its commercial wisdom in the understanding and
E interpretation which has been given the concurrence by the concerned
Committee and the financing bank. We are disposed to think that the
concept of "Government owned entity" cannot be conferred a narrow
construction. It would include its subsidiaries subject to the satisfaction
of the owner. There need not be a formation of a joint venture or a
consortium. In the obtaining fact situation, the interpretation placed by
F . the 1st respondent in the absence of any kind of perversity, bias or ma la
fide should not be interfered with in exercise of power of judicial review.
Decision taken by the 1st respondent, as is perceptible, is keeping in
view the commercial wisdom and the expertise and it is no way against
the public interest. Therefore, we concur with the view expressed by
G the High Court.
35. Resultantly, the appeals, being devoid of merit, are dismissed.
In the facts and circumstances of the case, there shall be no order as to
costs.
Kalpana K. Tripathy Appeals dismissed.