Transmission Corporation of Andhra Pradesh Ltd. and Others v. M/S. Gmr Vemagiri Power Generation Ltd. and Another
NAVIN SINHA, J. 1. The controversy for determination in the
present appeal is, whether the word ‘fuel’ as used in clause 1.1.27 of the
Power Purchase Agreement (hereinafter referred to as ‘PPA’) means
“natural gas only” or includes Regasified Liquefied Natural Gas
(hereinafter referred to as ‘RLNG’) also.
2. The Andhra Pradesh Electricity Regulatory Commis sion
(hereinafter referred to as “the Commission”), in O.P. N o. 20 of 2013
dated 08.08.2013, preferred by the respondent, held that the term ‘fuel’
as used in the PPA meant natural gas only in its natural form, and did not
include RLNG. Simply because the physical composition of natural gas
and RLNG are similar, it does not automatically entitle the respondent to
generate power with RLNG, which was more expensive and not
domestically available, affecting the per unit supply of power generated
by it, as ultimately the consumer would have to pay more.
3. In Appeal No. 222 of 2013 preferred by the respondent, the
Appellate Tribunal by the impugned order dated 30.06.2014 held that
use of the word “only” after “natural gas” in the PPA dated 02.05.2007
had to be understood in context of the deletion of other alternat e fuel
such as Naphtha etc. incorporated in the earlier PPAs, and it was never
intended to restrict the meaning of the word natural gas to exclude RLNG,
which was a variant of natural gas and did not come in the category of
an alternate fuel. It further held that the higher price of RLNG could not
be a determinative factor to exclude it from the agreement as any increase
in price of gas was an accepted risk, especially in vie w of the non-
availability of natural gas from the KG-D6 basin. The use of RLNG had
also been permitted on earlier occasions without any amendment to the
PPA.
TRANSMISSION CORPORATION OF A. P. LTD. v. M/s. GMR
VEMAGIRI POWER GENERATION LTD.
4. The predecessor of the appellant, the Andhra Pradesh Sta te
Electricity Board, in May, 1995 invited bids for establishing short gestation
gas/Naphtha/fuel oil based power stations to bridge the demand supply
gap of power in the State of Andhra Pradesh. Pursuant to the s ame, a
PPA was executed between the parties on 31.03.1997 under whi ch
Naphtha was the primary fuel and gas an alternate fuel. Considering
the high price of Naphtha, in March 2000, the Government of Andhra
Pradesh decided to make gas the primary fuel. The Ministry of Petroleum
on 05.06.2000 allotted 1.64 MMSCMD of natural gas to the respondent
from the KG-D6 Basin sourced through the Gas Authority of India Ltd
(GAIL), leading to a gas supply agreement dated 31.08.2001 betwe en
the respondent and the latter. The PPA was accordingly ame nded on
18.06.2003 making gas the primary fuel and Naphtha an alternate fuel.
The PPA underwent further amendment on 02.05.2007, restricting the
term ‘fuel’ to “natural gas only”. A comparative status of the three PPA’s
can beneficially be set out as follows:
PPA dated
31.03.1997
Amendment
Agreement to the
PPA dated
18.06.2003
Amendment
Agreement dated
02.05.2007
“1.1.27) “Fuel:
means gas, Naptha,
low sulphur heavy
stock or furnace oil,
and the like, that is
intended to be used
as primary fuel, by
one or more units of
the Project to
generate power from
the Project or in case
of unavailability of
Naptha any of the
above as alternate
fuel.”
1.1.27) “Fuel: means
Natural Gas that is
intended to be used
as primary fuel by
one or more units of
the project to generate
or in case of
unavailability of
primary fuel, Naptha
or Low Sulphur heavy
stock and the like as
alternate fuel.”
1.1.27) “Fuel: means
Natural Gas only.”
397
5. GAIL having been unable to supply gas under the agreement
due to prioritisation of other sectors, the respondent was p ermitted to
purchase natural gas from M/s. Reliance Industries Ltd (RIL) at GAIL
prices. The respondent, on 07.08.2012 and 27.08.2012, sought permission
to allow use of RLNG as fuel for generating power. The appe llant
rejected the request on 10.09.2012 stating that under the PPA dated
02.05.2007, fuel meant “natural gas only” and did not include RLNG,
which was priced much higher affecting the per unit price of p ower
generated from the same to the ultimate detriment of the consumers.
6. Shri Basava Prabhu Patil, learned senior counsel appearing for
the appellant, submitted that under the PPA, it was only natural gas in its
natural form which was agreed to be used as fuel for gener ation of
power. Merely because RLNG may be a variant of natural gas, will not
suffice to bring it within the definition of fuel under the PPA. The cost
of RLNG being three to four times higher than natur al gas, the
Commission rightly held that it was also a relevant factor to hold that
RLNG was never intended by the parties to be included in the agreement.
7. The word ‘fuel’, as defined in the agreement, had to be given
its natural meaning by confining it to natural gas only as intended by the
parties. The definition could not be extended so as to include RLNG, as
the parties never intended the same. There is no ambiguity in language
warranting any inclusion to the definition either by implication or intention.
Even if there was any ambiguity with regard to the intendment of t he
parties, the true intent has to be gathered from the plain meaning of the
words used, read conjunctively with all surrounding circumstances and
documents. Applying the common parlance test, RLNG was not
synonymous with natural gas in the business and neither interchangeable,
because of the additional processes required in the latter and the resultant
higher cost involved including importation, as distinct from natural gas
available at a lesser price and domestically.
8. Under the PPA dated 31.03.1997, Naphtha was the primary
fuel and gas was an alternate fuel. Clause 3.3 dealing with energy
charge defined cost of fuel based on indigenous and importation cos t.
The PPA contemplated approval of the fuel supply agreement by the
fuel supply committee, to ensure reasonable prices as the cost of power
generation was of paramount consideration in the int erest of the
consumer. The cost of Naphtha being higher, the PPA c ame to be
TRANSMISSION CORPORATION OF A. P. LTD. v. M/s. GMR
VEMAGIRI POWER GENERATION LTD. [NAVIN SINHA, J.]
Agreement dated
means
Natural Gas only.”
amended on 18.06.2003 making natural gas the primary fuel, and Naphtha
an alternate fuel. If RLNG was in contemplation of the parties, and was
considered to fall within the term natural gas, there would ha ve been
some discussion regarding it in the deliberations of the Commission while
approving the amendments to the PPA, especially in view of the price
difference. Such absence makes it manifest that the parties never
intended to include RLNG in the term natural gas. The significance of
the words “only” after “natural gas” in the third PPA dated 02.05.2007
cannot be lost sight of. It was necessitated in context of the realization
that the parties may have resorted to other costly alternate fuels
consequent to the dismantling of the administered price mechanism and
the fuel supply committee.
9. The fact that RLNG may have been permitted to be used for a
short period of seven days from 16.04.2009 to 23.04.2009 under pressing
circumstances of a power crisis, by special orders under Sect ion 11 of
the Electricity Act, 2003 or again for a short duration from 15.02.2011 to
31.05.2011 cannot be stretched to contend that RLNG was intended to
be included within the term natural gas. The cost of power g enerated
from natural gas was Rs.1.75 per KWH while that from RLNG wor ks
out to Rs.4.63 per KWH and the financial burden for this short duration
is Rs.427 crores. In March and April use of RLNG was permit ted at
per unit generation cost of Rs.9/- compared to Rs.3/- per unit with existing
natural gas leading to a financial burden of Rs.3.7 crores per day. These
exceptions can never be construed to mean the norm to conte nd that
use of RLNG was always in the contemplation of the partie s and was
intended to be included within the term natural gas. The very fact th at
the respondent sought permission on 07.08.2012 and 27.08.2012 to use
RLNG for power generation makes it manifest that even as per its
understanding, RLNG was not included within the term natural ga s
according to the intent of the parties. The appellant in its r eply dated
10.09.2012 had reiterated that RLNG did not fall within the ambit of the
PPA which was confined to natural gas only citing the cost difference of
power per unit also.
10. A contract document had to be interpreted in accordance with
the language used, with reference to the context in which it came to be
prepared. A technical view of an agreement, torn out of context, cannot
be taken to reinterpret the agreement and arrive at a new finding with
regard to the intendment of the parties by including something w hich
399
was never intended to be included, to the prejudice of a party to the
contract, while giving an undue advantage to the other. A primary
consideration will also be the understanding of the parties of the terms
of the contract and what was intended, as reflected inter alia from their
conduct. The contract being a commercial document, utmost importance
had to be given to its efficacy. Shri Patil, in support of the submissions
placed reliance on Polymat India (P) Ltd. & Anr. vs. National
Insurance Co. Ltd. & Ors., 2005 (9) SCC 174, Gedela Satchidananda
Murthy vs. Dy. Commissioner, Endowments Department, A.P. &
Ors., 2007 (5) SCC 677, Timblo Irmaos Ltd., Margo vs. Jorge Anibal
Matos Sequeira & Anr ., 1977 (3) SCC 474, Sappani Mohamed
Mohideen and Anr. vs. R.V. Sethusubramania Pillai and Ors., 1974
(1) SCC 615, Trutuf Safety Glass Industries vs. Commissioner of
Sales Tax, U.P., (2007) 7 SCC 242, The Union of India vs. M/s. D.N.
Revri and Co. and Ors., 1976 (4) SCC 147, Nabha Power Ltd. vs.
Punjab State Power Corporation Ltd. & Anr., 2017 SCC Online 1239
and Bharat Aluminum Company vs. Kaiser Aluminum Technic al
Services Inc., 2016 (4) SCC 126.
11. Shri Vikas Singh, learned senior counsel appearing for the
Respondent, submitted that the original bid documents permitted import
of fuel also, and fuel tie up linkage was the responsibility of the bidder.
The Respondent invested approximately Rs.1153.10 crores in setting up
the power generation plant, of which, 68.29% of the funding was from
banks and financial institutions. The plant has operated intermittently for
approximately 64 months only in the last 11 years. The conduct of the
appellant in not accepting availability declaration with regard to RLNG
was unjustified. The appellant was well aware of the possibility of future
hike in gas prices, and more particularly after disma ntling of the
administrated price mechanism inclusive of inflation, all of which would
make the gas prices market driven. Therefore, merely because the cost
of RLNG was higher could not be a ground to contend that it was never
intended to be included within the definition of natural gas or was contrary
to interest of the consumer. RLNG was but a form of natural gas,
compressed for transformation from gaseous to liquid state, r educing
the volume to facilitate transportation in a safe and stable manner. Once
delivered at the destination, it is regasified and then suppli ed to the
consumer. Even according to the dictionary meaning they are the same.
TRANSMISSION CORPORATION OF A. P. LTD. v. M/s. GMR
VEMAGIRI POWER GENERATION LTD. [NAVIN SINHA, J.]
12. The deletion of the words “intended to be used” after the
words “natural gas”, as used in the second PPA, and the repl acement
thereof in the third PPA by the words “natural gas onl y” gave a much
wider meaning and amplitude to the word natural gas so as to take within
its ambit RLNG also. The deletion of “importation charges” in the PPA
dated 18.06.2003 was of no significance as RLNG was to be delivered
at the project site through the pipeline, and the cost of fuel was to be at
the metering point at the project site, which would b e inclusive of
importation cost. Evidently there would be no separate charges by GAIL
towards importation of RLNG. So long as the supplies were at GAIL
prices, the appellants cannot raise objections with regard to price.
13. The term natural gas has not been defined under the PPA.
The definition of natural gas in Section 2(za)(i) of the Pet roleum and
Natural Gas Regulatory Board Act, 2006 (hereafter referred to as the
“PNGRB Act”) includes both liquefied natural gas (LNG) and RLNG.
The appellants on more than one occasion had themselves permit ted
use of RLNG for production of power in 2011, 2012 and 2013. It is
demonstrative of the fact that RLNG was never intended to be excluded
under the PPA. It was only when the respondent wrote to the appellant
for operationalising the RLNG scheme, that the appellant repl ied on
27.03.2015 raising objection to RLNG being outside the terms o f the
PPA. The respondent had never sought permission from the appellant
for use of RLNG by its letters dated 07.08.2012 and 27.08.2012, but
merely given intimation about what was otherwise permissible under the
PPA. After the dismantling of the administered price mecha nism and
the fuel Supply Committee, there was no requirement for consent or
approval of the appellant.
14. The appellant having itself permitted use of RLNG on more
than one occasion, cannot contend its exclusion especially wh en the
agreement clearly is suggestive of its inclusion. Alternately, there had
been waiver on part of the appellant by having permitted its use on more
than one occasion. The appellant cannot be permitted to approbate and
reprobate. Natural gas had been defined in Association of Natural
Gas & Ors. vs. Union of India & Ors., 2004 (4) SCC 489. The plea
that power generated by RLNG would be more costly and not in the
interest of the consumer is belied by the fact that today the appellant is
purchasing power at higher rate. The Director General , Petroleum
Planning and Analysis Cell had now fixed price for marketing including
401
pricing freedom for gas to be produced from discoveries in deepwater,
ultra-deepwater and high pressure-high temperature areas for the period
01.04.2016 to 31.09.2016 at US$ 6.61/MMBTU on GCV basis. On
05.05.2016, the respondent wrote to the appellant informing that GAIL
had communicated that ONGC has indicated availability of the g as in
the KG basin from its deepwater fiels-S1 and VA fields at the rate of
6.3$/MMBTU even which has not been acceded to, as being beyond
the PPA.
15. We have considered the submissions on behalf of the parties,
and are not in agreement with the conclusions of the Appellate Tribunal.
16. The original PPA dated 31.03.1997, provided for Naphtha to
be used as the primary fuel for generation of power and g as was an
alternate fuel. Importation was also permissible. The pric e was to be
fixed by the fuel supply committee, both to keep it reasonab le, and to
ensure that the cheaper option was always used. In March 200 0, the
Government of Andhra Pradesh, due to the cost factor, decided to replace
gas as the primary fuel, and Naphtha was made an alternate fuel leading
to allotment of natural gas by the Ministry of Petroleum and execution
of an agreement between the respondent and GAIL. The PPA was then
amended on 18.06.2003 making gas the primary fuel. Subsequently,
when GAIL was unable to supply the allocated quantities of natural gas
to the respondent because of sector prioritisation, the res pondent was
permitted to obtain supplies of natural gas from RIL. The realisation
that in the circumstances, the generator could resort to use of other
costly fuels also, led to the third amended PPA dated 02.05.2007 confining
the definition of ‘fuel’ to “natural gas only”.
17. It is relevant to notice that at both stages of the amendment to
the PPA, in the proceedings before the Commission under Section 21(5)
of the Andhra Pradesh Electricity Reforms Act, 1998, the parties never
referred to the availability of RLNG as fuel contemplated w ithin the
term “natural gas” and the discussion was confined to “natural gas only”.
Had the parties intended otherwise, or the respondent had any such
inkling in mind of RLNG being a variant of natural gas and consequently
intended to be included in it, coupled with its availability as compared to
natural gas, surely it would have figured in the discussion before the
Commission. The absence of the same, combined with RLNG having
to be imported, deletion of the importation clause in the PPA of 18.06.2003,
TRANSMISSION CORPORATION OF A. P. LTD. v. M/s. GMR
VEMAGIRI POWER GENERATION LTD. [NA VIN SINHA, J.]
the higher price of RLNG, leads to the inevitable conclusion that it was
never in the contemplation of the parties that RLNG was to be included
in the term “natural gas” even though it may be a variant of the same. It
stands to reason that if Naphtha was removed as primary fuel because
of the cost factor and made an alternate fuel in the second amendment
to the PPA, the question of RLNG being included within the term o f
“natural gas only” irrespective of the cost factor, will not stand the test
of reason.
18. A wrong question will inevitably lead to a wrong answer. The
question for consideration presently is not if RLNG is a form of natural
gas, but whether the parties intended to exclude any form of gaseous
fuel from the ambit of the contract except for natural gas in its nat ural
form from the domestic market, keeping the price of gas in mind, which
would ultimately set the price per unit of electricity for the consumer.
The PPA is a technical commercial document. It has been dr afted by
persons conversant with the business. RLNG and natural gas as used in
the agreement are not synonymous or interchangeable. The principle of
business efficacy will also have to be kept in mind for interpret ing the
contract. The terms of the agreement have to be read first to understand
the true scope and meaning of the same with regard to the nature of the
agreement that the parties had in mind. It will not be safe to exclude any
word in the same. In Khardah Company Ltd. vs. Raymon & Co.
(India) Private, Ltd., 1963 (3) SCR 183, on interpretation of a contract
it was observed as follows:
“18. … We agree that when a contract has been reduced to writing
we must look only to that writing for ascertaining the terms of the
agreement between the parties but it does not follow from t his
that it is only what is set out expressly and in so many words in
the document that can constitute a term of the contract betwee n
the parties. If on a reading of the document as a whole, it c an
fairly be deduced from the words actually used therein that t he
parties had agreed on a particular term, there is nothing i n law
which prevents them from setting up that term. The terms of a
contract can be expressed or implied from what has been
expressed. It is in the ultimate analysis a question of construction
of the contract. And again it is well established that in construing
a contract it would be legitimate to take into account surrounding
circumstances…”
403
19. It will not be a safe method to interpret a contract by picking
out one clause of the same defining fuel, apply a technical scientific
meaning to it as observed in Truetuf Safety Glass Industries (supra)
and then conclude that being a form of natural gas, RLNG was intended
to be impliedly included in the definition of fuel. The terms of a contract
have to be given their plain meaning with regard to the intendment of the
parties as to what was intended to be included and what was not intended
to be included, as distinct from an express exclusion. The commerc ial
parlance test will also have to be applied as to whether t hose in the
business consider the two forms of gas as synonymou s and
interchangeable. Quite obviously the answer has to be in the negative
considering the importation of RLNG , additional processes involved and
the consequent higher costs involved.
20. In the event of any ambiguity arising, the terms of the contract
will have to be interpreted by taking into consideration all surrounding
facts and circumstances, including correspondence exchanged, to arrive
at the real intendment of the parties, and not what one of the parties may
contend subsequently to have been the intendment or to say as included
afterwards, as observed in Bank of India & Anr. vs. K. Mohandas &
Ors., (2009) 5 SCC 313:
“28. The true construction of a contract must depend upon the
import of the words used and not upon what the parties choose to
say afterwards. Nor does subsequent conduct of the parties in
the performance of the contract affect the true effect of the clear
and unambiguous words used in the contract. The intention of the
parties must be ascertained from the language they have us ed,
considered in the light of the surrounding circumstances and the
object of the contract. The nature and purpose of the contract is
an important guide in ascertaining the intention of the parties.”
21. The respondent’s letters dated 07.08.2012 and 27.08.2012
become crucially relevant for the understanding that it was itself under
no misapprehension that RLNG was never intended to be included within
the definition of natural gas under the contract. In th e former, the
respondent wrote, “We await the confirmation from your good office to
take it up further for obtaining necessary consent, if any, in accordance
with law for use of RLNG and the resultant tariff increase.” The latter
again requested for permission to use RLNG to supplement shortfall in
TRANSMISSION CORPORATION OF A. P. LTD. v. M/s. GMR
VEMAGIRI POWER GENERATION LTD. [NA VIN SINHA, J.]
gas from the KG-D6 Basin, requesting to acknowledge its usage. The
contention of the respondent that these were only intimatio ns and not
request for permission to use RLNG stands belied from the plain language
used in them. The appellant in its reply dated 10.09.2012 explicitly stated
that under the agreement no other fuel except natural gas could be used
and that RLNG was never contemplated in the definition of fuel declining
to accept the spot supply agreement for RLNG supplies, citing the cost
of power per unit from the same at Rs.9-10 in comparison to Rs.3/- per
unit from natural gas. It is only thereafter the respondent approached
the Commission in OP No.20 of 2013. The pleadings of the respondent,
as quoted hereinafter, further confirm its own understanding that RLNG
was never intended to be included in the definition of fuel which w as
confined to natural gas only :-
“9. Since the above scenario affects the generation activities
of the Petitioner, the Petitioner proposed to use RLNG. In this
respect, the Petitioner has already made representati ons to
the Respondent Nos. 2 and 3 vide its letters dated 7.8. 2012
and 27.8.2012 (produced as Annexures P-2 and P-3
respectively). In both these letters, the Petitioner app ealed to
the said Respondents to allow usage of RLNG and
substantiated the circumstances/reasons for the said re quest
of the petitioner.
10. To the utter surprise and shock of the Petitioner, instead
of acceding to the above requests of the Petitioner , the
Respondent No.3 has rejected the above requested of the
Petitioner vide its letter dated 10.09.2012.”
22. The sporadic use of RLNG on one or two occasions under
pressing circumstances, after due orders under Section 11 of the Electricity
Act, 2003, for short durations, cannot make the exception the nor m to
contend either that RLNG was included in the term fuel or t hat the
appellant had agreed to its use. The question of waiver by the appellant
or application of the principle of approbate and reprobate does not arise
in the facts of the case.
23. The present was a contract for purchase of power gener ated
from fuel which was reasonably priced so as to keep in check the cost
of power generated from the same, in the interest of the cons umer.
Undoubtedly, cost of fuel was a primary consideration in the mind of the
405
appellant. The contextual background in which the PPA originally came
to be made, the subsequent amendments, the understandi ng of the
respondent of the agreement as reflected from its own communications
and pleadings make it extremely relevant that a contextual interpretation
be given to the question whether RLNG was ever intended to be included
within the term “Natural Gas”, as observed in Bihar State Electricity
Board vs. Green Rubber Industries, (1990) 1 SCC 731:
“23…. Every contract is to be considered with reference to i ts
object and the whole of its terms and accordingly the whole context
must be considered in endeavouring to collect the intention of the
parties, even though the immediate object of enquiry is the meaning
of an isolated clause….”
24. In the facts and circumstances of the present case, there can
be no manner of doubt that the parties by their conduct and dea lings
right up to the institution of proceedings by the respondent befo re the
Commission were clear in their understanding that RLNG was not to be
included within the term “Natural Gas” under the PPA. The observations
in Gedela Satchidananda Murthy (supra) are considered apposite in
the facts of the present case :-
“32…The principle on which Miss Rich relies is that formulated
by Lord Denning, M.R. in Amalgamated Investment & Property
Co. Ltd. v. Texas-Commerce International Bank Ltd., [1982] 1
QB at p.121:
‘If parties to a contract, by their course of dea ling, put a
particular interpretation on the terms of it—on the faith of which
each of them—to the knowledge of the other—acts and conducts
their mutual affairs—they are bound by that interpretation just as
much as if they had written it down as being a variation of the
contract. There is no need to inquire whether their particul ar
interpretation is correct or not—or whether they were mist aken
or not—or whether they had in mind the original terms or not.
Suffice it that they have, by their course of dealing, put their own
interpretation on their contract, and cannot be allowed to go back
on it.’
(emphasis supplied)”
25. A commercial document cannot be interpreted in a manner to
arrive at a complete variance with what may originally have been the
TRANSMISSION CORPORATION OF A. P. LTD. v. M/s. GMR
VEMAGIRI POWER GENERATION LTD. [NAVIN SINHA, J.]
intendment of the parties. Such a situation can only be contem plated
when the implied term can be considered necessary to lend efficacy to
the terms of the contract. If the contract is capable of interpretation on
its plain meaning with regard to the true intention of the parties it will not
be prudent to read implied terms on the understanding of a party, or by
the court, with regard to business efficacy as observed in Satya Jain
(D) thr. Lrs. & Ors. vs. Anis Ahmed Rushdie (D) thr. Lrs. & Ors. ,
(2013) 8 SCC 131, as follows:-
“33. The principle of business efficacy is normally invoked to read
a term in an agreement or contract so as to achieve the result or
the consequence intended by the parties acting as p rudent
businessmen. Business efficacy means the power to pro duce
intended results. The classic test of business efficacy was proposed
by Lord Justice Bowen,L.J. in Moorcock. This test requires that
a term can only be implied if it is necessary to give business efficacy
to the contract to avoid such a failure of consideration that the
parties cannot as reasonable businessmen have intended. But only
the most limited term should then be implied–the bare minimum to
achieve this goal. If the contract makes business sense w ithout
the term, the courts will not imply the same. The following passage
from the opinion of Bowen, L.J. in the Moorcock (supra) sums up
the position: (PD p.68)
“…In business transactions such as this, what the law desires
to effect by the implication is to give such business efficacy to
the transaction as must have been intended at all events by
both parties who are business men; not to impose on one side
all the perils of the transaction, or to emancipate one side from
all the chances of failure, but to make each party promise in
law as much, at all events, as it must have been in the
contemplation of both parties that he should be responsible for
in respect of those perils or chances.”
34. Though in an entirely different context, this court in Unit ed
India Insurance Co. Ltd. v. Manubhai Dharamasinhbhai Gajera
and Ors. had considered the circumstances when reading an
unexpressed term in an agreement would be justified on the basis
that such a term was always and obviously intended by a nd
between the parties thereto. Certain observations in this regard
407
expressed by Courts in some foreign jurisdictions were noti ced
by this court in Para 51 of the report. As the same may ha ve
application to the present case it would be useful to notice the
said observations :(SCC p.434)
“51. …’…”Prima facie that which in any contract is left to
be implied and need not be expressed is something s o
obvious that it goes without saying; so that, if, while the
parties were making their bargain, an officious bystande r,
were to suggest some express provision for it in th eir
agreement, they would testily suppress him with a common
‘Oh, of course!’ ‘’ Shirlaw v. Southern Foundries (1926 )
Ltd., KB p.227.’
* * *
“An expressed term can be implied if and only if the court
finds that the parties must have intended that term to form
part of their contract: it is not enough for the court to find
that such a term would have been adopted by the parties
as reasonable men if it had been suggested to them: it must
have been a term that went without saying, a term necessary
to give business efficacy to the contract, a term w hich,
although tacit, formed part of the contract which the parties
made for themselves. Trollope and Colls Ltd. v. North West
Metropolitan Regl. Hospital Board, All ER p.268a-b.’ “
35. The business efficacy test, therefore, should be applied only
in cases where the term that is sought to be read as im plied is
such which could have been clearly intended by the parties at the
time of making of the agreement...”
26. The definition of natural gas in Section 2(za)(i) of the PNGRB
Act, has no relevance to the present controversy as the Act was enacted
with the object to oversee and regulate refining, processing, distribution
and marketing of petroleum products and natural gas. Similarl y, the
observation made in Association of Natural Gas (supra) in context of
the controversy with regard to legislative entry has no relevance to the
interpretation of the PPA.
27. The aforesaid discussion, therefore, leads to the inevitabl e
conclusion that the intention of the parties under the agre ement, as
TRANSMISSION CORPORATION OF A. P. LTD. v. M/s. GMR
VEMAGIRI POWER GENERATION LTD. [NAVIN SINHA, J.]
amended from time to time, was to generate power from fuel reasonably
priced, so as to ultimately make available power to th e consumers at
reasonable rates. The choice of fuel as natural gas only has, therefore,
to be understood as being confined to natural gas only in its natural form.
The respondent was well aware that RLNG was never inten ded to be
included in the definition of natural gas as understood by the parties,
notwithstanding that it may be a variant of natural gas.
28. The appeal, therefore, has to be allowed, the Appellate Tribunal
judgment is reversed, and the Commission order dated 08.08.2013 is
affirmed.
Ankit Gyan Appeal allowed.