Samir Narain Bhojwani v. M/S. Aurora Properties and Investments and Anr.
A.M. KHANWILKAR, J. 1. The captioned appeal challenges
the judgment and order passed by the Division Bench of the Bom bay
High Court dated 9 th July, 2018 in Commercial Appeal No.173 of 2017,
whereby the Division Bench dismissed the appeal filed by the appellant
and upheld the decision of the learned Single Judge dated 9 th October,
2017 in Notice of Motion No.147 of 2013, wherein the learned Single
Judge inter alia passed a mandatory interlocutory injunction directing
the appellant to hand over 8 (eight) flats along with 16 (sixte en) car
parking spaces under the Settlement Agreement dated 4 th November,
2016 and Consent Terms dated 25 th September, 2017 between respondent
Nos.1 and 2 inter partes .
2. The relevant facts are as follows: Respondent No.1/plainti ff
was appointed by one Andheri Kamgar Nagar Cooperative Housing
Society Ltd. (for short, ‘ the Society’ ) under a Development
Agreement dated 6 th October, 1996 as a developer under the Slum
Development/ Rehabilitation Scheme to develop the suit pro perty in
55
question, being a plot of land situated at Versova Link Roa d, Taluka
Andheri and bearing Survey No. 139, City Survey No. 1319 (Par t)
admeasuring 8892 sq. mts. or thereabouts as per Indenture of L ease
dated 31 st March, 1993 and 9402 sq. mts. as per City Survey Records.
One part of the suit property was for constructing tenem ents free of
charge for project-affected persons and the balance pro perty could be
used to develop and sell the balance FSI. Responden t No.1 then
executed an Agreement for Sub-Development dated 22 nd September,
1999 with respondent No.2/defendant No.1, transferring the benefits of
development rights in the suit property, with the c onsent of the
aforementioned Society, to respondent No.2 after keeping aside 15,000
sq. ft. for itself i.e. respondent No.1.
3. Subsequently, respondent No.2 executed an Agreement for
Development dated 10 th March, 2003 with the appellant/defendant No.2,
whereunder the appellant would be entitled to 55% of the tota l area
available for free sale buildings and car parking in the suit property and
respondent No.2 retained 45% of the total area avai lable for
construction of free sale buildings and car parking by utilizing FSI which
may be available on the suit property as per the Slum Re habilitation
Scheme. This agreement was entered into without the c onsent of
respondent No.1 and hence, all three parties execute d a Tripartite
Agreement dated 11 th September, 2009, referencing the previous
agreements of 6 th October, 1996 and 22 nd September, 1999 wherein
respondent No.1 was entitled to an area of 22,500 sq. ft., an incr ease
from its earlier agreed upon 15,000 sq. ft., which would be allocated out
of the 45% share due to respondent No. 2
4. Disputes arose during the construction of the building, which
resulted in respondent No.1 filing a Commercial Suit No. 62 of 2013
against respondent No.2 and the appellant inter alia seeking
specific performance of the Development Agreement d ated 22 nd
September, 1999, read with the Tripartite Agreement dated 11 th
September, 2009, including handing over constructed area of 22,500 sq.
ft. in the free sale buildings along with proportionate car parking space,
in the form of 12 (twelve) flats in Wings ‘A’ and ‘B’ of the building ‘Bay
– View’ constructed on the suit property and 24 (twent y four) car
parking spaces. Respondent No.1 also took out Notice of Motion No.
147 of 2013 for interim reliefs, seeking to restrain respondent No.2 and
the appellant from creating third party rights in the suit property without
SAMIR NARAIN BHOJWANI v. M/S. AURORA PROPERTIES
AND INVESTMENTS [A. M. KHANWILKAR, J.]
first handing over possession of the 22,500 sq. ft. constructed area in the
form of flats and parking spaces. Respondent No. 1 alleged t hat this
interim relief was necessitated by the fact that it s advocate had
conducted a search in the sub-registrar’s office and found a mortgage
deed executed by the appellant in favour of a third party with respect to
12 flats and 24 parking spaces in the building ‘Bay–View’ and that it
apprehended that the appellant would sell or create third party rights in
respect of the said flats. The alleged mortgage deed itse lf was not
produced by respondent No.1 on the ground that it had applied for a
copy of the same but was yet to receive it. Respondent No.1 also sought
to appoint a Court Receiver to take charge of the premises in the suit
property comprising its 22,500 sq. ft. constructed area. An ad-interim,
consent order was passed on 3 rd December, 2012, in the said Notice of
Motion No. 147 of 2013, whereby respondent No. 2 and the appellant
agreed to not dispose of or create third party rights in respect of 8 flats
in the completed Wings ‘A’ and ‘B’ of the building and 4 fla ts in the
under-construction Wing ‘C’ of the building, totaling 12 flats.
5. The parties filed their respective replies and rejoinders in the
suit and notice of motion. The appellant’s stance wa s that he had
completed his contractual obligations and offered respondent No.2 its
entitlement of 45% area in the constructed buildings but respondent No.2
had failed to take possession of the same. The subsequent delay in
construction of Wing ‘C’ of the building was due to the failure of
respondent No.2 to obtain a Commencement Certificate for Wing ‘C’,
resulting in losses to the appellant. Owing to this breach committed by
respondent No.2, it was no longer entitled to its 45% sh are in the
constructed area and as a consequence, respondent No .1 was not
entitled to its 22,500 sq. ft. area which could only be claimed out of the
respondent No.2’s entitlement.
6.The appellant then took out Notice of Motion No. 540 of 2013,
seeking to refer the suit to arbitration under Section 8 of the Arbitration
and Conciliation Act, 1996 (“ the Arbitration Act”) and Arbitration
Application No. 86 of 2013, seeking to appoint an arbitrator under
Section 11 of the Arbitration Act. Both these proceedings were rejected
by the High Court vide its order dated 30 th September, 2014 on the ground
that while the Development Agreement of 22 nd September, 1999
between respondent Nos.1 and 2 contained an arbitration clau se and
similarly, the Agreement of 10 th March, 2003 between the appellant and
57
respondent No.2 also contained an arbitration clause, howeve r, the
Tripartite Agreement of 11 th September, 2009 itself did not contain an
arbitration clause and that a mere reference made in the Tripartite
Agreement to the previous agreements would not make the arbitration
clauses therein part of the Tripartite Agreement. T he appellant
challenged that decision right upto this Court in SLP (Civil) No. 2235 of
2015, which stood rejected.
7. The appellant also initiated proceedings under Section 9 of the
Arbitration Act against respondent Nos.1 and 2 before the High Court.
The High Court refused to grant any relief in the petition fi led under
Section 9 of the Arbitration Act. The appellant the n withdrew the
Section 9 proceedings and initiated arbitration solely against respondent
No. 2 under the Agreement dated 10 th March, 2003. In the said
arbitration proceedings, respondent No.2 filed an application for interim
reliefs under Section 17 of the Arbitration Act inter alia seeking
specific performance of the agreement of 10 th March, 2003 including
possession of its entire 45% share of flats in the buildings constructed on
the suit property. Respondent No.2 contended that the application was
necessitated by the fact that the appellant had violated the terms of the
10 th March, 2003 Agreement and had created third-party rig hts in
respect of his 55% entitlement in the suit property , without first
providing respondent No.2 with the occupation and possession of its
45% entitlement in the suit property as set out in the said Agreement.
Respondent No.2 also submitted that the appellant had deposi ted a
refundable amount of Rs.4 crore as part of his obligation under t he
Agreement but that refund of the said deposit was not, in any way,
connected with handing over of the respondent No.2’s entitlem ent of
flats. In any event, respondent No.2 had offered to refund the said
deposit in exchange for possession of the flats due to it, w hich the
appellant had refused.
8. By an interim order dated 12 th October, 2016, the sole
arbitrator made prima facie observations that construction of Wing ‘C’
in the building situated on the suit property had been delayed owing to
respondent No.2’s failure to obtain the Commencement Certificate for
the same. Further, respondent No.2 had allowed the appellant to
construct only 88 flats so far, which worked out to 72% of the total area
to be constructed. On that basis, the arbitrator was of the opinion that
respondent No.2 could not receive its entire 45% share in the constructed
SAMIR NARAIN BHOJWANI v. M/S. AURORA PROPERTIES
AND INVESTMENTS [A. M. KHANWILKAR, J.]
area of 88 flats, which worked out to 31.6 flats, but instead, woul d
receive 72% of its 45% share which worked out to 28.5 flats. F rom
these 28.5 flats, 12 flats were to be kept aside for respo ndent No.1 as
directed in the High Court’s ad-interim order dated 3 rd December, 2012
and thus, respondent No.2 was entitled to 16.5 flats. Out of 16.5 fl ats,
the appellant was directed to hand over possession o f 16 flats to
respondent No. 2, after which respondent No.2 would refund the
deposit given by the appellant in respect of such flats. The remaining
amount of respondent No.2’s entitlement in one flat would be discharged
by both respondent No.2 and the appellant jointly disposing of the said
flat at a mutually agreed price.
9. This order was challenged by the appellant, first before the
High Court and having failed there, before this Court in SLP (Civil) No.
35563 of 2016. This Court, vide order dated 14 th December, 2016,
refused to set aside the High Court’s decision but recorded t hat the
observations made by the sole arbitrator and High Court woul d not
influence the final outcome of the matter.
10.Reverting to Notice of Motion No.147 of 2013 in the suit filed
by respondent No.1, it was then finally heard and judgment reserv ed.
Pending the decision, however, respondent Nos. 1 and 2 filed Consent
Terms dated 25 th September, 2017 according to which respondent No.2
agreed to hand over an additional 8 (eight) flats along with 16 (sixteen)
parking spaces to respondent No.1 in full and final settle ment of the
Development Agreement of 22 nd September, 1999 and the Tripartite
Agreement of 11 th September, 2009.
11. The Learned Single Judge vide decision dated 9 th October,
2017 in Notice of Motion No.147 of 2013, relied upon the interim order
of 12th October, 2016 passed by the sole arbitrator, terming it as an
interim award. The Single Judge was of the opinion that the
apportionment of flats done by the arbitrator had become res judicata .
The arbitrator’s finding, that respondent No.2 was entitled to 28.5 flats,
had attained finality since the appeals to the High Court and this Court
had been rejected. Further, from these 28.5 flats, 12 flats along with 24
parking spaces formed part of respondent No.2’s entitlement, which, in
turn, belonged to respondent No.1, and had been kept out of the scope
of the arbitration since there was an ad-interim order of the High Court
operating in that regard. Possession and keys of the remaining 16 flats
out of the 28.5 flats had been handed over by the a ppellant to
59
respondent No.2, for which the appellant’s deposit ha d also been
refunded by respondent No.2, as directed by the arbitrator.
12.The Single Judge further opined that even if respondent No.2
was ultimately held liable to compensate the appellant for damages, the
same could not be recovered from the said 12 flats as the se flats were
ultimately and rightfully due to respondent No.1 (original plaintiff) and
out of bounds for the appellant. The Single Judge rejected the appellant’s
argument that since respondent No.1 claimed through respondent No.2,
any breach by respondent No.2 would automatically a ffect the
entitlement of respondent No.1 as well.
13.The question as to whether respondent No.2 was obligated to
hand over possession of 8 flats to respondent No.1 as per the settlement
agreement dated 4 th November, 2016 and the Consent Terms dated
25 th September, 2017 and whether the appellant had to hand over the
keys of the said flats to respondent No.1, were answered by the Single
Judge in the affirmative, with the finding that respondent No.2 was the
rightful owner of the balance 39.6 flats, including the 8 flats, out of the
88 constructed flats, and that the appellant had no rights over the same.
The point of respondent No.2 being the rightful owner of the 8 flats was
based on the following aspects:
a. Respondent No.2 alone was entitled to develop t he suit
property as the letter of intent from the SRA was in favour of
respondent No.2;
b. The appellant was a contractor who had been given the right
to develop the suit property and his rights flowed fro m
respondent No. 2;
c. Respondent No.2 had retained its right to construct 45% of
the total area available and the appellant had even executed
a Power of Attorney (POA) in favour of respondent no.2
entitling respondent No.2 to execute agreements for sale on
ownership basis, leave and license, etc. for the flats and car
parking spaces in the suit property, including the said 8 flats
and similarly, respondent No.2 had executed a POA in favour
of the appellant allowing the appellant to dispose of his flats
and car parking spaces which he was entitled to receive as
part of his 55% share. This was even conceded to by the
appellant in the arbitration proceedings and in light of the same,
SAMIR NARAIN BHOJWANI v. M/S. AURORA PROPERTIES
AND INVESTMENTS [A. M. KHANWILKAR, J.]
the appellant was estopped from objecting to respondent No.2
handing over 8 flats to respondent No.1;
14. On the issue of the appellant not being the owner of the said
flats, the Single Judge recorded that merely because the a ppellant had
constructed the said flats and had the keys to the same, he could not be
said to be the owner of the flats and he could not prevent resp ondent
No.2 from handing over possession of the 8 flats to respondent N o.1.
The appellant merely had derivative rights over the sui t property,
flowing from respondent No.1 through respondent No. 2, and any
dispute between respondent No.2 and the appellant could not, in any
way, affect the right of respondent No.1 over the suit property. The
Consent Terms dated 25 th September, 2017 between respondent Nos.1
and 2 clearly set out that respondent No.2 was obligated to hand over 8
flats to respondent No.1 and the right of respondent No.1 over the said
flats was paramount to the rights of the other parties.
15.The Single Judge thus directed the appellant, by a mandatory
order, to hand over keys and possession of the said 8 flats to respondent
No.1 along with 16 parking spaces, recording that he had moulded the
reliefs originally sought by respondent No.1 in the changed circumstances
of the case and in order to shorten the litigation and do complete justice.
16. Aggrieved by the Single Judge’s decision, the app ellant
challenged the said decision before the Division Bench of the High Court
in Commercial Appeal No.173 of 2017. It was urged on behalf of the
appellant that respondent Nos.1 and 2 had entered into the Consent
Terms dated 27 th September, 2017 with a view to defeat the appellant’s
claim. Unless respondent No.2 completed its entire obliga tions with
respect to the building still under construction in the s uit property,
respondent No.1 was not entitled to receive its 8 fl ats as per the
Consent Terms. The appellant further contended that the handing over
of 8 flats to respondent No.1 was, in effect, a final relief since nothing
further remained in the suit and the interim order of the Sing le Judge
was in fact a final order and that the confirmation of the arbitral tribunal’s
order had no effect on the proceedings before the Single Judge. These
arguments were countered by respondent No. 1 which inter alia
submitted that the actual dispute was between the a ppellant and
respondent No.2 and that it (respondent No.1) was being made to suffer
for such dispute. Respondent No.1 contended that th e main
61
development agreement had been executed between the Societ y and
respondent No.1 and the rights of the other parties flowed through such
agreement. Hence, there was nothing wrong in the Sin gle Judge
moulding reliefs in its favour. Respondent No.2 echoed respondent No.1’s
arguments.
17. The Division Bench by its judgment and order dated 9 th July,
2018, upheld the mandatory direction issued by the Single Judge at an
interlocutory stage and rejected the appeal, holding that the Single Judge
had addressed the various issues in detail and that it was right to mould
the reliefs, even at the interim stage, in light of changed circumstances
in the case. The Division Bench opined that the appellant was not left
remediless in case respondent No.1 failed in the suit, as his remedies
were kept open.
18. We have heard Mr. Mukul Rohatgi, learned senior counsel
appearing for the appellant, Mr. Shyam Divan, learned senior counsel
appearing for respondent No.1 and Mr. Mahendra K. Ghelani, learned
counsel appearing for respondent No.2.
19. From the chronology of events, it is indisputable that the present
appeal emanates from an interlocutory order passed by the learned Single
Judge of the High Court on an application under Order XXXIX which, in
turn, has been confirmed by the Division Bench. That interloc utory
order has been passed in the suit filed by respondent No.1 ag ainst the
appellant and respondent No.2 for the following substantive reliefs:
“a) this Hon’ble Court be pleased to declare that the suit agreement
i.e. the said Development Agreement dated 22 nd September 1999
(Exhibit “B” to the Plaint), read with the said Agreement dated
11 th September 2009 (Exhibit “J” to the plaint), are valid, subsisting
and binding between the Plaintiff and the Defendants.
b) this Hon’ble Court be pleased to order and decree the specific
performance of the suit agreements dated 22 nd September 1999
(Exhibit “B” to the plaint), read with Agreement da ted
11 th September 2009 (Exhibit “J” to the plaint) including handing
over to the Plaintiff constructed area of 22500 sq.ft. in the fre e
sale buildings along with proportionate car parking space in the
form of 12 flats in Wings “A” and “B” of the building “Bay –
View” situated on the property described in Exhibit “A” to t he
plaint and 24 car parking spaces.
SAMIR NARAIN BHOJWANI v. M/S. AURORA PROPERTIES
AND INVESTMENTS [A. M. KHANWILKAR, J.]
c) In the alternative to prayer clause (b) this Hon’ble Co urt be
pleased to order, decree and direct the Defendants to ref und a
sum of Rs.75,00,000/- together with interest at 18% as set out in
the Particulars of Claim at Exhibit “M” to the plaint;
d) In the alternative to prayer (a) and (b) and in addition to prayer
(c) above, this Hon’ble Court be pleased order, decree and direct
the Defendants to pay damages of Rs.173,47,53,425/- (Rupees
One Hundred Seventy Three Crores Forty Seven Lacs Fifty Three
Thousand Four Hundred Twenty Five Only) as set out in particulars
of Claim at Exhibit “M” to the plaint.
e) This Hon’ble Court be pleased to pass an order of Mandatory
and Permanent Injunction against the Defendants, their servants,
agents, assigns and/or any other person acting through or under
them from in any manner directly or indirectly dealing wi th or
disposing of or alienating or parting with the possession of or
creating third party rights in respect of the premises coming to the
share of the Defendants in Wings “A” & “B” of the building
“Bay-View” situated on the property described in Exhibit “A” to
the plaint without first delivering to the Plaintiff, the possession of
22500 sq.ft. constructed areas per SRA sanctioned plan w ith
proportionate car parking space in the form of 12 flats in Wings
“A” and “B” of the building “Bay –View” situated on the property
described in Exhibit “A” to the plaint and 24 car parking spaces.”
20. During the pendency of the suit for aforementioned reliefs,
respondent No.1/plaintiff filed Notice of Motion No.147/2013 for th e
following interim reliefs:
“(a) Pending the hearing and final disposal of the present suit, this
Hon’ble Court be pleased to injunct the Defendants, servants ,
agents, assigns and/or any other persons acting through or under
them from in any manner directly or indirectly dealing wi th or
disposing of or alienating or parting with the possession of or
creating third party rights in respect of the premises coming to the
share of the Defendants in Wings “A” & “B” of the building
“Bay-View” situated on the property described in Exhibit “A” to
the Plaint without first delivering to the Plaintiff, the possession of
22500 sq.ft. constructed areas per SRA sanctioned plan w ith
proportionate car parking space in the form of 12 flats in Wings
63
“A” and “B” of the building “Bay-View” situated on the property
described in Exhibit “A” to the plaint and 24 car parking spaces.
(b) Pending the hearing and final disposal of the present suit, this
Hon’ble Court be pleased to appoint Court Receiver, High Court,
Bombay and/or such other fit and proper person as Receiver of
premises coming to the share of the Defendant No.1 in Wings
“A” & “B” of the building “Bay-View” situated on the property
described in the Exhibit “A” to the Plaint with all powers under
Order XL Rule 1 of the Code of Civil Procedure Code 1908
including the power to take possession of premises coming to the
share of the Defendant No.1 in Wings “A” and “B” of the building
“Bay-View” situated on the property described in the Exhibit “A”
to the plaint and hand over to the Plaintiff the possessio n of
constructed area as per SRA sanctioned plan in the free sale
building in the form of 12 flats in Wings “A” and “B” of the building
“Bay-View” situated on the property described in Exhibit “A” to
the Plaint and 24 car parking spaces.
(c) ad interim reliefs in terms of prayer (a) & (b).
(d) for costs of the suit;
(e) for such further and other reliefs as this Hon’ble C ourt may
deem fit and proper in the nature and circumstances of the case.”
21. Indeed, the learned Single Judge of the High Court granted
ad-interim relief on 3 rd December, 2012 during the pendency of the
Notice of Motion. The same reads thus:
“Heard the Learned Senior Advocates appearing for the parties.
The following order is passed by consent without going into the
merits of the case and keeping all the contentions of the parties
open.
(i) The Defendants shall not sell, dispose of, alienate, encumber,
part with possession and/or create third party rights in respect of
4 flats in Wing “A” and 4 flats in Wing “B” which flats are
already constructed and occupation certificate is obtai ned in
respect of the same. The said 8 flats are identifie d on the
sanctioned plan which is taken on record and marked “X” for
identification.
SAMIR NARAIN BHOJWANI v. M/S. AURORA PROPERTIES
AND INVESTMENTS [A. M. KHANWILKAR, J.]
(ii) The Defendants shall also not sell, dispose of, alienate,
encumber, part with possession and/or create third party rights in
respect of 4 flats in Wing “C”, the construction of which is in
progress. The said four flats are identified on the plan tendered in
Court and marked “X”.
(iii) It is clarified that the above 12 flats pertain to 45 per cent
share in flats of Defendant No.1 as per the agreements ent ered
into by and between Defendant Nos.1 and 2. The Defendant No.2
has informed the Court that Defendant No.2 will be contending
that Defendant No.1 is not entitled to their 45 per cent share in
the flats so constructed on the ground that Defendant No.1 has
allegedly not complied with their obligations under the Agreements.
(iv) The Defendants shall also not sell, dispose of, alienate,
encumber, part with possession and/or create third party rights in
respect of the proportionate car parking spaces in respec t of the
above 12 flats also identified on the plan marked “X”.
2. Place the above Notice of Motion along with Notice of Motion
(L) NO.3338 of 2012 taken out by Defendant No.2 und er
Section 8 of the Arbitration and Conciliation Act, 1996 for hearing
and final disposal on 15 th January, 2013.”
The aforementioned order was corrected on 17 th December, 2012
in the following terms:
“This application is for speaking to the minutes of the order dated
3rd December, 2012.
2. In clause (i), 4 flats in Wing “A” and 4 flats in Wing “B” be
read as 5 flats in Wing “A” and 3 flats in Wing “B”.
Application is accordingly disposed of.”
22. The said ad-interim arrangement continued durin g the
pendency of Notice of Motion. However, while finally disposing of the
Notice of Motion No. 147/2013, the learned Single Judge of the High
Court vide judgment and order dated 9 th October, 2017 passed a
mandatory order directing the appellant to hand over 8 flats and 16
parking spaces to respondent No.1/plaintiff. For pa ssing such
mandatory order the learned Single Judge placed rel iance on the
decision of this Court in Gaiv Dinshaw Irani and Others Versus
65
Tehmtan Irani and Others 1, holding that the Courts ought to mould the
relief in accordance with the changed circumstances for tr ying the
litigation or to do complete justice. The view so taken by the learned
Single Judge commended to the Division Bench.
23. What has, however, been glossed over by the High Court is
that the Settlement Agreement dated 4 th November, 2016 and the
Consent Terms dated 29 th September, 2017 have been entered into
between the respondent No.1/plaintiff and respondent No.2/defendant
No.1 inter partes . That could not be thrust upon the appellant/
defendant No.2 who had executed a separate agreemen t with
respondent No.2/defendant No.1. The appellant could be bound only by
the agreement dated 10 March, 2003 in his favour and executed by him.
Admittedly, the said agreement is the subject matter of a rbitration
proceedings, inter alia because respondent No.2 had failed to discharge
its obligation thereunder. The appellant has already parted wi th the
possession of flats to respondent No.2 in furtherance of agreement dated
10 th March, 2003 and respondent No.1/plaintiff could be accommodated
only against those flats. Asking the appellant to hand over additional 8
flats and 16 parking spaces by way of mandatory order, would b e to
superimpose the liability of respondent No.2/defendant No.1 on the
appellant for discharging its obligation qua respondent No.1/plaintiff in
relation to the agreement entered between them dated 22 nd September,
1999 and including Settlement Agreement dated 4 th November, 2016
and Consent Terms dated 25 th September, 2017, to which the appellant
is not a party.
24. That apart, the learned Single Judge as well as the Division
Bench have committed fundamental error in applying the princip le of
moulding of relief which could at best be resorted to at the time of
consideration of final relief in the main suit and not at an interlocutory
stage. The nature of order passed against the appellant is undeniably a
mandatory order at an interlocutory stage. There is marked distinction
between moulding of relief and granting mandatory r elief at an
interlocutory stage. As regards the latter, that can be gr anted only to
restore the status quo and not to establish a new set of things differin g
from the state which existed at the date when the suit was instituted.
This Court in Dorab Cawasji Warden Versus Coomi Sorab Warden
and Others ,2 has had occasion to consider the circumstances
1(2014) 8 SCC 294
2(1990) 2 SCC 117
SAMIR NARAIN BHOJWANI v. M/S. AURORA PROPERTIES
AND INVESTMENTS [A. M. KHANWILKAR, J.]
warranting grant of interlocutory mandatory injunction. In paragraphs
16 & 17, after analysing the legal precedents on the point as noticed in
paragraphs 11-15, the Court went on to observe as follows:
“16. The relief of interlocutory mandatory injunctions are
thus granted generally to preserve or restore the s tatus
quo of the last non-contested status which preceded the
pending controversy until the final hearing when full rel ief
may be granted or to compel the undoing of those acts that
have been illegally done or the restoration of that which
was wrongfully taken from the party complaining . But since
the granting of such an injunction to a party who fails or would fail
to establish his right at the trial may cause great injus tice or
irreparable harm to the party against whom it was granted or
alternatively not granting of it to a party who succeeds or would
succeed may equally cause great injustice or irreparable har m,
courts have evolved certain guidelines. Generally stated these
guidelines are:
(1) The plaintiff has a strong case for trial. That is, it shal l
be of a higher standard than a prima facie case that is norma lly
required for a prohibitory injunction.
(2) It is necessary to prevent irreparable or seri ous injury
which normally cannot be compensated in terms of money.
(3) The balance of convenience is in favour of the one seeking
such relief.
17. Being essentially an equitable relief the grant or refusal of an
interlocutory mandatory injunction shall ultimately rest in the sound
judicial discretion of the court to be exercised in the light of the
facts and circumstances in each case. Though the above guidelines
are neither exhaustive nor complete or absolute rules, and the re
may be exceptional circumstances needing action, applying them
as prerequisite for the grant or refusal of such injunctions would
be a sound exercise of a judicial discretion.”
(emphasis supplied)
25. The Court, amongst others, rested its exposition on the
dictum in Halsbury’s Laws of England, 4 th edition, Volume 24,
paragraph 948, which reads thus:
67
“A mandatory injunction can be granted on an interlocutory
application as well as at the hearing, but, in the absence of special
circumstances, it will not normally be granted. However, if the
case is clear and one which the court thinks ought to be decided
at once, or if the act done is a simple and summary one which can
be easily remedied, or if the defendant attempts to steal a march
on the plaintiff, such as where, on receipt of notice that an injunction
is about to be applied for, the defendant hurries on the work in
respect of which complaint is made so that when he receives
notice of an interim injunction it is completed, a ma ndatory
injunction will be granted on an interlocutory application.”
26. The principle expounded in this decision has bee n
consistently followed by this Court. It is well established that an interim
mandatory injunction is not a remedy that is easily granted. It is an order
that is passed only in circumstances which are clear and th e prima
facie material clearly justify a finding that the status quo ha s been
altered by one of the parties to the litigation and the interests of justice
demanded that the status quo ante be restored by way of an interim
mandatory injunction. (See Metro Marins and Another Versus Bonus
Watch Co. (P) Ltd. and Others 3, Kishore Kumar Khaitan and
Another Versus Praveen Kumar Singh 4 and Purshottam Vishandas
Raheja and Another Versus Shrichand Vishandas Raheja (Dead)
through LRS. and Others 5)
27. In the factual scenario in which mandatory order has bee n
passed against the appellant, in our opinion, is in excess of jurisdiction.
Such a drastic order at an interlocutory stage ought to be esch ewed. It
cannot be countenanced.
28. Reverting to the decision in Gaiv Dinshaw Irani, (supra),
relied upon by the High Court, the Court moulded the relief in favour of
the party to the proceedings to do substantial justice whil st finally
disposing of the proceedings and did not do so at an interlocutory stage.
In other words, reliance placed on the principle of moulding of relief is
inapposite to the fact situation of the present case.
29.Resultantly, the invocation of principle of moulding of reliefs
so also the exercise of power to grant mandatory or der at an
3(2004) 7 SCC 478
4(2006) 3 SCC 312
5(2011) 6 SCC 73
SAMIR NARAIN BHOJWANI v. M/S. AURORA PROPERTIES
AND INVESTMENTS [A. M. KHANWILKAR, J.]
interlocutory stage, is manifestly wrong. To put it differ ently, while
analysing the merits of the contentions the High Court was swayed away
by the consent agreement between the respondents inter partes to which
the appellant was not a party. Thus, he could not be b ound by the
arrangement agreed upon between the respondents inter se. The
appellant would be bound only by the agreement ente red with
respondent No.2 dated 10 th March, 2003 and at best the tripartite
agreement dated 11 th September, 2009. The respondent No.2 having
failed to discharge its obligation under the stated agree ment dated
10 th March, 2003, cannot be permitted to take advantage of its ow n
wrong in reference to the arrangement agreed upon by it with
respondent No.1/plaintiff and including to defeat th e claim of the
appellant in the arbitration proceedings.
30. It would have been a different matter if the High Court were
to continue the ad-interim arrangement directed in terms of order dated
3rd December, 2012 and as corrected on 17 th December, 2012, until the
final disposal of the suit. However, by no stretch of imaginat ion, the
appellant could be directed to hand over 8 additional flats and 16 parking
spaces to respondent No.1 with whom the appellant h as had no
independent agreement in that regard. The fact that responden t No.1
would get a right in the suit property in terms of agreem ent dated
22 nd September, 1999, Settlement Agreement dated 4 th November, 2016
and Consent Terms dated 25 th September, 2017 with respondent No.2,
cannot be the basis to set up a claim against the appellant and, especially
because complying with the directions in the impugned order woul d
result in bestowing advantage on respondent No.2 who has failed to
discharge its obligation under the agreement dated 10 th March, 2003
with the appellant.
31. In view of the above, we have no hesitation to conclude that
the High Court committed manifest error and exceeded its jurisdiction
in granting interlocutory mandatory injunction against the appellant.
32.Accordingly, the impugned judgment and order passed by the
High Court deserves to be set aside but while doing so, we de em it
appropriate to revive the ad-interim order passed by the Single Judge of
the High Court on 3 rd December, 2012 in Notice of Motion No.147/2013
and as corrected on 17 th December, 2012, which shall operate until the
disposal of the suit or until it is modified by the High Court on account of
subsequent developments, if any, as and when occasion arises.
69
33. While parting, we make it clear that the observations made in
this judgment are only for considering the matter in issue under
consideration and shall not influence the substanti ve proceedings
pending between the parties. The same be decided on its own merits.
34.The appeal is allowed in the aforementioned terms. No costs.
Nidhi Jain Appeal allowed.