Common Cause v. Union of India & Ors.
MADAN B. LOKUR, J.
1. In this batch of substantive applications, we are concer ned
with what is described as “Illegalities involved in the mini ng lease of
Sarda Mines Private Limited”by the Central Empowered Committee in
its report of 16 th October, 2014.
2. It is not necessary to repeat all the facts leading u p to these
applications since the background has already been detailed b y us in
Common Cause v. State of Orissa .1
1 (2017) 9 SCC499
1207
3. While dealing with the mining lease of Sarda Mines Privat e
Limited, the Central Empowered Committee or the CEC concerned itself
with seven issues. They are:
1. Regarding renewal of the mining lease.
2. Regarding validity of the Environmental Clearance.
3. Regarding sale of iron ore in the form of ROM by Sarda Mines
Private Limited.
4. Regarding diversion of additional land for mining and allied
activities
5. Regarding production of iron ore without/in excess of the
Environmental clearance.
6. Regarding enquiry done by the State Government for alleged
violation of Rule 37, MCR, 1960 [Mineral Concession Rules of
1960].
7. Regarding alleged ownership of the mining lease actually being
with Jindal Steel and Power Ltd.
4. For the present, we are concerned only with the validity of the
environmental clearance granted to Sarda Mines Private Limited or SMPL
and the production of iron ore without/in excess of the environ mental
clearance. The concern relates to a mining lease granted to SMPL over
947.046 hectares of land for 20 years from 14 th August, 2001 to 13 th
August, 2021.The mining lease is of Thakurani Mines, Block B, Village
Soyabali, District Keonjhar in Odisha. We are not concerne d with the
validity or otherwise of the grant or renewal of the mining lease to SMPL.
Grant of permission to mine
5. It has been pointed out to us and this is not disputed, that SMPL
was granted permission on 13 th July, 1999 to extract 1,40,000 MT of iron
ore per annum.The permission granted clearly indicates that it is in the
context of reopening (to the extent of broken up area of 94.02 4 acres)
the existing mine where the highest production was 1,39,802.00 MT
during 1966 as certified by the Deputy Director (Mines). The said
extraction or production was of iron ore and the permissiongra nted in
1999 was also for extraction or production of iron ore. This was in accord
COMMON CAUSE v. UNION OF INDIA & ORS.
[MADAN B. LOKUR, J.]
with the provisions of the Mines and Minerals (Develop ment and
Regulation) Act, 1957 (MMDR Act) that permits mining of the mineral
iron ore.
The permission granted on 13 th July, 1999reads as follows:
“Subject : Reopening of iron ore mines in Block-B in village
Soyabali of Thakurani iron ore mines in District
Keonjhar, Orissa - clarifications reg.
Sir,
This has reference to letter of 10 th June, 1999 jointly from you
and Shri M.L. Sarda seeking clarification on applicability of
the provisions of the EIA Notification of 1994. We have noted
the following:
(i) The Department of Steel and Mines, Government of Orissa
has agreed to renew mining lease in respect of Block-B
covering an area of 2340.20 acres in village Soyabali of
the Thakurani iron ore mines in favour of Shri S.L. Sarda
and Shri M.L. Sarda.
(ii) The entire lease area is in reserve forest for whichde-
reservation proposal has been forwarded by the DFO,
Keonjhar to the PCCF, Bhubaneswar.
(iii) Already broken up area is 94.024 acres.
(iv) Highest production from Block-B mines was 1,39,802.00
MT during 1966 as certified by Dy. Director (Mines),
Joda, Keonjhar in his letter No. 7892 dated 26.5.99.
(v) Applications have been submitted to Orissa State Pollution
Control Board for obtaining “consent to operate” and IBM
for approval of mining plan.
Further, it has been noted that you are planning to reopen the
mine sometimes by the end of 1999 without change in broken
up area and production level. Also there is no plan to modernise
the mine. It has also been noted that wet drilling will be adopted
on working phases. Besides management of surface run off,
mine water discharge and plantation of OB dumps, wate r
spraying on haul roads, transfer points and crushing plant will
be done regularly.
1209
The provisions of EIA Notification of 1994 are not applicable
to the renewal of mining lease proposals that do not involve
expansion or modernisation. However, you should confine
excavation only to already broken up area of 94.024 acres as
per mining plan approved and limit production to 1,40,000 MTPA
[TPA?]. You are also advised to obtain other statu tory
approvals from the concerned authorities including the forestry
clearance under the Forest (Conservation) Act, 1980 and ensure
compliance with the general environmental conditions as
indicated in Annexure-I. In case, you plan any expansion or
modernisation then prior approval under the provisions of the
EIA Notification of 1994 as amended subsequently should be
obtained from the Ministry.”
6. Again, the admitted position is that SMPL did not act upon the
permission granted on 13 th July, 1999 till 13/14 August, 2001. The apparent
reason is that the mining lease in favour of SMPL was renewed only on
13/14 August, 2001. It is only after the mining lease was renewed that
SMPL started mining or extracting iron ore on the basis of the permission
granted on 13 th July, 1999.
Grant of environmental clearance
7. The next important date that we are concerned with is 22 nd
September, 2004 that is the date on which SMPL was granted
environmental clearance for the extraction of iron ore. The environmental
clearance granted to SMPL was for expansion of production of iron ore
(lump) from 1.5 lakh tonnes per annum (LTPA) to 4.0 million tonnes per
annum (MTPA). There was a progressive gradation in the produc tion
capacity inasmuch as during the first year the increase in p roduction
was permitted from 1.5 LTPA to 0.5 MTPA; 3.0 MTPA by the third
year and 3.750 MTPA from the fifth year to achieve the rated capacity
in production of 4.0 MTPA during the 17 th year.
8. However, what is strange about the environmental cleara nce
granted to SMPL on 22 nd September, 2004 is that it referred to the
“proposalfor expansion of production of iron ore (lump)” from 1.5 LTPA
to 4.0 MTPA. In fact, the permission granted on 13 th July, 1999 was for
production of iron ore and not for iron ore (lump). It is not even the case
of SMPL that it was granted the permission on 13 th July, 1999 for the
extraction or production of iron ore (lump), Moreover, the MMDR Act
refers to the mineral iron ore and not to iron ore (lump).The concept of
COMMON CAUSE v. UNION OF INDIA & ORS.
[MADAN B. LOKUR, J.]
extraction or production of iron ore (lump) introduced in the environmental
clearance was alien to the permission granted on 13 th July, 1999 and the
MMDR Act. Therefore, the environmental clearance granted on 2 2 nd
September, 2004 must be understood in the context of the permission
granted on 13 th July, 1999 and the MMDR Act. If so appreciated, then it
is clear that environmental clearance was granted to SMPL only related
to the expansion of production of iron ore from 1.5 LTPA to 4.0 MTPA.
As mentioned above, it is not even the case of SMPL that it was granted
permission to extract iron ore (lump) to the extent of 1.4 LTPA in terms
of the permission granted on 13 th July, 1999. Our understanding of the
environmental clearance in this context and in this regard keeping these
factors in mind is of considerable importance insofar as the decision in
the applications is concerned, as will be apparent a little later.
Retrospective effect of the environmental clearance
9. Learned counsel for SMPL did not contest or dispute that an
environmental clearance does not have any retrospective e ffect. It is
operational from the date it is granted. In any event, this issue is no
longer res integra having been settled in the decision rendered
in CommonCause in paragraph 87 of the Report. The submission made,
however, was that the benefit of retrospectivity of the environmental
clearance should be given to SMPL from the date on which the mining
lease was renewed, that is, with effect from 13/14 August, 2001. The
reason for claiming this benefit is that the expanded permissible production
would then commence from August 2001 and SMPL would be entitled
to extract a larger quantity of iron ore with the progressive gradation
given in the environmental clearance with the result that the 3 rd year of
production would be 2004 and the 5 th year of production would be 2006
and not 2009. Similarly, the 17 th year of production would be 2018 and
not 2021.
10. We simply cannot accept this submission since it is pla inly
contrary to the decision of this Court in Common Cause . Moreover and
additionally, accepting the submission would mean that for the period
from 13/14 August, 2001 till 22 nd September, 2004 SMPL would have
the benefit of the permission granted on 13 th July, 1999 as well as the
retrospective benefit of the environmental clearanc e dated 22 nd
September, 2004 meaning thereby that SMPL would have two mini ng
permissions, which is obviously not possible . However, we cannot deny
1211
to SMPL the benefit of the permission granted on 13 th July, 1999 on the
basis of which SMPL carried out mining activities from the date of renewal
of the mining lease that is 13/14 August, 2001 till 22 nd September, 2004.
Even learned Amicus does not have any objection to granting the benefit
of the permission to SMPL for this period, to the extent th at SMPL
extracted or produced 1.4 LTPA of iron ore during this period. Therefore,
the mining activity carried out by SMPL from 13/14 August, 2001 till the
date of the environmental clearance, that is, 22 nd September, 2004 is
legal to the extent of 1.4 LTPA and SMPL cannot be penalised for this
mining activity during this period.
11. It was submitted by learned counsel for SMPL that if t he
environmental clearance is not given retrospective effect then it would
mean that its validity would not be co-extensive with the te rm of the
mining lease. Resultantly, theoperation of the environmental clearance
though granted for the life of the mining lease would necessa rily be
curtailed to the detriment of SMPL. This submission is noted only to be
rejected. The submission made can hardly be a ground for giving
retrospective effect to the environmental clearance. If the life of the
environmental clearance is curtailed due to operation of the law, then so
be it.
12. Learned counsel for SMPL has shown us a Summary ofthe
Project, Environmental Impact Assessment and Enviro nmental
Management Plan relating to the proposed expansion of the Thakurani
iron ore mine, Block-B, District Keonjhar, Orissa. This document is of
February 2002 and is to be found on page 25 of volume 168 of the paper
book. He has drawn our attention to page 28 thereof which rela tes to
the mining proposed by open-cast method using drilling and blas ting.
The production build-up is given in the form of a chart but it takes 2001-
2002 as the first year of production. This is obviously on the assumption
that the environmental clearance relates back to the date of renew al of
the mining lease in 2001. However, since we have hel d that the
environmental clearance does not and cannot have any retrosp ective
effect, the first year of production should in fact be 2004-2005 (pro rata)
based on the environmental clearance. On the basis of the chart pointed
out by learned counsel for SMPL, it is quite clear that there has been
excess mining of iron ore from the first year of production i tself. This
excess mining is clearly illegal and must be penalised in terms of our
judgement in Common Cause .
COMMON CAUSE v. UNION OF INDIA & ORS.
[MADAN B. LOKUR, J.]
13. We leave it to the Central Empowered Committee (CEC) t o
quantify the penalty to be imposed on SMPL from 22 nd September, 2004
and based on the terms of the environmental clearance. The calculation
should also take into consideration our conclusion that the environmental
clearance is not retrospective and the first year of production, in view of
the environmental clearance granted to SMPL would be 2004-2005. Any
mining in excess of the environmental clearance by SMPL would be and
is illegal.
Extraction of iron ore (lump)
14. The main rub of the controversy before us lies in the
terminology employed in the environmental clearance granted to SMPL
- whether it was entitled to extract iron ore (lump) or m ineral iron
ore,within the limits laid down in the environmental clearance.
15. Before resolving this controversy, it must be clearly understood
that extraction of the mineral iron ore is the extraction of iron ore Run of
Mine or ROM. Lumps of iron ore are, in a sense, a by-product of ROM
as are topsoil, mineral rejects, sub-grade ore and fines and the distinctions
made are for the purposes of payment of royalty. The subm ission of
learned counsel for SMPL is to the effect that SMPL was entit led to
extract iron ore (lump) in terms of the environmental clearanc e. If this
submission is to be taken literally, then SMPL was entit led to extract
only iron ore (lump) without extracting iron ore ROM. This would b e
much like the argument put forth by Portia enabling Shylock to extract
his pound of flesh without spilling a drop of blood. However, we need
not take a decision in this regard merely on semantics.
16. That lumps are a by-product of the extraction of iron ore
ROM is clear from the decision of this Court rendered in National
Mineral Development Corporation Ltd. v. State of M.P .2 wherein this
Court noted the process of winning the mineral as described by the
appellant therein in the following words:
“Iron ore deposits occur mostly in the hill ranges and iron ore is
found on the top of the hill i.e. on the surface. The process by
which the mineral is won has been described by the appellant as
under:
“The ore is extracted by opencast method of mining for which
mining benches are prepared. Firstly, holes are drilled on the
benches covering the entire height of the bench at regula r
2 (2004) 6 SCC 281
1213
distance depending on ore types. After charging of the holes
with explosives this portion of the bench is blasted. The blasted
material known as ROM (run-of-mines) consists of large
boulders, fragments and fines along with other
contaminants. ROM is transported to crushing plant by
dumpers and crushed to below 150 mm sizes. This
crushed ROM contains lump, fines and also
contaminants such as alumina and silica . The crushed ore
is transported to screening plant through conveyor belts and is
washed with water and screened in vibrating screens. Vibrating
screens segregate ore into different sizes such as lump,
calibrated ore and fines……” (Emphasis supplied by us).
17. Similarly, in Tata Steel Limited v. Union of India 3 it was
observed that in the process of mining, iron ore is extrac ted (that is
ROM) and separated into ore lumps, fines and waste material which is
commonly known as slime.
18. Looked at in this light, the context in which permission was
granted to SMPL on 13 th July, 1999 is important. Permission was granted
to SMPL to extract the mineral iron ore. This had no reference at all to
the sub-category or by-product called iron ore (lump) b ut must be
understood as permission to extract mineral iron ore ROM. It was this
permission that was sought to be proposed for expansion of production
and if it is looked at in this contemporaneous or historical (whichever)
background, then it is quite obvious that the environmental cle arance
granted on 22 nd September, 2004 was only with reference toiron ore
ROM. This must also be read in the context of the MMDR Act whic h
refers to the mineral iron ore and does not refer toiron ore (lump). A
combination of these two factors convinces us that the environ mental
clearance granted to SMPL was only with reference toiron ore ROM
and notiron ore (lump), notwithstanding the terminology employed in the
environmental clearance.
19. Taking the view as canvassed by learned counsel for SM PL
would lead to a rather anomalous situation wherein, for the purposes of
extracting iron ore (lump) of a permissible quantity, SMPL could extract
as much iron ore ROM as it desired. In other words, for the purposes of
extracting iron ore (lump) of 4.0 MTPA could it be said that SMPL was
entitled to extract iron ore ROM to the extent of 6.0 MTPA or even 8.0
3 (2015) 6 SCC 193
COMMON CAUSE v. UNION OF INDIA & ORS.
[MADAN B. LOKUR, J.]
MTPA? The answer to this is certainly in the negative ot herwise the
environmental clearance granted to SMPL would be devoid of any rational
meaning whatsoever. Also taking this into consideration, it does appear
to us that though the environmental clearance granted to S MPL was
unhappily worded, it must be given a realistic meaning so that it is not
rendered ineffective on the ground of vagueness and to the detriment of
the environment as also to the detriment of SMPL.
20. In this context, it is necessary to refer to the Summary of the
Project, Environmental Impact Assessment and Enviro nmental
Management Plan of February 2002 placed on record by SMPL in
volume 168 of the paper book. The table or chart on page 28 thereof and
which forms a part of the document indicates that for the production ore
extraction of iron ore (lump) the total excavation of iron ore ROM
proposed is almost double the quantity. The chart is as follows:
21. It is quite clear to us even from the above chart th at the
interpretation sought to be given by learned counsel for SMPL t o the
environmental clearance was never intended and if it was, t hen the
Y ea rs Lu mp O re
(+ 5 1 80m
a n d 3 0 +
1 8m) (M T)
To tal
E xcav a tion
(M T)
R O M
(M T)
To p
S o il
(M T)
M iner al
r ejects
(M T)
S ub gra d e
O re (M T)
Fin es ,
5 mm
(M T)
1 st year
200 1200 2
0.500 1 .1 51 0 .770 0.000 0.3 4 9 0 .032 0. 270
2 nd y ear
200 2200 3
1.196 2 .1 59 1 .840 0.000 0.2 67 0 .052 0 . 6 44
3 r d y ear
200 3200 4
1.976 3 .4 99 3 .040 0.000 0.1 2 1 0 .338 1. 064
4
t h
y ea r
200 4200 5
2.990 4 .8 29 4 .600 0.000 0.1 83 0 .046 1 . 6 10
5 t h y ea r
200 5200 6
3.750 6 .0 58 5 .770 0.000 0.2 31 0 .057 2 . 0 20
Su b Tot al 10.41 2 17 .696 1 6.02 0 0.000 1.1 51 0 .525 5 . 6 06
200 7 201 1 18.75 0 33 .571 2 8.85 0 0.024 1.3 42 3 .355 10 .1 00
201 2201 6 18.75 0 33 .547 2 8.85 0 0.000 1.3 4 2 3 .355 10. 100
201 7 202 1 20.00 35 .779 3 0.77 0 0.000 1.4 31 3 .578 10 .7 70
Gr an d To tal 67.91 2 120 .5 93 1 04.9 0 0.024 5.2 66 10 .813 36 .5 76
1215
unfortunate consequence would be that the environmental clearanc e
must be held to be invalid and quashed, resulting in greater damag e to
the interests of SMPL than envisaged. On a realistic inte rpretation to
the environmental clearance, for the purposes of calculating exc ess or
illegal production of iron ore, the entire extraction of iron ore ROM is
required to be taken into consideration.
22. We may note in this context that it has come on record that
the entire iron ore ROM extracted by SMPL is actually sold to Jindal
Steel and Power Ltd. or JSPL and it is not only iron ore (lump) that is
sold to JSPL. In this factual background, the issue of the rela tionship
between SMPL and JSPL arises but we are not concerned with this for
the present. However, what is more important is that it is the sale of iron
ore ROM that is made by SMPL to JSPL and not the sale of iron ore
(lump). In other words, SMPL is desirous of taking full advantage of its
extraction and production of iron ore ROM but at the same time shying
away from the legal consequences that follow.
23. It was submitted by learned counsel for SMPL that the CEC
has confused itself between extraction or production of iron ore ROM
and extraction or production of iron ore (lump) and as a consequence, it
has arrived at an incorrect figure of excess or illegal mining by SMPL.
In fact, the contention is that SMPL has neither been involved i n any
excess or illegal mining and the conclusions arrived at by the CEC are
totally incorrect. We cannot accept this submission i n view of the
discussion above, including the conduct and activities of SMP L, the
provisions of the MMDR Act and the context in which the permission
and environmental clearance was granted to SMPL. Un der the
circumstances, we find no merit in the objections raised by SMPL to the
report of the CEC with regard to the validity of the envi ronmental
clearance or the excess or illegal mining of iron ore by SMPL.
24. However, in view of our conclusion, the CEC might have to
rework the quantum of excessive or illegal mining carried out by SMPL
and the consequent penalty. For this, we grant 6 weeks’ time to the CEC
to do the needful. All records relevant for arriving at a decision should
be made available by SMPL and the concerned authorities to the CEC.
25. The substantive applications are disposed of to the above extent
and in terms of the above directions.
COMMON CAUSE v. UNION OF INDIA & ORS.
[MADAN B. LOKUR, J.]
Devika Gujral IAs disposed of.