Board of Control for Cricket in India v. Kochi Cricket Pvt. Ltd. and Etc.
R. F. NARIMAN, J. 1. Leave granted.
2. The present batch of appeals raises an important question as to
the construction of Section 26 of the Arbitration an d Conciliation
(Amendment) Act, 2015 (hereinafter referred to as the “Amendmen t
Act”), which reads as follows:
“Section 26. Act not to apply to pending arbitral
proceedings.
Nothing contained in this Act shall apply to the ar bitral
proceedings commenced, in accordance with the provisions of
section 21 of the principal Act, before the commencement of
this Act unless the parties otherwise agree but this A ct shall
apply in relation to arbitral proceedings commenced on or after
the date of commencement of this Act.”
3. The questions raised in these appeals require the mentioning of
only a few important dates. In four of these appeals, namely, Board of
Control for Cricket in India v. Kochi Cricket Pvt. Ltd. and Ors .
(SLP(C) No. 19545-19546 of 2016), Arup Deb & Ors. v. Global Asia
Venture Company (SLP(C) No. 20224 of 2016), M/s Maharashtra
Airports Development Company Ltd. v. M/s PBA Infrastructur e
Ltd. (SLP(C) No.5021 of 2017) and UB Cotton Pvt. Ltd. v. Jayshri
Ginning and Spinning Pvt. Ltd. (SLP(C) No.33690 of 2017), Section
34 applications under the Arbitration and Conciliat ion Act, 1996
(hereinafter referred to as the “1996 Act”) were all fi led prior to the
coming into force of the Amendment Act w.e.f. 23 rd October, 2015. In
the other four appeals, the Section 34 applications were filed after the
Amendment Act came into force. The question with which we ar e
confronted is as to whether Section 36, which was substitute d by the
Amendment Act, would apply in its amended form or in its original form
to the appeals in question.
4. The relevant facts of the first appeal namely, Board of Control
for Cricket in India v. Kochi Cricket Pvt. Ltd. and Ors. (SLP(C)
841
Nos. 19545-19546 of 2016), are as follows. A notice dated 18 th January,
2012 was sent by Respondent No.1 invoking arbitration under a franchise
agreement dated 12 th March, 2011. A Sole Arbitrator was appointed,
who delivered two arbitral awards dated 22 nd June, 2015 against the
Appellant and in favour of the Respondents. On 16 th September, 2015,
the Appellants filed an application under Section 34 of the 1996 Act in
the Bombay High Court challenging the aforesaid arbitral awards. On
26 th November, 2015, the Respondents filed two execution applications
in the High Court for payment of the amounts awarded under the two
awards, pending enforcement of such awards. These were resisted by
two Chamber Summons filed by the Appellants dated 3 rd December,
2015, praying for dismissal of the aforesaid execution applications stating
that the old Section 36 would be applicable, and that, therefore, there
would be an automatic stay of the awards until the Section 34 proceedings
had been decided. The Chamber Summons were argued before a
learned Single Judge, who, by the impugned judgment in Special Leave
Petition (Civil) No.19545-19546 of 2016, dismissed the aforesaid Chamber
Summons and found that the amended Section 36 would be applicable in
the facts of this case. This is how the appeal from the aforesaid judgment
has come before us.
5. As aforementioned, the skeletal dates necessary to decide
the present appeals in the other cases would only be that so far as two
of the other appeals are concerned, namely, Arup Deb & Ors. v. Global
Asia Venture Company (SLP(C) No.20224 of 2016) and M/s
Maharashtra Airports Development Company Ltd. v. M/s P BA
Infrastructure Ltd. (SLP(C) No.5021 of 2017), the Section 34
applications were filed on 27 th April, 2015, and 25 th May, 2015 respectively
and the stay petitions or execution applications in those cases filed under
Section 36 were dated 16 th December, 2015 and 26 th October, 2016
respectively. In U.B. Cotton Pvt. Ltd. v. Jayshri Ginning and
Spinning Pvt. Ltd. (SLP(C) No.33690 of 2017), the Section 34
application was filed on 22 nd February, 2013 and the execution application
was filed in 2014, which was transferred, by an order dated 12 th January,
2017, to the Commercial Court, Rajkot as Execution Petition No. 1 of
2017. In the other cases, namely, Wind World (India) Ltd. v. Enercon
GMBH through its Director (SLP(C) Nos.8372-8373 of 2017),
Yogesh Mehra v. Enercon GMBH through its Director (SLP(C)
Nos.8376-8378 of 2017), Ajay Mehra v. Enercon GMBH through
its Director (SLP(C) Nos.8374-8375 of 2017), and Anuradha Bhatia
BOARD OF CONTROL FOR CRICKET IN INDIA v. KOCHI
CRICKET PVT. LTD. [R. F. NARIMAN, J.]
v. M/s Ardee Infrastructure Pvt. Ltd. (SLP(C) Nos.9599-9600 of
2017), the Section 34 applications were filed after 23 rd October, 2015,
viz., on 7 th December, 2016 in the first two appeals, on 6 th December,
2016 in the third appeal and on 4 th January, 2016 in the last appeal.
6. Section 36, which is the bone of contention in the present appeals,
is set out hereinbelow:
PRE-AMENDED PROVISION
“Section 36. Enforcement.
Where the time for making an application to set aside the arbitral
award under section 34 has expired, or such application having
been made, it has been refused, the award shall be enforced
under the Code of Civil Procedure, 1908 (5 of 1908) in the same
manner as if it were a decree of the Court.”
AMENDED PROVISION
“Section 36. Enforcement.
(1) Where the time for making an application to set aside the
arbitral award under section 34 has expired, then, subject to the
provisions of sub-section (2), such award shall be enforced i n
accordance with the provisions of the Code of Civil Procedure,
1908, in the same manner as if it were a decree of the court.
(2) Where an application to set aside the arbitral award has been
filed in the Court under section 34, the filing of such an application
shall not by itself render that award unenforceable, unless the
Court grants an order of stay of the operation of the said arbitral
award in accordance with the provisions of sub-section (3), on a
separate application made for that purpose.
(3) Upon filing of an application under sub-section (2) for stay of
the operation of the arbitral award, the Court may, subject to
such conditions as it may deem fit, grant stay of the operation of
such award for reasons to be recorded in writing:
Provided that the Court shall, while considering the application
for grant of stay in the case of an arbitral award for payment of
money, have due regard to the provisions for grant of stay of a
money decree under the provisions of the Code of Civil Procedure,
1908 (5 of 1908).”
843
6. Wide ranging arguments have been made on behalf of the parties
before us. Shri C.A. Sundaram, learned Senior Advocate, leadi ng the
charge on behalf of the Appellants, has argued that Sectio n 26 of the
Amendment Act consists of two parts. According to him, the sec ond
part, which makes the Amendment Act applicable in relation to arbitral
proceedings commenced on or after the date of commencement of this
Act, is the principal part, whereas the first part of Se ction 26 is in the
nature of a proviso or exception. It is his submission, therefore, that so
far as the first part is concerned, Section 6 of the General Clauses Act,
1897 would be attracted, in which event the vested right to cha llenge
arbitral awards would continue by virtue of the said Section un der the
old Act, which would, therefore, apply to the facts of all th ese cases.
For this purpose, he relied upon certain passages i n Thyssen
Stahlunion v. Steel Authority of India (1999) 9 SCC 334, N.S. Nayak
& Sons v. State of Goa (2003) 6 SCC 56, and Milkfood Ltd. v GMC
Ice Cream Pvt. Ltd. (2004) 7 SCC 288. Given the fact that the vested
right is preserved, the amendment is only prospective in nature, and for
this purpose, he has cited a large number of judgments, starting with the
celebrated judgment in Garikapati Veeraya v. N. Subbiah Choudhry
(1957) SCR 488. He then referred to a chart of the effect of the
amendments made in general by the Amendment Act, in which he divided
the amended sections into three parts, namely, those that are only
procedural, those that are only substantive and those that are procedural
as well as substantive. In his submission, Section 36 is s ubstantive in
nature, in that, in place of an automatic stay of the award under the old
regime, Order LXI, Rule 5 of the CPC will now be applicabl e. As a
result of this, instead of an automatic stay, a deposit of the entire amount
or substantial amount of the award would now have to be made i n the
interim period between the award and the decision in the S ection 34
application. He referred to the 246 th Law Commission Report as well as
the debates leading to the Amendment Act to buttress his submissions.
He also referred to the report of a High Level Committee headed by
Justice B.N. Srikrishna, delivered on 30 th July, 2017, in which, after
referring to the divergent views taken by the High Courts, the Committee
recommended that the Amendment Act will not apply t o arbitral
proceedings as well as Court proceedings which arise out of such arbitral
proceedings, where the arbitral proceedings themselves have commenced
in accordance with Section 21 before the commenceme nt of the
Amendment Act. Concomitantly, according to the High Level Committee,
BOARD OF CONTROL FOR CRICKET IN INDIA v. KOCHI
CRICKET PVT. LTD. [R. F. NARIMAN, J.]
the Amendment Act will only apply to arbitral proceedings commenced
on or after the commencement of the Amendment Act and to Cou rt
proceedings that arise out of or in relation to such arbitral proceedings.
8. Shri K.V. Viswanathan, learned Senior Advocate appearing on
behalf of the BCCI in Civil Appeal arising out of SLP(C) No.19546 of
2016, has argued that the expression “arbitral proceedings” in both parts
of Section 26 refers only to proceedings before an arbitrator and is the
same in both parts. Consequently, it is clear that i t is only arbitral
proceedings that have commenced after 23 rd October, 2015 and Court
proceedings in relation thereto, that will be governed by the Amendment
Act. If the arbitral proceedings have commenced under t he old Act,
then those proceedings as well as all Court proceedings in relation thereto,
would be governed only by the old Act. According to him, Section 6 of
the General Clauses Act would be attracted, insofar as Court proceedings
are concerned, when the first part of Section 26 is applied. According
to him, the second part would not become superfluous on his reading of
Section 26, as the option given to the parties would be gi ven only on
application of the first part and not the second. According to the learned
senior counsel, the judgment in Thyssen (supra) is determinative of the
present case, inasmuch as an entirely new challenge procedur e under
Section 34 is laid down by the amendments made in 2015, somewhat
like the challenge procedure laid down in the original Section 34 of the
1996 Act, when contrasted with Section 30 of the Arbitration Act, 1940.
According to the learned senior counsel, party autonom y must be
respected, and this being the position, parties who have ente red into
agreements in the expectation that the old regime will app ly cannot
suddenly be foisted with a completely different reg ime under the
Amendment Act. According to the learned senior counsel, Section 85
of the 1996 Act is similar to Section 26 of the Amendment Act and,
therefore, the judgment in Thyssen (supra) must apply on all fours.
The learned senior counsel also forcefully put to us a number of anomalies
that would arise if the amendment to Section 36 were to be given
retrospective operation. According to him, the right to be governed by
the broad appellate/supervisory procedure found in sections 34 and 37
of the 1996 Act would be a vested right, resulting in the Amendment Act
not being applicable. Insofar as Section 36 is concerned, t he learned
senior counsel made elaborate submissions on the differenc e between
enforceability and execution, and stated that whereas the form er dealt
with substantive rights, the latter dealt with procedural rights. Equally,
845
the expression “has been” contained in the amended Section 36(2) is
purely contextual and equivalent to the expression “is”. For this, he has
cited certain judgments which we will refer to in due course. According
to the learned senior counsel, the decision in National Aluminium Co.
Ltd. v. Pressteel & Fabrications (P) Ltd. (2004) 1 SCC 540, which
exhorted the legislature to amend Section 36, cannot take the matter any
further, in that the said decision cannot be read to say that Section 36
should be substituted with retrospective effect.
9. Shri Tushar Mehta, learned Additional Solicitor G eneral
appearing in SLP (C) No.5021 of 2017, supported the arguments of his
predecessor and added that, given a retrospective operation of Section
36, various anomalies would arise, which would lead to hardship and
inconvenience and that, therefore, we should not impart retrospec tive
operation to the aforesaid provision.
10. Shri Arvind Datar, learned senior advocate appearing in SLP
(C) No.20224 of 2016, supported Shri Viswanathan in stating that t he
amendments made by the Amendment Act were very far reaching and
changed the basis of challenge to arbitral awards. It would not be fair to
retrospectively change the rules of the game insofar as such awards are
concerned. According to the learned senior counsel, the expression “in
relation to” that was used in Section 85 of the 1996 Act, as expounded in
Thyssen (supra), was because Section 85 repealed three enactments
together, and not because it sought to refer to Court procee dings. He
reiterated that in the interest of clarity, the report of the High Level
Committee, headed by Justice B.N. Srikrishna referred to by Shri
Sundaram, was the correct position so that it clearly be delineated that
the moment arbitral proceedings commenced before the Amendme nt
Act, such “proceedings”, which would include all Court proceedings in
relation thereto, would be governed by the old Act, and only arbitral
proceedings commenced after the Amendment Act came into forc e,
together with related Court proceedings, would all be governed by the
Amendment Act.
11. Shri Anirudh Krishnan, learned Advocate appearing for the
intervenor in SLP (C) No.20224 of 2016, referred to Section 85A contained
in the 246 th Law Commission Report which, according to him, was given
a go-by and was not followed in Section 26. He referred to th e Law
Minister’s speech stating that the amendment must be given prospective
effect and further argued that the reason why the expression “in relation
BOARD OF CONTROL FOR CRICKET IN INDIA v. KOCHI
CRICKET PVT. LTD. [R. F. NARIMAN, J.]
to” was used in the second part of Section 26 was because a distinction
was made on whether the seat of the arbitral tribunal was in India or
outside India. According to the learned counsel, since amendments have
been made in Part II of the 1996 Act as well, if a seat based categorization
is seen, the expression “in relation to” would not apply to Court
proceedings simpliciter, but to arbitral tribunals wh ich have their seat
outside India. He further argued that Sections 34 and 36 are part of one
scheme and are the “appeal package” insofar as arbitral p roceedings
are concerned and must, therefore, go along with the arbitral proceedings.
This being the position, it is clear that the pre-amendment position would
apply in case of arbitrations which commenced before the Amendment
Act came into force.
12. Leading arguments for the other side, Shri Neeraj Kaul, learned
senior counsel appearing in SLP(C) Nos.19545-19546 of 2016,
emphasized that in the first part of Section 26, there is an absence of the
mention of Court proceedings. According to the learned senior counsel,
this was of great significance and would, therefore, s how that the
Amendment Act would retrospectively apply to Court proceedings, as
distinguished from arbitral proceedings. On a correct co nstruction of
Section 26, according to the learned senior counsel, the second part of
Section 26 takes within its sweep both arbitral proceedin gs as well as
Court proceedings in relation thereto and would, therefore, apply to arbitral
proceedings as well as Court proceedings in relation thereto, which have
commenced after the Amendment Act came into force. For this purpose,
he relied heavily on paragraph 23 in Thyssen (supra) and, submitted
that, therefore, on a true construction of Section 26, Section 34
proceedings that have commenced before the Amendment Act c ame
into force would be governed by the Amendment Act, and ar bitral
proceedings which commenced after the Amendment Act, together with
Section 34 applications made in relation thereto, would then be governed
under the second part of Section 26 of the Amendment Act. According
to the learned senior counsel, no vested right exists inasmuch as Section
34 proceedings are not appellate proceedings. In any case, Section 26
evinces a contrary intention and would take away any such right assuming
a vested right is involved. He countered the argume nts of Shri
Viswanathan, in particular, by stating that the original intent of the 1996
Act was to minimise Court intervention and to restrict the gr ounds of
challenge of arbitral awards, and inasmuch as the decisions of this Court
in ONGC v. Saw Pipes Ltd (2003) 5 SCC 705 and ONGC Ltd.
847
v. Western Geco International Ltd. (2014) 9 SCC 263 had gone
contrary to the original intention of the 1996 Act, all that the Amendment
Act did was to bring the 1996 Act back, in accordance with its original
intent, by nullifying the aforesaid judgments. He added that the ground
of patent illegality that had been added by the Amendment Act also
differs from the said ground as understood in the earlier case law, and
has been added only qua domestic and not international commercial
arbitrations. Learned senior counsel then argued that given the fact that
court proceedings in this country take an inordinately long time, the whole
object of the amendment to Section 36 would be stultified, if Section 36
is only to apply to court proceedings that result from arbitral proceedings,
which have commenced on and after the commencement of the
Amendment Act. That this could never be the case is clear from a
judgment of the House of Lords, reported as Minister of Public Works
of the Government of the State of Kuwait v. Sir Frederick Snow
and Partners , (1984) 2 WLR 340, which is strongly relied upon.
Learned senior counsel also stated that there is no distinction between
execution and enforcement, and “enforcement” under Section 36, is
nothing but execution of an award, as if it were a decree under the Code
of Civil Procedure, 1908. He further argued that it is well set tled that
execution proceedings are procedural in nature and would be retrospective
and, therefore, the substituted Section 36 would apply even in cases
where the Section 34 application is made before the commencement of
the Amendment Act. Another argument was that the expression “ has
been” contained in Section 36(2), as amended, would, in any case, refer
to Section 34 proceedings that have already been fil ed, even pre-
amendment, and for this purpose, he referred to certain judgments.
13. Shri P. Chidambaram, learned senior counsel appearing for
the Respondents in SLP (C) Nos.8372-8373 of 2017, emphasised the
word “but” that appears in Section 26, which not only segregate s the
first part of Section 36 from the second part, but also makes it clear that
the two parts apply to two different situations. The first part, according
to learned senior counsel, would apply to the arbitral proceedings
themselves i.e. from the Section 21 stage up to the Section 32 stage of
the 1996 Act, whereas the second part would include all proceedi ngs
that begin from the Section 21 stage and all court proceedings in relation
thereto. According to Shri Chidambaram, Section 36, in its original form,
is only a clog on the right of the decree holder. He argued that there is no
corresponding vested right in the judgment debtor to indefinitely delay
BOARD OF CONTROL FOR CRICKET IN INDIA v. KOCHI
CRICKET PVT. LTD. [R. F. NARIMAN, J.]
proceedings and for this purpose, he cited several judgments. According
to the learned senior counsel, Section 36 proceedings are entirely
independent of Section 34 proceedings and the moment Section 36 speaks
of an award being enforceable under the Code of Civil Procedure as if
it were a decree, enforceability only means execution and nothing else.
He then referred to Satish Kumar v. Surinder Kumar , (1969) 2 SCR
244 to show that an award is not mere waste paper when it is delivered
and before it becomes a decree, as it decides the rights o f the parties
and, therefore, being final and binding on parties, is a judgment delivered
between parties, which may become executable on certain condi tions
being met, but which do not detract from the fact that the award itself
has “vitality”.
14. Shri Kapil Sibal, learned senior counsel appearing on behalf of
the Respondents in SLP (C) Nos.8374-8375 of 2017, has argued before
us that the Statement of Objects and Reasons for the Amendment Act,
in particular paragraph 4 thereof, would make it clear that the Amendment
Act was necessitated because of India’s poor performance i n contract
enforcement among the nations in the world. For this reason, according
to the learned senior counsel, it is clear that Section 26 n eeds to be
interpreted in such a manner as would further the o bject of the
Amendment Act and that this being so, it is clear that Section 26 must be
read as being a provision which is not a savings provision at all, but a
provision which destroys all rights, if any, that vested in the Appellants in
the 1996 Act as unamended. For this purpose, he cited certain judgments
which will be referred to in the course of our judgment.
15. Dr. A.M. Singhvi, learned senior counsel appearing on behalf
of the Respondents in SLP (C) Nos.8376-8378 of 2017, has stated that
the correct construction of Section 26 would be the intermediate between
the extremes that have been canvassed before us by lea rned counsel
appearing on behalf of the Appellants. According to him, it is important
to emphasise that the first part applies only to arbitral proceedings before
an arbitral tribunal and the second part would apply only to court
proceedings in relation thereto. This becomes clear from two things;
one, the expression “to” appearing in the first part as contrasted with the
expression “in relation to” appearing in the second part; and , two, the
presence of Section 21 of the 1996 Act in the first part and its absence
in the second part of Section 26. According to him, this would be the
correct interpretation of Section 26, which would result in no anomalies,
849
as it is clear that the date of commencement of an arbitr al proceeding
would be fixed with reference to Section 21 and the date of
commencement of a court proceeding would be fixed with reference to
the date on which the court proceeding is filed, and it is only arbitral
proceedings and court proceedings which are filed a fter the
commencement of the Amendment Act that would be so covered.
16. Shri Nakul Dewan, learned Advocate appearing on behalf of
the Respondent in SLP (C) No.20224 of 2016 has argued that the first
part of Section 26 speaks of “the arbitral proceedings” com menced in
accordance with the provisions of Section 21. The second part of Section
26 omits the word “the” as well as Section 21, making it clear that it is
the arbitral proceedings before the Arbitrator alone that is referred to in
the first part of Section 26, as opposed to Court proceedings referred to
in the second part of Section 26, where the expression “in relation to
arbitral proceedings” does not contain the word “the”. Accor ding to
him, such interpretation is not contrary to the doctrine of party autonomy,
which is never conferred on any party without limits, there being non-
derogable provisions in the 1996 Act from which parties , even by
agreement, cannot derogate. According to the learned counsel, each
and every Court proceeding under the 1996 Act is a separate and distinct
proceeding and it is the date of such proceeding alone which is relevant
for the purpose of determining whether the Amendment Act applies.
According to the learned counsel, there is no vested right t o resist the
execution of an award merely because an application for set ting aside
the award is pending under Section 34 of the 1996 Act. Even on the
assumption that there is such a vested right, it is taken away, given the
clear legislative intent of Section 26 of the Amendment Act. Lastly, he
argued that on facts, clause 22.2(5) of the agreement between the parties
automatically brought in all amendments to the 1996 Act an d that,
therefore, Section 36 in its amended form would necessarily apply to the
facts in this case.
17. Having heard extensive and wide ranging arguments on the
reach of Section 26 of the Amendment Act, it will be important to first
bear in mind the principles of interpretation of such a provision. That an
Amendment Act does include within it provisions that may be repealed
either wholly or partially and that the provisions of Section 6 of the General
Clauses Act would generally apply to such Amendment Acts is beyond
any doubt – See Bhagat Ram Sharma v. Union of India , 1988 (Supp)
BOARD OF CONTROL FOR CRICKET IN INDIA v. KOCHI
CRICKET PVT. LTD. [R. F. NARIMAN, J.]
SCC 30 at 40-41. That such a provision is akin to a repeal and savings
clause would be clear when it is read with Section 27 of the Amendment
Act and Section 85 of the 1996 Act, which are set out hereinbelow:
“Section 27. Repeal and savings.
(1) The Arbitration and Conciliation (Amendment) Ordinance,
2015, is hereby repealed.
(2) Notwithstanding such repeal, anything done or any action
taken under the principal Act, as amended by the said Ordinance,
shall be deemed to have been done or taken under th e
corresponding provisions of the principal Act, as amended by
this Act.
xxx xxx xxx
Section 85. Repeal and savings.—
(1) The Arbitration (Protocol and Convention) Act, 1937 (6 of
1937), the Arbitration Act, 1940 (10 of 1940) and the Foreign
Awards (Recognition and Enforcement) Act, 1961 (45 of 1961)
are hereby repealed.
(2) Notwithstanding such repeal,—
(a) the provisions of the said enactments shall apply in relation to
arbitral proceedings which commenced before this Act cam e
into force unless otherwise agreed by the parties but thi s Act
shall apply in relation to arbitral proceedings which commenced
on or after this Act comes into force;
(b) all rules made and notifications published, under the said
enactments shall, to the extent to which they are not repugnant
to this Act, be deemed respectively to have been made or issued
under this Act.”
18. At this point, it is instructive to refer to th e 246 th Law
Commission Report which led to the Amendment Act. This Repor t,
which was handed over to the Government in August, 2014, had this to
state on why it was proposing to replace Section 36 of the 1996 Act:
“AUTOMATIC STAY OF ENFORCEMENT OF THE
AWARD UPON ADMISSION OF CHALLENGE
43. Section 36 of the Act makes it clear that an arbitral award
becomes enforceable as a decree only after the time for filing a
petition under section 34 has expired or after the section 34 petition
851
has been dismissed. In other words, the pendency of a section
34 petition renders an arbitral award unenforceable . The
Supreme Court, in National Aluminum Co. Ltd. v. Pressteel &
Fabrications, (2004) 1 SCC 540 held that by virtue of section 36,
it was impermissible to pass an Order directing the losing party
to deposit any part of the award into Court. While this decision
was in relation to the powers of the Supreme Court to pass such
an order under section 42, the Bombay High Court in Afcons
Infrastructure Limited v. The Board of Trustees, Port of Mumbai
2014 (1) Arb LR 512 (Bom) applied the same principle to the
powers of a Court under section 9 of the Act as well. Admission
of a section 34 petition, therefore, virtually paralyzes the process
for the winning party/award creditor.
44. The Supreme Court, in National Aluminium, has criticized
the present situation in the following words:
“However, we do notice that this automatic suspension of the
execution of the award, the moment an application challenging
the said award is filed under section 34 of the Act leaving no
discretion in the court to put the parties on terms, in our opinion,
defeats the very objective of the alternate dispute resolut ion
system to which arbitration belongs. We do find that there is a
recommendation made by the concerned Ministry to th e
Parliament to amend section 34 with a proposal to empower the
civil court to pass suitable interim orders in such cases. In view
of the urgency of such amendment, we sincerely hope tha t
necessary steps would be taken by the authorities concerned at
the earliest to bring about the required change in law.”
45. In order to rectify this mischief, certain amendments have
been suggested by the Commission to section 36 of the Act,
which provide that the award will not become unenforceable
merely upon the making of an application under section 34.
So far as the transitory provision, so described by the Report, is concerned,
the Report stated:
“76. The Commission has proposed to insert the new section 85-
A to the Act, to clarify the scope of operation of each of the
amendments with respect to pending arbitrations/proceedings.
As a general rule, the amendments will operate prospectivel y,
BOARD OF CONTROL FOR CRICKET IN INDIA v. KOCHI
CRICKET PVT. LTD. [R. F. NARIMAN, J.]
except in certain cases as set out in section 85-A or other wise
set out in the amendment itself.”
The Report then went on to amend Section 36 as follows:
“Amendment of Section 36
19. In section 36, (i) add numbering as sub-section (1) befor e
the words “Where the time” and after the words “Section 34
has expired,” delete the words “or such application having been
made, it has been refused” and add the words “then subject to
the provision of sub-section (2) hereof,”
(ii) insert sub-section “(2) Where an application to set aside the
arbitral award has been filed in the Court under section 34, the
filing of such an application shall not by itself render the award
unenforceable, unless upon a separate application made for that
purpose, the Court grants stay of the operation of the award in
accordance with the provisions of sub-section (3) hereof;”
(iii) insert sub-section “(3) Upon filing of the separate application
under subsection (2) for stay of the operation of the award, the
court may, subject to such conditions as it may deem fit, g rant
stay of the operation of the award for reasons to be recorded in
writing.”
(iv) insert proviso “Provided that the Court shall while considering
the grant of stay, in the case of an award for money shall have
due regard to the provisions for grant of stay of money decrees
under the Code of Civil Procedure, 1908.”
[NOTE : This amendment is to ensure that the mere filing of an
application under section 34 does not operate as an automatic
stay on the enforcement of the award. The Supreme Court in
National Aluminium Co. Ltd. v. Pressteel & Fabrications (P )
Ltd. and Anr, (2004) 1 SCC 540, recommends that such an
amendment is the need of the hour.]” 1
1 As a matter of fact, the amended Section 36 only b rings back Article 36(2) of the
UNCITRAL Model Law, which is based on Article 6 of the New York Convention, and
which reads as under:
“36(2). If an application for setting aside or suspension of an award has
been made to a court referred to in paragraph (1)(a)(v) of this article, the
court where recognition or enforcement is sought may, if it considers it
proper, adjourn its decision and may also, on the a pplication of the
party claiming recognition or enforcement of the award, order the other
party to provide appropriate security.”
853
The transitory provision Section 85A was then set out as follows:
“Insertion of Section 85A
A new section Section 85A on transitory provisions has been
incorporated.
Transitory provisions.— (1) Unless otherwise provided in the
Arbitration and Conciliation (Amending) Act, 2014, the provisions
of the instant Act (as amended) shall be prospective in operation
and shall apply only to fresh arbitrations and fresh applications,
except in the following situations –
(a) the provisions of section 6-A shall apply to all pend ing
proceedings and arbitrations. Explanation: It is clarified that where
the issue of costs has already been decided by the court/tribunal,
the same shall not be opened to that extent.
(b) the provisions of section 16 sub-section (7) shall apply to all
pending proceedings and arbitrations, except where the issue
has been decided by the court/tribunal.
(c) the provisions of second proviso to section 24 shall apply to
all pending arbitrations.
(2) For the purposes of the instant section,—
(a) “fresh arbitrations” mean arbitrations where there has been
no request for appointment of arbitral tribunal; or application for
appointment of arbitral tribunal; or appointment of the arbitral
tribunal, prior to the date of enforcement of the Arbitration and
Conciliation (Amending) Act, 2014.
(b) “fresh applications” mean applications to a court or arbitral
tribunal made subsequent to the date of enforcement of the
Arbitration and Conciliation (Amending) Act, 2014.
[NOTE: This amendment is to clarify the scope of operation of
each of the proposed amendments with respect to pend ing
arbitrations/proceedings.]”
19. The debates in Parliament in this context were referred to by
counsel on both sides. Shri T. Satpathy (Dhenkanal) stated:
“You have brought in an amendment to Section 25 (a) saying
that this Act will not be retrospective. When the Bill for judges’
BOARD OF CONTROL FOR CRICKET IN INDIA v. KOCHI
CRICKET PVT. LTD. [R. F. NARIMAN, J.]
pension and salary could be retrospective, why can you not amend
it with retrospective effect so that ONGC-RIL case could be
brought under this Act and let it be adjudicated as early as possible
within 18 months and let the people of this country get some
justice some time. Let us be fair to them.”
To similar effect is the speech of Shri APJ Reddy, which reads as under:
“It is unclear whether the amended provisions shall apply to
pending arbitration proceedings. The Law Commission of India,
in its 246th Report, which recommended amendments to the
Arbitration & Conciliation Act, 1996, had proposed to insert a
new Section 85-A to the Act, which would clarify the scope of
operation to each amendment with respect to pending arbitration
proceedings. However, this specific recommendation has not been
incorporated into the Ordinance. One of the reasons for bringing
about this ordinance is to instill a sense of confidence in foreign
investors in our judicial process, with regard to certaint y of
implementation in practice and ease of doing business. Therefore,
it is strongly urged to incorporate Section 85A as proposed b y
the 246th Report of the Law Commission of India, where it clearly
states the scope of operation of the amended provisions.”
The Law Minister in response to the aforesaid speeches state d:
“Nobody has objected to this Bill but some of our friends have
observed certain things. They have said that the Bill is the need
of the hour and that a good Bill has been brought. A few
suggestions have been given by them. One of the suggestions
was that it should have retrospective effect. If the parties agree,
then there will be no problem. Otherwise, it will only ha ve
prospective effect.”
20. Finally, Section 26 in its present form was tabled as Section
25A at the fag end of the debates, and added to the Bill. A c ouple of
things may be noticed on a comparison of Section 85A, as proposed by
the Law Commission, and Section 26 as ultimately enacted. Fir st and
foremost, Section 85A states that the amendments shall be prospective
in operation and then bifurcates proceedings into two parts – (i) fresh
arbitrations, and (ii) fresh applications. Fresh arbitrations are defined as
various proceedings before an arbitral tribunal that is constituted, whereas
fresh applications mean applications to a Court or Tri bunal, made
855
subsequent to the date of enforcement of the Amendment Act. T hree
exceptions are provided by Section 85A, to which the Amendment Act
will apply retrospectively. The first deals with provi sions relating to
costs, the second deals with the new provision contained in Section 16(7)
(which has not been adopted by the Amendment Act) and the third deals
with the second proviso to Section 24, which deals, inter alia, with oral
hearings and arguments on a day-to-day basis and the non-grant of
adjournments, unless sufficient cause is made out.
21. What can be seen from the above is that Section 26 has, while
retaining the bifurcation of proceedings into arbitrati on and Court
proceedings, departed somewhat from Section 85A as proposed by the
Law Commission.
22. That a provision such as Section 26 has to be construed literally
first, and then purposively and pragmatically, so as to keep the object of
the provision also in mind, has been laid down in Thyssen (supra) in
paragraph 26 as follows:
“26. Present-day courts tend to adopt a purposive approach while
interpreting the statute which repeals the old law and fo r that
purpose to take into account the objects and reasons which led
to the enacting of the new Act. We have seen above that thi s
approach was adopted by this Court in M.M.T.C. Ltd.
case [(1996) 6 SCC 716]. Provisions of both the Acts, old and
new, are very different and it has been so observed in Sundaram
Finance Ltd. case [(1999) 2 SCC 479]. In that case, this Court
also said that provisions of the new Act have to be interpre ted
and construed independently and that in fact reference to the old
Act may actually lead to misconstruction of the provisions of the
new Act. The Court said that it will be more relevant, whil e
construing the provisions of the new Act, to refer to the
UNCITRAL Model Law rather than the old Act. In the case
of Kuwait Minister of Public Works v. Sir Frederick Snow
and Partners [(1984) 1 All ER 733 (HL)] the award was given
before Kuwait became a party to the New York Convention
recognised by an Order in Council in England. The House of
Lords held that though a foreign award could be enforced in
England under the (U.K.) Arbitration Act, 1975 as when the
proceedings for enforcement of the award were initiate d in
England Kuwait had become a party to the Convention . It
BOARD OF CONTROL FOR CRICKET IN INDIA v. KOCHI
CRICKET PVT. LTD. [R. F. NARIMAN, J.]
negatived the contention that on the date the award was given
Kuwait was not a party to the New York Convention.”
(at pages 370-371)
Similarly, in Milkfood Limited (supra) at 315, this Court, while construing
Section 85 of the 1996 Act, had this to say:
“70. Section 85 of the 1996 Act repeals the 1940 Act. Sub-section
(2) of Section 85 provides for a non obstante clause. Clause ( a)
of the said sub-section provides for saving clause stating that the
provisions of the said enactments shall apply in relation to arbitral
proceedings which commenced before the said Act came int o
force. Thus, those arbitral proceedings which were commenced
before coming into force of the 1996 Act are saved and the
provisions of the 1996 Act would apply in relation to arbitral
proceedings which commenced on or after the said Act came
into force. Even for the said limited purpose, it is necessary t o
find out as to what is meant by commencement of arbi tral
proceedings for the purpose of the 1996 Act wherefor a lso
necessity of reference to Section 21 would arise. The court is to
interpret the repeal and savings clauses in such a manner so as
to give a pragmatic and purposive meaning thereto. It is one
thing to say that commencement of arbitration proceedings is
dependent upon the facts of each case as that would be subject
to the agreement between the parties. It is also another thing to
say that the expression “commencement of arbitratio n
proceedings” must be understood having regard to the context
in which the same is used; but it would be a totally different thing
to say that the arbitration proceedings commence only for the
purpose of limitation upon issuance of a notice and for no other
purpose. The statute does not say so. Even the case-laws do not
suggest the same. On the contrary, the decisions of this Court
operating in the field beginning from Shetty’s
Constructions [(1998) 5 SCC 599] are ad idem to the effect
that Section 21 must be taken recourse to for the purpose of
interpretation of Section 85(2)( a) of the Act. There is no reason,
even if two views are possible, to make a departure from t he
decisions of this Court as referred to hereinbefore.”
23. All learned counsel have agreed, and this Court has found, on
a reading of Section 26, that the provision is indeed in two par ts. The
857
first part refers to the Amendment Act not applying to certain proceedings,
whereas the second part affirmatively applies the Amendme nt Act to
certain proceedings. The question is what exactly is contained i n both
parts. The two parts are separated by the word ‘but’, which also shows
that the two parts are separate and distinct. However, Shri Viswanathan
has argued that the expression “but” means only that there is an emphatic
repetition of the first part of Section 26 in the second part of the said
Section. For this, he relied upon the Concise Oxford Dictionary on Current
English, which states:
“introducing emphatic repetition; definitely (wanted to see nobody,
but nobody)”.
Quite obviously, the context of the word “but” in Section 26 cannot bear
the aforesaid meaning, but serves only to separate the two distinct parts
of Section 26.
24. What will be noticed, so far as the first part is conc erned,
which states, “Nothing contained in this Act shall apply to the arbitral
proceedings commenced, in accordance with the provisions of section
21 of the principal Act, before the commencement of this Act unless the
parties otherwise agree…” is that: (1) “the arbitral p roceedings” and
their commencement is mentioned in the context of Section 21 of t he
principal Act; (2) the expression used is “to” and not “in relation to”; and
(3) parties may otherwise agree. So far as the second part of Section 26
is concerned, namely, the part which reads, “…but this Act shall apply in
relation to arbitral proceedings commenced on or after t he date of
commencement of this Act” makes it clear that the expression “in relation
to” is used; and the expression “the” arbitral procee dings and “in
accordance with the provisions of Section 21 of the principal A ct” is
conspicuous by its absence.
25. That the expression “the arbitral proceedings” r efers to
proceedings before an arbitral tribunal is clear from the heading of Chapter
V of the 1996 Act, which reads as follows:
“Conduct of Arbitral Proceedings”
The entire chapter consists of Sections 18 to 27 dealing with the conduct
of arbitral proceedings before an arbitral tribunal. What is also important
to notice is that these proceedings alone are referred to, the expression
“to” as contrasted with the expression “in relation to” making this clear.
Also, the reference to Section 21 of the 1996 Act, which appears in
BOARD OF CONTROL FOR CRICKET IN INDIA v. KOCHI
CRICKET PVT. LTD. [R. F. NARIMAN, J.]
Chapter V, and which speaks of the arbitral proceeding s commencing
on the date on which a request for a dispute to be referred to arbitration
is received by the respondent, would also make it clear tha t it is these
proceedings, and no others, that form the subject matter of the first part
of Section 26. Also, since the conduct of arbitral proceedings is largely
procedural in nature, parties may “otherwise agree” an d apply the
Amendment Act to arbitral proceedings that have commenced befo re
the Amendment Act came into force. 2
In stark contrast to the first part of Section 26 is the second part, where
the Amendment Act is made applicable “in relation to” arbitral proceedings
which commenced on or after the date of commencemen t of the
Amendment Act. What is conspicuous by its absence in the second part
is any reference to Section 21 of the 1996 Act. Whereas the first part
refers only to arbitral proceedings before an arbitral tribunal, the second
part refers to Court proceedings “in relation to” arbitr al proceedings,
and it is the commencement of these Court proceedings that is referred
to in the second part of Section 26, as the words “in relation t o the
arbitral proceedings” in the second part are not cont rolled by the
application of Section 21 of the 1996 Act. Section 26, therefore, bifurcates
proceedings, as has been stated above, with a great degre e of clarity,
into two sets of proceedings – arbitral proceedings themselves, and Court
proceedings in relation thereto. The reason why the first part of Section 26
2 Section 29A of the Amendment Act provides for time limits within which an arbitral
award is to be made. In Hitendra Vishnu Thakur v. State of Maharashtra (1994) 4
SCC 602 at 633, this Court stated:
“( iii ) Every litigant has a vested right in substantive law but no such
right exists in procedural law.
(iv ) A procedural statute should not generally speakin g be applied
retrospectively where the result would be to create new disabilities or
obligations or to impose new duties in respect of t ransactions already
accomplished.
(v) A statute which not only changes the procedure but also creates new
rights and liabilities shall be construed to be pro spective in operation,
unless otherwise provided, either expressly or by n ecessary
implication.”
It is, inter alia, because timelines for the making of an arbitral award have been laid
down for the first time in Section 29A of the Amend ment Act that parties were given
the option to adopt such timelines which, though pr ocedural in nature, create new
obligations in respect of a proceeding already begun under the unamended Act. This is,
of course, only one example of why parties may othe rwise agree and apply the new
procedure laid down by the Amendment Act to arbitral proceedings that have commenced
before it came into force.
859
is couched in negative form is only to state that the Amendment Act will
apply even to arbitral proceedings commenced before the amendment if
parties otherwise agree. If the first part of Section 26 were couched in
positive language (like the second part), it would have been necessary to
add a proviso stating that the Amendment Act would apply even to arbitral
proceedings commenced before the amendment if the parties agree. In
either case, the intention of the legislature remains the same, the negative
form conveying exactly what could have been stated positively, with the
necessary proviso. Obviously, “arbitral proceedings” ha ving been
subsumed in the first part cannot re-appear in the second part, and t he
expression “in relation to arbitral proceedings” would, therefore, apply
only to Court proceedings which relate to the arbitral proceedings. The
scheme of Section 26 is thus clear: that the Amendment Act is prospective
in nature, and will apply to those arbitral proceedings that are commenced,
as understood by Section 21 of the principal Act, on or after the
Amendment Act, and to Court proceedings which have commenced on
or after the Amendment Act came into force.
26. We now consider some of the submissions of learned counsel
for the parties as to what ought to be the true construction of Section 26.
According to Shri Sundaram, the second part of Section 26 should b e
taken to be the principal part, with the first part being read as an exception
to the principal part. This is so that Section 6 of the General Clauses Act
then gets attracted to the first part, the idea being to save accrued rights.
Section 6 applies unless a contrary intention appears in the enactment in
question. The plain language of Section 26 would make it clear t hat a
contrary intention does so appear, Section 26 being a special provision
having to be applied on its own terms.
27. Thus, in Transport and Dock Workers’ Union & others
v. New Dholera Steamship Ltd., Bombay and others, (1967) 1 LLJ
434, a Five Judge Bench of this Court held:
“6. It was contended before us that as an appeal is a continuation
of the original proceeding the repeal should not aff ect the
enforcement of the provisions of the Ordinance in this case .
Reliance is placed upon Section 6 of the General Clauses Act ,
1897 wherein is indicated the effect of repeal of an enactme nt
by another. It is contended that as the Payment of Bonus
Ordinance has been repealed by Section 40(1), the consequences
envisaged in Section 6 of the General Clauses Act must follow
BOARD OF CONTROL FOR CRICKET IN INDIA v. KOCHI
CRICKET PVT. LTD. [R. F. NARIMAN, J.]
and the present matter must be disposed of in accordance with
the Ordinance as if the Act had not been passed. It is submitted
that there was a right and a corresponding obligation to pay bonus
under Section 10 of the Ordinance and that right and obligation
cannot be obliterated because of the repeal of the Ordinance .
This argument is not acceptable because of the provisions of the
second sub-section of Section 40. That sub-section reads as
follows:
“40. Repeal and saving .
(1)***
(2) Notwithstanding such repeal, anything done or any action
taken under the said Ordinance shall be deemed to have been
done or taken under this Act as if this Act had commenced on
the 29th May, 1965.”
Section 6 of the General Clauses Act applies ordinarily but it
does not apply if a different intention appears in the r epealing
Act. Here a different intention is made to appear expressly and
the special saving incorporated in the repealing Act protects only
anything done or any action taken under the Ordinance which is
deemed to have been done or taken under this Act as if the Act
had commenced on 29th May, 1965. Nothing had been done
under the Ordinance and no action was taken which needs
protection; nor was anything pending under the Ordinance which
could be continued as if the Act had not been passed. There was
thus nothing which was to be saved after the repeal o f the
Ordinance and this question which might have arisen under the
Ordinance now ceases to exist.”
In Kalawati Devi Harlalka v. CIT (1967) 3 SCR 833, a repeal and
savings provision contained in Section 297 of the Income Tax Act, 1961
was held to evidence an intention to the contrary under Section 6 of the
General Clauses Act as follows:
“14. The learned counsel for the appellant submits that Parliament
had Section 6 of the General Clauses Act in view, and therefore
no express provision was made dealing with appeals and
revisions, etc. In our view, Section 6 of the General Clauses Act
would not apply because Section 297(2) evidences an intention
to the contrary. In Union of India v. Madan Gopal Kabra [25
861
ITR 5] while interpreting Section 13 of the Finance Act, 1950,
already extracted above, this Court observed at p. 68:
“Nor can Section 6 of the General Clauses Act, 1897, serve to
keep alive the liability to pay tax on the income of the y ear
1949-50 assuming it to have accrued under the repealed State
law, for a “different intention” clearly appears in Sect ions 2
and 13 of the Finance Act read together as indicated above.”
It is true that whether a different intention appears or not mu st
depend on the language and content of Section 297(2). It seems
to us, however, that by providing for so many matters mentioned
above, some in accord with what would have been the result
under Section 6 of the General Clauses Act and some contrary
to what would been the result under Section 6, Parliament has
clearly evidenced an intention to the contrary.”
28. Shri Sundaram’s submission is also not in consonance with the
law laid down in some of our judgments. The approach to statutes, which
amend a statute by way of repeal, was put most felicit ously by B.K.
Mukherjea, J. in State of Punjab v. Mohar Singh , 1955 1 SCR 893 at
899-900, thus:
“In our opinion the approach of the High Court to the question is
not quite correct. Whenever there is a repeal of an enactm ent,
the consequences laid down in Section 6 of the General Clauses
Act will follow unless, as the section itself says, a different intention
appears. In the case of a simple repeal there is scar cely any
room for expression of a contrary opinion. But when the repeal
is followed by fresh legislation on the same subject we would
undoubtedly have to look to the provisions of the new Act, but
only for the purpose of determining whether they indicate a
different intention. The line of enquiry would be, not whether the
new Act expressly keeps alive old rights and liabilities but whether
it manifests an intention to destroy them. We cannot therefore
subscribe to the broad proposition that Section 6 of the General
Clauses Act is ruled out when there is repeal of an enactment
followed by a fresh legislation. Section 6 would be applicable in
such cases also unless the new legislation manifests an intention
incompatible with or contrary to the provisions of the s ection.
Such incompatibility would have to be ascertained f rom a
consideration of all the relevant provisions of the new law and
BOARD OF CONTROL FOR CRICKET IN INDIA v. KOCHI
CRICKET PVT. LTD. [R. F. NARIMAN, J.]
the mere absence of a saving clause is by itself not material. It is
in the light of these principles that we now proceed to examine
the facts of the present case.”
(Emphasis Supplied)
This statement of the law has subsequently been followed in Transport
and Dock Workers Union & Ors. v. New Dholera Steams hips
Ltd., Bombay and Ors. (supra) at paragraph 6 and T.S. Baliah v.
T.S. Rengachari, 1969 3 SCR 65 at 71-72.
29. Equally, the suggested interpretation of Shri Viswanathan would
not only do violence to the plain language of Section 26, but would also
ignore the words “in relation to” in the second part of Section 26, as well
as ignore the fact that Section 21 of the 1996 Act, though mentioned in
the first part, is conspicuous by its absence in the second part. According
to Shri Viswanathan, the expression “arbitral proceedings commenced”
is the same in both parts and, therefore, the commencement of arbitral
proceedings under Section 21 is the only thing to be looked at in bo th
parts. Thus, according to the learned senior counsel, if arbitral proceedings
have commenced prior to coming into force of the Amendment Act, the
said proceedings, together with all proceedings in Court in relation thereto,
would attract only the provisions of the unamended 1996 Act. Similarly,
when arbitral proceedings have commenced under Section 21 after the
coming into force of the Amendment Act, those proceedings, including
all courts proceedings in relation thereto, would be governed b y the
Amendment Act. This is not the scheme of Section 26 at all, as has been
pointed out above. Further, this argument is more or less the conclusion
reached by the report of the High Level Committee, headed by Justice
B.N. Srikrishna, to amend the 1996 Act. 3 It can be seen from the report
of the High Level Committee that an amendment would be required to
3 Shri Tushar Mehta, learned ASG, referred to a press release from the Government of
India, dated March 7 th , 2018, after arguments have been concluded, in a w ritten
submission made to us. According to him, the press release refers to a new Section 87
in a proposed amendment to be made to the 1996 Act. The press release states that the
Union Cabinet, chaired by the Prime Minister, has a pproved the Arbitration and
Conciliation (Amendment) Bill, 2018 in which a new Section 87 is proposed to be
inserted as follows:
“A new section 87 is proposed to be inserted to cla rify that unless parties
agree otherwise the Amendment Act 2015 shall not ap ply to (a) Arbitral
proceedings which have commenced before the commenc ement of the
Amendment Act of 2015 (b) Court proceedings arising out of or in relation to
such arbitral proceedings irrespective of whether s uch court proceedings are
863
Section 26 to incorporate its findings. Section 87 of the proposed
Arbitration and Conciliation (Amendment) Bill, 2018 cannot be looked
commenced prior to or after the commencement of the Amendment Act of
2015 and shall apply only to Arbitral proceedings commenced on or after the
commencement of the Amendment Act of 2015 and to co urt proceedings
arising out of or in relation to such Arbitral proceedings.”
The Srikrishna Committee had recommended the following:
“The Committee feels that permitting the 2015 Amend ment Act to apply to
pending court proceedings related to arbitrations c ommenced prior to 23
October 2015 would result in uncertainty and prejud ice to parties, as they
may have to be heard again. It may also not be advi sable to make the 2015
Amendment Act applicable to fresh court proceedings in relation to such
arbitrations, as it may result in an inconsistent p osition. Therefore, it is felt
that it may be desirable to limit the applicability of the 2015 Amendment Act
to arbitrations commenced on or after 23 October 20 15 and related court
proceedings.
Recommendations
1. Section 26 of the 2015 Amendment Act may be amen ded to provide that:
a. unless parties agree otherwise, the 2015 Amendme nt Act shall not apply
to: (a) arbitral proceedings commenced, in accordan ce with section 21 of the
ACA, before the commencement of the 2015 Amendment Act; and (b) court
proceedings arising out of or in relation to such arbitral proceedings irrespective
of whether such court proceedings are commenced pri or to or after the
commencement of the 2015 Amendment Act; and
b. the 2015 Amendment Act shall apply only to arbit ral proceedings
commenced on or after the commencement of the 2015 Amendment Act and
to court proceedings arising out of or in relation to such arbitral proceedings.
2. The amended Section 26 shall have retrospective effect from the date of
commencement of the 2015 Amendment Act.”
The High Level Committee recommended this after referring to divergent views taken
by various High Courts. This included the interpret ation given by the Calcutta High
Court in Electrosteel Castings Limited v. Reacon Engineers (India) Pvt. Ltd. (A.P.
No. 1710 of 2015 decided on 14.01.2016) and Tufan Chatterjee v. Rangan Dhar ,
(FMAT No. 47 of 2016 decided on 02.03.2016), the Ma dhya Pradesh High Court in
Pragat Akshay Urja Limited Company v. State of M.P and Ors ., (Arbitration Case
Nos. 48, 53 and 54/2014, decided on 30.06.2016), th e Madras High Court in New
Tirupur Area Development v. Hindustan Construction Co. Limited , (Application
No. 7674 of 2015 in O.P. No. 931 of 2015) and the Bombay High Court in Rendezvous
Sports World v. BCCI (Chamber Summons No. 1530 of 2015 in Execution Application
(L) No. 2481 of 2015, Chamber Summons No. 1532 of 2015 in Execution Application
(L) No. 2482 and Chamber Summons No. 66 of 2016 in Execution Application (L) No.
2748 of 2015 decided on 08.08.2016).
In addition to this, the following decisions by var ious High Courts also deal with the
applicability of the Amendment Act:
i. Calcutta High Court: Nitya Ranjan Jena v. Tata Capital Financial Services
Ltd., GA No. 145/206 with AP No. 15/2016, West Bengal Power Development
Corporation Ltd. v. Dongfang Electric Corporation , 2017 SCCOnline Cal
BOARD OF CONTROL FOR CRICKET IN INDIA v. KOCHI
CRICKET PVT. LTD. [R. F. NARIMAN, J.]
at, at this stage, for the interpretation of Section 26 of the Amendment
Act for two reasons: (i) Section 87, as ultimately enacted, may not be in
the form that is referred to in the press release; and (ii) a proposed Bill,
introducing a new and different provision of law can hardly be the basis
for interpretation of a provision of law as it now sta nds. Obviously,
9388, Saraf Agencies v. Federal Agencies for State Property Management ,
AIR 2017 Cal. 65, Reliance Capital Ltd. v. Chandana Creations , 2016 SCC
Cal. 9558 and Braithwaite Burn & Jessop Construction Company Ltd. v.
Indo Wagon Engineering Ltd., AIR 2017 (NOC 923) 314.
ii. Bombay High Court: M/s. Maharashtra Airport Development Company
Ltd. v. M/s. PBA Infrastructure Ltd., 2017 SCCOnline Bom (7840), Enercon
GmbH v. Yogesh Mehra , 2017 SCC Bom 1744 and Global Aviation Services
Pvt. Ltd. v. Airport Authority of India , Commercial Arbitration Petition No.
434/2017,
iii. Madras High Court: Jumbo Bags Ltd. v. New India Assurance Company
Limited , 2016 (3) CTC 769.
iv. Delhi High Court: ICI Soma JV v. Simplex Infrastructures Ltd., 2016 SCC
Online Del 5315, Tantia-CCIL (JV) v. Union of India , ARB. P. 615/2016,
Raffles Design International India Pvt. Ltd. v. Edu comp Professional
Education Ltd. and Ors. , OMP (I) (COMM.) 23/2015, Orissa Concrete
and Allied Industries Ltd. v. Union of India and Or s., Arb. P. No. 174 of
2016, Takamol Industries Pvt. Ltd. v. Kundan Rice Mills Ltd., EX. P. 422/
2014 & EA No. 739/2016, Apex Encon Projects Pvt. Ltd. v. Union of India &
Anr., 2017 SCC Online Del. 9779 and Ratna Infrastructure Projects Pvt.
Ltd. v. Meja Urja Nigam Pvt. Ltd., 2017 SCC Online Del 7808.
v. Patna High Court: SPS v. Bihar Rajya Pul Nirman Nigam Ltd. , Request
Case No. 14 of 2016 and Kumar and Kumar Associates v. Union of India ,
2017 1 PLJR 649.
vi. Gujarat High Court: OCI Corp. v. Kandla Export Corporation & Ors., 2017
GLH (1) 383, Abhinav Knowledge Services Pvt. Ltd. v. Babasaheb
Amdebdkar Open University , AIR 2017 (NOC 1012) 344 and Pallav
Vimalbhai Shah v. Kalpesh Sumatibhai Shah , O/IAAP/15/2017.
vii. Kerala High Court: Shamsudeen v. Shreeram Transport Finance Ltd ., ILR
2017 Vol. 1, Ker. 370 and Jacob Mathew v. PTC Builders , 2017 (5) KHC 583.
viii. Tripura High Court: Subhash Podder v. State of Tripura , 2016 SCC Tri. 500.
ix. Chhatisgarh High Court: Orissa Concrete and Allied Industries Limited v.
Union of India and Ors. , Arbitration Application No. 34/2014.
x. Rajasthan High Court: Dwarka Traders Pvt. Ltd. v. Union of India, S.B. ,
Arbitration Application No. 95/2013 and Mayur Associates, Engineers and
Contractors v. Gurmeet Singh & Ors., S.B. Arbitration Application No. 74/
2013.
xi. Himachal Pradesh High Court: RSWM v. The Himachal Pradesh State
Supplies Co. Ltd. , Arb Case No. 104/2016 and P.K. Construction Co. &
Ors. v. Shimla Municipal Co. & Ors. , Civil Writ Petition No. 2322/2016.
xii. Punjab & Haryana High Court: Alpine Minmetals India Pvt. Ltd. v. Noble
Resources Ltd., LPA No. 917/2017.
865
therefore, Shri Viswanathan’s approach leads to an amendment of Section
26, as recommended by the Srikrishna Committee, and not interpretation
thereof. For all these reasons, his argument must, therefore, be rejected.
Shri Datar’s argument is more or less the same as Shri Viswanathan’s,
and suffers from the same infirmity as Shri Viswanathan’s interpretation.
Shri A. Krishnan, in bringing in the concept of “seat”, is again doing
complete violence to the language of Section 26, as “place of arbitration”
is a well-known concept contained in Section 20 of the 1996 Act, which
finds no mention whatsoever in Section 26 of the Amendment Act. For
these reasons, his interpretation cannot also be accepted.
30. Shri Neeraj Kishan Kaul, learned senior counsel appearing on
behalf of Respondents in SLP(C) Nos.19545-19546 of 2016, has argued
that the first part of Section 26 does not apply to Court proc eedings at
all, thereby indicating that the Amendment Act must be given retrospective
effect insofar as Court proceedings in relation to arbitral proceedings
are concerned. For this purpose, he relied on Minister of Public Works
of the Government of the State of Kuwait (supra).
31. In that case, the question that arose was as to the corr ect
construction of Section 7(1) of the U.K. Arbitration Act, 1975. The said
section was given retrospective effect in applying t he New York
Convention to arbitration agreements that were entered into before the
convention was made applicable, for the reason that nobo dy had an
accrued right/defence which was taken away. All defences available in
a common law action on the award would be available and continued to
be available. Hence, it was held that the award could always have been
enforced by one form of procedure and that it subsequently bec ame
enforceable by an alternative form. This judgment can have no application
to the present case, inasmuch as the Amendment Act, as appli cable to
Court proceedings that arose in relation to arbitral proceedings, cannot
be said to apply to mere forms of procedure, but also includes substantive
law applicable to such Court proceedings post the Amendment Act. Also,
it is wholly fallacious to say that since the first part of Section 26 does
not refer to Court proceedings in relation to arbitral proce edings, the
Amendment Act is retrospective insofar as such proc eedings are
concerned. The second part of Section 26 would then ha ve to be
completely ignored, which, as has been seen hereinabove, applies to
Court proceedings in relation to arbitral proceedings only prospectively,
i.e. if such Court proceedings are commenced after the Amendm ent
BOARD OF CONTROL FOR CRICKET IN INDIA v. KOCHI
CRICKET PVT. LTD. [R. F. NARIMAN, J.]
Act comes into force. For these reasons, such an interpretation of Section
26 is unacceptable.
32. Shri Chidambaram, appearing on behalf of some of the
Respondents, has argued that the interpretation accepted by this Court
supra is the correct interpretation. He has also argued that, alternatively,
the expression “in relation to arbitral proceedings” in the second part of
Section 26 would also include within it arbitral proceedings before the
arbitral tribunal, as otherwise Section 26 would not apply the Amendment
Act to such arbitral proceedings. We are afraid that thi s alternative
interpretation does not appeal to us, for the simple reason that when the
first part of Section 26 makes it clear that arbitral proceedings commenced
before the Amendment Act would not be governed by the Amendment
Act, it is clear that arbitral proceedings that have commenced after the
Amendment Act comes into force would be so governed by it, a s has
been held by us above. The negative form of the language of the first
part only becomes necessary to indicate that parties may otherwise agree
to apply the Amendment Act to arbitral proceedings commenced even
before the Amendment Act comes into force. The absenc e of any
reference to Section 21 of the 1996 Act in the second part of Section 26
of the Amendment Act is also a good reason as to why arbitral proceedings
before an arbitral tribunal are not contemplated in the second part.
33. Shri Sibal has argued that Section 26 is not a savings clause at
all and cannot be construed as such. According to the learned se nior
counsel, Section 26 manifests a clear intention to destroy all rights, vested
or otherwise, which have accrued under the unamended 1996 Act. We
are unable to accept these submissions as it is clear that the intendment
of Section 26 is to apply the Amendment Act prospectively to arbitral
proceedings and to court proceedings in relation thereto. This approach
again does not commend itself to us.
34. Dr. Singhvi has, however, argued that the approach indicated
by us above could be termed as an “intermediate approach”, i.e. it is an
approach which does not go to either of the extreme approaches of Shri
Sundaram, Shri Viswanathan and Shri Datar or that of Shri Sibal. Further,
according to the learned senior counsel, this approach has the merit of
both clarity, as well as no anomalies arising as a result, as it is clear that
the Amendment Act is to be applied only prospectively with effect from
the date of its commencement, and only to arbitral proceedings a nd to
court proceedings in relation thereto, which have commenced on or after
867
the commencement of the Amendment Act. We think this is the correct
approach as has already been indicated by us above.
35. The judgment in Thyssen (supra), was strongly relied upon
by counsel on both sides. It is, therefore, important to deal wi th this
judgment in a little detail. In Thyssen (supra), Section 85 of the 1996
Act came up for consideration. What is clear is that Sect ion 85(2)(a)
had the expression “in relation to arbitral proceedings” in both parts of
sub-section (2)(a). When speaking of the repealed enactments, it stated
that they will apply “in relation to” arbitral proceedings which commenced
before the 1996 Act came into force, but that otherwise the 1996 Act
shall apply “in relation to” arbitral proceedings, which commenced on or
after the 1996 Act came into force.
36. The judgment in Thyssen (supra) construed Section 85 as
follows:
“23. Section 85(2)( a) of the new Act is in two limbs: ( 1) provisions
of the old Act shall apply in relation to arbitral proceedings which
commenced before the new Act came into force unless otherwise
agreed by the parties, and ( 2) the new Act shall apply in relation
to arbitral proceedings which commenced on or after the new
Act came into force. The first limb can further be bif urcated
into two: ( a) provisions of the old Act shall apply in relation to
arbitral proceedings commenced before the new Act came into
force, and ( b) the old Act will not apply in such cases where the
parties agree that it will not apply in relation to arbitral proceedings
which commenced before the new Act came into force. The
expression “in relation to” is of the widest import as held by
various decisions of this Court in Doypack Systems (P)
Ltd. [(1988) 2 SCC 299], Mansukhlal Dhanraj Jain [(1995) 2
SCC 665], Dhanrajamal Gobindram [AIR 1961 SC 1285 :
(1961) 3 SCR 1020] and Navin Chemicals Mfg . [(1993) 4 SCC
320] This expression “in relation to” has to be given full effect
to, particularly when read in conjunction with the words “the
provisions” of the old Act. That would mean that the old Act will
apply to the whole gambit of arbitration culminating in the
enforcement of the award. If it was not so, only the word “to”
could have sufficed and when the legislature has used t he
expression “in relation to”, a proper meaning has to be give n .
This expression does not admit of restrictive meaning. The first
BOARD OF CONTROL FOR CRICKET IN INDIA v. KOCHI
CRICKET PVT. LTD. [R. F. NARIMAN, J.]
limb of Section 85(2)( a) is not a limited saving clause. It saves
not only the proceedings pending at the time of commencement
of the new Act but also the provisions of the old A ct for
enforcement of the award under that Act.”
(at page 369)
[Emphasis Supplied]
The judgment then goes on to refer to Section 48 of the Arbitration Act,
1940, which is set out therein as follows:
“48. Saving for pending references .—The provisions of this
Act shall not apply to any reference pending at the
commencement of this Act, to which the law in force immediately
before the commencement of this Act shall notwithstanding any
repeal effected by this Act continue to apply.”
(at page 349)
Paragraph 33 goes on to state the difference between Section 85( 2)(a)
of the 1996 Act and the earlier Section 48 of the 1940 Act, as follows:
“33. Because of the view of Section 85(2)( a) of the new Act which we
have taken, it is not necessary for us to consider difference in the repealing
provisions as contained in Section 48 of the old Act and Section 85 of the
new Act. We may, however, note that under Section 48 of the old Act
the concept is of “reference” while under the new A ct it is
“commencement”. Section 2( e) of the old Act defines “reference”. Then
under Section 48 the word used is “to” and under Section 85(2)( a) the
expression is “in relation to” . It, therefore, also appears that it is not
quite relevant to consider the provision of Section 48 of the ol d Act to
interpret Section 85(2)( a).”
(at page 375)
[Emphasis Supplied]
Paragraph 25 specifically states that Section 6 of the Ge neral Clauses
Act will not apply, inasmuch as a different intention does appear from
the plain language of Section 85(2)(a). Ultimately, after st ating seven
conclusions in paragraph 22, this Court went on to state that enforcement
of an award under the 1940 Act would be an accrued right for the reason
that the challenge procedure under Section 30 of the 1940 Act w as
wider and completely different from the challenge procedure und er
869
Section 34 of the 1996 Act, and that to avoid confusion and hardship, it
would be important to refer to the expression “in relation to” as meaning
the entire gamut of arbitral proceedings, beginning with commencement
and ending with enforcement of an award.
37. The judgment in Thyssen (supra) dealt with a differently
worded provision, and emphasized the difference in language between
the expression “to” and the expression “in relation to”. In reference to
the Acts which were repealed under Section 85, proceedings which
commenced before the 1996 Act were to be governed by the re pealed
Acts. These proceedings would be the entire gamut of proceedings, i.e.
from the stage of commencement of arbitral proceedin gs until the
challenge proceedings against the arbitral award had been e xhausted.
Similar was the position with respect to the applicability of the 1996 Act,
which would again apply to the entire gamut of arbitral proceed ings,
beginning with commencement and ending with enforcement of the
arbitral award. It is clear, therefore, that Section 85(2)(a) has two major
differences in language with Section 26: one, that the exp ression “in
relation to” does not appear in the first part of Section 26 a nd only the
expression “to” appears; and, second, that “commencement” in the first
part of Section 26 is as is understood by Section 21 of the 1996 Act. The
second part of Section 85(2)(a) is couched in language simi lar to the
second part of Section 26 with this difference, that Section 21 contained
in the first part of Section 26 is conspicuous by its absence in the second
part.
38. The judgment in Thyssen (supra) was followed in N.S. Nayak
(supra). After setting out paragraph 32 of the judgment i n Thyssen
(supra) and paragraphs 22 and 23 of the aforesaid judgment, this Court
concluded:
“13. As stated in paragraph 22, Conclusion 1 withou t any
reservation provides that the provisions of the old Act shall apply
in relation to the arbitral proceedings which have commenced
before coming into force of the new Act. Conclusion 2, in our
view, is required to be read in context with Conclusion 1, that is
to say, the phrase “in relation to arbitral proceedings” cannot be
given a narrow meaning to mean only pendency of the
proceedings before the arbitrator. It would cover no t only
proceedings pending before the arbitrator but would also cover
the proceedings before the court and any proceedings which are
BOARD OF CONTROL FOR CRICKET IN INDIA v. KOCHI
CRICKET PVT. LTD. [R. F. NARIMAN, J.]
required to be taken under the old Act for the award becoming a
decree under Section 17 thereof and also appeal ari sing
thereunder. Hence, Conclusions 1 and 2 are to be read together
which unambiguously reiterate that once the arbitral proceedings
have started under the old Act, the old Act would apply for the
award becoming a decree and also for appeal arising thereunder.
14. Conclusion 3 only reiterates what is provided in vario us
sections of the Arbitration Act, which gives option to the parties
to opt for the procedure as per their agreement during the arbitral
proceedings before the arbitrator. The phrase “unless otherwise
agreed by the parties” used in various sections, namely, 17, 21,
23(3), 24(1), 25, 26, 29, 31, 85(2)( a) etc. indicates that it is open
to the parties to agree otherwise. During the arbitral proceedings,
right is given to the parties to decide their own procedure. So if
there is an agreement between the parties with regard to t he
procedure to be followed by the arbitrator, the arbitr ator is
required to follow the said procedure. Reason being, the arbitrator
is appointed on the basis of the contract between the parties and
is required to act as per the contract. However, this wou ld not
mean that in appeal parties can contend that the ap pellate
procedure should be as per their agreement. The appel late
procedure would be governed as per the statutory provisions
and parties have no right to change the same. It is also sett led
law that the right to file an appeal is accrued right that cannot be
taken away unless there is specific provision to the cont rary.
There is no such provision in the new Act. In the present cases,
the appeals were pending before the High Court under th e
provisions of the old Act and, therefore, appeals are required to
be decided on the basis of the statutory provisions under the said
Act. Hence, there is no substance in the submission made by the
learned counsel for the appellant.”
(at pages 63-64)
The majority judgment in Milkfood Limited (supra), after referring to
the judgments in Thyssen (supra) and N.S. Nayak (supra), concluded
that, on the facts of that case, the 1940 Act will apply and not the 1996
Act. These judgments are distinguishable for the same reasons, as they
only follow and apply Thyssen (supra).
871
39. From a reading of Section 26 as interpreted by us, it thu s
becomes clear that in all cases where the Section 34 pet ition is filed
after the commencement of the Amendment Act, and an application for
stay having been made under Section 36 therein, will be gove rned by
Section 34 as amended and Section 36 as substituted. But, w hat is to
happen to Section 34 petitions that have been filed before the
commencement of the Amendment Act, which were governed by Section
36 of the old Act? Would Section 36, as substituted, apply to such petitions?
To answer this question, we have necessarily to decide on what is meant
by “enforcement” in Section 36. On the one hand, it has been argued
that “enforcement” is nothing but “execution”, and on the other hand, it
has been argued that “enforcement” and “execution” a re different
concepts, “enforcement” being substantive and “executi on” being
procedural in nature.
40. At this stage, it is necessary to set out the scheme of the 1996
Act. An arbitral proceeding commences under Section 21, unless
otherwise agreed by parties, when a dispute arises between the parties
for which a request for the dispute to be referred to arbitration is received
by the respondent. The arbitral proceedings terminate under Section
32(1) by the delivery of a final arbitral award or by the circumstances
mentioned in Section 32(2). The mandate of the arbi tral tribunal
terminates with the termination of arbitral proceedings, save and except
for correction and interpretation of the award within the bounds of Section
33, or the making of an additional arbitral award as to claims presented
in the proceedings, but omitted from the award. Once this is over , in
cases where an arbitral award is delivered, such award shall be final
and binding on the parties and persons claiming under them, under Section
35 of the 1996 Act. Under Section 36, both pre and post amendment ,
such award shall be “enforced” in accordance with the provisions of the
Code of Civil Procedure, 1908, in the same manner as if it were a decree
of the Court. It is clear that the scheme of the 1996 Act is materially
different from the scheme of the 1940 Act. Under Section 17 of the
1940 Act, once an award was delivered, the Court had to pronounce
judgment in accordance with the award, following which a decree would
be drawn up, which would then be executable under the Code of Civil
Procedure. Under Section 36 of the 1996 Act, the Court does not have
to deliver judgment in terms of the award, which is then followed by a
decree, which is the formal expression of the adjudication between the
parties. Under Section 36 of the 1996 Act, the award is deemed to be a
BOARD OF CONTROL FOR CRICKET IN INDIA v. KOCHI
CRICKET PVT. LTD. [R. F. NARIMAN, J.]
decree and shall be enforced under the Code of Civil Procedure as
such.
41. This brings us to the manner of enforcement of a decree under
the Code of Civil Procedure. A decree is enforced under the C ode of
Civil Procedure only through the execution process – see Order XXI of
the Code of Civil Procedure. Also, Section 36(3), as amended, refers to
the provisions of the Code of Civil Procedure for grant of sta y of a
money decree. This, in turn, has reference to Order LXI, Rule 5 of the
Code of Civil Procedure, which appears under the Chapter headi ng,
“Stay of Proceedings and of Execution”. This being so, it is c lear that
Section 36 refers to the execution of an award as if it were a decree,
attracting the provisions of Order XXI and Order LXI, Rule 5 of the
Code of Civil Procedure and would, therefore, be a provision d ealing
with the execution of arbitral awards. This being the case, we need to
refer to some judgments in order to determine whether execution
proceedings and proceedings akin thereto give rise to vested rights, and
whether they are substantive in nature.
42. In Lalji Raja and Sons v. Hansraj Nathuram , (1971) 1 SCC
721 at 728, this Court was concerned with a judgment debtor’s right to
resist execution of a decree. Section 20(1)(b) of the Co de of Civil
Procedure (Amendment) Act, 1951 was extended to Madhya Bharat
and other areas, as a result of which the judgment debtor’s right to resist
execution of a decree was protected. In this context, this Court held that
the Amendment Act of 1951 made decrees, which could have been
executed only by courts in British India, executable in the whole of India.
Stating that the change made was one relating to procedure only, this
Court held:
“15. This provision undoubtedly protects the rights acquired and
privileges accrued under the law repealed by the Amending Act.
Therefore the question for decision is whether the non-
executability of the decree in the Morena Court under the law in
force in Madhya Bharat before the extension of “the Code” can
be said to be a right accrued under the repealed law. We do not
think that even by straining the language of the provision it can
be said that the non-executability of a decree within a particular
territory can be considered as a privilege. Therefore the onl y
question that we have to consider is whether it can be considered
as a “right accrued” within the meaning of Section 20(1)( b) of
873
the Code of Civil Procedure (Amendment) Act, 1950. In the
first place, in order to get the benefit of that provision, the non-
executability of the decree must be a right and secondly it must
be a right that had accrued from the provisions of the repealed
law. It is contended on behalf of the judgment-debtors that when
the decree was passed, they had a right to resist the exec ution
of the decree in Madhya Bharat in view of the provisions of the
Indian Code of Civil Procedure (as adapted) which was in force
in the Madhya Bharat at that time and the same is a vested right.
It was further urged on their behalf that that right was preserved
by Section 20(1)( b) of the Code of Civil Procedure (Amendment)
Act, 1950. It is difficult to consider the non-executability of the
decree in Madhya Bharat as a vested right of the judgment -
debtors. The non-executability in question pertains to the
jurisdiction of certain courts and not to the rights of the judgment-
debtors. Further the relevant provisions of the Civil Proc edure
Code in force in Madhya Bharat did not confer the right claimed
by the judgment-debtors. All that has happened in view of the
extension of “the Code” to the whole of India in 1951 is that the
decrees which could have been executed only by courts in British
India are now made executable in the whole of India. The change
made is one relating to procedure and jurisdiction. Even before
“the Code” was extended to Madhya Bharat the decree in
question could have been executed either against the person of
the judgment-debtors if they had happened to come to British
India or against any of their properties situated in British India.
The execution of the decree within the State of Madhya Bharat
was not permissible because the arm of “the Code” did not reach
Madhya Bharat. It was the invalidity of the order transfer ring
the decree to the Morena Court that stood in the way of the
decree-holders in executing their decree in that court on the earlier
occasion and not because of any vested rights of the judgment-
debtors. Even if the judgment-debtors had not objected to the
execution of the decree, the same could not have been executed
by the court at Morena on the previous occasion as that court
was not properly seized of the execution proceedings. By the
extension of “the Code” to Madhya Bharat, want of jurisdiction
on the part of the Morena Court was remedied and that court is
now made competent to execute the decree.
BOARD OF CONTROL FOR CRICKET IN INDIA v. KOCHI
CRICKET PVT. LTD. [R. F. NARIMAN, J.]
16. That a provision to preserve the right accrued under a repealed
Act “was not intended to preserve the abstract rights conferred
by the repealed Act.... It only applies to specific rights given to
an individual upon happening of one or the other of the events
specified in statute” — See Lord Atkin’s observatio ns
in Hamilton Gell v. White. [(1922) 2 KB 422]. The mere right,
existing at the date of repealing statute, to take adva ntage of
provisions of the statute repealed is not a “right accrued” within
the meaning of the usual saving clause — See Abbot v. Minister
for Lands [(1895) AC 425] and G. Ogden Industries Pvt.
Ltd. v. Lucas. [(1969) 1 All ER 121]”
In Narhari Shivram Shet Narvekar v. Pannalal Umediram (1976) 3
SCC 203 at 207, this Court, following Lalji Raja (supra), held as follows:
“8. Learned counsel appearing for the appellant how ever
submitted that since the Code of Civil Procedure wa s not
applicable to Goa the decree became inexecutable and this being
a vested right could not be taken away by the application of the
Code of Civil Procedure to Goa during the pendency of the appeal
before the Additional Judicial Commissioner. It seems to us that
the right of the judgment debtor to pay up the decree pass ed
against him cannot be said to be a vested right, nor can the
question of executability of the decree be regarded as a
substantive vested right of the judgment debtor. A fortiori the
execution proceedings being purely a matter of procedure it is
well settled that any change in law which is made during the
pendency of the cause would be deemed to be retroactive in
operation and the appellate court is bound to take notice of the
change in law.”
Since it is clear that execution of a decree pertains to th e realm of
procedure, and that there is no substantive vested right i n a judgment
debtor to resist execution, Section 36, as substituted, would apply even
to pending Section 34 applications on the date of commencement of the
Amendment Act.
43. The matter can also be looked at from a slightly differe nt
angle. Section 36, prior to the Amendment Act, is only a clog on the right
of the decree holder, who cannot execute the award in his favour, unless
the conditions of this section are met. This does not mean that there is a
corresponding right in the judgment debtor to stay the execution of such
875
an award. Learned counsel on behalf of the Appellants have, however,
argued that a substantive change has been made in the award, whi ch
became an executable decree only after the Section 34 proceedings
were over, but which is now made executable as if it was a decree with
immediate effect, and that this change would, therefore, take away a
vested right or accrued privilege in favour of the Responden ts. It has
been argued, relying upon a number of judgments, that since Section 36
is a part of the enforcement process of awards, there is a vested right or
at least a privilege accrued in favour of the Appellants in the unamended
1996 Act applying insofar as arbitral proceedings and court proceedings
in relation thereto have commenced, prior to the commencement of the
Amendment Act. The very judgment strongly relied upon by senior counsel
for the appellants, namely Garikapati Veeraya (supra), itself states in
proposition (v) at page 515, that the vested right of appeal can be taken
away only by a subsequent enactment, if it so provides specifically or by
necessary intendment and not otherwise. We have already h eld that
Section 26 does specifically provide that the court proceedings in relation
to arbitral proceedings, being independent from arbitral p roceedings,
would not be viewed as a continuation of arbitral proceedings, but would
be viewed separately. This being the case, it is unnecessary to refer to
judgments such as Union of India v. A.L. Rallia Ram , (1964) 3 SCR
164 and NBCC Ltd. v. J.G. Engineering (P) Ltd., (2010) 2 SCC 385,
which state that a Section 34 proceeding is a supervisory a nd not an
appellate proceeding. Snehadeep Structures (P) Ltd. v. Maharashtra
Small-Scale Industries Development Corpn. Ltd. , (2010) 3 SCC
34 at 47-49, which was cited for the purpose of stating that a Section 34
proceeding could be regard as an “appeal” within the meaning of Section
7 of the Interest on Delayed Payments To Small Scale and Ancillary
Industrial Undertakings Act, 1993, is obviously distinguishable on the
ground that it pertains to the said expression appearing in a beneficial
enactment, whose object would be defeated if the word “appeal” did not
include a Section 34 application. This is made clear by the a foresaid
judgment itself as follows:
“36. On a perusal of the plethora of decisions aforementioned,
we are of the view that “appeal” is a term that carries a wide
range of connotations with it and that appellate jurisdiction can
be exercised in a variety of forms. It is not necessary that the
exercise of appellate jurisdiction will always involve re-agitation
of entire matrix of facts and law. We have already seen
BOARD OF CONTROL FOR CRICKET IN INDIA v. KOCHI
CRICKET PVT. LTD. [R. F. NARIMAN, J.]
in Abhayankar [(1969) 2 SCC 74] that even an order passed
by virtue of limited power of revision under Section 115 of the
Code is treated as an exercise of appellate jurisdiction, though
under that provision, the Court cannot go into the questions of
facts. Given the weight of authorities in favour of giving such a
wide meaning to the term “appeal”, we are constrained to
disagree with the contention of the learned counsel fo r the
respondent Corporation that appeal shall mean only a challenge
to a decree or order where the entire matrix of law and fact can
be re-agitated with respect to the impugned order/decree. There
is no quarrel that Section 34 envisages only limited grounds of
challenge to an award; however, we see no reason why that
alone should take out an application under Section 34 outside the
ambit of an appeal especially when even a power of revision is
treated as an exercise of appellate jurisdiction by this Court and
the Privy Council.
xxx xxx xxx
40. It may be noted that Section 6(1) empowers the buyer to
obtain the due payment by way of any proceedings . Thus the
proceedings that the buyer can resort to, no doubt, incl udes
arbitration as well. It is pertinent to note that as opposed to Section
6(2), Section 6(1) does not state that in case the parties choose
to resort to arbitration, the proceedings in pursuance thereof will
be governed by the Arbitration Act. Hence, the right context in
which the meaning of the term “appeal” should be interpreted is
the Interest Act itself. The meaning of this term un der the
Arbitration Act or the Code of Civil Procedure would have been
relevant if the Interest Act had made a reference to them. For
this very reason, we also do not find it relevant that the Arbitration
Act deals with applications and appeals in two different chapters.
We are concerned with the meaning of the term “appeal” in the
Interest Act, and not in the Arbitration Act.”
44. Learned senior counsel appearing on behalf of the Respondents,
has also argued that the expression “has been” in Section 3 6(2), as
amended, would make it clear that the section itself refers to Section 34
applications which have been filed prior to the commence ment of the
Amendment Act and that, therefore, the said section would apply, on its
plain language, even to Section 34 applications that have been filed prior
877
to the commencement of the Amendment Act. For this purpose, t he
judgment in State of Bombay v. Vishnu Ramchandra (1961) 2 SCR
26, was strongly relied upon. In that judgment, it was observed, while
dealing with Section 57 of the Bombay Police Act, 1951, t hat the
expression “has been punished” is in the present perfect tense and can
mean either “shall have been” or “shall be”. Looking to the scheme of
the enactment as a whole, the Court felt that “shall have been” is more
appropriate. This decision was referred to in paragraphs 60 and 61 of
Workmen v. Firestone Tyre & Rubber Co. of India (P) Ltd., (1973)
1 SCC 813 at 838 and the ratio culled out was that such expression may
relate to past or future events, which has to be gathered from the context,
as well as the scheme of the particular legislation. In the context in
which Section 11A of the Industrial Disputes Act, 1947 was enact ed,
this Court held that Section 11A has the effect of alter ing the law by
abridging the rights of the employer. This being so, the expression “has
been” would refer only to future events and would have no implication
to disputes prior to December 15, 1971. However, in a significant
paragraph, this Court held:
“63. It must be stated at this stage that procedural law has always
been held to operate even retrospectively, as no party has a vested
right in procedure.…”
45. Being a procedural provision, it is obvious that the context of
Section 36 is that the expression “has been” would refer to Section 34
petitions filed before the commencement of the Amendment Ac t and
would be one pointer to the fact that the said section would indeed apply,
in its substituted form, even to such petitions. The judgment in L’Office
Cherifien Des Phosphates and another v. Yamashita-S hinnihon
Steamship Co. Ltd., (1994) 1 AC 486 is instructive. A new Section
13A was introduced with effect from 1 st January, 1992, by which
Arbitrators were vested with the power of dismissing a claim if there is
no inordinate or an inexcusable delay on the part of the cl aimant in
pursuing the claim. This Section was enacted because the House of
Lords in a certain decision had suggested that such delays in arbitration
could not lead to a rejection of the claim by itself. What led to the
enactment of the Section was put by Lord Mustill thus:
“My Lords, the effect of the decision of the House in the Bremer
Vulkan case, coupled with the inability of the courts to furnish
any alternative remedy which might provide a remedy for th e
BOARD OF CONTROL FOR CRICKET IN INDIA v. KOCHI
CRICKET PVT. LTD. [R. F. NARIMAN, J.]
abuse of stale claims, aroused a chorus of disapproval which
was forceful, sustained and (so far as I am aware) vir tually
unanimous. There is no need to elaborate. The criticisms came
from every quarter. Several Commonwealth countries hastily
introduced legislation conferring on the court, or on the arbitrator,
a jurisdiction to dismiss stale claims in arbitration. The history of
the matter, and the reasons why the question was not as easy as
it might have appeared, were summarized in an article published
in 1989 by Sir Thomas Bingham (Arbitration International, vol.
5, pp. 333 et seq.), and there is no need to rehearse them here.
Taking account of various apparent difficulties the Departmental
Advisory Committee on Arbitration hesitated for a time both as
to the principle and as to whether the power to dismiss should be
vested in the court or the arbitrator, but the pressure from all
quarters became irresistible and in 1990 the Courts and Legal
Services Act inserted, through the medium of Section 102, a
new Section 13A in the Arbitration Act, 1950.”
(at page 522)
The question which arose in that case was whether delay that had taken
place before the Section came into force could be taken into account by
an arbitrator in order to reject the claim in that case. The House of
Lords held that given the clamor for change and given the pr actical
value and nature of the rights involved, it would be permissible to look at
delay caused even before the Section came into force. In his concluding
paragraph, Lord Mustill held:
“In this light, I turn to the language of Section 13A construed, in
case of doubt, by reference to its legislative background. The
crucial words are: “(a) . . . there has been inordi nate and
inexcusable delay . . . “ Even if read in isolation these wor ds
would I believe be sufficient, in the context of Section 13A as a
whole, to demonstrate that the delay encompasses all the delay
which has caused the substantial risk of unfairness. If there were
any doubt about this the loud and prolonged chorus of complaints
about the disconformity between practices in arbitration and in
the High Court, and the increasing impatience for something to
be done about it, show quite clearly that Section 13A was intended
to bite in full from the outset. If the position were otherwi se it
would follow that, although Parliament has accepted the advice
879
of all those who had urged that this objectionable system should
be brought to an end, and has grasped the nettle and provided a
remedy, it has reconciled itself to the continuation of ar bitral
proceedings already irrevocably stamped with a risk of injustice.
I find it impossible to accept that Parliament can have intended
any such thing, and with due respect to those who have suggested
otherwise I find the meaning of Section 13A sufficiently clear to
persuade me that in the interests of reform Parliament was willing
to tolerate the very qualified kind of hardship involved in giving
the legislation a partially retrospective effect. Accordingly, I agree
with Beldam L.J. that the arbitrator did have the powers to which
he purported to exercise. I would therefore allow the appeal and
restore the award of the arbitrator.”
46. In 2004, this Court’s Judgment in National Aluminium
Company (supra) had recommended that Section 36 be substituted, as
it defeats the very objective of the alternative dispute resolution system,
and that the Section should be amended at the earliest to bring about the
required change in law. It would be clear that looking at t he practical
aspect and the nature of rights presently involved, and the sheer unfairness
of the unamended provision, which granted an automatic stay to execution
of an award before the enforcement process of Section 34 was over
(and which stay could last for a number of years) without having to look
at the facts of each case, it is clear that Section 36 as amended should
apply to Section 34 applications filed before the commencement of the
Amendment Act also for the aforesaid reasons.
47. Both sides locked horns on whether a proceeding under Section
36 could be said to be a proceeding which is independent of a proceeding
under Section 34. In view of what has been held by us above, it is
unnecessary for us to go into this by-lane of forensic argument.
48. However, Shri Viswanathan strongly relied upon the
observations made in paragraph 32 in Thyssen (supra)and the judgment
in Hameed Joharan v. Abdul Salam , (2001) 7 SCC 573. It is no doubt
true that paragraph 32 in Thyssen (supra) does, at first blush, support
Shri Viswanathan’s stand. However, this was stated in the context of
the machinery for enforcement under Section 17 of the 1940 Act which,
as we have seen, differs from Section 36 of the 1996 Act, bec ause of
the expression “in relation to arbitral proceedings”, which t ook in the
entire gamut, starting from the arbitral proceedings before the arbitral
BOARD OF CONTROL FOR CRICKET IN INDIA v. KOCHI
CRICKET PVT. LTD. [R. F. NARIMAN, J.]
tribunal and ending up with enforcement of the award. It was also in the
context of the structure of the 1940 Act being completely different from
the structure of the 1996 Act, which repealed the 1940 Act. In the present
case, it is clear that “enforcement” in Section 36 is to treat the award as
if it were a decree and enforce it as such under the Code of Civil
Procedure, which would only mean that such decree has to be executed
in the manner indicated. Also, a stray sentence in a judgment in a particular
context cannot be torn out of such context and applied in a situat ion
where it has been argued that enforcement and execution are one and
the same, at least for the purpose of the 1996 Act. In Regional
Manager & Anr. v. Pawan Kumar Dubey (1976) 3 SCR 540, at 544
it was held:
“We think that the principles involved in applying Article 311(2)
having been sufficiently explained in Shamsher Singh’s case
(supra) it should no longer be possible to urge that Sughar
Singh’s case (supra) could give rise to some misapprehension
of the law. Indeed, we do not think that the principles of la w
declared and applied so often have really changed. But, the
application of the same law to the differing circumstances and
facts of various cases which have come up to this Court could
create the impression sometimes that there is some co nflict
between different decisions of this Court. Even where there
appears to some conflict, it would, we think, vanish when the
ratio decidendi of each case is correctly understood. It is the
rule deducible from the application of law to the fact s and
circumstances of a case which constitutes its ratio decidendi
and not some conclusion based upon facts which may appear to
be similar. One additional or different fact can make a world of
difference between conclusions in two cases even when the
same principles are applied in each case to similar facts.”
49. For the same reason, it is clear that the judgment in Hameed
Joharan (supra), which stated that execution and enforcement were
different concepts in law, was in the context of Article 136 of the Limitation
Act, 1963, read with Section 35 of the Indian Stamp Act, 1899, which is
wholly different. The argument in that case was that Article 136 of the
Limitation Act prescribes a period of 12 years for the execu tion of a
decree or order, after it becomes enforceable. What was argued was
that it would become enforceable only when stamped and Section 35 of
881
the Stamp Act was referred to for the said purpose. In this context, this
Court held:
“And it is on this score it has been contended that the partition
decree thus even though already passed cannot be acted upon,
neither becomes enforceable unless drawn up and engrossed on
stamp papers. The period of limitation, it has been contended in
respect of the partition decree, cannot begin to run t ill it is
engrossed on requisite stamp paper. There is thus, it has be en
contended, a legislative bar under Section 35 of the Indian Stamp
Act for enforceability of partition decree. Mr Mani contende d
that enforcement includes the whole process of getting an award
as well as execution since execution otherwise mean s due
performance of all formalities, necessary to give validity to a
document. We are, however, unable to record our concurrence
therewith. Prescription of a twelve-year period certain cannot
possibly be obliterated by an enactment wholly unconnected
therewith. Legislative mandate as sanctioned under Article 136
cannot be kept in abeyance unless the selfsame legislation makes
a provision therefor. It may also be noticed that by the passing of
a final decree, the rights stand crystallised and it is only thereafter
its enforceability can be had, though not otherwise.”
(at page 593)
It is for this reason that it was stated that enforceabil ity of a decree
under the Limitation Act cannot be the subject matter of Section 35 of
the Stamp Act. Therefore, Section 35 of the Stamp Act coul d not be
held to “overrun” the Limitation Act and thus, give a complete go-by to
the legislative intent of Article 136 of the Limitation Act . Here again,
observations made in a completely different context have to be understood
in that context and cannot be applied to a totally different situation.
50. As a matter of fact, it was noticed that furnishing of st amp
paper was an act entirely within the domain and control of the Appellant
in that case, and any delay in the matter of furnishing the same cannot
possibly be said to stop limitation, as no one can take advantage of his
own wrong (see paragraph 13). As a matter of fact, the Court held that
unless a distinction was made between execution and enforcement, the
result in that case would lead to an “utter absurdity”. The Court held,
“absurdity cannot be the outcome of an interpretation of a Court order
and wherever there is even a possibility of such absurdity, it would be a
BOARD OF CONTROL FOR CRICKET IN INDIA v. KOCHI
CRICKET PVT. LTD. [R. F. NARIMAN, J.]
plain exercise of judicial power to repeal the same rather than encouraging
it” (see paragraph 38).
51. Shri Viswanathan then referred us to this Court’s judgment in
Akkayanaicker v. A.A.A. Kotchadainaidu and Anr. (2004) 12 SCC
469, which, according to him, has followed the judgment in Hameed
Joharan (supra). This judgment again would have no application for the
simple reason that the narrow point that was decided in that case was
whether the time period for execution of a decree under Section 136 of
the Limitation Act would start when the decree was originally made or
whether a fresh period of limitation would begin after the decree was
amended having been substantially scaled down by a Debt Relief Act.
This Court held that as the original decree could not be enf orced and
only the amended decree could be enforced, 12 years has to be counted
from the date of the amended decree. It is clear that this judgment also
does not carry the matter further.
52. It was also argued that an award by itself had no legal efficacy,
until it became enforceable, and that, therefore, until it could be enforced
as a decree of the Court, it would continue to remain suspended. H ere
again, the judgment in Satish Kumar (supra)is extremely instructive.
The question in that case was as to whether, under the 1940 Ac t, an
award had any legal efficacy before a judgment followed thereupon and
it was made into a decree. A Full Bench of the Punjab and Haryana
High Court held that until it is made a rule of the Court, such an award is
waste paper. This Court strongly disagreed and followed its unreported
decision in Uttam Singh Dugal & Co. v. Union of India as follows:
“It seems to us that the main reason given by the two Full Benches
for their conclusion is contrary to what was held by this Court in
its unreported decision in Uttam Singh Dugal & Co. v. Union
of India [ Civil Appeal No. 162 of 1962—judgment delivered on
11-10-1962] . The facts in this case, shortly stated, were that
Uttam Singh Dugal & Co. filed an application under Section 33
of the Act in the Court of the Subordinate Judge, Hazaribag.
The Union of India, Respondent 1, called upon Respondent 2,
Col. S.K. Bose, to adjudicate upon the matter in dispute between
Respondent 1 and the appellant Company. The case of Uttam
Singh Dugal & Co. was that this purported reference to
Respondent 2 for adjudication on the matters alleged to be in
dispute between them and Respondent 1 was not competent
883
because by an award passed by Respondent 2 on April 23, 1952
all the relevant disputes between them had been decided. The
High Court held inter alia that the first award did not create any
bar against the competence of the second reference. On appeal
this Court after holding that the application under Section 33
was competent observed as follows:
“The true legal position in regard to the effect of an award is
not in dispute. It is well settled that as a general rule, all claims
which are the subject-matter of a reference to arbitration merge
in the award which is pronounced in the proceedings before
the arbitrator and that after an award has been pronounced,
the rights and liabilities of the parties in respect of the said
claims can be determined only on the basis of the said award.
After an award is pronounced, no action can be started on the
original claim which had been the subject-matter of the
reference. As has been observed by Mookerjee, J., in the case
of Bhajahari Saha Banikya v. Behary Lal Basak [33 Cal.
881 at p. 898] the award is, in fact, a final adjudicatio n of a
Court of the parties own choice, and until impeached upon
sufficient grounds in an appropriate proceeding, an award, which
is on the fact of it regular, is conclusive upon the merits of the
controversy submitted, unless possibly the parties have intended
that the award shall not be final and conclusive … in reality, an
award possesses all the elements of vitality, even though it has
not been formally enforced, and it may be relied upon in a
litigation between the parties relating to the same subject -
matter”. This conclusion, according to the learned Judge, is
based upon the elementary principle that, as between the parties
and their privies, an award is entitled to that respect which is
due to the judgment of a court of last resort. Therefore, if the
award which has been pronounced between the parties has in
fact, or can, in law, be deemed to have dealt with the present
dispute, the second reference would be incompetent. This
position also has not been and cannot be seriously disputed.”
This Court then held on the merits “that the dispute in regard to
overpayments which are sought to be referred to the arbitration
of Respondent 2 by the second reference are not new disputes;
they are disputes in regard to claims which the Chief Engineer
should have made before the arbitration under the f irst
BOARD OF CONTROL FOR CRICKET IN INDIA v. KOCHI
CRICKET PVT. LTD. [R. F. NARIMAN, J.]
reference”. This Court accordingly allowed the appeal and se t
aside the order passed by the High Court.
This judgment is binding on us. In our opinion this judgment lays
down that the position under the Act is in no way different from
what it was before the Act came into force, and that an aw ard
has some legal force and is not a mere waste paper. If the award
in question is not a mere waste paper but has some legal effect
it plainly purports to or affects property within the meaning of
Section 17(1)( b) of the Registration Act.”
(at pages 248-249)
53. Justice Hegde, in a separate concurring judgment, specifically
stated that an award creates rights in property, but th ose rights cannot
be enforced until the award is made a decree of the Court. The Learned
Judge put it very well when he said, “It is one thing to say that a right is
not created, it is an entirely different thing to say that the right created
cannot be enforced without further steps”. The Amendment Act h as
only made an award executable conditionally after it is mad e, like a
judgment of a Court, the only difference being that a decree would not
have to be formally drawn following the making of such award.
54. Shri Viswanathan then argued, relying upon R. Rajagopal
Reddy v. Padmini Chandrasekharan (1995) 2 SCC 630, Fuerst Day
Lawson Ltd. v. Jindal Exports Ltd. (2001) 6 SCC 356, Sedco Forex
International Drill. Inc. v. CIT (2005) 12 SCC 717 and Bank of
Baroda v. Anita Nandrajog (2009) 9 SCC 462, that a clarificatory
amendment can only be retrospective, if it does not substantively change
the law, but merely clarifies some doubt which has crept into the law.
For this purpose, he referred us to the amendments made in Section 34
by the Amendment Act and stated that despite the fact that Explanations
1 and 2 to Section 34(2) stated that “for the avoidance of any doubt, it is
clarified”, this is not language that is conclusive in nature, but it is open
to the Court to go into whether there is, in fact, a substantive change that
has been made from the earlier position or whether a doubt has merely
been clarified. According to learned senior counsel, since fundamental
changes have been made, doing away with at least two judgment s of
this Court, being Saw PipesLtd (supra) and Western Geco (supra),
as has been held in paragraph 18 in HRD Corporation (Marcus Oil
and Chemical Division) v. Gail (India) Limited (Forme rly Gas
Authority of India Ltd.) 2017 SCC Online 1024, it is clear that such
885
amendments would only be prospective in nature. We do not expres s
any opinion on the aforesaid contention since the amendments made to
Section 34 are not directly before us. It is enough to state that Section
26 of the Amendment Act makes it clear that the Amendment Act, as a
whole, is prospective in nature. Thereafter, whether certain provisions
are clarificatory, declaratory or procedural and, therefore, retrospective,
is a separate and independent enquiry, which we are not requi red to
undertake in the facts of the present cases, except to the extent indicated
above, namely, the effect of the substituted Section 36 of the Amendment
Act.
55. Learned counsel for the Appellants have painted a lurid picture
of anomalies that would arise in case the Amendment Act were generally
to be made retrospective in application. Since we have already held that
the Amendment Act is only prospective in application, no such anomalies
can possibly arise. It may also be noted that the choosing of Section 21
as being the date on which the Amendment Act would apply to arbitral
proceedings that have been commenced could equally be stated to give
rise to various anomalies. One such anomaly could be that the arbitration
agreement itself may have been entered into years earlier, and disputes
between the parties could have arisen many years after the said arbitration
agreement. The argument on behalf of the Appellants is that parties are
entitled to proceed on the basis of the law as it exists o n the date on
which they entered into an agreement to refer disputes to arbitration. If
this were to be the case, the starting point of the applic ation of the
Amendment Act being only when a notice to arbitrate has been received
by the respondent, which as has been stated above, could be many years
after the arbitration agreement has been entered into, would itself give
rise to the anomaly that the amended law would apply even to arbitration
proceedings years afterwards as and when a dispute arises and a notice
to arbitrate has been issued under Section 21. In such a case, the parties,
having entered into an arbitration agreement years earlier, coul d well
turn around and say that they never bargained for the change in law that
has taken place many years after, and which change will apply to them,
since the notice, referred to in Section 21, has been issued af ter the
Amendment Act has come into force. Cut off dates, by their very nature,
are bound to lead to certain anomalies, but that does not mean that the
process of interpretation must be so twisted as to negate both the plain
language as well as the object of the amending statute. On this ground
also, we do not see how an emotive argument can be converted i nto a
BOARD OF CONTROL FOR CRICKET IN INDIA v. KOCHI
CRICKET PVT. LTD. [R. F. NARIMAN, J.]
legal one, so as to interpret Section 26 in a manner that would be contrary
to both its plain language and object.
56. However, it is important to remember that the Amendment
Act was enacted for the following reasons, as the Statement of Objects
and Reasons for the Amendment Act states:
“2. The Act was enacted to provide for speedy disposal of cases
relating to arbitration with least court intervention. With the
passage of time, some difficulties in the applicability of the Act
have been noticed. Interpretation of the provisions of the Act by
courts in some cases have resulted in delay of dispo sal of
arbitration proceedings and increase in interference of courts in
arbitration matters, which tend to defeat the object of the Act.
With a view to overcome the difficulties, the matter was referred
to the Law Commission of India, which examined the issue in
detail and submitted its 176th Report. On the basis of the said
report, the Arbitration and Conciliation (Amendment) Bill, 2003
was introduced in the Rajya Sabha on 22nd December, 2003.
The said Bill was referred to the Department-relate d
Parliamentary Standing Committee on Personnel, Publ ic
Grievances, Law and Justice for examination and Report. The
said Committee, submitted its Report to the Parliament on 4th
August, 2005, wherein the Committee recommended that since
many provisions of the said Bill were contentious, the Bill may
be withdrawn and a fresh legislation may be brought afte r
considering its recommendations. Accordingly, the said Bill was
withdrawn from the Rajya Sabha.
3. On a reference made again in pursuance of the above, the
Law Commission examined and submitted its 246th Report on
“Amendments to the Arbitration and Conciliation Act, 1996” in
August, 2014 and recommended various amendments in the Act.
The proposed amendments to the Act would facilitate and
encourage Alternative Dispute Mechanism, especially arbitration,
for settlement of disputes in a more user-friendly, cost effective
and expeditious disposal of cases since India is committed to
improve its legal framework to obviate in disposal of cases.
4. As India has been ranked at 178 out of 189 nations in the
world in contract enforcement, it is high time that urgent steps
887
are taken to facilitate quick enforcement of contracts, easy
recovery of monetary claims and award of just compensation
for damages suffered and reduce the pendency of cases in courts
and hasten the process of dispute resolution through arbitration,
so as to encourage investment and economic activity.
5. As Parliament was not in session and immediate steps we re
required to be taken to make necessary amendments to the
Arbitration and Conciliation Act, 1996 to attract foreign investment
by projecting India as an investor friendly country having a sound
legal framework, the President was pleased to promulgate t he
Arbitration and Conciliation (Amendment) Ordinance, 2015.
6. It is proposed to introduce the Arbitration and Concilia tion
(Amendment) Bill, 2015, to replace the Arbitration and
Conciliation (Amendment) Ordinance, 2015, which inter alia,
provides for the following, namely:—
(i) to amend the definition of “Court” to provide that in the case
of international commercial arbitrations, the Court should be the
High Court;
(ii) to ensure that an Indian Court can exercise jurisdiction to
grant interim measures, etc., even where the seat of the arbitration
is outside India;
(iii) an application for appointment of an arbitrator s hall be
disposed of by the High Court or Supreme Court, as the case
may be, as expeditiously as possible and an endeavour should be
made to dispose of the matter within a period of sixty days;
(iv) to provide that while considering any applicati on for
appointment of arbitrator, the High Court or the Supreme Court
shall examine the existence of a prima facie arbitration agreement
and not other issues;
(v) to provide that the arbitral tribunal shall make its award within
a period of twelve months from the date it enters upon the
reference and that the parties may, however, extend such period
up to six months, beyond which period any extension can only be
granted by the Court, on sufficient cause;
(vi) to provide that a model fee Schedule on the basis of which
High Courts may frame rules for the purpose of determination
BOARD OF CONTROL FOR CRICKET IN INDIA v. KOCHI
CRICKET PVT. LTD. [R. F. NARIMAN, J.]
of fees of arbitral tribunal, where a High Court appoints arbitrator
in terms of section 11 of the Act;
(vii) to provide that the parties to dispute may at any stage agree
in writing that their dispute be resolved through fa st track
procedure and the award in such cases shall be made within a
period of six months;
(viii) to provide for neutrality of arbitrators, when a pe rson is
approached in connection with possible appointment a s an
arbitrator;
(ix) to provide that application to challenge the award is to be
disposed of by the Court within one year.
7. The amendments proposed in the Bill will ensure that arbitration
process becomes more user-friendly, cost effective and lead to
expeditious disposal of cases.”
(Emphasis Supplied)
57. The Government will be well-advised in keeping the aforesaid
Statement of Objects and Reasons in the forefront, if it pr oposes to
enact Section 87 on the lines indicated in the Government’s press release
dated 7 th March, 2018. The immediate effect of the proposed Section 87
would be to put all the important amendments made by the Amendment
Act on a back-burner, such as the important amendments made to Sections
28 and 34 in particular, which, as has been stated by the Sta tement of
Objects and Reasons, “…have resulted in delay of disposal of arbitration
proceedings and increase in interference of courts in arbitration matters,
which tend to defeat the object of the Act”, and will now not be applicable
to Section 34 petitions filed after 23 rd October, 2015, but will be applicable
to Section 34 petitions filed in cases where arbitration proceedings have
themselves commenced only after 23 rd October, 2015. This would mean
that in all matters which are in the pipeline, despite the fact that Section
34 proceedings have been initiated only after 23 rd October, 2015, yet, the
old law would continue to apply resulting in delay of disposal of arbitration
proceedings by increased interference of Courts, which ultimately defeats
the object of the 1996 Act. 4 It would be important to remember that the
246 th Law Commission Report has itself bifurcated proceedings into
4 These amendments have the effect, as stated in HRD Corporation (Marcus Oil and
Chemical Division) v. Gail (India) Limited (Formerly Gas Authority of India
Ltd.) 2017 SCC Online 1024 (at paragraph 18) of limiting the grounds of challenge to
awards as follows:
889
two parts, so that the Amendment Act can apply to Court proce edings
commenced on or after 23 rd October, 2015. It is this basic scheme which
is adhered to by Section 26 of the Amendment Act, which ought not to
be displaced as the very object of the enactment of the Amendment Act
would otherwise be defeated.
58. At the fag end of the arguments, Shri Viswanathan, in rejoinder,
raised another point which arises only in Civil Appeals arising out of
SLP(C) No. 8374-8375 of 2017 and 8376-8378 of 2017. According to
him, the impugned judgment, when it dealt with the majority award in
favour of respondent Enercon GmbH, went behind the award in ordering
execution of a portion of the award in favour of Enercon, when the
majority award, in paragraph 331(3)(b), specifically ordered the 2 nd and
3rd defendants to pay to WWIL, which is a joint venture company, a sum
of Rs.6,77,24,56,570/-. The majority award of the tribunal had specifically
stated, in paragraph 298, as follows:
“Enercon’s claim is first pleaded as damages payable by the
Mehra directors directly to Enercon. It also pleads an alternative
claim for such further or other relief as the Tribunal consi ders
appropriate (paragraph 18 of the application of 13 Dece mber
2015 and paragraph 323.4 of its closing written submission dated
13 May 2016, as also its Statement of Claim of 30 September
2014, at paragraph 102(M).) In the Tribunal’s view, given that
WWIL is only part owned by Enercon (hence Enercon’s
“…In fact, the same Law Commission Report has amend ed Sections 28 and
34 so as to narrow grounds of challenge available under the Act. The judgment
in ONGC v. Saw Pipes Ltd, (2003) 5 SCC 705, has been expressly done away
with. So has the judgment in ONGC v. Western Geco I nternational Ltd.,
(2014) 9 SCC 263. Both Sections 34 and 48 have been brought back to the
position of law contained in Renusagar Power Plant Co. Ltd. v. General
Electric Co., (1994) Supp (1) SCC 644, where “publi c policy” will now
include only two of the three things set out therein, viz., “fundamental policy
of Indian law” and “justice or morality”. The ground relating to “the interest
of India” no longer obtains. “Fundamental policy of Indian law” is now to be
understood as laid down in Renusagar (supra). “Justice or morality” has been
tightened and is now to be understood as meaning only basic notions of justice
and morality i.e. such notions as would shock the conscience of the Court as
understood in Associate Builders v. Delhi Developme nt Authority, (2015) 3
SCC 49. Section 28(3) has also been amended to brin g it in line with the
judgment of this Court in Associate Builders (supra), making it clear that the
construction of the terms of the contract is primar ily for the arbitrator to
decide unless it is found that such a construction is not a possible one.”
BOARD OF CONTROL FOR CRICKET IN INDIA v. KOCHI
CRICKET PVT. LTD. [R. F. NARIMAN, J.]
pecuniary disadvantage resulting from the Mehra directors ’
wrongdoing is not the same as that of WWIL) and further that
WWIL remains the person most immediately affected by such
wrongdoing, the liability of the Mehra directors is best discharged
by requiring them to deciding upon such relief in favour of WWIL
(as distinct from direct relief in favour of Enercon), the Tribunal
sees no material disadvantage to Enercon, and, as for the Mehra
directors, no possible prejudice or other unfairness, whether as a
matter of pleading, the form of relief or otherwise.”
It is only thereafter that the Tribunal awarded the aforesaid amount in
paragraph 331(3)(b) as follows:
“(b) Jointly and severally-
(i) to pay to WWIL the sum of INR 6,772,456,570, being the
profit made by Vish Wind on the sale of allotment rights to WWIL
in the years ending 31 March 2011 and 2012 together with interest
thereon at the rate of 3% over European Central Bank rate from
those dates until the date of this Award.
(ii) To pay to the Claimants their legal and other costs in the sum
of €3,794,970.”
59. It is thus Shri Viswanathan’s contention that it is the decree
holder alone who can execute such decree in its favour, and that in the
present case it is WWIL who is the decree holder, insofar as paragraph
331(3)(b) is concerned and, that, therefore, Enerco n’s Chamber
Summons, to execute this portion of the award, is contrary to the Code
of Civil Procedure as well as a number of judgments construing the
Code.
60. On the other hand, the submission of the other side is that the
Mehra brothers, who are the 2 nd and 3 rd defendants in the arbitration
proceedings, are in control and management of WWIL, and have
wrongfully excluded Enercon from such control and manag ement.
WWIL, therefore, will never put this decree into execution. This being
so, the interest of justice requires that we should not interf ere with the
High Court judgment as there is no person that would be in a position to
enforce the award apart from Enercon.
61. We are of the opinion that even though the High Court may
not be strictly correct in its appreciation of the law, yet it has attempted
to do justice on the facts of the case as follows:
891
“These last words are important. If what Mr. Mehta sa ys is
correct and the decree was in favour of WWIL and not Enercon,
that necessarily posits a rejection of Enercon’s claim for damages
and, therefore, a material disadvantage to Enercon. But this is
not what the Arbitral Tribunal did at all. It accepted Enercon’s
plea. It accepted its argument that the Mehras were guilt y of
wrongdoing. It accepted that the Mehras were liable to make
good any advantage or benefit they have received. The Arbitral
Tribunal merely changed the vehicle or direction by which that
recompense, restitution or recovery was to be made. The
nomenclature is immaterial. Given the nature of disputes, indeed,
WWIL could never put this decree into execution. It never sought
this relief. It could not have. This is not in fact, as paragraph 298,
says a relief in favour of WWIL at all although WWIL may
benefit from it. It is a relief and a decree in favour of and only of
Enercon.”
In this view of the matter, we do not think it appropriate, in the interest of
justice, to interfere with the impugned judgment on this count.
62. In view of the above, the present batch of appeals is dismissed.
A copy of the judgment is to be sent to the Ministry of Law and Justice
and the Learned Attorney General for India in view of what is stated in
paragraphs 56 and 57 supra.
Nidhi Jain Appeals dismissed.
BOARD OF CONTROL FOR CRICKET IN INDIA v. KOCHI
CRICKET PVT. LTD. [R. F. NARIMAN, J.]