Pioneer Urban Land and Infrastructure Limited & Anr. v. Union of India & Ors.
R. F. NARIMAN, J. 1. The large number of writ petitions that
have been filed in this Court challenge the constitutional validity of
amendments made to the Insolvency and Bankruptcy Code, 2016
(hereinafter referred to as “the Code”), pursuant to a report prepared
by the Insolvency Law Committee dated26 thMarch, 2018 (hereinafter
referred to as the “Insolvency Committee Report”).The amendments
so made deem allottees of real estate projects to be “financial creditors”
so that they may trigger the Code, under Section 7 thereof, against the
real estate developer . In addition, being financial creditors, they are
entitled to be represented in the Committee of Creditors by authorised
representatives. The amendments so made to the Code are as follows:
PROVISIONS OF THE INSOLVENCY AND
BANKRUPTCY CODE, 2016 BEING CHALLENGED
1. Explanation to Section 5(8)(f):
“5. Definitions
In this part, unless the context otherwise requires, –
(8) “financial debt” means a debt along with interest, if any, which
is disbursed against the consideration for the time value of money
and includes-
(f) any amount raised under any other transaction, including any
forward sale or purchase agreement, having the commercial effect
of a borrowing;
Explanation.- For the purposes of this sub-clause,-
(i) any amount raised from an allottee under a real estate project
shall be deemed to be an amount having the commercial
effect of a borrowing; and
(ii) the expressions, “allottee” and “real estate project” shall have
the meanings respectively assigned to them in clauses (d)
and (zn) of section 2 of the Real Estate (Regulation and
Development) Act, 2016 (16 of 2016);”
2. Section 21(6A)(b)
“21. Committee of creditors
415
(6A) Where a financial debt-
(b)is owed to a class of creditors exceeding the number as may
be specified, other than the creditors covered under clause (a) or
sub-section (6), the interim resolution professional shall make an
application to the Adjudicating Authority along with the list of all
financial creditors, containing the name of an insolvency
professional, other than the interim resolution professional, to act
as their authorised representative who shall be appointed by the
Adjudicating Authority prior to the first meeting of the committee
of creditors; […]
and such authorised representative under clause (a) or clause (b)
or clause (c) shall attend the meetings of the committee of
creditors, and vote on behalf of each financial creditor to the extent
of his voting share.”
3. Section 25A
“25A.Rights and duties of authorized representatives of financial
creditors –
(1) The authorised representative under sub-section (6) or sub-
section (6A) of section 21 or sub-section (5) of section 24
shall have the right to participate and vote in meetings of the
committee of creditors on behalf of the financial creditor he
represents in accordance with the prior voting instructions of
such creditors obtained through physical or electronic means.
(2) It shall be the duty of the authorised representative to
circulate the agenda and minutes of the meeting of the com-
mittee of creditors to the financial creditor he represents.
(3) The authorised representative shall not act against the interest
of the financial creditor he represents and shall always act in
accordance with their prior instructions:
Provided that if the authorised representative represents several
financial creditors, then he shall cast his vote in respect of
each financial creditor in accordance with instructions received
from each financial creditor, to the extent of his voting share:
Provided further that if any financial creditor does not give
prior instructions through physical or electronic means, the
PIONEER URBAN LAND AND INFRASTRUCTURE L TD.
& ANR. v. UNION OF INDIA & ORS. [R.F . NARIMAN, J.]
authorised representative shall abstain from voting on behalf
of such creditor.
(4) The authorised representative shall file with the committee of
creditors any instructions received by way of physical or
electronic means, from the financial creditor he represents, for
voting in accordance therewith, to ensure that the appropriate
voting instructions of the financial creditor he represents is
correctly recorded by the interim resolution professional or
resolution professional, as the case may be.
Explanation – For the purposes of this section, the “electronic
means” shall be such as may be specified.””
2. The Code was passed by the Parliament on 28 th May, 2016.
Several petitions were then filed against real estate developers under
the Code by allottees who had entered into “assured returns /committed
returns” agreements with these developers, whereby , upon payment of
a substantial portion of the total sale consideration upfront at the time of
execution of the agreement, the developer undertook to pay a certain
amount to allottees on a monthly basis from the date of execution of the
agreement till the date of handing over of possession to the allottees.The
National Company Law Appellate Tribunal (hereinafter referred to as
“NCLAT”)on 21 st July, 2017 in Nikhil Mehtaand Sons (HUF) v. AMR
Infrastructure Ltd., (Company Appeal (AT) (Insolvency) No. 07 of
2017) held that amounts raised by developers under assured return
schemes had the “commercial effect of a borrowing”, which became
clear from the developer ’s annual returns in which the amount raised
was shown as “commitment charges” under the head “financial costs”.
As a result, such allottees were held to be “financial creditors” within
the meaning of Section 5(7) of the Code.
3. On 9th August, 2017, proceedings were initiated by IDBI Bank
against a large real estate developer, Jaypee Infratech Ltd. under Section
7 of the Code before the National Company Law Tribunal (hereinafter
referred to as “NCL T”) Allahabad Bench, alleging that Jaypee had
defaulted on a loan of Rs.526.1 1 crores. On 1 1th September, 2017, an
order was passed by this Hon’ble Court in Chitra Sharma & Ors. v .
Union of India (Writ Petition (Civil) No.744 of 2017) in the case of
Jaypee Infratech Ltd. appointing a representative of the home buyers,
417
i.e. the allottees, to participate in meetings of the Committee of Creditors
in order that their interests be protected.
4. While this order was passed in Chitra Sharma (supra), qua
another group of builders, namely , the Amrapali group, an order was
passed on 22 nd November, 2017 by this Court in Bikram Chatterji v.
Union of India (Writ Petition (Civil) No.940 of 2017) substantially on
the same lines as the order passed in Chitra Sharma (supra). During
proceedings before this Hon’ble Court in Chitra Sharma (supra), this
Court, vide order dated 21 st March, 2018, recorded that it was only
concerned with those home buyers who intend to obtain a refund of
amounts advanced by them, being 8% of the total home buyers/allottees
in Jaypee’ s case. Given these orders by this Court, the Insolvency
Committee Report suggested that amendments be made in the Code
seeking to clarify, as a matter of law, that allottees of real estate projects
are financial creditors.It may be noted that three members of the
Insolvency Law Committee, namely , ShriShardul Shrof f, Shri S. Sen
and Shri B. Sriram, dissented with the rest of the Insolvency Law
Committee on the proposed amendments. On 6th June, 2018, pursuant to
this Report, the Insolvency and Bankruptcy Code Amendment
Ordinance, 2018 (hereinafter referred to as the “Amendment Ordinance”)
was promulgated by which the three amendments (supra) to the Code
were inserted. On 17th August, 2018, the Parliament passed the Insolvency
and Bankruptcy Code(Second Amendment) Act, 2018(hereinafter
referred to as the “Amendment Act”) incorporating the aforesaid
amendments as were provided for by the Amendment Ordinance.
5. Dr. Abhishek Manu Singhvi, learned Senior Advocate, leading
the charge on behalf of the real estate developers, has argued that the
treatment of allottees as financial creditors violates two facets of Article
14. One, that the amendment is discriminatory inasmuch as it treats
unequals equally, and equals unequally, having no intelligible differentia;
and two, that there is no nexus with the objects sought to be achieved by
the Code. In fact, according to the learned senior counsel the amendments
fly in the face of the objects sought to be achieved by the Code, i.e. to
maximise value of assets so that the shareholders of a corporate debtor
do not suffer from bad management or poor management. In the facts
of the present cases, according to Dr . Singhvi, the “bad eggs” alone
have been looked at, and entities like his client and many others before
PIONEER URBAN LAND AND INFRASTRUCTURE L TD.
& ANR. v. UNION OF INDIA & ORS. [R.F . NARIMAN, J.]
us, who have completed building projects in time and are in every way
compliant with the law , can yet be jeopardised by Section 7 petitions
filed under the Code to blackmail them into making payments which
would divert funds which are otherwise to be used for the purpose of
the project. According to the learned senior counsel, a perfectly good
management which has several projects on its hands can be removed at
the instance of one allottee and either replaced – in which case the
massive funds infused by the developer himself would be set at naught –
or worse still, lead to commercial death, in that, if there are no resolution
plans or all resolution plans are rejected either by the Committee of
Creditors or by the authorities under the Code, a perfectly solvent
company would then be wound up, which would not be in the interest of
anybody, least of all the bulk of allottees themselves, who would want
possession of flats/apartments. According to him, therefore, these
amendments are manifestly arbitrary, being excessive, disproportionate,
irrational and without determining principle. For the same reason, the
Petitioners’ fundamental right under Article 19(1)(g) of the Constitution
of India is infracted, and the amendments, not being a reasonable
restriction in the public interest under Article 19(6) would, therefore,
have to be struck down. Equally, according to the learned senior counsel,
the deeming fiction in the explanation to Section 5(8)(f) of the Code is
inconsistent with the objects sought to be achieved by the Code and has
been stretched to absurd limits, making it manifestly arbitrary. Also, the
amendments made to Section 21 and the insertion of Section 25A of the
Code do away with the collegiality and commercial wisdom of the
Committee of Creditors, and are manifestly arbitrary on this count. He
made an impassioned plea that it was surprising that these amendments
were even made, in view of the fact that there is a specific legislation,
namely, the Real Estate (Regulation and Development) Act, 2016
(hereinafter referred to as “RERA”), which deals in detail with the real
estate sector, and provides for adjudication of disputes between allottees
and the developer, together with a large number of safeguards in favour
of the allottee, including agreements in statutory form, which would
replace the agreements entered into between the developer and the
allottees. According to him, therefore, a reading of RERA would show
that all concerns of the allottees would be addressed by this sector-
specific legislation and that the enactment of a sledgehammer to kill a
gnat would render the impugned amendments excessive, disproportionate
and violative of Articles 14 and 19(1)(g) of the Constitution on this score
419
also. In addition, the learned senior counsel scoffed at the Union’s stand,
in their counter affidavit before this Court, that the amendments made
are clarificatory in nature. According to Dr. Singhvi, by no stretch of
imagination could allottees who have parted with money as sale
consideration for an apartment be included within the definition of
“financial creditor” as originally enacted by Section 5(7). In fact, the
very need for a deeming fiction is so that Parliament brings in persons
who are not financial creditors, by forcibly inserting a square peg in a
round hole. He read to us this Court’ s judgment in Swiss Ribbons v.
Union of India (2019) 4 SCC 17, in copious detail, in order to drive
home the point that not a single one of several characteristics of financial
creditors stated in that judgment would apply to allottees/homebuyers.
On the contrary, if at all they could be assimilated to anybody, it would
be to operational creditors, in which event it would be enough to state
that there is a pre-existing dispute between the parties, as a result of
which the Code cannot get triggered. According to him, including allottees
of real estate projects - a huge amorphous and disparate lot - as financial
creditors, would not only be unworkable, as thousands of petitions would
flood the NCLT, but would also be both arbitrary and unworkable when
this large number of disparate persons is represented on the Committee
of Creditors, many of whom would speak in different voices, being
concerned only with their own investment, and having no concern
whatsoever for the financial betterment of the corporate debtor .
6. Shri Neeraj Kishan Kaul, learned Senior Advocate appearing
on behalf of some of the Petitioners, has adopted the submissions of Dr.
Singhvi. He cited judgments to buttress the Article 14 arguments made
by Dr. Singhvi, and added that an explanation cannot in any way interfere
with or change the enactment or any part thereof. He also argued that it
would be wholly arbitrary to include allottees as financial creditors when,
in fact, they possess none of the characteristics pointed out in Swiss
Ribbons (supra) of banks and financial institutions.
7. Shri Shyam Divan, learned Senior Advocate appearing on behalf
of some of the real estate developers, made an impassioned plea that in
one of the writ petitions in which he appears, the real estate developer
has infused over Rs. 100 crores in a particular project, through funds
that are obtained from abroad. If in the case of entities like this developer,
who complete projects on time and who have never defaulted, a single
allottee can knock at the doors of the NCL T and obtain an admission
PIONEER URBAN LAND AND INFRASTRUCTURE L TD.
& ANR. v. UNION OF INDIA & ORS. [R.F . NARIMAN, J.]
order, the management of the corporate debtor would be removed and
replaced by either somebody else, or, if not possible, the company would
be wound up. According to him, not only would this be highly arbitrary
and excessive, impacting the fundamental rights under Article 19(1)(g)
and 300-A, but would also have the indirect effect of dissuading foreigners
from investing in this country. He also argued that Article 14 interdicts
legislation whose object is itself discriminatory, and cited judgments to
prove his point. He argued with great vehemence, citing judgments to
buttress the proposition that a deeming fiction cannot do away with what
are the essentials of being a financial creditor. According to him, there is
no “debt” as defined under the Code; there is no “borrowing” as there is
no temporary handing over of money which has then to be returned;
there is no “disbursal” and no “sum raised” which has then to be handed
back. Equally , the commercial ef fect of a borrowing must be qua
transactions in which money is later replaced by money. According to
him, in the present case, at the time that the agreement is made between
the allottee and the real estate developer, what is agreed is that in return
for money paid by the allottee, a flat/apartment would be allotted. It is
only in the event of breach of the agreement on the part of the real
estate developer that monies are to be refunded, which does not bring
allottees within the definition of “financial creditor”. He also argued,
adopting Dr. Singhvi’s arguments, that all other categories of financial
creditors would involve these elements, and if read noscitur a sociis
with the other clauses, Section 5(8) of the Code would also make it clear
that persons can only be included if there is a borrowing, at the end of
which the borrowing is returned - with or without interest. He thus agreed
with Dr. Singhvi’s argument that what was sought to be inserted by the
amendment is a square peg in a round hole.
8. Shri Jayant Bhushan, learned Senior Advocate appearing on
behalf of some of the Petitioners, then followed. He stressed the facts
of Writ Petition No.357 of 2019 to show that huge sums have been
infused into a large number of projects by the developers themselves, all
such projects being constructed in accordance with RERA. According
to him, if the amendments pass muster, as many as 5000 workers engaged
across these real estate projects together with 600 employees would be
directly impacted. NCL T applications have been filed by allottees of
only 14 units out of 19,062 units sold. According to him, his client has
421
never defaulted in repayment of amounts borrowed from banks/financial
institutions and, in fact, upon initiation of the insolvency process, on
account of one petition filed by one allottee, IDFC invoked a standby
letter of credit and thereby recovered the entire amount due to them
being approximately Rs. 100 crores prematurely. Therefore, large solvent
real estate developers would be crippled if the Code were to be applied
in this fashion to them. Apart from buttressing arguments already made
on Articles 14 and 19(1)(g), he relied on judgments to show that a claim
for unliquidated damages becomes a debt only on adjudication, which
does not take place when a Section 7 application is heard. According to
him, since the NCLT can only go into “default” and as the definition of
“default” itself is vague and ambiguous, the said definition should be
struck down as being manifestly arbitrary . He also added, citing the
same judgment as Shri Neeraj Kaul, namely , S. Sundaram Pillai v .
V.R. Pattabiraman (1985) 1 SCC 591, that an explanation cannot enlarge
the scope of the original provision. He also made a without-prejudice
argument that even if allottees are not permitted to trigger the Code,
they may still be protected by making suitable amendments for their
inclusion in the Committee of Creditors, so that they may have a voice in
the future of the corporate debtor, which will impact the flats/apartments
to be given to them or refunds to be made, as the case may be.
9. Shri Gopal Sankaranarayanan, learned Senior Advocate,
followed Shri Bhushan and argued on the various facets of Articles 14
and 19(1)(g). He also sought directions to recalcitrant States to
immediately set up the requisite authorities under RERA and made an
impassioned plea that the words “claims as may be specified” in Section
15(1)(c) of the Code be struck down. According to him, real estate
developers and borrowers are treated as equals when they are, in fact,
unequals. Also, real estate developers are discriminated against when
compared with other entities supplying goods or services. The
amendments made are, therefore, excessive and disproportionate being
manifestly arbitrary. He also buttressed Dr . Singhvi’s argument that a
square peg is fitted into a round hole as none of the identifying traits of
financial creditors as explained in Swiss Ribbons (supra) are present
insofar as allottees are concerned. He added that, in any case, RERA
looks after all possible difficulties of allottees, who may in addition, invoke
the arbitration clause for resolution of disputes with the real estate
developer contained in most agreements.
PIONEER URBAN LAND AND INFRASTRUCTURE L TD.
& ANR. v. UNION OF INDIA & ORS. [R.F . NARIMAN, J.]
10. Shri Krishnan Venugopal, learned Senior Advocate, who
followed Shri Gopal Sankaranarayanan, placed before us the Global
Derivatives Study Group and extracts from Philip Wood’s Project Finance,
Subordinated Debt and State Loans; and Principles of International
Insolvency by the same author. He then relied on ‘The ACT Borrower’s
Guide to the LMA ’s Investment Grade Agreements’ produced by
Slaughter & May to explain the genesis of Section 5(8) generally and
5(8)(f) of the Code in particular . He then relied upon a number of
judgments, which according to him made it clear that a deeming fiction
is enacted when the position in reality is completely different, and hence,
a deeming fiction is introduced when something is not otherwise covered
under the main provision. On this basis, he contended that the amendment
to Section 5(8)(f) of the Code was prospective in nature. He also cited
judgments to show that time for completion of a project can never be
said to be of the essence of the agreement between the builder and the
allottee, and this being so, a builder cannot be said to be in default when
he does not deliver a flat/apartment within the time specified, but later.
According to him, since Section 5(8) of the Code is a “means and includes”
definition clause, it is exhaustive and therefore, to then introduce by way
of amendment something extra by means of a deeming fiction would
thus not be permissible in law. Shri Krishnan Venugopal also referred to
extracts from various authorities to demonstrate that even qua credit
and conditional sale agreements, ultimately Section 5(8) is concerned
only with transactions in which finance is involved. He also pointed out,
with reference to Chapter 1 1 Bankruptcy Proceedings in the United
States, that once a company has been stigmatised as being bankrupt or
having gone into bankruptcy, several persons who earlier dealt with the
company disengaged themselves, as a result of which the Company’ s
power to do business gets severely hampered.
11. The tail of the ar guments on behalf of the Petitioners then
wagged in the persona of several other counsel who added titbits here
and there. Shri Bhandari, appearing for one of the writ Petitioners, gave
a chart of a comparative analysis between the ‘UNCITRAL Legislative
Guide on Insolvency Law’ (2005) (hereinafter referred to as the
“UNCITRAL Legislative Guide”),which forms the basis of the Code,
and the Bankruptcy Law Reforms Committee Report (2015), argued
that the impugned amendments went against several features of this
UNCITRAL Legislative Guide. He contended that, first and foremost,
423
the fundamental difference between financial and operational creditors
was ignored. Secondly, he contended that by treating homebuyers, who
are in substance operational creditors, as financial creditors, infracts the
principle of equitable treatment of similarly situated creditors. Further,
the UNCITRAL Legislative Guide states that recognition of existing
creditor’s rights before the commencement of the insolvency proceedings
by the insolvency law is important. He contended that by treating a
home buyer as a financial creditor, the Code creates rights which such
homebuyer never had earlier . He further contended that by involving
such persons in the negotiation process by putting them on the Committee
of Creditors would infract the principle that, given their number and the
diverse interests that they have, coupled with no knowledge or any
commercial expertise of the corporate debtor, they should not and ought
not to be allowed to participate in the Committee of Creditors. Also,
insolvency law and other laws should be harmoniously construed, which
harmony is disrupted when the Code is applied to cases which should
really fall under RERA. Shri Bhandari was followed by Shri J. Gupta,
who argued that instead of deeming that allottees/homebuyers be regarded
as financial creditors, they ought to be regarded as operational creditors
in which case, defences available in such cases would then be
available.Shri Pulkit Deora then showed us accounting standards in which
it became clear that advances received from homebuyers by developers
cannot, from an accounting perspective, be treated as financial liabilities
and the amendments in doing so, therefore, violate the aforesaid standards
and become manifestly arbitrary. Also, after going into the definition of
“claim”, “financial debt” and “operational debt”, he argued that a financial
debt is a crystallised claim which is due, as opposed to an operational
debt which may simply be a claim upon breach of contract that may be
disputed and therefore not due. On this basis he contended that to put
homebuyers in the financial creditor category, instead of the operational
creditor category, would then blur this distinction and do away with a
vital defence available to the real estate developer in the case of
operational debts. Shri Rana Mukherjee, appearing through Shri K.
Poddar, argued that homebuyers would not fall within the category of
either financial or operational creditors and should therefore be subsumed
only within RERA, which is a complete code dealing with the real estate
industry. He further ar gued that RERA is a special Act as opposed to
the Code, which is a general Act and ought, therefore, to prevail. Also,
PIONEER URBAN LAND AND INFRASTRUCTURE L TD.
& ANR. v. UNION OF INDIA & ORS. [R.F . NARIMAN, J.]
as the adjudication process envisaged under RERA would be done away
with if the Code is to be applied, the application of the Code to homebuyers
would be manifestly arbitrary. M/s. Kejriwal and P. Aggarwal have argued
that on the facts of their cases, force majeur e events occurred as a
result of which possession could not be handed over. They also pointed
out that, from a practical point of view, the NCLT in such cases does not
go into defences which would demonstrate that delays in handing over
possession cannot be attributed to the developer, and being a summary
proceeding, merely goes ahead and admits a Section 7 petition despite
the fact that the developer is not at fault in not handing over the flat/
apartment in time. Shri S. Malhotra repeated some of the submissions
that have already been noted hereinabove. Shri P.S. Bindra argued that
we should apply the Amendment Act only prospectively , either from
2018 itself or at the very earliest from 1 st December, 2016. He also
argued that if this Court were to uphold the vires of the Amendment Act,
his clients ought to be at liberty to take various defences under the
agreement between his client and allottees, which this Court should make
clear in the event of allottees knocking at the doors of the NCL T.
12. Mrs. Madhavi Divan, learned Additional Solicitor General,
relying strongly upon Swiss Ribbons (supra), argued that the
Amendment Act would clearly be covered by the ratio laid down by this
Court in Swiss Ribbons(supra), which is that sufficient play in the joints
must be given to the legislature when it comes to economic legislation,
and every experiment that the legislature bonafide undertakes should
not be interfered with by the Court. She referred copiously to the
Insolvency Committee Report which led to the enactment of the
Amendment Act, and stated that the real reason for including allottees
as financial creditors is because, in substance, they finance the project
in which they will ultimately be given flats/apartments. She contended
that a cursory look at the agreement between developers and such
allottees would show that at every stage in the building process, certain
amounts have to be paid which are then supposed to be utilised in
constructing the apartments/flats. This is what makes them different
from other operational creditors. Also, in the case of operational creditors,
it is the person who stands in the place of the developer, who either sells
goods or renders service for which he is to be paid. The exact opposite
obtains in the case of homebuyers/allottees who in fact fund their own
flats/apartments. She was at great pains to point out that it must never
425
be forgotten that the Code is not a recovery mechanism. When a
homebuyer approaches the NCLT, if his petition is admitted, he does not
get his money back in the near foreseeable future and has to stand in
line and await either the vagaries of a resolution plan which gives him
some percentage of the monies owed to him, and/or completes the project
for him. In the event of winding up, he has then to stand in line and
receive whatever is available. As opposed to this, homebuyers/allottees
can and do approach the authorities under RERA in which, upon showing
breach on the part of the real estate developer , they would be able to
claim whatever has been paid by them in full together with interest thereon.
This being the case it is wholly incorrect to paint a picture, as was done
by learned senior counsel appearing on behalf of the Petitioners, that
trigger-happy allottees malafide invoke the Code to put pressure on
developers to refund their money given as advances. Also, it is wholly
incorrect to say that highly solvent companies would go in the red and
then be wound up under the Code. If in fact such companies are solvent,
the Committee of Creditors may decide to continue the same management
or may decide to accept resolution plans from other developers so that
the real estate development company continues as a going concern.
Winding up is only a last resort, which will never really occur in the case
of well managed corporate entities. She referred in copious detail to
NCLT and NCLAT judgments in which it was held that, save and except
allottees who had agreements in which a fixed monthly return was
guaranteed by the developer, allottees were held to be neither operational
nor financial creditors, resulting in great hardship to them. She took us
through the various sections of the Code afresh and argued that Section
5(8)(f), even read without the explanation, would, on its plain language,
include real estate development agreements. For this purpose, she relied
upon the definition of “payment” which would include “recompense”
and on the definition in Collin’s English dictionary of “borrow” which is
“to obtain or receive money on loan for temporary use intending to give
either money or something equivalent back to the lender”. In the facts
of these cases, she contended that the “something equivalent” would be
the flat/apartment. She also relied upon the definition of “commercial”
to show that the profit element is important. She stressed the fact that
the “time value of money” is present qua both allottee and builder as the
allottee would pay less than he would have to for a complete flat/
apartment, in which case the entire consideration for the flat/apartment
would have to be paid upfront; as against instalments while it is being
PIONEER URBAN LAND AND INFRASTRUCTURE L TD.
& ANR. v. UNION OF INDIA & ORS. [R.F . NARIMAN, J.]
completed. Qua the builder, she contended that the time value of money
would be the money paid by way of advances by allottees which would
be used to finance the building of the flats/apartments in the project. She
also relied strongly upon Section 18 of RERA to show that in order to be
a financial creditor, it is enough that a right recognised by Section 18 in
favour of the allottee to payment would exist, and therefore, would be
included within the definition of “financial debt” read with “debt” contained
in Section 5(8) and Section 3(1 1) of the Code respectively . She also
referred to and relied upon Section 4(2)(l)(D) of RERA to show that
70% of advances received by the developer from allottees must be put
into an escrow account, which can only be used for the project at hand,
showing therefore that even statutorily, monies paid by way of advance
are in the nature of a financing transaction. She then cited judgments to
show how the noscitur a sociis principle cannot be used when express
wider language is used in one of the sub-clauses of a particular provision,
making it clear that it is meant to be read by itself, and not in conjunction
with what precedes and succeeds it. She also cited judgments to show
that the expression “deemed” is also to put a certain matter beyond
doubt and argued that an explanation can be inserted by the legislature
as additional support to what is already contained in the main provision.
She added that deeming fictions put in explanations are not something
unknown to the law, and cited judgments to buttress her contention. She
also cited judgments to show that when “means” is used separately
from “includes”, the definition clause would be inclusive, as opposed to
when “means and includes” is used, and therefore argued that since
Section 5(8) is not exhaustive, the category of homebuyers could be
added therein. Also, according to her , “means” and “includes” when
interpreted by courts, is different from the legislature itself amending the
provision so as to add something therein. Legislative activity cannot be
confused with interpretational activity by the courts. She then argued,
referring to the provisions of RERA in some detail, that a complete
information bank is provided by RERA, which is provided by the real
estate developer himself, from which, like information utilities under the
Code, information, inter alia , as to defaults made by the real estate
developer would be available. According to her, therefore, all that the
NCLT would have to be supplied with by the allottee in his Section 7
petition would be this information, and, after receiving a reply from the
real estate developer, would then easily be able to decide whether a real
estate developer owes money in the form of compensation payable for
427
late completion of the project, and/or refund of money paid by the allottee.
It would be open for the real estate developer in its defence to say that
no amount is due and payable from the allottee, in that, the allottee is
himself in breach of conditions laid down by the agreement read with
the RERA, and rules and regulations made thereunder . According to
her, therefore, the NCLT would be able to decide such applications in
the same manner as would be decided in the case of banks and financial
institutions. She also rebutted the argument that the collegiality of creditors
will be affected by inserting home buyers into their committee by stating
that home buyers, like banks and financial institutions, and unlike other
operational creditors, are vitally concerned with the well-being of the
corporate debtor, as otherwise the real estate project would never come
to fruition. In rebutting the challenge to Section 21(6A) and Section 25A,
she said there may be teething problems with regard to how an authorised
representative is to vote on the Committee of Creditors, but stated that
the legislature is in the process of ironing out these creases and referred
to the recent Insolvency and Bankruptcy Code (Amendment) Bill, 2019
which has just been passed by Parliament. She also argued that
homebuyers may themselves finance up to 100% of a project, and in
case they finance a project by 100%, the Code would not work unless
they were recognised as financial creditors as, not being financial or
operational creditors, no Committee of Creditors could be set up at all;
andfor this purpose she relied upon the proviso to Section 21(8) of the
Code, read with Regulation 16 of the Insolvency and Bankruptcy Board
of India( Insolvency Resolution Pr ocess for Corporate Persons)
Regulations, 2016.She ar gued, ther efore, that on point of fact, if
allottees of r eal estate pr ojects were to be kept out of the Committee
of Creditors, that itself would be manifestly arbitrary as in most cases
they finance the project to the tune of at least 50%, going up to 100%.
She also stated that each project was usually carried out by a ‘special
purpose vehicle’, being a corporate entity on its own, and therefore, the
bogey of destabilisation of a management which has brought in large
funds for many projects, and which would be replaced for all projects,
would not be correct.
13. Shri Tushar Mehta, learned Solicitor General of India broadly
supported the detailed arguments of Mrs. Madhavi Divan, learned
Additional Solicitor General, by buttressing the same by citing various
judgments and authorities. According to him also, given the fact that
PIONEER URBAN LAND AND INFRASTRUCTURE L TD.
& ANR. v. UNION OF INDIA & ORS. [R.F . NARIMAN, J.]
Swiss Ribbons (supra) gives the legislature free play in the joints when
it comes to economic legislation and experimentation in this sphere, Swiss
Ribbons (supra) itself is more or less a complete answer to all
constitutional challenges that may be made to the Amendment Act.
14. A number of counsel then appeared for allottees in individual
cases. These counsel argued, by referring copiously to NCLT and NCLAT
orders, consumer forum judgments and High Court judgments, that the
consumer fora, and the authorities under RERA are not meaningful
remedies for allottees at all. According to them, loopholes made in the
rules by various States still allow one-sided agreements by real estate
developers to continue to govern the relationship between allottee and
real estate developer long after RERA has come into force. This has
been done, for example, by defining ‘Completion Certificate’ to include
partial completion certificates of projects (or parts of projects), so that
such partial certificates given to the real estate developer before coming
into force of RERA would make the provisions of RERA inapplicable.
Also, it has been pointed out that real estate developers have been
successful in arguing that RERA has now shut out the consumer fora so
far as allottees are concerned, and referred to stay orders by which
consumer fora for a long period of time were unable to proceed with
cases filed by allottees before them, until the National Consumer Disputes
Redressal Commission finally decided that the Consumer Protection Act,
1986 was an additional remedy and continued to be an additional remedy
to the remedies provided under RERA. They also pointed out that the
authorities themselves under RERA jostled the allottees about, as when
an allottee went to the Real Estate Regulatory Authority and obtained
orders against developers, such orders were nullified by some Appellate
Tribunal orders, stating that they should be sent to the adjudicating officer
who alone could decide disputes between allottees and real estate
developers. Separately, in answer to the argument that the admission of
a Section 7 application would be fatal to the management of the corporate
debtor, and that one single allottee could destabilise the management of
the corporate debtor and not just the project undertaken by the corporate
debtor, they pointed out that there were 5 stages at which it would be
open for the real estate developer to compromise with the allottee in
question, before the sledgehammer under the Code comes down on the
erstwhile management. They pointed out that settlements have taken
place at:(i) the stage of the Section 7 notice itself before replies were
429
filed by the real estate developer;(ii) after the NCLT issues notice on a
Section 7 application and before admission; (iii) after the hearing and
before the order admitting the matter; (iv) post-admission, and before
appointment of the Committee of Creditors where both the NCL T and
NCLAT use their inherent power to permit settlements; and (v)even
post setting-up of the Committee of Creditors, whereby settlements can
be arrived at under Section 12A of the Code with the concurrence of
90% of the creditors. On this basis, they pointed out that long before the
chopper comes down on the management of the corporate debtor , all
these opportunities are given to the management of the corporate debtor
to settle with the individual allottee, showing thereby that there is no real
infraction of Article 14, 19(1)(g) or 300-A of the Constitution. They also
argued that the provisions of Section 7(4) of the Code giving the NCLT
14 days within which to ascertain the existence of a default is directory
as has been held in Surendra Trading Company v. Juggilal Kamlapat
Jute Mills Company Limited and Ors.2017(16) SCC 143.They made
an impassioned plea, relying upon the background to RERA, to argue
that if these beneficial amendments were to be struck down, they would
be back in the same position as they were before enactment of other
measures, which have not really worked to afford them relief.
The Legislatur e’s right to experiment in matters economic
15. In Swiss Ribbons (supra), this Court was at pains to point
out, referring, inter alia, to various American decisions in paragraphs
17 to 24, that the legislature must be given free play in the joints when it
comes to economic legislation. Apart from the presumption of
constitutionality which arises in such cases, the legislative judgment in
economic choices must be given a certain degree of deference by the
courts. In paragraph 120 of the said judgment, this Court held:
“ 120.The Insolvency Code is a legislation which deals with
economic matters and, in the larger sense, deals with the economy
of the country as a whole. Earlier experiments, as we have seen,
in terms of legislations having failed, “trial” having led to repeated
“errors”, ultimately led to the enactment of the Code. The
experiment contained in the Code, judged by the generality of its
provisions and not by so- called crudities and inequities that have
been pointed out by the petitioners, passes constitutional muster.To
stay experimentation in things economic is a grave responsibility,
PIONEER URBAN LAND AND INFRASTRUCTURE L TD.
& ANR. v. UNION OF INDIA & ORS. [R.F . NARIMAN, J.]
and denial of the right to experiment is fraught with serious
consequences to the nation. We have also seen that the working
of the Code is being monitored by the Central Government by
Expert Committees that have been set up in this behalf.
Amendments have been made in the short period in which the
Code has operated, both to the Code itself as well as to
subordinate legislation made under it. This process is an ongoing
process which involves all stakeholders, including the petitioners.”
It is in this background that the constitutional challenge to the
Amendment Act will have to be decided.
Raison d’être for the Insolvency Code (Second Amendment)
Act of 2018
16. The Insolvency Committee Report is of crucial importance in
understanding why the legislature thought it fit to categorise homebuyers
as financial creditors under the Code. The recommendations made by
the said Insolvency Law Committee are set out hereinbelow in extenso:
“RECOMMENDATIONS PROPOSING AMENDMENTS
TO THE CODE AND RELEVANT SUBORDINATE
LEGISLATION
1. DEFINITIONS
Financial debt
1.1 Section 5(8) of the Code defines ‘financial debt’ to mean a
debt along with interest, if any , which is disbursed against the
consideration for the time value of money and inter alia includes
money borrowed against payment of interest, etc. The Committee’s
attention was drawn to the significant confusion regarding the
status of buyers of under-construction apartments (“ home
buyers”) as creditors under the Code. Multiple judgments have
categorised them as neither fitting within the definition of ‘finan-
cial’ nor ‘operational’ creditors. In one particular case, they have
been classified as ‘financial creditors’ due to the assured return
scheme in the contract, in which there was an arrangement
wherein it was agreed that the seller of the apartments would pay
‘assured returns’ to the home buyers till possession of property
was given. It was held that such a transaction was in the nature
of a loan and constituted a ‘financial debt’ within the Code. A
431
similar judgment was given in Anil Mahindroo & Anr v. Earth
Organics Infrastr uctur e. But it must be noted that these
judgments were given considering the terms of the contracts
between the home buyers and the seller and are fact specific.
Further, the IBBI issued a claim form for “creditors other than
financial or operational creditors”, which gave an indication that
home buyers are neither financial nor operational creditors.
1.2 Non-inclusion of home buyers within either the definition of
‘financial’ or ‘operational’ creditors may be a cause for worry
since it deprives them of, first, the right to initiate the corporate
insolvency resolution process (“ CIRP”), second, the right to be
on the committee of creditors (“ CoC”) and third, the guarantee
of receiving at least the liquidation value under the resolution plan.
Recent cases like Chitra Sharma v. Union of India and Bikram
Chatterji v . Union of India have evidenced the stance of the
Hon’ble Supreme Court in safeguarding the rights of home
buyers under the Code due to their current disadvantageous
position.
1.3 To completely understand the issue, it is imperative that the
peculiarity of the Indian real estate sector is highlighted. Delay in
completion of under-construction apartments has become a com-
mon phenomenon and the records indicate that out of 782 con-
struction projects in India monitored by the Ministry of Statistics
and Programme Implementation, Government of India, a total of
215 projects are delayed with the time over-run ranging from 1 to
261 months. Another study released by the Associated Chambers
of Commerce and Industry of India, revealed that 826 housing
projects are running behind schedule across 14 states as of De-
cember 2016.Further, the Committee agreed that it is well under-
stood that amounts raised under home buyer contracts is a signifi-
cant amount, which contributes to the financing of construction of
an asset in the future.
1.4 The current definition of ‘financial debt’ under section 5(8) of
the Code uses the words “includes”, thus the kinds of financial
debts illustrated are not exhaustive. The phrase “disbursed
against the consideration for the time value of money” has
been the subject of interpretation only in a handful of cases under
the Code. The words “time value” have been interpreted to mean
PIONEER URBAN LAND AND INFRASTRUCTURE L TD.
& ANR. v. UNION OF INDIA & ORS. [R.F . NARIMAN, J.]
compensation or the price paid for the length of time for which
the money has been disbursed. This may be in the form of
interest paid on the money , or factoring of a discount in the
payment.
1.5 On a review of various financial terms of agreements
between home buyers and builders and the manner of utilisation
of the disbursements made by home buyers to the builders, it is
evident that the agreement is for disbursement of money by the
home buyer for the delivery of a building to be constructed in the
future. The disbursement of money is made in relation to a future
asset, and the contracts usually span a period of 4-5 years or
more. The Committee deliberated that the amounts so raised are
used as a means of financing the real estate project, and are thus
in effect a tool for raising finance, and on failure of the project,
money is repaid based on time value of money. On a plain reading
of section 5(8)(f), it is clear that it is a residuary entry to cover
debt transactions not covered under any other entry , and the
essence of the entry is that “amount should have been raised
under a transaction having the commercial effect of a
borrowing.” An example has been mentioned in the entry itself
i.e. forward sale or purchase agreement. The interpretation to be
accorded to a forward sale or purchase agreement to have the
texture of a financial contract may be drawn from an observation
made in the case of Nikhil Mehta and Sons (HUF) v . AMR
Infrastr ucture Ltd.:
“A for ward contract to sell pr oduct at the end of a specified
period is not a financial contract. It is essentially a contract
for sale of specified goods . It is true that some time financial
transactions seemingly r estructured as sale and r epurchase.
Any r epurchase and r everse r epo transaction ar e sometimes
used as devices for raising money . In a transaction of this
nature an entity may r equire liquidity against an asset and
the financer in r eturn sell it back by way of a for war d
contract. The differ ence between the two prices would imply
the rate of r eturn to the financer .”(emphasis supplied)
1.6 Thus, not all forward sale or purchase are financial
transactions, but if they are structured as a tool or means for
raising finance, there is no doubt that the amount raised may be
433
classified as financial debt under section 5(8)(f). Drawing an
analogy , in the case of home buyers, the amounts raised
under the contracts of home buyers are in effect for the
purposes of raising finance, and are a means of raising
finance. Thus, the Committee deemed it prudent to clarify
that such amounts raised under a real estate project from a
home buyer fall within entry (f) of section 5(8).
1.7 Further, it may be noted that the amount of money given by
home buyers as advances for their purchase is usually very high,
and frequent delays in delivery of possession may thus, have a
huge impact. For example, in Chitra Sharma v. Union of India
the amount of debts owed to home buyers, which was paid by
them as advances, was claimed to be INR Fifteen Thousand
Crore, more than what was due to banks. Despite this, banks are
in a more favourable position under the Code since they are
financial creditors. Moreover , the general practice is that these
contracts are structured unilaterally by construction companies
with little or no say of the home buyers. A denial of the right of a
class of creditors based on technicalities within a contract that
such creditor may not have had the power to negotiate, may not
be aligned with the spirit of the Code.
1.8 The Committee also discussed that section 30(2)(e) of the
Code provides that all proposed resolution plans must not
contravene any provisions of law in force, and thus, the
provisions of Real Estate (Regulation and Development) Act, 2016
(“RERA”) will need to be complied with and resolution plans
under the Code should be compliant with the said law.
1.9. Finally, the Committee concluded that the current definition
of ‘financial debt’ is sufficient to include the amounts raised from
home buyers / allottees under a real estate project, and hence,
they are to be treated as financial creditors under the Code.
However, given the confusion and multiple interpretations being
taken, at this stage, it may be prudent to explicitly clarify that such
creditors fall within the definition of financial creditor, by inserting
an explanation to section 5(8)(f) of the Code. Accordingly, in CIRP,
they will be a part of the CoC and will be represented in the
manner specified in paragraph 10 of this report, and in the event
of liquidation, they will fall within the relevant entry in the
PIONEER URBAN LAND AND INFRASTRUCTURE L TD.
& ANR. v. UNION OF INDIA & ORS. [R.F . NARIMAN, J.]
liquidation waterfall under section 53. The Committee also agreed
that resolution plans under the Code must be compliant with
applicable laws, like RERA, which may be interpreted through
section 30(2)(e) of the Code. It may be noted that there was
majority support in the Committee for the abovementioned
treatment of home buyers. However , certain members of the
Committee, namely Sh. Shardul Shroff, Sh. Sudarshan Sen and
Sh. B. Sriram, differed on this matter.”
(emphasis supplied)
17. When it came to devising a mechanism by which several
persons may be represented by one authorised representative, the
Insolvency Law Committee concluded:
“10.8 In light of the deliberation above, the Committee felt that a
mechanism requires to be provided in the Code to mandate
representation in meetings of security holders, deposit holders,
and all other classes of financial creditors which exceed a certain
number, through an authorised representative. This can be done
by adding a new provision to section 21 of the Code. Such a
representative may either be a trustee or an agent appointed under
the terms of the debt agreement of such creditors, otherwise an
insolvency professional may be appointed by the NCLT for each
such class of financial creditors. Additionally, the representative
shall act and attend the meetings on behalf of the respective class
of financial creditors and shall vote on behalf of each of the
financial creditor to the extent of the voting share of each such
creditor , and as per their instructions. To ensure adequate
representation by the authorised representative of the financial
creditors, a specific provision laying down the rights and duties of
such authorised representatives may be inserted. Further , the
requisite threshold for the number of creditors and manner of
voting may be specified by IBBI through regulations to enable
efficient voting by the representative. Also, regulation 25 may
also be amended to enable voting through electronic means such
as e-mail, to address any technical issues which may arise due to
a large number of creditors voting at the same time.”
18. It can be seen that the Insolvency Law Committee found, as
a matter of fact, that delay in completion of flats/apartments has become
435
a common phenomenon, and that amounts raised from homebuyers
contributes significantly to the financing of the construction of such flats/
apartments. This being the case, it was important, therefore, to clarify
that homebuyers are treated as financial creditors so that they can trigger
the Code under Section 7 and have their rightful place on the Committee
of Creditors when it comes to making important decisions as to the future
of the building construction company, which is the execution of the real
estate project in which such homebuyers are ultimately to be housed.
19. Shri Shardul Shroff, whose dissent was provided to us in the
form of an e-mail, after finding that self-financed homebuyers may be
financial creditors, but a homebuyer who is a borrower is not, then went
on to state:
“8. If the home buyers have taken loans fr om banks, then it
is such lenders who should be on the table on the CoC as
special status cr editors.
9. Our r epor t ought to be alter ed to the extent that
home buyers financiers should be tr eated as unsecur ed
financial cr editors and they should be
representatives of the home buyers. Ther e should be no dir ect
right given to home buyers to be the CoC.”
Even the dissent of Shri Shroff recognises that in the case of
homebuyers, who have taken loans from banks, such banks ought to be
on the Committee of Creditors. If such banks ought to be on the Committee
of Creditors as representatives of the home buyers, and they are to vote
only in accordance with the homebuyer ’s instructions, why should the
homebuyer himself then not be on the Committee of Creditors, and why
should it make any difference as to whether he has borrowed money
from banks in order to pay instalments under the agreement for sale or
whether he does it from his own finances? These matters have not been
addressed by the dissenting view which in principle, as we have seen,
supports homebuyers who have taken loans as against homebuyers who
have used their own finances. Perhaps the real reason for Shri Shrof f’s
dissent is the fact that unsecured, as opposed to secured, financial creditors
are being put on the Committee of Creditors. If there is otherwise good
reason as to why this particular group of unsecured creditors, like deposit
PIONEER URBAN LAND AND INFRASTRUCTURE L TD.
& ANR. v. UNION OF INDIA & ORS. [R.F . NARIMAN, J.]
holders, should be part of the Committee of Creditors, it is difficult to
appreciate how such a group can be excluded.
The Real Estate (Regulation and Development) Act, 2016
(RERA) and its impact on the real estate sector
20. The Statement of Objects and Reasons of RERA reads as
follows:
STATEMENT OF OBJECTS AND REASONS
“1. The real estate sector plays a catalytic role in fulfilling the
need and demand for housing and infrastructure in the country .
While the sector has grown significantly in recent years, it has
been largely unregulated, with absence of professionalism and
standardisation and lack of adequate consumer protection. Though
the Consumer Protection Act, 1986 is available as a forum to the
buyers in the real estate market, the recourse is only curative and
is not adequate to address all the concerns of buyers and promoters
in that sector. The lack of standardisation has been a constraint to
the healthy and orderly growth of industry . Therefore, the need
for regulating the sector has been emphasised in various forums.
2. In view of the above, it becomes necessary to have a Central
legislation, namely, the Real Estate (Regulation and Development)
Bill, 2013 in the interests of effective consumer protection,
uniformity and standardisation of business practices and
transactions in the real estate sector. The proposed Bill provides
for the establishment of the Real Estate Regulatory Authority (the
Authority) for regulation and promotion of real estate sector and
to ensure sale of plot, apartment or building, as the case may be,
in an efficient and transparent manner and to protect the interest
of consumers in real estate sector and establish the Real Estate
Appellate Tribunal to hear appeals from the decisions, directions
or orders of the Authority.
3. The proposed Bill will ensure greater accountability towards
consumers, and significantly reduce frauds and delays as also the
current high transaction costs. It attempts to balance the interests
of consumers and promoters by imposing certain responsibilities
on both. It seeks to establish symmetry of information between
the promoter and purchaser, transparency of contractual conditions,
set minimum standards of accountability and a fast-track dispute
437
resolution mechanism. The proposed Bill will induct professionalism
and standardisation in the sector , thus paving the way for
accelerated growth and investments in the long run.”
21. It may be stated that Sections 2, 20 to 39, 41 to 58, 71 to 78
and 81 to 92 of this statute were brought into force on 1 st May, 2016.
Sections 3 to 19 which deal with registration of real estate projects and
real estate agents; functions and duties of promoters; rights and duties
of allottees, together with Section 40 which deals with recovery of interest
or penalty or compensation and enforcement of orders qua the same;
the Sections dealing with offences and penalties, viz., Sections 59 to 70
and Sections 79 and 80 which bar the jurisdiction of Civil Courts and
deal with cognizance of offences under the RERA were all brought into
force one year later i.e. on the 1 st day of May , 2017. This was for the
reason that the “appropriate Government” as defined in Section 2(g),
which means the various State Governments and Union Territories, were
given a period of one year to establish/appoint the Real Estate Regulatory
Authority, the adjudicating officer and the Appellate Tribunal, consequent
upon which the aforesaid Sections were brought into force one year
later - in the hope and expectation that the appropriate Government
would set up the aforesaid authorities within the period of one year from
1st May, 2016. The relevant provisions of RERA are set out hereunder:
“2. Definitions . —In this Act, unless the context otherwise
requires, —
(a) “adjudicating officer” means the adjudicating officer
appointed under sub-section (1) of section 71;
xxx xxxxxx
(d) “allottee” in relation to a real estate project, means the person
to whom a plot, apartment or building, as the case may be, has
been allotted, sold (whether as freehold or leasehold) or
otherwise transferred by the promoter, and includes the person
who subsequently acquires the said allotment through sale,
transfer or otherwise but does not include a person to whom
such plot, apartment or building, as the case may be, is given on
rent;
(e) “apartment” whether called block, chamber , dwelling unit,
flat, office, showroom, shop, godown, premises, suit, tenement,
PIONEER URBAN LAND AND INFRASTRUCTURE L TD.
& ANR. v. UNION OF INDIA & ORS. [R.F . NARIMAN, J.]
unit or by any other name, means a separate and self-contained
part of any immovable property, including one or more rooms
or enclosed spaces, located on one or more floors or any part
thereof, in a building or on a plot of land, used or intended to be
used for any residential or commercial use such as residence,
office, shop, showroom or godown or for carrying an any
business, occupation, profession or trade, or for any other type
of use ancillary to the purpose specified;
xxx xxxxxx
(g) “appropriate Government” means in respect of matters relating
to, —
(i) the Union territory without Legislature, the Central
Government;
(ii) the Union territory of Puducherry , the Union territory
Government;
(iii) the Union territory of Delhi, the Central Ministry of Urban
Development;
(iv) the State, the State Government;
xxx xxxxxx
(i) “Authority” means the Real Estate Regulatory Authority
established under sub-section (1) of section 20;
xxx xxxxxx
(s) “development” with its grammatical variations and cognate
expressions, means carrying out the development of immovable
property, engineering or other operations in, on, over or under the
land or the making of any material change in any immovable
property or land and includes re-development;
xxx xxxxxx
(zn) “real estate project” means the development of a building or
a building consisting of apartments, or converting an existing
building or a part thereof into apartments, or the development of
land into plots or apartments, as the case may be, for the purpose
of selling all or some of the said apartments or plots or building, as
439
the case may be, and includes the common areas, the development
works, all improvements and structures thereon, and all easement,
rights and appurtenances belonging thereto;
xxx xxxxxx
3. Prior registration of real estate project with Real Estate
Regulatory Authority. —(1) No promoter shall advertise, market,
book, sell or offer for sale, or invite persons to purchase in any
manner any plot, apartment or building, as the case may be, in any
real estate project or part of it, in any planning area, without
registering the real estate project with the Real Estate Regulatory
Authority established under this Act:
Provided that projects that are ongoing on the date of
commencement of this Act and for which the completion certificate
has not been issued, the promoter shall make an application to the
Authority for registration of the said project within a period of
three months from the date of commencement of this Act:
Provided further that if the Authority thinks necessary, in the interest
of allottees, for projects which are developed beyond the planning
area but with the requisite permission of the local authority , it
may, by order, direct the promoter of such project to register with
the Authority, and the provisions of this Act or the rules and
regulations made thereunder , shall apply to such projects from
that stage of registration.
(2) Notwithstanding anything contained in sub-section (1), no
registration of the real estate project shall be required—
(a) where the area of land proposed to be developed does not
exceed five hundred square meters or the number of apartments
proposed to be developed does not exceed eight inclusive of all
phases:
Provided that, if the appropriate Government considers it necessary,
it may, reduce the threshold below five hundred square meters or
eight apartments, as the case may be, inclusive of all phases, for
exemption from registration under this Act;
(b) where the promoter has received completion certificate for a
real estate project prior to commencement of this Act;
PIONEER URBAN LAND AND INFRASTRUCTURE L TD.
& ANR. v. UNION OF INDIA & ORS. [R.F . NARIMAN, J.]
(c) for the purpose of renovation or repair or re-development which
does not involve marketing, advertising selling or new allotment
of any apartment, plot or building, as the case may be, under the
real estate project.
Explanation. —For the purpose of this section, where the real
estate project is to be developed in phases, every such phase shall
be considered a standalone real estate project, and the promoter
shall obtain registration under this Act for each phase separately.
4. Application for r egistration of r eal estate pr ojects. —
(1) Every promoter shall make an application to the Authority for
registration of the real estate project in such form, manner, within
such time and accompanied by such fee as may be prescribed by
the regulations made by the Authority.
(2) The promoter shall enclose the following documents along
with the application referred to in sub-section (1), namely: —
(a) a brief details of his enterprise including its name, registered
address, type of enterprise (proprietorship, societies, partnership,
companies, competent authority), and the particulars of registration,
and the names and photographs of the promoter;
(b) a brief detail of the projects launched by him, in the past five
years, whether already completed or being developed, as the case
may be, including the current status of the said projects, any delay
in its completion, details of cases pending, details of type of land
and payments pending;
(c) an authenticated copy of the approvals and commencement
certificate from the competent authority obtained in accordance
with the laws as may be applicable for the real estate project
mentioned in the application, and where the project is proposed to
be developed in phases, an authenticated copy of the approvals
and commencement certificate from the competent authority for
each of such phases;
(d) the sanctioned plan, layout plan and specifications of the
proposed project or the phase thereof, and the whole project as
sanctioned by the competent authority;
441
(e) the plan of development works to be executed in the proposed
project and the proposed facilities to be provided thereof including
firefighting facilities, drinking water facilities, emergency
evacuation services, use of renewable energy;
(f) the location details of the project, with clear demarcation of
land dedicated for the project along with its boundaries including
the latitude and longitude of the end points of the project;
(g) proforma of the allotment letter , agreement for sale, and the
conveyance deed proposed to be signed with the allottees;
(h) the number, type and the carpet area of apartments for sale in
the project along with the area of the exclusive balcony or verandah
areas and the exclusive open terrace areas apartment with the
apartment, if any;
(i) the number and areas of garage for sale in the project;
(j) the names and addresses of his real estate agents, if any , for
the proposed project;
(k) the names and addresses of the contractors, architect, structural
engineer, if any and other persons concerned with the development
of the proposed project;
(l) a declaration, supported by an affidavit, which shall be signed
by the promoter or any person authorised by the promoter ,
stating:—
(A) that he has a legal title to the land on which the development
is proposed along with legally valid documents with
authentication of such title, if such land is owned by another
person;
(B) that the land is free from all encumbrances, or as the case
may be details of the encumbrances on such land including any
rights, title, interest or name of any party in or over such land
along with details;
(C) the time period within which he undertakes to complete the
project or phase thereof, as the case may be;
PIONEER URBAN LAND AND INFRASTRUCTURE L TD.
& ANR. v. UNION OF INDIA & ORS. [R.F . NARIMAN, J.]
(D) that seventy per cent. of the amounts realised for the real
estate project from the allottees, from time to time, shall be
deposited in a separate account to be maintained in a scheduled
bank to cover the cost of construction and the land cost and
shall be used only for that purpose:
Provided that the promoter shall withdraw the amounts from
the separate account, to cover the cost of the project, in proportion
to the percentage of completion of the project:
Provided further that the amounts from the separate account
shall be withdrawn by the promoter after it is certified by an
engineer, an architect and a chartered accountant in practice that
the withdrawal is in proportion to the percentage of completion of
the project:
Provided also that the promoter shall get his accounts audited
within six months after the end of every financial year by a
chartered accountant in practice, and shall produce a statement
of accounts duly certified and signed by such chartered accountant
and it shall be verified during the audit that the amounts collected
for a particular project have been utilised for that project and the
withdrawal has been in compliance with the proportion to the
percentage of completion of the project.
Explanation.— For the purpose of this clause, the term “schedule
bank” means a bank included in the Second Schedule to the
Reserve Bank of India Act, 1934;
(E) that he shall take all the pending approvals on time, from
the competent authorities;
(F) that he has furnished such other documents as may be
prescribed by the rules or regulations made under this Act; and
(m) such other information and documents as may be prescribed.
(3) The Authority shall operationalise a web based online system
for submitting applications for registration of projects within a
period of one year from the date of its establishment.
5. Grant of registration.— On receipt of the application under
sub-section (1) of section 4, the Authority shall within a period of
thirty days.
443
(a) grant registration subject to the provisions of this Act and
the rules and regulations made thereunder , and provide a
registration number, including a Login Id and password to the
applicant for accessing the website of the Authority and to create
his web page and to fill therein the details of the proposed
project; or
(b) reject the application for reasons to be recorded in writing,
if such application does not conform to the provisions of this
Act or the rules or regulations made thereunder:
Provided that no application shall be rejected unless the applicant
has been given an opportunity of being heard in the matter.
(2) If the Authority fails to grant the registration or reject the
application, as the case may be, as provided under sub-section
(1), the project shall be deemed to have been registered, and the
Authority shall within a period of seven days of the expiry of the
said period of thirty days specified under sub-section (1), provide
a registration number and a Login Id and password to the promoter
for accessing the website of the Authority and to create his web
page and to fill therein the details of the proposed project.
(3) The registration granted under this section shall be valid for a
period declared by the promoter under sub-clause (C) of clause
(1) of sub-section (2) of section 4 for completion of the project or
phase thereof, as the case may be.
6. Extension of registration.— The registration granted under
section 5 may be extended by the Authority on an application
made by the promoter due to force majeure, in such form and on
payment of such fee as may be prescribed:
Provided that the Authority may in reasonable circumstances,
without default on the part of the promoter, based on the facts of
each case, and for reasons to be recorded in writing, extend the
registration granted to a project for such time as it considers
necessary, which shall, in aggregate, not exceed a period of one
year:
Provided further that no application for extension of registration
shall be rejected unless the applicant has been given an opportunity
of being heard in the matter.
PIONEER URBAN LAND AND INFRASTRUCTURE L TD.
& ANR. v. UNION OF INDIA & ORS. [R.F . NARIMAN, J.]
Explanation.— For the purpose of this section, the expression
“force majeure” shall mean a case of war , flood, drought, fire,
cyclone, earthquake or any other calamity caused by nature
affecting the regular development of the real estate project.
7.Revocation of registration.— (1) The Authority may, on receipt
of a complaint or suo motu in this behalf or on the recommendation
of the competent authority, revoke the registration granted under
section 5, after being satisfied that—
(a) the promoter makes default in doing anything required by
or under this Act or the rules or the regulations made thereunder;
(b) the promoter violates any of the terms or conditions of the
approval given by the competent authority;
(c) the promoter is involved in any kind of unfair practice or
irregularities.
Explanation.—For the purposes of this clause, the term “unfair
practice” means a practice which, for the purpose of promoting
the sale or development of any real estate project adopts any
unfair method or unfair or deceptive practice including any of the
following practices, namely:—
(A) the practice of making any statement, whether in writing
or by visible representation which,—
(i) falsely represents that the services are of a particular
standard or grade;
(ii) represents that the promoter has approval or affiliation
which such promoter does not have;
(iii) makes a false or misleading representation concerning
the services;
(B) the promoter permits the publication of any advertisement
or prospectus whether in any newspaper or otherwise of services
that are not intended to be offered;
(d) the promoter indulges in any fraudulent practices.
(2) The registration granted to the promoter under section 5 shall
not be revoked unless the Authority has given to the promoter not
less than thirty days notice, in writing, stating the grounds on which
445
it is proposed to revoke the registration, and has considered any
cause shown by the promoter within the period of that notice
against the proposed revocation.
(3) The Authority may, instead of revoking the registration under
sub-section (1), permit it to remain in force subject to such further
terms and conditions as it thinks fit to impose in the interest of the
allottees, and any such terms and conditions so imposed shall be
binding upon the promoter.
(4) The Authority, upon the revocation of the registration,—
(a) shall debar the promoter from accessing its website in relation
to that project and specify his name in the list of defaulters and
display his photograph on its website and also inform the other
Real Estate Regulatory Authority in other S tates and Union
territories about such revocation or registration;
(b) shall facilitate the remaining development works to be carried
out in accordance with the provisions of section 8;
(c) shall direct the bank holding the project back account, specified
under sub clause (D) of clause (I) of sub-section (2) of section 4,
to freeze the account, and thereafter take such further necessary
actions, including consequent de-freezing of the said account,
towards facilitating the remaining development works in
accordance with the provisions of section 8;
(d) may, to protect the interest of allottees or in the public interest,
issue such directions as it may deem necessary .
8. Obligation of Authority consequent upon lapse of or on
revocation of registration.— Upon lapse of the registration or
on revocation of the registration under this Act, the Authority,
may consult the appropriate Government to take such action as it
may deem fit including the carrying out of the remaining
development works by competent authority or by the association
of allottees or in any other manner, as may be determined by the
Authority:
Provided that no direction, decision or order of the Authority
under this section shall take effect until the expiry of the period of
appeal provided under the provisions of this Act:
PIONEER URBAN LAND AND INFRASTRUCTURE L TD.
& ANR. v. UNION OF INDIA & ORS. [R.F . NARIMAN, J.]
Provided further that in case of revocation of registration of a
project under this Act, the association of allottees shall have the
first right of refusal for carrying out of the remaining development
works.
xxx xxxxxx
11. Functions and duties of promoter.—(1) The promoter shall,
upon receiving his Login Id and password under clause (a) of
sub-section (1) or under sub-section (2) of section 5, as the case
may be, create his web page on the website of the Authority and
enter all details of the proposed project as provided under sub-
section (2) of section 4, in all the fields as provided, for public
viewing, including—
(a) details of the registration granted by the Authority;
(b) quarterly up-to-date the list of number and types of
apartments or plots, as the case may be, booked;
(c) quarterly up-to-date the list of number of garages booked;
(d) quarterly up-to-date the list of approvals taken and the
approvals which are pending subsequent to commencement
certificate;
(e) quarterly up-to-date status of the project; and
(f) such other information and documents as may be specified
by the regulations made by the Authority.
(2) The advertisement or prospectus issued or published by the
promoter shall mention prominently the website address of the
Authority, wherein all details of the registered project have been
entered and include the registration number obtained from the
Authority and such other matters incidental thereto.
(3) The promoter at the time of the booking and issue of allotment
letter shall be responsible to make available to the allottee, the
following information, namely:—
(a) sanctioned plans, layout plans, along with specifications,
approved by the competent authority, by display at the site or
447
such other place as may be specified by the regulations made
by the Authority;
(b) the stage wise time schedule of completion of the project,
including the provisions for civic infrastructure like water ,
sanitation and electricity.
(4) The promoter shall—
(a) be responsible for all obligations, responsibilities and functions
under the provisions of this Act or the rules and regulations
made thereunder or to the allottees as per the agreement for
sale, or to the association of allottees, as the case may be, till
the conveyance of all the apartments, plots or buildings, as the
case may be, to the allottees, or the common areas to the
association of allottees or the competent authority, as the case
may be:
Provided that the responsibility of the promoter, with respect to
the structural defect or any other defect for such period as is
referred to in sub-section (3) of section 14, shall continue even
after the conveyance deed of all the apartments, plots or
buildings, as the case may be, to the allottees are executed.
(b) be responsible to obtain the completion certificate or the
occupancy certificate, or both, as applicable, from the relevant
competent authority as per local laws or other laws for the
time being in force and to make it available to the allottees
individually or to the association of allottees, as the case may
be;
(c)be responsible to obtain the lease certificate, where the real
estate project is developed on a leasehold land, specifying the
period of lease, and certifying that all dues and charges in regard
to the leasehold land has been paid, and to make the lease
certificate available to the association of allottees;
(d) be responsible for providing and maintaining the essential
services, on reasonable charges, till the taking over of the
maintenance of the project by the association of the allottees;
PIONEER URBAN LAND AND INFRASTRUCTURE L TD.
& ANR. v. UNION OF INDIA & ORS. [R.F . NARIMAN, J.]
(e) enable the formation of an association or society or co-
operative society , as the case may be, of the allottees, or a
federation of the same, under the laws applicable:
Provided that in the absence of local laws, the association of
allottees, by whatever name called, shall be formed within a
period of three months of the majority of allottees having booked
their plot or apartment or building, as the case may be, in the
project;
(f) execute a registered conveyance deed of the apartment,
plot or building, as the case may be, in favour of the allottee
along with the undivided proportionate title in the common areas
to the association of allottees or competent authority , as the
case may be, as provided under section 17 of this Act;
(g) pay all outgoings until he transfers the physical possession
of the real estate project to the allottee or the associations of
allottees, as the case may be, which he has collected from the
allottees, for the payment of outgoings (including land cost,
ground rent, municipal or other local taxes, charges for water
or electricity, maintenance char ges, including mortgage loan
and interest on mortgages or other encumbrances and such
other liabilities payable to competent authorities, banks and
financial institutions, which are related to the project):
Provided that where any promoter fails to pay all or any of the
outgoings collected by him from the allottees or any liability ,
mortgage loan and interest thereon before transferring the real
estate project to such allottees, or the association of the allottees,
as the case may be, the promoter shall continue to be liable,
even after the transfer of the property , to pay such outgoings
and penal charges, if any, to the authority or person to whom
they are payable and be liable for the cost of any legal
proceedings which may be taken therefor by such authority or
person;
(h) after he executes an agreement for sale for any apartment,
plot or building, as the case may be, not mortgage or create a
charge on such apartment, plot or building, as the case may be,
and if any such mortgage or charge is made or created then
notwithstanding anything contained in any other law for the
449
time being in force, it shall not affect the right and interest of
the allottee who has taken or agreed to take such apartment,
plot or building, as the case may be;
(5) The promoter may cancel the allotment only in terms of the
agreement for sale:
Provided that the allottee may approach the Authority for relief, if
he is aggrieved by such cancellation and such cancellation is not
in accordance with the terms of the agreement for sale, unilateral
and without any sufficient cause.
(6) The promoter shall prepare and maintain all such other details
as may be specified, from time to time, by regulations made by
the Authority.
xxx xxxxxx
13. No deposit or advance to be taken by promoter without
first entering into agr eement for sale. (1) A promoter shall
not accept a sum more than ten per cent of the cost of the
apartment, plot, or building as the case may be, as an advance
payment or an application fee, from a person without first entering
into a written agreement for sale with such person and register
the said agreement for sale, under any law for the time being in
force.
(2) The agreement for sale referred to in sub-section (1) shall be
in such form as may be prescribed and shall specify the particulars
of development of the project including the construction of building
and apartments, along with specifications and internal development
works and external development works, the dates and the manner
by which payments towards the cost of the apartment, plot or
building, as the case may be, are to be made by the allottees and
the date on which the possession of the apartment, plot or building
is to be handed over, the rates of interest payable by the promoter
to the allottee and the allottee to the promoter in case of default,
and such other particulars, as may be prescribed.
xxx xxxxxx
18. Return of amount and compensation —(1) If the promoter
fails to complete or is unable to give possession of an apartment,
plot or building,—
PIONEER URBAN LAND AND INFRASTRUCTURE L TD.
& ANR. v. UNION OF INDIA & ORS. [R.F . NARIMAN, J.]
(a) in accordance with the terms of the agreement for sale or ,
as the case may be, duly completed by the date specified therein;
or
(b) due to discontinuance of his business as a developer on account
of suspension or revocation of the registration under this Act or
for any other reason,
he shall be liable on demand to the allottees, in case the allottee
wishes to withdraw from the project, without prejudice to any
other remedy available, to return the amount received by him in
respect of that apartment, plot, building, as the case may be, with
interest at such rate as may be prescribed in this behalf including
compensation in the manner as provided under this Act:
Provided that where an allottee does not intend to withdraw from
the project, he shall be paid, by the promoter , interest for every
month of delay, till the handing over of the possession, at such
rate as may be prescribed.
(2) The promoter shall compensate the allottees in case of any
loss caused to him due to defective title of the land, on which the
project is being developed or has been developed, in the manner
as provided under this Act, and the claim for compensation under
this subsection shall not be barred by limitation provided under
any law for the time being in force.
(3) If the promoter fails to discharge any other obligations imposed
on him under this Act or the rules or regulations made thereunder
or in accordance with the terms and conditions of the agreement
for sale, he shall be liable to pay such compensation to the allottees,
in the manner as provided under this Act.
19. Rights and duties of allottees —(1) The allottee shall be
entitled to obtain the information relating to sanctioned plans, layout
plans along with the specifications, approved by the competent
authority and such other information as provided in this Act or the
rules and regulations made thereunder or the agreement for sale
signed with the promoter.
(2) The allottee shall be entitled to know stage-wise time schedule
of completion of the project, including the provisions for water ,
451
sanitation, electricity and other amenities and services as agreed
to between the promoter and the allottee in accordance with the
terms and conditions of the agreement for sale.
(3) The allottee shall be entitled to claim the possession of
apartment, plot or building, as the case may be, and the association
of allottees shall be entitled to claim the possession of the common
areas, as per the declaration given by the promoter under sub-
clause (C) of clause (I) of sub-section (2) of section 4.
(4) The allottee shall be entitled to claim the refund of amount
paid along with interest at such rate as may be prescribed and
compensation in the manner as provided under this Act, from the
promoter, if the promoter fails to comply or is unable to give
possession of the apartment, plot or building, as the case may be,
in accordance with the terms of agreement for sale or due to
discontinuance of his business as a developer on account of
suspension or revocation of his registration under the provisions
of this Act or the rules or regulations made thereunder.
(5) The allottee shall be entitled to have the necessary documents
and plans, including that of common areas, after handing over the
physical possession of the apartment or plot or building as the
case may be, by the promoter.
(6) Every allottee, who has entered into an agreement or sale to
take an apartment, plot or building as the case may be, under
section 13, shall be responsible to make necessary payments in
the manner and within the time as specified in the said agreement
for sale and shall pay at the proper time and place, the share of
the registration charges, municipal taxes, water and electricity
charges, maintenance charges, ground rent, and other charges, if
any.
(7) The allottee shall be liable to pay interest, at such rate as may
be prescribed, for any delay in payment towards any amount or
charges to be paid under sub-section (6).
(8) The obligations of the allottee under sub-section (6) and the
liability towards interest under sub-section (7) may be reduced
when mutually agreed to between the promoter and such allottee.
PIONEER URBAN LAND AND INFRASTRUCTURE L TD.
& ANR. v. UNION OF INDIA & ORS. [R.F . NARIMAN, J.]
(9) Every allottee of the apartment, plot or building as the case
may be, shall participate towards the formation of an association
or society or cooperative society of the allottees, or a federation
of the same.
(10) Every allottee shall take physical possession of the apartment,
plot or building as the case may be, within a period of two months
of the occupancy certificate issued for the said apartment, plot or
building, as the case may be.
(11) Every allottee shall participate towards registration of the
conveyance deed of the apartment, plot or building, as the case
may be, as provided under sub-section (1) of section 17 of this
Act.
20. Establishment and incorporation of Real Estate
Regulatory Authority — (1) The appropriate Government shall,
within a period of one year from the date of coming into force of
this Act, by notification, establish an Authority to be known as the
Real Estate Regulatory Authority to exercise the powers conferred
on it and to perform the functions assigned to it under this Act:
Provided that the appropriate Government of two or more States
or Union territories may , if it deems fit, establish one single
Authority:
Provided further that, the appropriate Government may, if it deems
fit, establish more than one Authority in a State or Union territory,
as the case may be:
Provided also that until the establishment of a Regulatory Authority
under this section, the appropriate Government shall, by order ,
designate any Regulatory Authority or any officer preferably the
Secretary of the department dealing with Housing, as the
Regulatory Authority for the purposes under this Act:
Provided also that after the establishment of the Regulatory
Authority, all applications, complaints or cases pending with the
Regulatory Authority designated, shall stand transferred to the
Regulatory Authority so established and shall be heard from the
stage such applications, complaints or cases are transferred.
(2) The Authority shall be a body corporate by the name aforesaid
having perpetual succession and a common seal, with the power,
453
subject to the provisions of this Act, to acquire, hold and dispose
of property, both movable and immovable, and to contract, and
shall, by the said name, sue or be sued.
xxx xxxxxx
31. Filing of complaints with the Authority or the adjudicating
officer.— (1) Any aggrieved person may file a complaint with the
Authority or the adjudicating officer, as the case may be, for any
violation or contravention of the provisions of this Act or the rules
and regulations made thereunder against any promoter allottee or
real estate agent, as the case may be.
Explanation.—For the purpose of this sub-section “person” shall
include the association of allottees or any voluntary consumer
association registered under any law for the time being in force.
(2) The form, manner and fees for filing complaint under
sub-section (1) shall be such as may be prescribed.
xxx xxxxxx
34. Functions of Authority —The functions of the Authority
shall include—
(a) to register and regulate real estate projects and real estate
agents registered under this Act;
(b) to publish and maintain a website of records, for public
viewing, of all real estate projects for which registration has
been given, with such details as may be prescribed, including
information provided in the application for which registration
has been granted;
(c) to maintain a database, on its website, for public viewing,
and enter the names and photographs of promoters as defaulters
including the project details, registration for which has been
revoked or have been penalised under this Act, with reasons
therefor, for access to the general public;
(d) to maintain a database, on its website, for public viewing,
and enter the names and photographs of real estate agents
who have applied and registered under this Act, with such details
as may be prescribed, including those whose registration has
been rejected or revoked;
PIONEER URBAN LAND AND INFRASTRUCTURE L TD.
& ANR. v. UNION OF INDIA & ORS. [R.F . NARIMAN, J.]
(e) to fix through regulations for each areas under its jurisdiction
the standard fees to be levied on the allottees or the promoter
or the real estate agent, as the case may be;
(f) to ensure compliance of the obligations cast upon the
promoters, the allottees and the real estate agents under this
Act and the rules and regulations made thereunder;
(g) to ensure compliance of its regulations or orders or directions
made in exercise of its powers under this Act;
(h) to perform such other functions as may be entrusted to the
Authority by the appropriate Government as may be necessary
to carry out the provisions of this Act.
xxx xxxxxx
36. Power to issue interim orders. —Where during an inquiry ,
the Authority is satisfied that an act in contravention of this Act,
or the rules and regulations made thereunder, has been committed
and continues to be committed or that such act is about to be
committed, the Authority may, by order, restrain any promoter ,
allottee or real estate agent from carrying on such act until the
conclusion of such inquiry of until further orders, without giving
notice to such party, where the Authority deems it necessary.
37. Powers of Authority to issue dir ections. —The Authority
may, for the purpose of dischar ging its functions under the
provisions of this Act or rules or regulations made thereunder ,
issue such directions from time to time, to the promoters or allottees
or real estate agents, as the case may be, as it may consider
necessary and such directions shall be binding on all concerned.
38. Powers of Authority. —(1) The Authority shall have powers
to impose penalty or interest, in regard to any contravention of
obligations cast upon the promoters, the allottees and the real estate
agents, under this Act or the rules and the regulations made
thereunder.
(2) The Authority shall be guided by the principles of natural justice
and, subject to the other provisions of this Act and the rules made
thereunder, the Authority shall have powers to regulate its own
procedure.
455
(3) Where an issue is raised relating to agreement, action, omission,
practice or procedure that—
(a) has an appreciable prevention, restriction or distortion of
competition in connection with the development of a real estate
project; or
(b) has effect of market power of monopoly situation being
abused for affecting interest of allottees adversely,
then the Authority, may suo motu, make reference in respect
of such issue to the Competition Commission of India.
39. Rectification of orders . —The Authority may, at any time
within a period of two years from the date of the order made
under this Act, with a view to rectifying any mistake apparent
from the record, amend any order passed by it, and shall make
such amendment, if the mistake is brought to its notice by the
parties:
Provided that no such amendment shall be made in respect of any
order against which an appeal has been preferred under this Act:
Provided further that the Authority shall not, while rectifying any
mistake apparent from record, amend substantive part of its order
passed under the provisions of this Act.
40. Recovery of interest or penalty or compensation and
enforcement of order , etc.-
(1) If a promoter or an allottee or a real estate agent, as the
case may be, fails to pay any interest or penalty or compensation
imposed on him, by the adjudicating officer or the Regulatory
Authority or the Appellate Authority, as the case may be, under
this Act or the rules and regulations made thereunder , it shall
be recoverable from such promoter or allottee or real estate
agent, in such manner as may be prescribed as an arrears of
land revenue.
(2) If any adjudicating of ficer or the Regulatory Authority or
the Appellate Tribunal, as the case may be, issues any order or
directs any person to do any act, or refrain from doing any act,
which it is empowered to do under this Act or the rules or
regulations made thereunder , then in case of failure by any
PIONEER URBAN LAND AND INFRASTRUCTURE L TD.
& ANR. v. UNION OF INDIA & ORS. [R.F . NARIMAN, J.]
person to comply with such order or direction, the same shall
be enforced, in such manner as may be prescribed.
xxx xxxxxx
43. Establishment of Real Estate Appellate Tribunal— (1)
The appropriate Government shall, within a period of one year
from the date of coming into force of this Act, by notification,
establish an Appellate Tribunal to be known as the — (name of
the State/Union territory) Real Estate Appellate Tribunal.
xxx xxxxxx
44. Application for settlement of disputes and appeals to
Appellate Tribunal— (1) The appropriate Government or the
competent authority or any person aggrieved by any direction or
order or decision of the Authority or the adjudicating officer may
prefer an appeal to the Appellate Tribunal.
xxx xxxxxx
58. Appeal to High Court. —(1) Any person aggrieved by any
decision or order of the Appellate Tribunal, may, file an appeal to
the High Court, within a period of sixty days from the date of
communication of the decision or order of the Appellate Tribunal,
to him, on any one or more of the grounds specified in section 100
of the Code of Civil Procedure, 1908 (5 of 1908):
Provided that the High Court may entertain the appeal after the
expiry of the said period of sixty days, if it is satisfied that the
appellant was prevented by sufficient cause from preferring the
appeal in time.
Explanation.—The expression “High Court” means the High Court
of a State or Union territory where the real estate project is
situated.
(2) No appeal shall lie against any decision or order made by
the Appellate Tribunal with the consent of the parties.
59. Punishment for non registration under section 3. — (1)
If any promoter contravenes the provisions of section 3, he shall
be liable to a penalty which may extend up to ten per cent of the
estimated cost of the real estate project as determined by the
Authority.
457
(2) If any promoter does not comply with the orders, decisions
or directions issued under sub-section (1) or continues to violate
the provisions of section 3, he shall be punishable with
imprisonment for a term which may extend up to three years
or with fine which may extend up to a further ten per cent of
the estimated cost of the real estate project, or with both.
60. Penalty for contravention of section 4 . —If any promoter
provides false information or contravenes the provisions of section
4, he shall be liable to a penalty which may extend up to five per
cent. of the estimated cost of the real estate project, as determined
by the Authority.
61. Penalty for contravention of other provisions of this
Act.— If any promoter contravenes any other provisions of this
Act, other than that provided under section 3 or section 4, or the
rules or regulations made thereunder, he shall be liable to a penalty
which may extend up to five per cent. of the estimated cost of the
real estate project as determined by the Authority.
xxx xxxxxx
71. Power to adjudicate .— (1) For the purpose of adjudging
compensation under sections 12, 14, 18 and section 19, the
Authority shall appoint in consultation with the appropriate
Government one or more judicial of ficer as deemed necessary ,
who is or has been a District Judge to be an adjudicating officer
for holding an inquiry in the prescribed manner, after giving any
person concerned a reasonable opportunity of being heard:
Provided that any person whose complaint in respect of matters
covered under sections 12, 14, 18 and section 19 is pending before
the Consumer Disputes Redressal Forum or the Consumer
Disputes Redressal Commission or the National Consumer
Redressal Commission, established under section 9 of the
Consumer Protection Act, 1986, (68 of 1986), on or before the
commencement of this Act, he may, with the permission of such
Forum or Commission, as the case may be, withdraw the complaint
pending before it and file an application before the adjudicating
officer under this Act.
PIONEER URBAN LAND AND INFRASTRUCTURE L TD.
& ANR. v. UNION OF INDIA & ORS. [R.F . NARIMAN, J.]
(2) The application for adjudging compensation under sub-
section (1), shall be dealt with by the adjudicating officer as
expeditiously as possible and dispose of the same within a period
of sixty days from the date of receipt of the application:
Provided that where any such application could not be disposed
of within the said period of sixty days, the adjudicating officer
shall record his reasons in writing for not disposing of the
application within that period.
(3) While holding an inquiry the adjudicating officer shall have
power to summon and enforce the attendance of any person
acquainted with the facts and circumstances of the case to
give evidence or to produce any document which in the opinion
of the adjudicating officer, may be useful for or relevant to the
subject matter of the inquiry and if, on such inquiry, he is satisfied
that the person has failed to comply with the provisions of any
of the sections specified in sub-section (1), he may direct to
pay such compensation or interest, as the case may be, as he
thinks fit in accordance with the provisions of any of those
sections.
xxx xxxxxx
72. Factors to be taken into account by the adjudicating
officer.— While adjudging the quantum of compensation or
interest, as the case may be, under section 71, the adjudicating
officer shall have due regard to the following factors, namely:—
(a) the amount of disproportionate gain or unfair advantage,
wherever quantifiable, made as a result of the default;
(b) the amount of loss caused as a result of the default;
(c) the repetitive nature of the default;
(d) such other factors which the adjudicating officer considers
necessary to the case in furtherance of justice.
xxx xxxxxx
79. Bar of jurisdiction. —No civil court shall have jurisdiction to
entertain any suit or proceeding in respect of any matter which
the Authority or the adjudicating officer or the Appellate Tribunal
459
is empowered by or under this Act to determine and no injunction
shall be granted by any court or other authority in respect of any
action taken or to be taken in pursuance of any power conferred
by or under this Act.
xxx xxxxxx
88. Application of other laws not barred— The provisions of
this Act shall be in addition to, and not in derogation of, the provisions
of any other law for the time being in force.
89. Act to have overriding effect.— The provisions of this Act
shall have effect, notwithstanding anything inconsistent therewith
contained in any other law for the time being in force.”
22. A perusal of the aforesaid provisions would show that, on and
from the coming into force of the RERA, all real estate projects (as
defined) would first have to be registered with the Real Estate Regulatory
Authority, which, before registering such projects, would look into all
relevant details, including delay in completion of other projects by the
developer. Importantly , the promoter is now to make a declaration
supported by an affidavit, that he undertakes to complete the project
within a certain time period, and that 70% of the amounts realised for
the project from allottees, from time to time, shall be deposited in a
separate account, which would be spent only to defray the cost of
construction and land cost for that particular project. Registration is
granted by the authority only when it is satisfied that the promoter is a
bonafide promoter who is likely to perform his part of the bargain
satisfactorily. Registration of the project enures only for a certain period
and can only be extended due to force majeure events for a maximum
period of one year by the authority, on being satisfied that such events
have, in fact, taken place. Registration once granted, may be revoked if
it is found that the promoter defaults in complying with the various statutory
requirements or indulges in unfair practices or irregularities. Importantly,
upon revocation of registration, the authority is to facilitate the remaining
development work, which can then be carried out either by the
“competent authority” as defined by the RERA or by the association of
allottees or otherwise. The promoter at the time of booking and issue of
allotment letters has to make available to the allottees information, inter
alia, as to the stage-wise time schedule of completion of the project.
Deposits or advances beyond 10% of the estimated cost as advance
PIONEER URBAN LAND AND INFRASTRUCTURE L TD.
& ANR. v. UNION OF INDIA & ORS. [R.F . NARIMAN, J.]
payment cannot be taken without first entering into an agreement for
sale. Importantly, the agreement for sale will now no longer be a one-
sided contract of adhesion, but in such form as may be prescribed, which
balances the rights and obligations of both the promoter and the allottees.
Importantly, under Section 18, if the promoter fails to complete or is
unable to give possession of an apartment, plot or building in accordance
with the terms of the agreement for sale, he must return the amount
received by him in respect of such apartment etc. with such interest as
may be prescribed and must, in addition, compensate the allottee in case
of any loss caused to him. Under Section 19, the allottee shall be entitled
to claim possession of the apartment, plot or building, as the case may
be, or refund of amount paid along with interest in accordance with the
terms of the agreement for sale. In addition, all allottees are to be
responsible for making necessary payments in instalments within the
time specified in the agreement for sale and shall be liable to pay interest
at such rate as may be prescribed for any delay in such payment. Under
Section 31, any aggrieved person may file a complaint with the authority
or the adjudicating officers set up by such authority against any promoter,
allottee or real estate agent, as the case may be, for violation or
contravention of the RERA, and rules and regulations made thereunder.
Also, if after adjudication a promoter, allottee or real estate agent fails to
pay interest, penalty or compensation imposed on him by the authorities
under the RERA, the same shall be recoverable as arrears of land
revenue. Appeals may be filed to the Real Estate Appellate Tribunal
against decisions or orders of the authority or the adjudicating of ficer.
From orders of the Appellate Tribunal, appeals may thereafter be filed
to the High Court. Stiff penalties are to be awarded for breach and/or
contravention of the provisions of the RERA. Importantly, under Section
72, the adjudicating officer must first determine that the complainant has
established “default” on the part of the respondent, after which
consequential orders may then follow. Under Section 88, the provisions
of RERA are in addition to and not in derogation of the provisions of any
other law for time being in force and under Section 89, RERA is to have
effect notwithstanding anything inconsistent contained in any other law
for the time being in force.
The Insolvency and Bankruptcy Code, 2016 vis-à-vis the
Real Estate (Regulation and Development) Act, 2016
23. Section 238 of the Code reads as follows:
461
“238. The provisions of this Code shall have effect,
notwithstanding anything inconsistent therewith contained in any
other law for the time being in force or any instrument having
effect by virtue of any such law .”
24. It is significant to note that there is no provision similar to that
of Section 88 of RERA in the Code, which is meant to be a complete
and exhaustive statement of the law insofar as its subject matter is
concerned. Also, the non-obstante clause of RERA came into force on
1st May, 2016, as opposed to the non-obstante clause of the Code which
came into force on 1 st December, 2016. Further , the amendment with
which we are concerned has come into force only on 6 th June, 2018.
Given these circumstances, it is a little difficult to accede to arguments
made on behalf of learned senior counsel for the Petitioners, that RERA
is a special enactment which deals with real estate development projects
and must, therefore, be given precedence over the Code, which is only a
general enactment dealing with insolvency generally . From the
introduction of the explanation to Section 5(8)(f) of the Code, it is clear
that Parliament was aware of RERA, and applied some of its definition
provisions so that they could apply when the Code isto be interpreted.
The fact that RERA is in addition to and not in derogation of the provisions
of any other law for the time being in force, also makes it clear that the
remedies under RERA to allottees were intended to be additional and
not exclusive remedies. Also, it is important to remember that as the
authorities under RERA were to be set up within one year from 1st May,
2016, remedies before those authorities would come into effect only on
and from 1st May, 2017 making it clear that the provisions of the Code,
which came into force on 1st December, 2016, would apply in addition to
the RERA.
25. In KSL & Industries Ltd. v. Arihant Threads Ltd. (2015)
1 SCC 166, a Three Judge Bench of this Court held that the Sick Industries
Companies (Special Provisions) Act, 1985 (hereinafter referred to as
the “Sick Act”) would prevail over the Recovery of Debts Due to Banks
and Financial Institutions Act, 1993 (hereinafter referred to as the
“Recovery Act”) - both statutes containing non-obstante clauses. After
going into the scheme of both the statutes, this Court referred in particular
to Section 34(2) of the Recovery Act and then held as follows:
“35. This special law, which deals with the recovery of debts due
to banks and financial institutions, makes the procedure for
PIONEER URBAN LAND AND INFRASTRUCTURE L TD.
& ANR. v. UNION OF INDIA & ORS. [R.F . NARIMAN, J.]
recovery of such debts exclusive and even unique. The non
obstante clause in sub-section (1) confers an overriding effect on
the provisions of the RDDB Act notwithstanding anything incon-
sistent therewith contained in any other law for the time being in
force. Sub-section (2), however, makes the RDDB Act additional
to and not in derogation or annulment of the five Acts mentioned
therein i.e. the Industrial Finance Corporation Act, 1948; the State
Financial Corporations Act, 1951; the Unit Trust of India Act,
1963; the Industrial Reconstruction Bank of India Act, 1984 and
the Sick Industrial Companies (Special Provisions) Act, 1985.
36. Sub-section (2) was added to Section 34 of the RDDB Act
w.e.f. 17-1-2000 by Act 1 of 2000. There is no doubt that when
an Act provides, as here, that its provisions shall be in addition to
and not in derogation of another law or laws, it means that the
legislature intends that such an enactment shall coexist along with
the other Acts. It is clearly not the intention of the legislature, in
such a case, to annul or detract from the provisions of other laws.
The term “ in der ogation of ” means “ in abr ogation or r epeal
of”. The Black’ s Law Dictionar y sets forth the following
meaning for “derogation”:
“ derogation.—The partial repeal or abrogation of a law by a
later Act that limits its scope or impairs its utility and force.”
It is clear that sub-section (1) contains a non obstante clause,
which gives the overriding effect to the RDDB Act. Sub-section
(2) acts in the nature of an exception to such an overriding effect.
It states that this overriding effect is in relation to certain laws
and that the RDDB Act shall be in addition to and not in
abrogation of, such laws. SICA is undoubtedly one such law.
37. The effect of sub-section (2) must necessarily be to preserve
the powers of the authorities under SICA and save the
proceedings from being overridden by the later Act i.e. the RDDB
Act.
38. We, thus, find a harmonious scheme in relation to the
proceedings for reconstruction of the company under SICA, which
includes the reconstruction of debts and even the sale or lease of
the sick company’s properties for the purpose, which may or may
not be a part of the security executed by the sick company in
favour of a bank or a financial institution on the one hand, and the
463
provisions of the RDDB Act, which deal with recovery of debts
due to banks or financial institutions, if necessary by enforcing
the security charged with the bank or financial institution, on the
other.
xxx xxxxxx
48. In view of the observations of this Court in the decisions
referred to and relied on by the learned counsel for the parties we
find that, the purpose of the two enactments is entirely different.
As observed earlier, the purpose of one is to provide ameliorative
measures for reconstruction of sick companies, and the purpose
of the other is to provide for speedy recovery of debts of banks
and financial institutions. Both the Acts are “special” in this sense.
However , with reference to the specific purpose of
reconstruction of sick companies, SICA must be held to be a
special law, though it may be considered to be a general law in
relation to the recovery of debts. Whereas, the RDDB Act may
be considered to be a special law in relation to the recovery of
debts and SICA may be considered to be a general law in this
regard. For this purpose we rely on the decision in LIC v. Vijay
Bahadur [(1981) 1 SCC 315 : 1981 SCC (L&S) 111] . Normally
the latter of the two would prevail on the principle that the legisla-
ture was aware that it had enacted the earlier Act and yet chose
to enact the subsequent Act with a non obstante clause. In this
case, however, the express intendment of Parliament in the non
obstante clause of the RDDB Act does not permit us to take that
view. Though the RDDB Act is the later enactment, sub-section
(2) of Section 34 thereof specifically provides that the provisions
of the Act or the Rules made thereunder shall be in addition to,
and not in derogation of, the other laws mentioned therein
including SICA.
49. The term “not in derogation” clearly expresses the intention
of Parliament not to detract from or abrogate the provisions of
SICA in any way. This, in effect must mean that Parliament in-
tended the proceedings under SICA for reconstruction of a sick
company to go on and for that purpose further intended that all
the other proceedings against the company and its properties should
be stayed pending the process of reconstruction. While the term
“proceedings” under Section 22 of SICA did not originally include
the RDDB Act, which was not there in existence. Section 22
covers proceedings under the RDDB Act.”
PIONEER URBAN LAND AND INFRASTRUCTURE L TD.
& ANR. v. UNION OF INDIA & ORS. [R.F . NARIMAN, J.]
26. In view of Section 34(2) of the Recovery Act, this Court held
that despite the fact that the non-obstante clause contained in the
Recovery Act is later in time than the non-obstante clause contained in
the Sick Act, in the event of a conflict, the Recovery Act i.e. the later
Act must give way to the Sick Act i.e. the earlier Act. Several judgments
were referred to in which ordinarily a later Act containing a non-obstante
clause must be held to have primacy over an earlier Act containing a
non-obstante clause, as Parliament must be deemed to be aware of the
fact that the later Act is intended to override all earlier statutes including
those which contained non-obstante clauses. This statement of the law
was departed from in KSL & Industries (supra)only because of the
presence of a Section like Section 88 of RERA contained in the Recovery
Act, which makes it clear that the Act is meant to be in addition to and
not in derogation of other statutes. In the present case, it is clear that
both tests are satisfied, namely, that the Code as amended, is both later
in point of time than RERA, and must be given precedence over RERA,
given Section 88 of RERA.
27. In fact, in Bank of India v . Ketan Par ekh (2008) 8 SCC
148, this Court held that Section 9A of the Special Court (Trial of Offences
Relating to Transactions in Securities) Act, 1992 (hereinafter referred to
as the “Special Court Act”) must be considered to be legislation that is
subsequent to the Recovery Act, since Section 9A was introduced by
amendment, into the Special Court Act after the Recovery Act. Needless
to add, both statutes contained non-obstante clauses. This Court held:
“ 28. In the present case, both the two Acts i.e. the Act of 1992
and the Act of 1993 start with the non obstante clause. Section 34
of the Act of 1993 starts with non obstante clause, likewise
Section 9-A (sic 13) of the Act of 1992. But incidentally, in this
case Section 9-A came subsequently i.e. it came on 25-1-1994.
Therefore, it is a subsequent legislation which will have the
overriding ef fect over the Act of 1993. But cases might arise
where both the enactments have the non obstante clause then in
that case, the proper perspective would be that one has to see the
subject and the dominant purpose for which the special
enactment was made and in case the dominant purpose is
covered by that contingencies, then notwithstanding that the Act
might have come at a later point of time still the intention can be
ascertained by looking to the objects and reasons. However , so
far as the present case is concerned, it is more than clear that
465
Section 9-A of the Act of 1992 was amended on 25-1-1994
whereas the Act of 1993 came in 1993. Therefore, the Act of
1992 as amended to include Section 9-A in 1994 being
subsequent legislation will prevail and not the provisions of the
Act of 1993.”
(emphasis supplied)
28. It is clear , therefore, that even by a process of harmonious
construction, RERA and the Code must be held to co-exist, and, in the
event of a clash, RERA must give way to the Code. RERA, therefore,
cannot be held to be a special statute which, in the case of a conflict,
would override the general statute, viz. the Code.
29. As a matter of fact, the Code and RERA operate in completely
different spheres. The Code deals with a proceeding in rem in which the
focus is the rehabilitation of the corporate debtor . This is to take place
by replacing the management of the corporate debtor by means of a
resolution plan which must be accepted by 66% of the Committee of
Creditors, which is now put at the helm of affairs, in deciding the fate of
the corporate debtor. Such resolution plan then puts the same or another
management in the saddle, subject to the provisions of the Code, so that
the corporate debtor may be pulled out of the woods and may continue
as a going concern, thus benefitting all stakeholders involved. It is only
as a last resort that winding up of the corporate debtor is resorted to, so
that its assets may be liquidated and paid out in the manner provided by
Section 53 of the Code.On the other hand, RERA protects the interests
of the individual investor in real estate projects by requiring the promoter
to strictly adhere to its provisions. The object of RERA is to see that real
estate projects come to fruition within the stated period and to see that
allottees of such projects are not left in the lurch and are finally able to
realise their dream of a home, or be paid compensation if such dream is
shattered, or at least get back monies that they had advanced towards
the project with interest. At the same time, recalcitrant allottees are not
to be tolerated, as they must also perform their part of the bargain, namely,
to pay instalments as and when they become due and payable. Given
the different spheres within which these two enactments operate, different
parallel remedies are given to allottees – under RERA to see that their
flat/apartment is constructed and delivered to them in time, barring which
compensation for the same and/or refund of amounts paid together with
interest atthe very least comes their way. If, however, the allottee wants
PIONEER URBAN LAND AND INFRASTRUCTURE L TD.
& ANR. v. UNION OF INDIA & ORS. [R.F . NARIMAN, J.]
that the corporate debtor’s management itself be removed and replaced,
so that the corporate debtor can be rehabilitated, he may prefer a Section
7 application under the Code. That another parallel remedy is available
is recognised by RERA itself in the proviso to Section 71(1), by which
an allottee may continue with an application already filed before the
Consumer Protection fora, he being given the choice to withdraw such
complaint and file an application before the adjudicating officer under
RERA read with Section 88.In similar circumstances, this Court in Swaraj
Infrastructure Private Limited v . Kotak Mahindra Bank Limited
(2019) 3 SCC 620 has held that Debt Recovery Tribunal proceedings
under the Recovery of Debts Due to Banks and Financial Institutions
Act, 1993 and winding up proceedings under the Companies Act, 1956
can carry on in parallel streams(see paragraphs 21 and 22 therein).
Financial and Operational Creditors
30. In Innoventive Industries v . ICICI Bank & Anr. (2018)
1 SCC 407, this Court after setting out some of the sections of the Code,
laid down the Scheme of the Code when it came to financial and
operational creditors triggering the Code against a Corporate debtor .
This Court held:
“ 27. The scheme of the Code is to ensure that when a default
takes place, in the sense that a debt becomes due and is not paid,
the insolvency resolution process begins. Default is defined in
Section 3(12) in very wide terms as meaning non-payment of a
debt once it becomes due and payable, which includes
non-payment of even part thereof or an instalment amount. For
the meaning of “debt”, we have to go to Section 3(1 1), which in
turn tells us that a debt means a liability of obligation in respect of
a “claim” and for the meaning of “claim”, we have to go back to
Section 3(6) which defines “claim” to mean a right to payment
even if it is disputed. The Code gets triggered the moment default
is of rupees one lakh or more (Section 4). The corporate
insolvency resolution process may be triggered by the corporate
debtor itself or a financial creditor or operational creditor . A
distinction is made by the Code between debts owed to financial
creditors and operational creditors. A financial creditor has been
defined under Section 5(7) as a person to whom a financial debt
is owed and a financial debt is defined in Section 5(8) to mean a
467
debt which is disbursed against consideration for the time value
of money. As opposed to this, an operational creditor means a
person to whom an operational debt is owed and an operational
debt under Section 5(21) means a claim in respect of provision of
goods or services.
28. When it comes to a financial creditor triggering the process,
Section 7 becomes relevant. Under the Explanation to Section
7(1), a default is in respect of a financial debt owed to any
financial creditor of the corporate debtor — it need not be a debt
owed to the applicant financial creditor . Under Section 7(2), an
application is to be made under sub-section (1) in such form and
manner as is prescribed, which takes us to the Insolvency and
Bankruptcy (Application to Adjudicating Authority) Rules, 2016.
Under Rule 4, the application is made by a financial creditor in
Form 1 accompanied by documents and records required therein.
Form 1 is a detailed form in 5 parts, which requires particulars of
the applicant in Part I, particulars of the corporate debtor in Part
II, particulars of the proposed interim resolution professional in
Part III, particulars of the financial debt in Part IV and
documents, records and evidence of default in Part V. Under Rule
4(3), the applicant is to dispatch a copy of the application filed
with the adjudicating authority by registered post or speed post to
the registered of fice of the corporate debtor . The speed, within
which the adjudicating authority is to ascertain the existence of a
default from the records of the information utility or on the basis
of evidence furnished by the financial creditor, is important. This
it must do within 14 days of the receipt of the application. It is at
the stage of Section 7(5), where the adjudicating authority is to be
satisfied that a default has occurred, that the corporate debtor is
entitled to point out that a default has not occurred in the sense
that the “debt”, which may also include a disputed claim, is not
due. A debt may not be due if it is not payable in law or in fact .
The moment the adjudicating authority is satisfied that a default
has occurred, the application must be admitted unless it is
incomplete, in which case it may give notice to the applicant to
rectify the defect within 7 days of receipt of a notice from the
adjudicating authority. Under sub-section (7), the adjudicating
authority shall then communicate the order passed to the financial
PIONEER URBAN LAND AND INFRASTRUCTURE L TD.
& ANR. v. UNION OF INDIA & ORS. [R.F . NARIMAN, J.]
creditor and corporate debtor within 7 days of admission or
rejection of such application, as the case may be.
29. The scheme of Section 7 stands in contrast with the scheme
under Section 8 where an operational creditor is, on the
occurrence of a default, to first deliver a demand notice of the
unpaid debt to the operational debtor in the manner provided in
Section 8(1) of the Code. Under Section 8(2), the corporate debtor
can, within a period of 10 days of receipt of the demand notice or
copy of the invoice mentioned in sub-section (1), bring to the
notice of the operational creditor the existence of a dispute or the
record of the pendency of a suit or arbitration proceedings, which
is pre-existing— i.e. before such notice or invoice was received
by the corporate debtor. The moment there is existence of such a
dispute, the operational creditor gets out of the clutches of the
Code.
30. On the other hand, as we have seen, in the case of a
corporate debtor who commits a default of a financial debt, the
adjudicating authority has merely to see the records of the
information utility or other evidence produced by the financial
creditor to satisfy itself that a default has occurred. It is of no
matter that the debt is disputed so long as the debt is “due” i.e.
payable unless interdicted by some law or has not yet become
due in the sense that it is payable at some future date. It is only
when this is proved to the satisfaction of the adjudicating
authority that the adjudicating authority may reject an application
and not otherwise.”
(emphasis supplied)
31. Likewise, in Swiss Ribbons (supra), this Court while repelling
a challenge to the constitutional validity of the Code based on a purported
infraction of Article 14, differentiated between financial and operational
creditors. In so doing, it made it clear that the context of the decision
dealt with banks and financial institutions as financial creditors as opposed
to operational creditors who could be corporations or individuals to whom
monies were owed for goods and/or services. In certain circumstances,
financial creditors could also be individuals, such as debenture holders
and fixed deposit holders, who were then spoken of as follows:
469
“ 42. A perusal of the definition of “financial creditor” and
“financial debt” makes it clear that a financial debt is a debt
together with interest, if any , which is disbursed against the
consideration for time value of money. It may further be money
that is borrowed or raised in any of the manners prescribed in
Section 5(8) or otherwise, as Section 5(8) is an inclusive
definition. On the other hand, an “operational debt” would include
a claim in respect of the provision of goods or services, including
employment, or a debt in respect of payment of dues arising
under any law and payable to the Government or any local
authority.
43. A financial creditor may trigger the Code either by itself or
jointly with other financial creditors or such persons as may be
notified by the Central Government when a “default” occurs. The
Explanation to Section 7(1) also makes it clear that the Code may
be triggered by such persons in respect of a default made to any
other financial creditor of the corporate debtor , making it clear
that once triggered, the resolution process under the Code is a
collective proceeding in rem which seeks, in the first instance, to
rehabilitate the corporate debtor . Under Section 7(4), the
adjudicating authority shall, within the prescribed period,
ascertain the existence of a default on the basis of evidence
furnished by the financial creditor; and under Section 7(5), the
adjudicating authority has to be satisfied that a default has
occurred, when it may, by order, admit the application, or dismiss
the application if such default has not occurred. On the other
hand, under Sections 8 and 9, an operational creditor may, on the
occurrence of a default, deliver a demand notice which must
then be replied to within the specified period. What is important is
that at this stage, if an application is filed before the adjudicating
authority for initiating the corporate insolvency resolution process,
the corporate debtor can prove that the debt is disputed. When
the debt is so disputed, such application would be rejected.
xxx xxxxxx
46. However , the Insolvency Law Committee (ILC), in its
Report of March 2018 dealt with debenture-holders and fixed
deposit-holders, who are also financial creditors, and are
numerous. The Report then went on to state:
PIONEER URBAN LAND AND INFRASTRUCTURE L TD.
& ANR. v. UNION OF INDIA & ORS. [R.F . NARIMAN, J.]
“10.6. For certain securities, a trustee or an agent may already be
appointed as per the terms of the security instrument. For
example, a debenture trustee would be appointed if debentures
exceeding 500 have been issued [Section 71(5), Companies Act,
2013] or if secured debentures are issued [Rule 18(1)( c),
Companies (Share Capital and Debenture) Rules, 2014]. Such
creditors may be represented through such pre-appointed
trustees or agents. For other classes of creditors which exceed a
certain threshold in number, like home buyers or security-holders
for whom no trustee or agent has already been appointed under a
debt instrument or otherwise, an insolvency professional (other
than IRP) shall be appointed by NCLT on the request of IRP. It is
to be noted that as the agent or trustee or insolvency professional
i.e. the authorised representative for the creditors discussed above
and executors, guarantors, etc. as discussed in Para 9 of this
Report, shall be a part of the CoC, they cannot be related parties
to the corporate debtor in line with the spirit of proviso to Section
21(2).
***
10.8. In light of the deliberation above, the Committee felt that a
mechanism requires to be provided in the Code to mandate
representation in meetings of security-holders, deposit-holders, and
all other classes of financial creditors which exceed a certain
number, through an authorised representative. This can be done
by adding a new provision to Section 21 of the Code. Such a
representative may either be a trustee or an agent appointed
under the terms of the debt agreement of such creditors,
otherwise an insolvency professional may be appointed by NCLT
for each such class of financial creditors. Additionally , the
representative shall act and attend the meetings on behalf of the
respective class of financial creditors and shall vote on behalf of
each of the financial creditors to the extent of the voting share of
each such creditor , and as per their instructions. To ensure
adequate representation by the authorised representative of the
financial creditors, a specific provision laying down the rights and
duties of such authorised representatives may be inserted.
Further, the requisite threshold for the number of creditors and
manner of voting may be specified by IBBI through regulations to
471
enable efficient voting by the representative. Also, Regulation 25
may also be amended to enable voting through electronic means
such as e-mail, to address any technical issues which may arise
due to a large number of creditors voting at the same time.”
47. Given this Report, the Code was amended and Sections 21
(6-A) and 21(6-B) were added, which are set out hereinbelow:
“21. Committee of Creditors . —
(1)-(6) * * *
(6-A) Where a financial debt—
(a) is in the form of securities or deposits and the terms of the
financial debt provide for appointment of a trustee or agent to act
as authorised representative for all the financial creditors, such
trustee or agent shall act on behalf of such financial creditors;
(b) is owed to a class of creditors exceeding the number as may
be specified, other than the creditors covered under clause (a) or
sub-section (6), the interim resolution professional shall make an
application to the adjudicating authority along with the list of all
financial creditors, containing the name of an insolvency
professional, other than the interim resolution professional, to act
as their authorised representative who shall be appointed by the
adjudicating authority prior to the first meeting of the Committee
of Creditors;
(c) is represented by a guardian, executor or administrator , such
person shall act as authorised representative on behalf of such
financial creditors,
and such authorised representative under clause (a) or clause (b)
or clause ( c) shall attend the meetings of the Committee of
Creditors, and vote on behalf of each financial creditor to the
extent of his voting share.
(6-B) The remuneration payable to the authorised
representative—
(i) under clauses (a) and (c) of sub-section (6-A), if any, shall be
as per the terms of the financial debt or the relevant
documentation; and
PIONEER URBAN LAND AND INFRASTRUCTURE L TD.
& ANR. v. UNION OF INDIA & ORS. [R.F . NARIMAN, J.]
(ii) under clause ( b) of sub-section (6-A) shall be as specified
which shall form part of the insolvency resolution process costs.”
48. Also, Regulations 16-A and 16-B of the Insolvency and
Bankruptcy Board of India (Insolvency Resolution Process for
Corporate Persons) Regulations, 2016 (the CIRP Regulations)
were added, with effect from 4-7-2018, as follows:
“ 16-A. Authorised represent ative.—(1) The interim resolution
professional shall select the insolvency professional, who is the
choice of the highest number of financial creditors in the class in
Form CA received under sub-regulation (1) of Regulation 12, to
act as the authorised representative of the creditors of the
respective class:
Provided that the choice for an insolvency professional to act as
authorised representative in Form CA received under
sub-regulation (2) of Regulation 12 shall not be considered.
(2) The interim resolution professional shall apply to the
adjudicating authority for appointment of the authorised
representatives selected under sub-regulation (1) within two days
of the verification of claims received under sub-regulation (1) of
Regulation 12.
(3) Any delay in appointment of the authorised representative for
any class of creditors shall not affect the validity of any decision
taken by the committee.
(4) The interim resolution professional shall provide the list of
creditors in each class to the respective authorised representative
appointed by the adjudicating authority.
(5) The interim resolution professional or the resolution
professional, as the case may be, shall provide an updated list of
creditors in each class to the respective authorised representative
as and when the list is updated.
Clarification: The authorised representative shall have no role in
receipt or verification of claims of creditors of the class he
represents.
(6) The interim resolution professional or the resolution
professional, as the case may be, shall provide electronic means
473
of communication between the authorised representative and the
creditors in the class.
(7) The voting share of a creditor in a class shall be in proportion
to the financial debt which includes an interest at the rate of eight
per cent per annum unless a different rate has been agreed to
between the parties.
(8) The authorised representative of creditors in a class shall be
entitled to receive fee for every meeting of the committee
attended by him in the following manner, namely:
(9) The authorised representative shall circulate the agenda to
creditors in a class and announce the voting window at least
twenty-four hours before the window opens for voting
instructions and keep the voting window open for at least twelve
hours.
16-B. Committee with only creditors in a class . — Where the
corporate debtor has only creditors in a class and no other
financial creditor eligible to join the committee, the committee shall
consist of only the authorised representative(s).”
49. It is obvious that debenture-holders and persons with home
loans may be numerous and, therefore, have been statutorily dealt
with by the aforesaid change made in the Code as well as the
Regulations. However, as a general rule, it is correct to say that
financial creditors, which involve banks and financial institutions,
would certainly be smaller in number than operational creditors of
a corporate debtor.
xxx xxxxxx
61. Insofar as set-off and counterclaim is concerned, a set-off of
amounts due from financial creditors is a rarity. Usually, financial
debts point only in one way—amounts lent have to be repaid.
However, it is not as if a legitimate set-off is not to be considered
/glyph817umbe r of
creditors in
the c lass
Fee per meeting of
the com mitte e (R s)
10-100 15,000
101 -1000 20,000
More than
1000
25,000
PIONEER URBAN LAND AND INFRASTRUCTURE L TD.
& ANR. v. UNION OF INDIA & ORS. [R.F . NARIMAN, J.]
at all. Such set-off may be considered at the stage of filing of
proof of claims during the resolution process by the resolution
professional, his decision being subject to challenge before the
adjudicating authority under Section 60.”
The Article 14 Challenge (I): Discrimination
32. Learned counsel for the Petitioners have emphasised that
treating allottees to be financial creditors is discriminatory inasmuch as
unequals are treated equally, equals are treated unequally, and both are
without any intelligible differentia having any nexus with the objects of
the Code. It is argued that discrimination arises, equals being treated as
unequal, as real estate developers are differentiated from other entities
who supply goods or services and would, therefore, be discriminated
against as, in the case of real estate developers, all that an allottee would
have to show is that a debt is due to him, whereas in the cases of persons
supplying goods or services if there exists any pre-existing dispute
between the operational debtor and the person who purchases the goods
or avails of the services, the operational debtor would be outside the
clutches of the Code. It was also argued that unequals are treated as
equals as banks and financial institutions are completely different from
real estate developers, as has been recognised in Swiss Ribbons (supra),
and to treat these unequals as equals by making real estate developers
financial debtors, again infracts Article 14.
33. When Article 14 is alleged to have been infracted by legislation
which is economic in nature, it is important to first restate a few
fundamental principles. In Ram Krishna Dalmia v . Justice S.R.
Tendolkar (1959) SCR 279, this Court laid down the oft quoted
principles that apply when challenges on the ground of discrimination
are made to statutes. This Court held:
“…The principle enunciated above has been consistently adopted
and applied in subsequent cases. The decisions of this Court
further establish—
(a) that a law may be constitutional even though it relates to a
single individual if, on account of some special circumstances or
reasons applicable to him and not applicable to others, that single
individual may be treated as a class by himself;
475
(b) that there is always a presumption in favour of the
constitutionality of an enactment and the burden is upon him who
attacks it to show that there has been a clear transgression of the
constitutional principles;
(c) that it must be presumed that the legislature understands and
correctly appreciates the need of its own people, that its laws are
directed to problems made manifest by experience and that its
discriminations are based on adequate grounds;
(d) that the legislature is free to recognise degrees of harm and
may confine its restrictions to those cases where the need is deemed
to be the clearest;
(e) that in order to sustain the presumption of constitutionality the
court may take into consideration matters of common knowledge,
matters of common report, the history of the times and may
assume every state of facts which can be conceived existing at
the time of legislation; and
(f) that while good faith and knowledge of the existing conditions
on the part of a legislature are to be presumed, if there is nothing
on the face of the law or the surrounding circumstances brought
to the notice of the court on which the classification may
reasonably be regarded as based, the presumption of constitu-
tionality cannot be carried to the extent of always holding that
there must be some undisclosed and un-known reasons for
subjecting certain individuals or corporations to hostile or
discriminating legislation.(at page 297, 298)”
34. This principle has been re-iterated by this Court in State of
Bihar v. Shree Baidyanath Ayurved Bhawan (P) Ltd. (2005) 2 SCC
762 at 783 and more recently in Karnataka Live Band Restaurants
Assn. v . State of Karnataka (2018) 4 SCC 372 at 393 where this
Court re-iterated the principles to test legislation on the touchstone of
Article 14 as laid down by this Court in Ram Krishna Dalmia (supra),
wherein as extracted above, this Court held that the legislature is free to
recognise degrees of harm and confine its application to those cases
where the need is deemed to be the clearest.
35. In State of Gujarat and Anr. v. Shri Ambica Mills Ltd.,
Ahmedabad, etc.(1974) 4 SCC 656, this Court dealt with classifications
PIONEER URBAN LAND AND INFRASTRUCTURE L TD.
& ANR. v. UNION OF INDIA & ORS. [R.F . NARIMAN, J.]
that are under-inclusive and held, particularly with regard to economic
legislation, that such under-inclusion would not result in the death-knell
of such laws on the anvil of Article 14. This Court put it thus:
“ 53. The equal protection of the laws is a pledge of the protection
of equal laws. But laws may classify . And the very idea of
classification is that of inequality. In tackling this paradox the Court
has neither abandoned the demand for equality nor denied the
legislative right to classify . It has taken a middle course. It has
resolved the contradictory demands of legislative specialization
and constitutional generality by a doctrine of reasonable
classification. [See Joseph Tussman and Jacobusten Brook The
Equal Protection of the Law, 37 California Rev 341]
54. A reasonable classification is one which includes all who are
similarly situated and none who are not. The question then is:
what does the phrase “similarly situated” mean? The answer to
the question is that we must look beyond the classification to the
purpose of the law . A reasonable classification is one which
includes all persons who are similarly situated with respect to the
purpose of the law . The purpose of a law may be either the
elimination of a public mischief or the achievement of some
positive public good.
55. A classification is under-inclusive when all who are included
in the class are tainted with the mischief but there are others also
tainted whom the classification does not include. In other words,
a classification is bad as under-inclusive when a State benefits or
burdens persons in a manner that furthers a legitimate purpose
but does not confer the same benefit or place the same burden on
others who are similarly situated. A classification is
over-inclusive when it includes not only those who are similarly
situated with respect to the purpose but others who are not so
situated as well. In other words, this type of classification
imposes a burden upon a wider range of individuals than are
included in the class of those attended with mischief at which the
law aims. Herod ordering the death of all male children born on a
particular day because one of them would someday bring about
his downfall employed such a classification.
477
56. The first question, therefore, is, whether the exclusion of
establishments carrying on business or trade and employing less
than 50 persons makes the classification under-inclusive, when it
is seen that all factories employing 10 or 20 persons, as the case
may be, have been included and that the purpose of the law is to
get in unpaid accumulations for the welfare of the labour . Since
the classification does not include all who are similarly situated
with respect to the purpose of the law , the classification might
appear, at first blush, to be unreasonable. But the Court has
recognised the very real difficulties under which legislatures
operate — difficulties arising out of both the nature of the
legislative process and of the society which legislation attempts
perennially to re-shape — and it has refused to strike down
indiscriminately all legislation embodying classificatory inequality
here under consideration. Mr Justice Holmes, in urging tolerance
of under-inclusive classifications, stated that such legislation should
not be disturbed by the Court unless it can clearly see that there is
no fair reason for the law which would not require with equal
force its extension to those whom it leaves untouched. [ Missouri,
K&T Rly v. May, 194 US 267, 269] What, then, are the fair
reasons for non-extension? What should a court do when it is
faced with a law making an under-inclusive classification in areas
relating to economic and tax matters? Should it, by its judgment,
force the legislature to choose between inaction or perfection?
xxx xxxxxx
66. That the legislation is directed to practical problems, that the
economic mechanism is highly sensitive and complex, that many
problems are singular and contingent that laws are not abstract
propositions and do not relate to abstract units and are not to be
measured by abstract symmetry , that exact wisdom and nice
adaption of remedies cannot be required, that judgment is largely
a prophecy based on meagre and uninterpreted experience, should
stand as reminder that in this area the Court does not take the
equal protection requirement in a pedagogic manner [See
“General Theory of Law and State”, p. 161] .
67. In the utilities, tax and economic regulation cases, there are
good reasons for judicial self-restraint if not judicial deference to
PIONEER URBAN LAND AND INFRASTRUCTURE L TD.
& ANR. v. UNION OF INDIA & ORS. [R.F . NARIMAN, J.]
legislative judgment. The legislature after all has the affirmative
responsibility. The Courts have only the power to destroy, not to
reconstruct. When these are added to the complexity of economic
regulation, the uncertainty, the liability to error, the bewildering
conflict of the experts, and the number of times the judges have
been overruled by events — self-limitation can be seen to be the
path to judicial wisdom and institutional prestige and stability. [See
“General Theory of Law and State”, p. 161]
xxxxxxxxx
71. The Court must be aware of its own remoteness and lack of
familiarity with local problems. Classification is dependent on the
peculiar needs and specific difficulties of the community. The needs
and difficulties of the community are constituted out of facts and
opinions beyond the easy ken of the Court [ See “General Theory
of Law and State”, p. 161] . It depends to a great extent upon an
assessment of the local condition of these concerns which the
legislature alone was competent to make.”
36. In V.C. Shukla v.State (Delhi Administration) 1980 Supp.
SCC 249, this Court further elaborated:
“ 11. In a diverse society and a lar ge democracy such as ours
where the expanding needs of the nation change with the temper
of the times, it is extremely difficult for any legislation to make
laws applicable to all persons alike. Some amount of
classification is, therefore, necessary to administer various spheres
of the activities of the State. It is well settled that in applying
Article 14 mathematical precision or nicety or perfect equanimity
are not required. Similarity rather than identity of treatment is
enough. The courts should not make a doctrinaire approach in
construing Article 14 so as to destroy or frustrate any beneficial
legislation. What Article 14 prohibits is hostile discrimination and
not reasonable classification for the purpose of legislation.
Furthermore, the legislature which is in the best position to
understand the needs and requirements of the people must be
given sufficient latitude for making selection or differentiation and
so long as such a selection is not arbitrary and has a rational basis
having regard to the object of the Act, Article 14 would not be
attracted. That is why this Court has laid down that presumption
479
is always in favour of the constitutionality of an enactment and
the onus lies upon the person who attacks the statute to show that
there has been an infraction of the constitutional concept of equality.
It has also been held that in order to sustain the presumption of
constitutionality, the court is entitled to take into consideration
matters of common knowledge, common report, the history of the
times and all other facts which may be existing at the time of the
legislation. Similarly , it cannot be presumed that the
administration of a particular law would be done with an “evil eye
and an unequal hand”. Finally, any person invoking Article 14 of
the Constitution must show that there has been discrimination
against a person who is similarly situate or equally circumstanced.
In the case of State of U.P. v. Deoman Upadhyaya [AIR 1960
SC 1125 : (1961) 1 SCR 14 : (1961) 2 SCJ 334] Subba Rao, J.,
observed as follows:
“No discrimination can be made either in the privileges conferred
or in the liabilities imposed. But these propositions conceived in
the interests of the public, if logically stretched too far , may not
achieve the high purpose behind them. In a society of unequal
basic structure, it is wellnigh impossible to make laws suitable in
their application to all the persons alike. So, a reasonable
classification is not only permitted but is necessary if society should
progress.”
37. Equally, it is important to note that classification need not be
perfect. In Venkateshwara Theatre v. State of A.P. (1993) 3 SCC
677 this Court held:
“ 20. Article 14 enjoins the S tate not to deny to any person
equality before the law or the equal protection of the laws. The
phrase “equality before the law” contains the declaration of
equality of the civil rights of all persons within the territories of
India. It is a basic principle of republicanism. The phrase “equal
protection of laws” is adopted from the Fourteenth Amendment
to the U.S. Constitution. The right conferred by Article 14
postulates that all persons similarly circumstanced shall be treated
alike both in privileges conferred and liabilities imposed. Since the
State, in exercise of its governmental power, has, of necessity, to
make laws operating differently on different groups of persons
PIONEER URBAN LAND AND INFRASTRUCTURE L TD.
& ANR. v. UNION OF INDIA & ORS. [R.F . NARIMAN, J.]
within its territory to attain particular ends in giving effect to its
policies, it is recognised that the State must possess the power of
distinguishing and classifying persons or things to be subjected to
such laws. It is, however , required that the classification must
satisfy two conditions, namely, (i) it is founded on an intelligible
differentia which distinguishes those that are grouped together
from others; and (ii) the differentia must have a rational relation
to the object sought to be achieved by the Act. It is not the
requirement that the classification should be scientifically perfect
or logically complete. Classification would be justified if it is not
palpably arbitrary. (See : Re, Special Cour ts Bill, 1978 [(1979)
1 SCC 380 : (1979) 2 SCR 476, 534-36] .) If there is equality and
uniformity within each group, the law will not be condemned as
discriminative, though due to some fortuitous circumstance
arising out of a peculiar situation some included in a class get an
advantage over others, so long as they are not singled out for
special treatment. (See: Khandige Sham Bhat v. Agricultural
I.T.O. [(1963) 3 SCR 809, 817: AIR 1963 SC 591: (1963) 48 ITR
21])
(emphasis supplied)
xxx xxxxxx
23. Just as a difference in the treatment of persons similarly
situate leads to discrimination, so also discrimination can arise if
persons who are unequals, i.e. differently placed, are treated
similarly. In such a case failure on the part of the legislature to
classify the persons who are dissimilar in separate categories and
applying the same law, irrespective of the differences, brings about
the same consequence as in a case where the law makes a
distinction between persons who are similarly placed. A law
providing for equal treatment of unequal objects, transactions or
persons would be condemned as discriminatory if there is
absence of rational relation to the object intended to be achieved
by the law.
xxx xxxxxx
29. In the instant case, we find that the legislature has prescribed
different rates of tax by classifying theatres into different classes,
namely , air -conditioned, air -cooled, ordinary (other than
481
air-conditioned and air-cooled), permanent and semi-permanent
and touring and temporary . The theatres have further been
categorised on the basis of the type of the local area in which
they are situate. It cannot, therefore, be said that there has been
no attempt on the part of the legislature to classify the cinema
theatres taking into consideration the differentiating circumstances
for the purpose of imposition of tax. The grievance of the
appellants is that the classification is not perfect. What they want
is that there should have been further classification amongst the
theatres falling in the same class on the basis of the location of
the theatre in each local area. We do not think that such a
contention is well founded.”
38. Also, in Mardia Chemicals Ltd. v. Union of India (2004) 4
SCC 311, this Court held that Parliamentary intent cannot be thwarted
even if it operates a bit harshlyon a small section of the public, if otherwise
made in the larger public interest. This Court said:
“74. A reference has also been made for similar observations in
Srinivasa Enterprises v. Union of India [(1980) 4 SCC 507] at
SCC pp. 513-14 and in Jalan T rading Co. (P) Ltd. v. Mill
Mazdoor Sabha [AIR 1967 SC 691 : (1967) 1 SCR 15] at SCR
p. 36. While referring to the observations made in Collector of
Customs v. Nathella Sampathu Chetty [AIR 1962 SC 316 : (1962)
3 SCR 786 : (1962) 1 Cri LJ 364] at SCR pp. 829-30 it is
submitted that the intent of Parliament shall not be defeated merely
for the reason that it may operate a bit harshly on a small section
of public where it may be necessary to make such provisions of
achieving the desired objectives to ensure that the nefarious
activities of smuggling, etc. had to be necessarily curbed. In
Fatehchand Himmatlal [(1977) 2 SCC 670] where debts of the
agriculturists were wiped off, this Court observed:
“44. Every cause claims its martyr and if the law, necessitated by
practical considerations, makes generalizations which hurt a few,
it cannot be helped by the Court. Otherwise, the enforcement of
the Debt Relief Act will turn into an enquiry into scrupulous and
unscrupulous creditors, frustrating through endless litigation, the
instant relief to the indebted which is the promise of the
legislature.” (SCC p. 689, para 44)”
PIONEER URBAN LAND AND INFRASTRUCTURE L TD.
& ANR. v. UNION OF INDIA & ORS. [R.F . NARIMAN, J.]
The principle contained in Swiss Ribbons (supra), that far greater
deference is accorded to economic legislation, as the legislature is given
free play in the joints and is at liberty to conduct economic experiments
in public interest, finds an early application in Shri Ambica Mills (supra),
and applies on all fours in this case. Sub-paras (b), (c), (d) and (f) of
Ram Krishna Dalmia(supra) are all also attracted in the present case.
39. It is also important to remember that the Code is not meant to
be a debt recovery mechanism [see paragraph 28 of Swiss Ribbons
(supra)]. It is a proceeding in rem which, after being triggered, goes
completely outside the control of the allottee who triggers it. Thus, any
allottee/homebuyer who prefers an application under Section 7 of the
Code takes the risk of his flat/apartment not being completed in the near
future, in the event of there being a breach on the part of the developer.
Under the Code, he may never get a refund of the entire principal, let
alone interest. This is because, the moment a petition is admitted under
Section 7, the resolution professional must first advertise for and find a
resolution plan by somebody, usually another developer, which has then
to pass muster under the Code, i.e. that it must be approved by at least
66% of the Committee of Creditors and must further go through challenges
before NCLT and NCLAT before the new management can take over
and either complete construction, or pay out or refund amounts. Depending
on the kind of resolution plan that is approved, such homebuyer/allottee
may have to wait for a very long period for the successful completion of
the project. He may never get his full money back together with interest
in the event that no suitable resolution plan is forthcoming, in which
case, winding up of the corporate debtor alone would ensue. On the
other hand, if such allottee were to approach the Real Estate Regulatory
Authority under RERA, it is more than likely that the project would be
completed early by the persons mentioned therein, and/or full amount of
refund and interest together with compensation and penalty, if any, would
be awarded. Thus, given the bonafides of the allottee who moves an
application under Section 7 of the Code, it is only such allottee who has
completely lost faith in the management of the real estate developer
who would come before the NCL T under the Code hoping that some
other developer takes over and completes the project, while always taking
the risk that if no one were to come forward, corporate death must
ensue and the allottee must then stand inline to receive whatever is
given to him in winding up. Given the reasons of the Insolvency Committee
483
Report, which show that experience of the real estate sector in this
country has not been encouraging, in that huge amounts are advanced
by ordinary people to finance housing projects which end up in massive
delays on the part of the developer or even worse, i.e. failure of the
project itself, and given the state of facts which was existing at the time
of the legislation, as adverted to by the Insolvency Committee Report, it
is clear that any alleged discrimination has to meet the tests laid down in
Ram Krishna Dalmia (supra), V.C. Shukla (supra), Shri Ambica
Mills(supra),Venkateshwara Theatre(supra) and Mardia Chemicals
(supra).
40. It is impossible to say that classifying real estate developers is
not founded upon an intelligible differentia which distinguishes them from
other operational creditors, nor is it possible to say that such classification
is palpably arbitrary having no rational relation to the objects of the Code.
It was vehemently argued by learned counsel on behalf of the Petitioners
that if at all real estate developers were to be brought within the clutches
of the Code, being like operational debtors, at best they could have been
brought in under this rubric and not as financial debtors. Here again,
what is unique to real estate developers vis-à-vis operational debts, is
the fact that, in operational debts generally, when a person supplies goods
and services, such person is the creditor and the person who has to pay
for such goods and services is the debtor . In the case of real estate
developers, the developer who is the supplier of the flat/apartment is the
debtor inasmuch as the home buyer/allottee funds his own apartment by
paying amounts in advance to the developer for construction of the
building in which his apartment is to be found. Another vital difference
between operational debts and allottees of real estate projects is that an
operational creditor has no interest in or stake in the corporate debtor ,
unlike the case of an allottee of a real estate project, who is vitally
concerned with the financial health of the corporate debtor, for otherwise,
the real estate project may not be brought to fruition. Also, in such event,
no compensation, nor refund together with interest, which is the other
option, will be recoverable from the corporate debtor. One other important
distinction is that in an operational debt, there is no consideration for the
time value of money – the consideration of the debt is the goods or
services that are either sold or availed of from the operational creditor .
Payments made in advance for goods and services are not made to fund
manufacture of such goods or provision of such services. Examples
PIONEER URBAN LAND AND INFRASTRUCTURE L TD.
& ANR. v. UNION OF INDIA & ORS. [R.F . NARIMAN, J.]
given of advance payments being made for turnkey projects and capital
goods, where customisation and uniqueness of such goods are important
by reason of which advance payments are made, are wholly inapposite
as examples vis-à-vis advance payments made by allottees. In real estate
projects, money is raised from the allottee, being raised against
consideration for the time value of money. Even the total consideration
agreed at a time when the flat/apartment is non-existent or incomplete,
is significantly less than the price the buyer would have to pay for a
ready/complete flat/apartment, and therefore, he gains the time value of
money.Likewise, the developer who benefits from the amounts disbursed
also gains from the time value of money. The fact that the allottee makes
such payments in instalments which are co-terminus with phases of
completion of the real estate project does not any the less make such
payments as payments involving “exchange”, i.e. advances paid only in
order to obtain a flat/apartment. What is predominant, insofar as the real
estate developer is concerned, is the fact that such instalment payments
are used as a means of finance qua the real estate project. One other
vital difference with operational debts is the fact that the documentary
evidence for amounts being due and payable by the real estate developer
is there in the form of the information provided by the real estate developer
compulsorily under RERA. This information, like the information from
information utilities under the Code, makes it easy for home buyers/
allottees to approach the NCLT under Section 7 of the Code to trigger
the Code on the real estate developer ’s own information given on its
webpage as to delay in construction, etc. It is these fundamental
differences between the real estate developer and the supplier of goods
and services that the legislature has focused upon and included real
estate developers as financial debtors. This being the case, it is clear
that there cannot be said to be any infraction of equal protection of the
laws.
41. Shri Shyam Divan relying upon Nagpur Improvement Trust
and Anr. v. Vithal Rao and Ors. (1973) 1 SCC 500 at paragraph 26
and Subramanian Swamy v . Dir ector , Central Bur eau of
Investigation and Anr. (2014) 8 SCC 682 at paragraphs 44, 58 and 68
argued that the object of the amendment is itself discriminatory in that it
seeks to insert into a “means and includes” definition a category which
does not fit therein, namely , real estate developers who do not, in the
classical sense, borrow monies like banks and financial institutions.
According to him, therefore, the object itself being discriminatory , the
485
inclusion of real estate developers as financial debtors should be struck
down.We have already pointed out how real estate developers are, in
substance, persons who avail finance from allottees who then fund the
real estate development project. The object of dividing debts into two
categories under the Code, namely , financial and operational debts, is
broadly to sub-divide debts into those in which money is lent and those
where debts are incurred on account of goods being sold or services
being rendered. We have no doubt that real estate developers fall squarely
within the object of the Code as originally enacted insofar as they are
financial debtors and not operational debtors, as has been pointed out
hereinabove. So far as unequals being treated as equals is concerned,
home buyers/allottees can be assimilated with other individual financial
creditors like debenture holders and fixed deposit holders, who have
advanced certain amounts to the corporate debtor . For example, fixed
deposit holders, though financial creditors, would be like real estate
allottees in that they are unsecured creditors. Financial contracts in the
case of these individuals need not involve large sums of money. Debenture
holders and fixed deposit holders, unlike real estate holders, are involved
in seeing that they recover the amounts that are lent and are thus not
directly involved or interested in assessing the viability of the corporate
debtors. Though not having the expertise or information to be in a position
to evaluate feasibility and viability of resolution plans, such individuals,
by virtue of being financial creditors, have a right to be on the Committee
of Creditors to safeguard their interest. Also, the question that is to be
asked when a debenture holder or fixed deposit holder prefers a Section
7 application under the Code will be asked in the case of allottees of real
estate developers – is a debt due in fact or in law? Thus, allottees, being
individual financial creditors like debenture holders and fixed deposit
holders and classified as such, show that they within the larger class of
financial creditors, there being no infraction of Article 14 on this score.
42. The presumption that the legislature has understood and
correctly appreciated the need of its people and that the amendment to
the Code is directed to problems made manifest by experience, as was
pointed out by the Insolvency Law Committee findings(supra)
demonstrates that the presumption of constitutionality that attaches to
the Amendment Act has not been displaced by the Petitioners.
43. It was also argued with reference to Regulation 9A of the
Insolvency and Bankruptcy Board of India (Insolvency Resolution
PIONEER URBAN LAND AND INFRASTRUCTURE L TD.
& ANR. v. UNION OF INDIA & ORS. [R.F . NARIMAN, J.]
Process for Corporate Persons)Regulations, 2016 that homebuyers would
really fall within “other creditors” as a residuary class, who would have
to stand in line with their claims which would be made to the resolution
professional once the Code is triggered. Regulation 9A reads as follows:
“9A. Claims by other creditors.
(1) A person claiming to be a creditor , other than those covered
under regulations 7, 8, or 9, shall submit proof of its claim to the
interim resolution professional or resolution professional in
person, by post or by electronic means in Form F of the Schedule.
(2) The existence of the claim of the creditor referred to in
sub-section (1) may be proved on the basis of –
(a) the records available in an information utility, if any, or
(b) other relevant documents sufficient to establish the claim, in-
cluding any or all of the following:—
(i) documentary evidence demanding satisfaction of the claim;
(ii) bank statements of the creditor showing non-satisfaction of
claim;
(iii) an order of court or tribunal that has adjudicated upon
non-satisfaction of claim, if any.”
We have already held that given the fact that homebuyers/allottees
give advances to the real estate developer and thereby finance the real
estate project at hand, are really financial creditors. Given this finding,
this plea of the Petitioners must also be rejected. This challenge must
also, therefore, fail.
The Article 14 Challenge (II):Manifest arbitrariness; Article
19(1)(g) and Article 300-A
44. Counsel for the Petitioners argued that a square peg has been
fitted in a round hole and have thus stated that doing so would not only
be contrary to the objects sought to achieved by the Code, but would be
directly contrary to Swiss Ribbons(supra) in that every characteristic
of financial creditors vis-à-vis operational creditors would show that real
estate developers are assimilated to operational and not financial debtors.
For this purpose, in the written argument presented by Dr. Singhvi, relying
upon Swiss Ribbons(supra) it is stated that:
487
“FINDINGS IN SWISS RIBBONS P . LTD. V. UOI, (2019) 4 SCC
17 ON NA TURE OF OPERA TIONAL CREDIT ORS (OCs)/
FINANCIAL CREDIT ORS (FCs) VIS-À-VIS ALLOTTEES
PIONEER URBAN LAND AND INFRASTRUCTURE L TD.
& ANR. v. UNION OF INDIA & ORS. [R.F . NARIMAN, J.]
S./glyph1197o. FI/glyph1197DI/glyph1197GS I/glyph1197 SW ISS R IBBO/glyph1197S
W .R.T. RATIO/glyph1197ALE BEHI/glyph1197D
DISTI/glyph1197CTIO/glyph1197 BETW EE/glyph1197
FI/glyph1197A/glyph1197CIAL A/glyph1197D
OPERATIO/glyph1197AL CR EDITORS
R EASO /glyph1197 FO R /glyph1197O/glyph1197 -
A PPLIC ABILITY O F
D ISTI/glyph1197CTIO /glyph1197 BETW EE/glyph1197 FCs
and OCs (A S EXP LAI/glyph1197ED I/glyph1197
SWISS RIBBO/glyph1197S) I/glyph1197 CASE O F
H OM EBU YERS/ ALLO TTEES
1. hglyph““97ature of security :
“it is clea r that m ost financial
creditors, particularly banks and
fina ncial institutions, are secured
creditors whereas most operational
creditors are unsecure d, payme nts for
goods and services as well as
payme nts to worke rs not being
se cured by m ortgaged documents and
the like.”
[P ara 44]
Real estate allottee s/ hom ebuye rs are
unsecured creditors and are there fore
m ore akin to OCs ra ther than FCs
2. “The nature of loan agreements
with financial creditors is differe nt
from c ontracts with operational
creditors for supplying goods and
se rvice s.
Financial cre ditors generally lend
fina nce on a term loan or for working
capita l that e nables the c orporate
debtor to either set up and/or operate
its business. On the other hand,
contracts with operational c reditors
are relatable to supply of goods and
se rvice s in the operation of business.
Financial contracts genera lly involve
large sum s of m oney. By way of
contrast, operational contracts have
dues whose quantum is generally le ss.
Re al estate a llottees m ake paym ents
to the c orporate debtors in lieu of
services rendered – i.e., construction
of apartments. In several cases,
payments are also made on a
c onstruction-linked payment ba sis.
Each individual allottee w ill be owed
a sum that is often m uch sm aller than
the am ount owed to a single
bank/financ ial institution.
In the running of a business, operational
creditors can be many as opposed to
financial creditors , who lend finance for the
set up or working of business. It is obvious
that debenture holders and pers ons with
hom e loans m ay be num erous and,
therefore, have been statutorily dealt with
by the aforesaid change m ade in the Code
as well as the Regulations. However, as a
general rule, it is correct to say that
financial creditors, which involve banks and
financial institutions , would certainly be
sm aller in number than operational creditors
of a corporate debtor.
Als o, financial creditors have specified
repayment s chedules, and defaults entitle
financial creditors to recall a loan in totality.
C ontracts with operational creditors do n ot
have any such s tipulations .
Als o, the forum in which dispute resolution
takes place is com pletely different.
C ontracts with operational creditors can and
do have arbitration clauses where dispute
res olution is done privately. Operational
debts also tend to be recu rring in nature and
the possibility of genuin e disputes in case of
operational debts is m uch higher when
compared to financial debts. A simple
exam ple will suffice. Goods that are
su pplied m ay be substandard. Services that
are provided m ay be substandard. Goods
m ay not have been su pplied at all. All th ese
qua operational debts are matters to be
proved in arbitration or in the courts of law.
On the other h and, finan cial debts made to
banks and financial institution s are well-
documented and defaults made are easily
verifiable.”
[Para 43, 44]
R eal estate allottees are large in
number – often hundreds or
thousands, depending on the size of
the developer and the num ber of
developm ent projects .
There are n o repay ment schedules
in apartment buyer agreements – as
the payments have been made by
allottees towards grant of posses sion
of th eir units in a project – and the
date of pos ses sion is further subject
to force m ajeure and oth er
circums tances. R efund of m oney by
the developer only arises in the
event that th e allottee validly
term inates / cancels the agreement
and not otherwis e.
Agreem ents between allottees and
developers have arbitration clauses.
Fu rther, there is often th e pos sibility
of a genuine dispute in case of
allottees’ claims – e.g., where date
of possession stands extended on
account of force majeu re
circums tances and therefore
allottees’ righ t to receive refund has
not yet aris en, where there has been
delay on part of allottees in making
paymen ts to the developer, where
term ination/cancellation of the
agreem ent is not as per terms of the
agreem ent, etc. Thes e are n ot easily
verifiable/available and are required
to be examined by a court of law /
during an arbitration.
489PIONEER URBAN LAND AND INFRASTRUCTURE L TD.
& ANR. v. UNION OF INDIA & ORS. [R.F . NARIMAN, J.]
3. Regarding role and involvement of
FCs visàààvis OCs :
“financial creditors are, from the very
beginning, involved with assessing the
viability of the corporate debtor. They
can, and therefore do, engage in
restructuring of the loan as well as
reorganization of the corporate debtor’s
business when there is financial stress,
which are things operational creditors do
not and cannot do. Thus, preserving the
corporate debtor as a going concern,
while ensuring maximum recovery for
all creditors being the objective of the
Code, financial creditors are clearly
different from operational creditors and
therefore, there is obviously an
intelligible differentia between the two
which has a direct relation to the objects
sought to be achieved by the Code.”
[Para 45 ]
Allottees are interested in securing their
single time investment, and not the
financial w ell-being of, or ensuring the
continuity of, the corporate debtor as a
going-concern. Further, allottees in
different real estate projects of a
corporate debtor, may have different
interests confined only to that particular
development, with no interest in the
overall well-being or rearrangement or
viability of the Company. If such
allottees are vested with decision making
powers concerning the business of the
enterprise as a whole, it is unlikely that
sound financial decisions will be taken
having regard to the overall status of the
entity which will undoubtedly defeat the
very purpose and objective of the CIRP
process.
4. Regarding participation in the COC
meetings:
“Under the Code, the committee of
creditors is entrusted with the primary
responsibility of financial restructuring.
They are required to assess the viability
of a corporate debtor by taking into
account all available information as well
as to evaluate all alternative investment
opportunities that are available. The
committee of creditors is required to
evaluate the resolution plan on the basis
of feasibility and viability.”
“Since the financial creditors are in the
business of money lending, banks and
financial institutions are best equipped to
assess viability and feasibility of the
business of the corporate debtor. Even
at the time of granting loans, these banks
and financial institutions undertake a
detailed market study which includes a
techno-economic valuation report,
evaluation of business, financial
projection, etc. Since this detailed study
has already been undertaken before
sanctioning a loan, and since financial
Allottees do not have the expertise or
information to be in a position to evaluate
the feasibility and viability of resolution
plans keeping in mind the business of the
corporate debtor as a whole. Expecting
allottees to carry out such a function and
role is entirely impractical.
Allottees are interested in securing their
single time investment, and not the
financial w ell-being of, or ensuring the
continuity of, the corporate debtor as a
going-concern.
Allottees in different real estate projects
of a corporate debtor, may have different
interests confined only to that particular
development, with no interest in overall
well-being or rearrangement or viability
of the Company. If such allottees are
vested with decision making powers
concerning the business of the enterprise
as a whole, it is unlikely that sound
financial decisions will be taken having
regard to the overall status of the entity
creditors have trained employees
to assess viability and feasibility,
they are in a good position to
ev aluate th e contents of a
resolu tion plan. On the oth er
hand, operational creditors, who
prov ide goods and services, are
involved only in recovering
am ounts that are paid for such
goods and services, and are
typically unable to assess viability
an d feasibility of business.”
[Para 6 7, 6 9 ]
which will undoubtedly defeat the v ery pur pose
and objective of the CIRP process. Interests of
other stakeholders, including other financial
creditors, suppliers, small creditors, labour, etc. are
unlikely to be considered appropriately.
5. Regarding process for initiation
of corporate insolvency
resolution process:
• Information with respect
to debt incurred by
financial debtors:
“It is clear from these
Sections that information
in respect of debts
incurred by financial
debtors is easily
available through
information utilities
which, under the
Insolvency and
Bankruptcy Board of
India (Information
Utilities) Regulations,
2017 [ “Information
Utilities Regulations” ],
are to satisfy themselves
that information
provided as to the debt is
accurate. This is done
by giving notice to the
corporate debtor who
then has an opportunity
to correct such
information.
• In practice, real estate allottees do not
upload inform ation in respect of amounts
owed to them by developers with the
Information Utilities.
• Most of the sources evidencing a
financial debt as listed do not apply to
real-estate allottees.
491PIONEER URBAN LAND AND INFRASTRUCTURE L TD.
& ANR. v. UNION OF INDIA & ORS. [R.F . NARIMAN, J.]
Apart from the record maintained
by such utility, Form I appended to
the Insolvency and Bankruptcy
(Application to Adjudicating
Authority) Rules, 2016, makes it
clear that the following are other
sources which evidence a financial
debt:
(a) Particulars of security held, if any,
the date of its creation, its
estimated value as per the creditor;
(b) Certificate of registration of charge
issued by the registrar of
companies (if the corporate debtor
is a company);
(c) Order of a court, tribunal or
arbitral panel adjudicating on the
default;
(d) Record of default with the
information utility;
(e) Details of succession certificate, or
probate of a will, or letter of
administration, or court decree (as
may be applicable), under the
Indian Succession Act, 1925;
(f) The latest and complete copy of
the financial contract reflecting all
amendments and waivers to date;
(g) A record of default as available
with any credit information
company;
(h) Copies of entries in a bankers book
in accordance with the Bankers
Books Evidence Act, 1891.”
[Para 48, 49 ]
? With respect to set-offs:
“a set-off of amounts due from financial
creditors is a rarity. Usually, financial debts
point only in one way – amounts lent have
to be repaid.”
[Para 55 ]
* In the case of real estate allottees,
amounts are also due and payable by
the allottees to the developer – i.e.,
payments owed to the developer as per
the schedule under the Apartment
Buyer’s Agreement, interest on delayed
payments. Set-off of amounts is
therefore quite common in the case of
allottees.
45. As has been pointed out by us hereinabove, it is clear that the
context of Swiss Ribbons (supra) was a challenge under Article 14
stating that financial creditors have been discriminated against because
there is no real difference between financial and operational creditors,
and that such artificial distinction made by the Code, not having been
made anywhere else in the world, would be discriminatory , having no
rational relation with the object sought to be achieved by the Code and
would have, therefore, to be struck down under Article 14. As has been
pointed out by us hereinabove, the context of this argument was financial
institutions and banks on the one hand vis-à-vis operational creditors i.e.
those who supply goods and services, on the other . It is in this context
that the various differences that have been pointed out hereinabove were
made. However, the judgment itself recognises - as has been pointed
out by us hereinabove - in paragraphs 46 to 49, that it was not dealing
with individual financial creditors, such as debenture holders, fixed deposit
holders and home buyers. To apply a judgment rendered in a wholly
different context to the facts in the present cases would itself be an
arbitrary exercise. What has been stated hereinabove as to allottees
being individual financial creditors like deposit holders and debenture
? Requirement of proving ‘default’ in
case of section 7 applications :
Whereas a “claim” gives rise to a
“debt” only when it becomes “due”, a
“default” occurs only when a “debt”
becomes “due and payable” and is not
paid by the debtor. It is for this reason
that a financial creditor has to prove
“default” as opposed to an operational
creditor who merely “claims” a right to
payment of a liability or obligation in
respect of a debt which may be due.
When this aspect is borne in mind, the
differentiation in the triggering of
insolvency resolution process by
financial creditors under Section 7 and
by operational creditors under Sections
8 and 9 of the Code becomes clear.
[Para 59]
? In the case of real estate
allottees, in most cases, the
default has not yet occurred
since the date of possession is
often extended on account of
force majeure and other
circumstances. As a result, in
such a case, the right of the
allottees to terminate/cancel
their agreement with the
developer and seek a refund of
amounts paid would not have
arisen in the first place.
493
holders, applies on all fours to repel this argument based on another
facet of Article 14. In fact, the object of the Code, as originally set out in
paragraphs 27 and 28 of Swiss Ribbons (supra) is as follows:
“27. As is discernible, the Preamble gives an insight into what is
sought to be achieved by the Code. The Code is first and
foremost, a Code for reorganisation and insolvency resolution of
corporate debtors. Unless such reorganisation is effected in a
time-bound manner, the value of the assets of such persons will
deplete. Therefore, maximisation of value of the assets of such
persons so that they are efficiently run as going concerns is
another very important objective of the Code. This, in turn, will
promote entrepreneurship as the persons in management of the
corporate debtor are removed and replaced by entrepreneurs.
When, therefore, a resolution plan takes off and the corporate
debtor is brought back into the economic mainstream, it is able to
repay its debts, which, in turn, enhances the viability of credit in
the hands of banks and financial institutions. Above all, ultimately,
the interests of all stakeholders are looked after as the corporate
debtor itself becomes a beneficiary of the resolution scheme—
workers are paid, the creditors in the long run will be repaid in full,
and shareholders/investors are able to maximise their investment.
Timely resolution of a corporate debtor who is in the red, by an
effective legal framework, would go a long way to support the
development of credit markets. Since more investment can be
made with funds that have come back into the economy, business
then eases up, which leads, overall, to higher economic growth
and development of the Indian economy . What is interesting to
note is that the Preamble does not, in any manner , refer to
liquidation, which is only availed of as a last resort if there is
either no resolution plan or the resolution plans submitted are not
up to the mark. Even in liquidation, the liquidator can sell the
business of the corporate debtor as a going concern. (See Arcelor
Mittal [Arcelor Mittal (India) (P) Ltd. v. Satish Kumar Gupta ,
(2019) 2 SCC 1] at para 83, fn 3).
28. It can thus be seen that the primary focus of the legislation is
to ensure revival and continuation of the corporate debtor by
protecting the corporate debtor from its own management and
from a corporate death by liquidation. The Code is thus a
PIONEER URBAN LAND AND INFRASTRUCTURE L TD.
& ANR. v. UNION OF INDIA & ORS. [R.F . NARIMAN, J.]
? Requirement of proving ‘default’ in
respect of a debt which may be due.
In the case of real estate
allottees, in most cases, the
default has not yet occurred
since the date of possession is
often extended on account of
and other
circumstances. As a result, in
such a case, the right of the
allottees to terminate/cancel
their agreement with the
developer and seek a refund of
amounts paid would not have
arisen in the first place.
beneficial legislation which puts the corporate debtor back on its
feet, not being a mere recovery legislation for creditors. The
interests of the corporate debtor have, therefore, been bifurcated
and separated from that of its promoters/those who are in
management. Thus, the resolution process is not adversarial to
the corporate debtor but, in fact, protective of its interests. The
moratorium imposed by Section 14 is in the interest of the
corporate debtor itself, thereby preserving the assets of the
corporate debtor during the resolution process. The timelines within
which the resolution process is to take place again protects the
corporate debtor’s assets from further dilution, and also protects
all its creditors and workers by seeing that the resolution process
goes through as fast as possible so that another management can,
through its entrepreneurial skills, resuscitate the corporate debtor
to achieve all these ends.”
A reading of these paragraphs will show these very objects are
sub-served by treating allottees as financial creditors. The Code is thus
a beneficial legislation which can be triggered to put the corporate debtor
back on its feet in the interest of unsecured creditors like allottees, who
are vitally interested in the financial health of the corporate debtor , so
that a replaced management may then carry out the real estate project
as originally envisaged and deliver the flat/apartment as soon as possible
and/or pay compensation in the event of late delivery, or non-delivery, or
refund amounts advanced together with interest. Thus, applying the
Shayara Bano v. Union of India (2017)9 SCC 1test,it cannot be said
that a square peg has been forcibly fixed into a round hole so as to
render Section 5(8)(f) manifestly arbitrary i.e. excessive, disproportionate
or without adequate determining principle. For the same reason, it cannot
be said that Article 19(1)(g) has been infracted and not saved by Article
19(6) as the Amendment Act is made in public interest, and it cannot be
said to be an unreasonable restriction on the Petitioner ’s fundamental
right under Article 19(1)(g). Also, there is no infraction of Article 300-A
as no person is deprived of its property without authority of a
constitutionally valid law.
46. It was also argued that the UNCITRAL Legislative Guide,
from which most of the provisions of the Code derive their succour ,
have also been breached. This is for the reason that financial contracts
being different from operational contracts, the one should not be confused
495
with the other. Also, treatment of similarly situated creditors should be
the same, and as allottees are like operational creditors, they should not
be treated as financial creditors. We have already answered these
questions in the context of discrimination and manifest arbitrariness and
have found that, in point of fact, real estate allottees are really in the
nature of financial creditors, and thus the UNCITRAL Legislative Guide
has been followed, and not breached. Equally, it was argued that creating
new creditors’ rights in Insolvency Law, as opposed to recognising existing
creditors’ rights, will infract the UNCITRAL Legislative Guide. As will
be pointed out hereinbelow, since allottees of real estate projects have
always been subsumed within Section 5(8)(f), no new rights or claims
have been created. It was also contended that since allottees are then
said to have no expertise or knowledge in the working of the corporate
debtor, they cannot participate effectively in the Committee of Creditors,
and should therefore be kept out. The same answer as has been given
hereinabove, i.e. that allottees, like individual financial creditors who are
already on the Committee of Creditors, are to have a voice in determining
the corporate debtor and their own future. This contention, therefore,
also fails.
47. One other argument that is made on behalf of the counsel for
the Petitioners is that allottees of flats/apartments who do not want refunds,
but who want their flats/apartments constructed so that they may occupy
and live in their flats/apartments, will be jeopardised, as a single allottee
who does not want the flat/apartments, but wants a refund of amounts
paid for reasons best known to him, can trigger the Code and upset the
construction and handing over of such flats/apartments to the vast bulk
of allottees of a project who may be genuine buyers who wish to occupy
such flats/apartments as roofs over their heads. Another facet of this
argument is that the bulk of such persons will never be on the Committee
of Creditors, as they may not be persons who trigger the Code at all.
These arguments are met by the fact that all the allottees of the project
in question can either join together under the explanation to Section 7(1)
of the Code, or file their own individual petitions after the Code gets
triggered by a single allottee, stating that in addition to the construction
of their flat/apartment, they are also entitled to compensation under RERA
and/or under the general law , and would thus be persons who have a
“claim”, i.e. a right to remedy for breach of contract which gives rise to
a right to compensation, whether or not such right is reduced to judgment,
PIONEER URBAN LAND AND INFRASTRUCTURE L TD.
& ANR. v. UNION OF INDIA & ORS. [R.F . NARIMAN, J.]
and would therefore be persons to whom a liability or obligation in respect
of a “claim” is due. Such persons would, therefore, have a voice in the
Committee of Creditors as to future plans for completion of the project,
and compensation for late delivery of the flat/apartment. This contention
therefore also has no legs to stand upon.
48. It was then argued that placing allottees as financial creditors
is directly contrary to the object of the Code in maximising the value of
assets and putting the corporate debtor back on its feet. We may only
state that if a Section 7 application is admitted in favour of an allottee,
and if the management of the corporate debtor is in fact a strong and
stable one, nothing debars the same erstwhile management from offering
a resolution plan, subject to Section 29A of the Code, which may well be
accepted by the Committee of Creditors in which home buyers now
have a voice. Equally, to assume that the moment the insolvency resolution
process starts, corporate death must ensue is wholly incorrect. If the
real estate project is otherwise viable, resolution plans from others may
well be accepted and the best of these would then work in order to
maximise the value of the assets of the corporate debtor . Corporate
death, as has been stated in Swiss Ribbons (supra) is the last resort
under the Code after all other available options have failed. This argument
again need not deter us further.
49. It was then stated that there will be a flood of petitions before
the NCLT, and as the NCLT has to decide within a period of 14 days,
there will only be a summary decision in which a complicated agreement
entered into between home buyer and real estate developer will not be
gone into in order to discover whether a debt is due and payable. Coupled
with this argument, is the alternative argument that, given the fact that
RERA adequately looks after the rights and interests of allottees, to
apply the Code would then be manifestly arbitrary , as a management
which may have infused large funds to develop the real estate project
would then be summarily removed. A supplementary argument was made
that this would also infract Article 19(1)(g) and 300-A, as a person who
invests a huge sum of money from its own resources or borrowed
resources, would then be left in the lurch the moment the insolvency
resolution process is admitted.
50. The answer to these contentions is provided by reading some
of the provisions of RERA. Under paragraph 3 of the Statement of
497
Objects and Reasons of RERA, one of the important reasons for enacting
the RERA is to “establish symmetry of information between the promoter
and purchaser”. This is achieved through Section 4, where every promoter
in its application to the authority for registration under sub-clause (2)(b),
has to include the current status of the project, any delay in its completion,
details of cases pending, payments pending etc. Equally, under sub-clause
(g), the proforma of the allotment letter , agreement for sale and
conveyance deed proposed to be signed with the allottee are all to be
furnished. Also, under sub-clause (l)(C), the time period within which he
undertakes to complete the project is also to be stated. Above all, under
Section 4(3) read with Section 1 1, the authority is to operationalise a
web-based online system in which the promoter shall, upon receiving his
Login Id and password, create a webpage on the website of the authority
to enter all details as required by Section 4(2), including quarterly update
of the status of the project and the stage-wise time schedule of completion
of the project. Also, under Section 7, the Authority may revoke registration
for various reasons, and under Section7(4)(a) shall debar the promoter
from accessing its website in relation to that project, and thereafter specify
its name in the list of defaulters and display its photograph on the website
and inform other Real Estate Regulatory Authorities in other States and
Union Territories about such revocation. Equally, under Section 13(2),
the prescribed agreement for sale, which is to be entered into between
the promoter and allottee, must clearly state the date on which possession
of the apartment, plot or building is to be handed over, the rates of interest
payable by the promoter to the allottee in the case of default and such
other particulars, as may be prescribed. We were then referred to the
‘Andaman and Nicobar Islands Real Estate (Regulation and
Development) (General) Rules, 2016’ to give us a flavour of what is
actually prescribed by the Rules made by S tates and Union Territories
under RERA. Here, Rule 14 of these Rules speaks of details to be
published on the website; and among other details, Rule 14(1)(d) states
that the following details shall be uploaded by the promoter:
“14. Details to be published on the website.- (1) The
Authority shall ensure the following information, as applicable,
shall be made available on its website in respect of each project
registered under the Act, namely –
xxx xxxxxx
PIONEER URBAN LAND AND INFRASTRUCTURE L TD.
& ANR. v. UNION OF INDIA & ORS. [R.F . NARIMAN, J.]
(d) the promoter shall upload the following updates on the webpage
for the project, within fifteen days from the expiry of each
quarter, namely:-
(i) list of number and types of apartments or plots, booked;
(ii) list of number of garages booked;
(iii) status of the project-
(A) Status of construction of each building with photographs;
(B) Status of construction of each floor with photographs;
(C) Status of construction of internal infrastructure and
common areas with photographs.
(iv) status of approvals,-
(A) Approvals received;
(B) Approvals applied and expected date of receipt;
(C) Approvals to be applied and date planed for application;
(D) Modifications, amendment or revisions, if any, issued by
the competent authority with regard to any sanctioned
plans, layout plans, specifications, license, permit or
approval for the project;”
Also, Rules 15 and 16 provide for interest payable by the promoter
and timelines for refund as follows:
“ 15.Interest payable by promoter and allottee - The rate of
interest payable by the promoter to the allottee or by the allottee
to the promoter , as the case may be, shall be the S tate Bank of
India highest Marginal Cost of Lending Rate plus two per cent.
Provided that in case the State Bank of India Marginal Cost of
Lending Rate is not in use it would be replaced by such
benchmark lending rates which the State Bank of India may fix
from time to time for lending to the general public.
16.Timelines for refund- Any refund of monies along with the
applicable interest and compensation, if any , payable by the
promoter in terms of the Act or the rules and regulations made
thereunder, shall be payable by the promoter to the allottee within
499
forty-five days from the date on which such refund along with
applicable interest and compensation, as the case may be,
become due.”
It can thus be seen that just as information utilities provide the
kind of information as to default that banks and financial institutions are
provided under Sections 214 to 216 of the Code read with Regulations
25 and 27 of the Insolvency and Bankruptcy Board of India (Information
Utilities) Regulations, 2017, allottees of real estate projects can come
armed with the same kind of information, this time provided by the
promoter or real estate developer itself, on the basis of which, prima
facie at least, a “default” relating to amounts due and payable to the
allottee is made out in an application under Section 7 of the Code. We
may mention here that once this prima facie case is made out, the burden
shifts on the promoter/real estate developer to point out in their reply
and in the hearing before the NCLT, that the allottee is himself a defaulter
and would, therefore, on a reading of the agreement and the applicable
RERA Rules and Regulations, not be entitled to any relief including
payment of compensation and/or refund, entailing a dismissal of the said
application. At this stage also, it is important to point out, in answer to
the arguments made by the Petitioners, that under Section 65 of the
Code, the real estate developer can also point out that the insolvency
resolution process under the Code has been invoked fraudulently, with
malicious intent, or for any purpose other than the resolution of insolvency.
This the real estate developer may do by pointing out, for example, that
the allottee who has knocked at the doors of the NCLT is a speculative
investor and not a person who is genuinely interested in purchasing a
flat/apartment. They can also point out that in a real estate market which
is falling, the allottee does not, in fact, want to go ahead with its obligation
to take possession of the flat/apartment under RERA, but wants to jump
ship and really get back, by way of this coercive measure, monies already
paid by it. Given the above, it is clear that it is very difficult to accede to
the Petitioners’ contention that a wholly one-sided and futile hearing will
take place before the NCL T by trigger -happy allottees who would be
able to ignite the process of removal of the management of the real
estate project and/or lead the corporate debtor to its death.
51. At this juncture it is necessary to deal with the ar gument of
the Petitioners that as the NCL T is given only 14 days in which to
adjudicate on “default”, the NCLT cannot, in such a summary proceeding,
PIONEER URBAN LAND AND INFRASTRUCTURE L TD.
& ANR. v. UNION OF INDIA & ORS. [R.F . NARIMAN, J.]
give detailed findings based on arguments raised by the allottees which
are then countered with reference to a large number of documents and
complicated statutory provisions, and which entail detailed arguments,
which are then put forward by real estate developers.
52. This Court, while dealing with timelines provided qua operational
creditors, in Surendra Trading Company(supra), held that the timelines
contained in the provisos to Section 7(5), Section 9(5) and Section 10(4)
of the Code are all directory and not mandatory. This is for the obvious
reason that no consequence is provided if the periods so mentioned are
exceeded. Though this decision is not in the context of the 14-day period
provided by Section 7(4), we are of the view that this judgment would
apply squarely on all fours so that the period of 14 days given to the
NCLT for decision under Section 7(4) would be directory . We are
conscious of the fact that under Section 64(1) of the Code, the NCL T
President or the Chairperson of the NCLAT may, after taking into account
reasons by the NCLT or NCLAT for exceeding the period mentioned by
statute, extend the period of 14 days by a period not exceeding 10 days.
We may note that even this provision is directory, in that no consequence
is provided either if the period is not extended, or after the extension
expires. This is also for the good reason that an act of the court cannot
harm the litigant before it. Unfortunately , both the NCLT and NCLAT
do not have sufficient members to deal with the flood of applications and
appeals that is before them. The time taken in the queue by applicants
who knock at their doors cannot, for no fault of theirs, be put against
them. This Court, in State of Bihar v. Bihar Rajya Bhumi Vikas Bank
Samiti (2018) 9 SCC 472, has held in the context of Section 34(5) of the
Arbitration and Conciliation Act, 1996, that the absence of any
consequences for infraction of a procedural provision implies that such
a provision must be interpreted as being directory and not mandatory .
The Court held thus:
“ 19. It will thus be seen that Section 34(5) does not deal with the
power of the Court to condone the non-compliance thereof. It is
imperative to note that the provision is procedural, the object
behind which is to dispose of applications under Section 34
expeditiously. One must remember the wise observation contained
in Kailash [Kailash v. Nanhku, (2005) 4 SCC 480] , where the
object of such a provision is only to expedite the hearing and not
501
to scuttle the same. All rules of procedure are the handmaids of
justice and if, in advancing the cause of justice, it is made clear
that such provision should be construed as directory, then so be it.
xxx xxxxxx
21. Section 80, though a procedural provision, has been held to be
mandatory as it is conceived in public interest, the public purpose
underlying it being the advancement of justice by giving the
Government the opportunity to scrutinise and take immediate
action to settle a just claim without driving the person who has
issued a notice having to institute a suit involving considerable
expenditure and delay. This is to be contrasted with Section 34(5),
also a procedural provision, the infraction of which leads to no
consequence. To construe such a provision as being mandatory
would defeat the advancement of justice as it would provide the
consequence of dismissing an application filed without adhering
to the requirements of Section 34(5), thereby scuttling the
process of justice by burying the element of fairness.”
This argument must also therefore be rejected.
Challenge to Section 21(6A) and 25A of the Code
53. In the challenge to Section 21(6A) and Section 25A of the
Code, it has been argued by learned counsel for the Petitioners that the
allottees would fall in the following five categories and cannot be said,
therefore, to be a homogenous class. A glance at the five categories
would show, they ar gue, that they have, in fact, conflicting interests.
These five categories are stated to be as follows:
a) “Those who have taken possession and have executed sale
deeds, with or without further claims for delay
compensation;
b) Those who have taken possession but are yet to execute
sale deeds, with or without further claims for delay
compensation;
c) Those who are yet to receive possession and seek
possession, with or without delay compensation; or
PIONEER URBAN LAND AND INFRASTRUCTURE L TD.
& ANR. v. UNION OF INDIA & ORS. [R.F . NARIMAN, J.]
d) Those who are yet to receive possession and seek to obtain
refunds of sale consideration with interest.
e) Each of the above may be without or without NCDRC/
RERA orders/decrees.”
54. It has been argued that different instructions may be given by
different allottees making it difficult for the authorised representatives
to vote on the Committee of Creditors and that in any case, the collegiality
of the secured creditors will be disturbed. To this the answer is that like
other financial creditors, be they banks and financial institutions, or other
individuals, all persons who have advanced monies to the corporate debtor
should have the right to be on the Committee of Creditors. True, allottees
are unsecured creditors, but they have a vital interest in amounts that
are advanced for completion of the project, maybe to the extent of 100%
of the project being funded by them alone. As has been correctly argued
by the learned Additional Solicitor General, under the proviso to Section
21(8) of the Code if the corporate debtor has no financial creditors, then
under Regulation 16 of the I nsolvency and Bankr uptcy Boar d of
India( Insolvency Resolution Pr ocess for Corporate Persons)
Regulations, 2016 , up to 18 operational creditors then become the
Committee of Creditors or, if there are more than 18 operational creditors,
the highest in order of debt owed to operational creditors to the extent of
the first 18 are then represented on the Committee of Creditors together,
with a representative of the workers. If allottees who have funded a
real estate project of the corporate debtor to the extent of 100% are
neither financial creditors nor operational creditors, the mechanism of
the Committee of Creditors, who is now to take decisions after the Code
is triggered as to the future of the corporate debtor, will be non-existent
in a case where there are no operational creditors and no secured
creditors, because 100% of the project is funded by the allottees. Even
otherwise, as correctly argued by the learned Additional Solicitor General,
it would in fact be manifestly arbitrary to omit allottees from the Committee
of Creditors when they are vitally interested in the future of the corporate
debtor as they have funded anywhere from 50% to 100% of the project
in most cases.
55. On this point, we were referred to the Insolvency and
Bankruptcy Code (Amendment) Bill, 2019, which has just passed through
503
the Parliament, to amend the provisions of the Code in various aspects.
What is interesting is the insertion of Section 25A(3A) as follows:
“5. In section 25A of the principal Act, after sub-section (3), the
following sub-section shall be inserted, namely-
“(3A) Notwithstanding anything to the contrary contained in
sub-section (3), the authorised representative under sub-section
(6A) of section 21 shall cast his vote on behalf of all the financial
creditors he represents in accordance with the decision taken by
a vote of more than fifty per cent of the voting share of the
financial creditors he represents, who have cast their vote:
Provided that for a vote to be cast in respect of an application
under section 12A, the authorised representative shall cast his
vote in accordance with the provisions of sub-section (3).”
Given the fact that allottees may not be a homogenous group, yet
there are only two ways in which they can vote on the Committee
of Creditors – either to approve or to disapprove of a proposed
resolution plan. Sub-section (3A) goes a long way to ironing out
any creases that may have been felt in the working of Section
25A in that the authorised representative now casts his vote on
behalf of all financial creditors that he represents. If a decision
taken by a vote of more than 50% of the voting share of the
financial creditors that he represents is that a particular plan be
either accepted or rejected, it is clear that the minority of those
who vote, and all others, will now be bound by this decision. As
has been stated by us in Swiss Ribbons (supra), the legislature
must be given free play in the joints to experiment. Minor hiccups
that may arise in implementation can always be sorted out later .
Thus, any challenge to the machinery provisions contained in
Sections 21(6A) and 25A of the Code must be repelled.
The doctrine of ‘Reading Down’
56. Several counsel appearing on behalf of the Petitioners made
alternative submissions stating that if the Constitutional validity of the
impugned provisions is to be upheld, then the amendment to the Code
needs to be read-down so as to make it conform with Article 14 and
19(1)(g) and 300-A. Different suggestions were given as to reading
PIONEER URBAN LAND AND INFRASTRUCTURE L TD.
& ANR. v. UNION OF INDIA & ORS. [R.F . NARIMAN, J.]
down these provisions by different counsel. According to some of them,
before an order admitting a Section 7 application is made, all the financial
creditors of the corporate debtor could be called to the NCLT so that the
NCLT can then ascertain their views. If the vast majority of them were
to state that they would prefer to remain outside the Code, then the
Section 7 application filed by a single allottee ought to be dismissed.
Another learned counsel stated that there should be a threshold limit by
which at least 25% of the total number of allottees of the project should
be reached before they could trigger the Code. Other learned counsel
suggested that at the stage of the Section 7 application, an inquiry be
made to see if the corporate debtor is otherwise well-managed and is
solvent, in which case the Section 7 application ought to be dismissed.
Shri Jayant Bhushan, learned Senior Advocate appearing on behalf of
some of the Petitioners, also suggested that allottees ought not to be
allowed to trigger the Code at all, but that if the Code is otherwise
triggered, they can be members of the Committee of Creditors to take
decisions that will be beneficial to them. It was also suggested that,
before the Code is triggered by an allottee, there should be a finding of
“default” from the authorities under RERA. This is not unknown to law,
and this Court has itself stated, in another context, that a jurisdictional
finding by the Telecom Regulatory Authority of India must first be
obtained before the Competition Commission of India gives a finding on
unfair competition in the telecom sector , and the case of Competition
Commission of India v . Bhar ti Airtel Limited and Ors. (2019) 2
SCC 521 was relied upon for this purpose. All these ar guments were
really made based on the presumption that some allottees who may now
want to back out of the transaction and get a return of their money
owing to factors which may be endemic to them, or owing to the fact
that the market may have slumped as a result of which the investment
made by them in the flat/apartment would fall flat requiring them to pull
out of the transaction, would then be able to trigger the Code malafide,
and a reading down of these provisions would, therefore, obviate such
problem. All these arguments have been refuted in detail earlier in this
judgment. In a Section 7 application made by an allottee, the NCL T’s
‘satisfaction’ will be with both eyes open – the NCL T will not turn a
Nelson’s eye to legitimate defences by a real estate developer, as outlined
by us hereinabove. There is, therefore, no necessity to read into or read
down any of these provisions. Also, in Cellular Operators Association
505
of India v. TRAI (2016) 7 SCC 703, this Court held that when a provision
is cast in definite and unambiguous language, it is not permissible either
to mend or bend it, even if such recasting is in accord with good reason
and conscience. This Court said:
“50. But it was said that the aforesaid Regulation should be read
down to mean that it would apply only when the fault is that of the
service provider. We are afraid that such a course is not open to
us in law, for it is well settled that the doctrine of reading down
would apply only when general words used in a statute or
regulation can be confined in a particular manner so as not to
infringe a constitutional right. This was best exemplified in one of
the earliest judgments dealing with the doctrine of reading down,
namely, the judgment of the Federal Court in Hindu Women’s
Rights to Pr operty Act, 1937, In r e [Hindu Women’s Rights to
Property Act, 1937, In r e, 1941 SCC OnLine FC 3 : AIR 1941
FC 72] . In that judgment, the word “property” in Section 3 of the
Hindu Women’s Rights to Property Act was read down so as not
to include agricultural land, which would be outside the Central
Legislature’s powers under the Government of India Act, 1935.
This is done because it is presumed that the legislature did not
intend to transgress constitutional limitations. While so reading
down the word “property”, the Federal Court held: (SCC OnLine
FC)
“… If the restriction of the general words to purposes within the
power of the legislature would be to leave an Act with nothing or
next to nothing in it, or an Act different in kind, and not mer ely
in degree, from an Act in which the general words were given
the wider meaning, then it is plain that the Act as a whole must be
held invalid, because in such circumstances it is impossible to assert
with any confidence that the legislature intended the general words
which it has used to be construed only in the narrower sense:
Owners of SS Kalibia v. Wilson [ Owners of SS Kalibia v .
Wilson, (1910) 11 CLR 689 (Aust)] , Vacuum Oil Co. Pty. Ltd. v.
Queensland [ Vacuum Oil Co. Pty . Ltd. v. Queensland, (1934)
51 CLR 677 (Aust)] , R. v . Commonwealth Cour t of
Conciliation and Arbitration, ex p Whybr ow & Co.
[R. v. Commonwealth Cour t of Conciliation and Arbitration,
PIONEER URBAN LAND AND INFRASTRUCTURE L TD.
& ANR. v. UNION OF INDIA & ORS. [R.F . NARIMAN, J.]
ex p Whybr ow & Co. , (1910) 1 1 CLR 1 (Aust)] and British
Imperial Oil Co. Ltd. v. Federal Commr. of T axation [ British
Imperial Oil Co. Ltd. v. Federal Commr. of Taxation, (1925) 35
CLR 422 (Aust)] .”
(emphasis in original)
51. This judgment was followed by a Constitution Bench of this
Court in DTC v . Mazdoor Congr ess [ DTC v . Mazdoor
Congress, 1991 Supp (1) SCC 600 : 1991 SCC (L&S) 1213] . In
that case, a question arose as to whether a particular regulation
which conferred power on an authority to terminate the services
of a permanent and confirmed employee by issuing a notice
terminating his services, or by making payment in lieu of such
notice without assigning any reasons and without any opportunity
of hearing to the employee, could be said to be violative of the
appellants’ fundamental rights. Four of the learned Judges who
heard the case, the Chief Justice alone dissenting on this aspect,
decided that the regulation cannot be read down, and must,
therefore, be held to be unconstitutional. In the lead judgment on
this aspect by Sawant, J., this Court stated: (SCC pp. 728-29,
para 255)
“ 255. It is thus clear that the doctrine of reading down or of
recasting the statute can be applied in limited situations. It is
essentially used, firstly, for saving a statute from being struck down
on account of its unconstitutionality . It is an extension of the
principle that when two interpretations are possible—
one rendering it constitutional and the other making it
unconstitutional, the former should be preferred. The
unconstitutionality may spring from either the incompetence of
the legislature to enact the statute or from its violation of any of
the provisions of the Constitution. The second situation which
summons its aid is where the provisions of the statute are vague
and ambiguous and it is possible to gather the intentions of the
legislature from the object of the statute, the context in which the
provision occurs and the purpose for which it is made. However,
when the pr ovision is cast in a definite and unambiguous
language and its intention is clear , it is not permissible either
to mend or bend it even if such r ecasting is in accor d with
good r eason and conscience . In such circumstances, it is not
507
possible for the court to remake the statute. Its only duty is to
strike it down and leave it to the legislature if it so desires, to
amend it. What is further , if the remaking of the statute by the
courts is to lead to its distortion that course is to be scrupulously
avoided. One of the situations further where the doctrine can
never be called into play is where the statute requires extensive
additions and deletions. Not only it is no part of the court’s duty to
undertake such exercise, but it is beyond its jurisdiction to do so.”
(emphasis in original)
57. Given the fact that the Amendment Act has been held to be
constitutionally valid, and considering that its language is clear and
unambiguous, it is not possible to accede to the contentions of the
Petitioners to read down the clear provisions of the Amendment Act in
the manner suggested by them.
Interpretation of Section 5(8)(f) of the Code
58. Section 5(8)(f) of the Code has been set out in the beginning
of this judgment. What has been argued by learned counsel on behalf of
the Petitioners is that Section 5(8)(f), as it originally stood, is an exhaustive
provision which must be read noscitur a sociis, and if so read,
sub-clause (f) must take colour from the other clauses of the provision,
all of which show that the sine qua non of a “financial debt” is a loan of
money made with or without interest, which must then be returned as
money. This, according to the learned counsel for the Petitioners, is clear
from even a cursory reading of Section 5(8). Secondly , according to
learned counsel for the Petitioners, by no stretch of imagination, could
an allottee under a real estate project fall within Section 5(8)(f), as it
originally stood and the explanation must then be read prospectively i.e.
only on and from the date of the Amendment Act. Several sub-arguments
were made on the effect of deeming fictions generally and on the functions
of an explanation to a Section. Let us address all of these arguments.
59. First and foremost, a financial debt is defined as meaning a
“debt”. “Debt” is defined by Section 3(1 1) of the Code as follows:
“ 3. Definitions.- In this Code, unless the context otherwise
requires, -
xxx xxxxxx
PIONEER URBAN LAND AND INFRASTRUCTURE L TD.
& ANR. v. UNION OF INDIA & ORS. [R.F . NARIMAN, J.]
(11) “debt” means a liability or obligation in respect of a claim
which is due from any person and includes a financial debt and
operational debt;
This definition in turn takes us to the definition of “claim” in Section
3(6) and “default” in Section 3(12) of the Code which read as follows:
“(6) “claim” means-
(a) a right to payment, whether or not such right is reduced to
judgment, fixed, disputed, undisputed, legal, equitable, secured or
unsecured;
(b) right to remedy for breach of contract under any law for the
time being in force, if such breach gives rise to a right to payment,
whether or not such right is reduced to judgment, fixed, matured,
unmatured, disputed, undisputed, secured or unsecured;
xxx xxxxxx
(12) “default” means non-payment of debt when whole or any
part of the instalment of the amount of debt has become due and
payable and is not paid by the debtor or the corporate debtor , as
the case may be;”
60. Thus, in order to be a “debt”, there ought to be a liability or
obligation in respect of a “claim” which is due from any person. “Claim”
then means either a right to payment or a right to payment arising out of
breach of contract, and this claim can be made whether or not such right
to payment is reduced to judgment. Then comes “default”, which in turn
refers to non-payment of debt when whole or any part of the debt has
become due and payable and is not paid by the corporate debtor. Learned
counsel for the Petitioners relied upon the judgment in Union of India
v. Raman Ir on Foundry (1974) 2 SCC 231, and, in particular relied
strongly upon the sentence reading:
“ 11....Now the law is well settled that a claim for unliquidated
damages does not give rise to a debt until the liability is
adjudicated and damages assessed by a decree or order of a court
or other adjudicatory authority.”
509
It is precisely to do away with judgments such as Raman Iron
Foundry(supra) that “claim” is defined to mean a right to payment or a
right to remedy for breach of contract whether or not such right is reduced
to judgment. What is clear, therefore, is that a debt is a liability or obligation
in respect of a right to payment, even if it arises out of breach of contract,
which is due from any person, notwithstanding that there is no adjudication
of the said breach, followed by a judgment or decree or order . The
expression “payment” is again an expression which is elastic enough to
include “recompense”, and includes repayment. For this purpose, see
Himachal Pradesh Housing and Urban Development Authority
and Anr. v. Ranjit Singh Rana (2012) 4 SCC 505 (at paragraphs 13
and 14 therein), where the Webster ’s Comprehensive Dictionary
(International Edn.) Vol. 2 and the Law Lexicon by P. Ramanatha Aiyar
(2ndEdn., Reprint) are quoted.
61. The definition of “financial debt” in Section 5(8) then goes on
to state that a “debt” must be “disbursed” against the consideration for
time value of money.”Disbursement” is defined in Black’s Law Dictionary
(10th ed.) to mean:
“1. The act of paying out money , commonly from a fund or in
settlement of a debt or account payable. 2. The money so paid;
an amount of money given for a particular purpose.”
In the present context, it is clear that the expression “disburse”
would refer to the payment of instalments by the allottee to the real
estate developer for the particular purpose of funding the real estate
project in which the allottee is to be allotted a flat/apartment. The
expression “disbursed” refers to money which has been paid against
consideration for the “time value of money”. In short, the “disbursal”
must be money and must be against consideration for the “time value of
money”, meaning thereby , the fact that such money is now no longer
with the lender, but is with the borrower, who then utilises the money.
Thus far, it is clear that an allottee “disburses” money in the form of
advance payments made towards construction of the real estate project.
We were shown the ‘Dictionary of Banking Terms’ (Second edition) by
Thomas P. Fitch in which “time value for money” was defined thus:
“ present value: today’s value of a payment or a stream of
payment amount due and payable at some specified future date,
PIONEER URBAN LAND AND INFRASTRUCTURE L TD.
& ANR. v. UNION OF INDIA & ORS. [R.F . NARIMAN, J.]
discounted by a compound interest rate of DISCOUNT RATE.
Also called the time value of money . Today’s value of a stream
of cash flows is worth less than the sum of the cash flows to be
received or saved over time. Present value accounting is widely
used in DISCOUNTED CASH FLOW analysis.”
That this is against consideration for the time value of money is
also clear as the money that is “disbursed” is no longer with the allottee,
but, as has just been stated, is with the real estate developer who is
legally obliged to give money’s equivalent back to the allottee, having
used it in the construction of the project, and being at a discounted value
so far as the allottee is concerned (in the sense of the allottee having to
pay less by way of instalments than he would if he were to pay for the
ultimate price of the flat/apartment).
62. Shri Krishnan Venugopal took us to the ACT Borrower’s Guide
to the LMA ’s Investment Grade Agreements by Slaughter and May
(Fifth Edition, 2017). In this book “financial indebtedness” is defined
thus:
“ Definition of Financial Indebtedness (Investment Grade
Agreements)
“Financial Indebtedness” means any indebtedness for or in
respect of:
(a) moneys borrowed;
(b) any amount raised by acceptance under any acceptance credit
facility or dematerialised equivalent;
(c) any amount raised pursuant to any note purchase facility or
the issue of bonds, notes, debentures, loan stock or any similar
instrument;
(d) the amount of any liability in respect of any lease or hire
purchase contract which would, in accordance with GAAP ,
be treated as a balance sheet liability [(other than any liability
in respect of a lease or hire purchase contract which would, in
accordance with GAAP in force [ prior to 1 January 2019] /
[prior to [ ]] /[ ] have been treated as an operating lease)];
511
(e) receivables sold or discounted (other than any receivables to
the extent they are sold on a non -recourse basis);
(f) any amount raised under any other transaction (including any
forward sale or purchase agreement) of a type not referred to
in any other paragraph of this definition having the commercial
effect of a borrowing;
(g) any derivative transaction entered into in connection with
protection against or benefit form fluctuation in any rate or
price (and, when calculating the value of any derivative
transaction, only the marked to market value (or, if any actual
amount is due as a result of the termination or close-out of that
derivative transaction, that amount) shall be taken into account);
(h) any counter-indemnity obligation in respect of a guarantee,
indemnity, bond, standby or documentary letter of credit or
any other instrument issued by a bank or financial institution;
and
(i) the amount of any liability in respect of any guarantee or
indemnity for any of the items referred to in paragraphs (a) to
(h) above.”
63. When compared with Section 5(8), it is clear that Section 5(8)
seems to owe its genesis to the definition of “financial indebtedness”
that is contained for the purposes of Investment Grade Agreements.
Shri Venugopal argued that even insofar as derivative transactions are
concerned, it is clear that money alone is given against consideration for
time value of money and a transaction which is a pure sale agreement
between “borrowers” and “lender” cannot possibly be said to fit within
any of the categories mentioned in Section 5(8).He relied strongly on
the passage in Slaughter and May’ s book which are extracted
hereinbelow:
“ Any amount raised having the “commercial effect of a
borrowing”
A wide range of transactions can be caught by paragraph (f),
including for example forward purchases and sales of currency
PIONEER URBAN LAND AND INFRASTRUCTURE L TD.
& ANR. v. UNION OF INDIA & ORS. [R.F . NARIMAN, J.]
and repo agreements. Conditional and credit sale arrangements
could also be covered here as could certain redeemable shares.
The precise scope of this limb can be uncertain. Ideally, from the
Borrower’s perspective, if there are additional categories of debt
which should be included in “Financial Indebtedness”, these should
be described specifically and this catch- all paragraph, deleted. A
few strong Borrowers do achieve that position. Most, however
are required to accept the “catch-all” and will therefore need to
consider which of their liabilities might be caught by it, and whether
specific exclusions might be required.”
64. What is clear from what Shri Venugopal has read to us is that
a wide range of transactions are subsumed by paragraph (f) and that the
precise scope of paragraph (f) is uncertain. Equally, paragraph (f) seems
to be a “catch all” provision which is really residuary in nature, and
which would subsume within it transactions which do not, in fact, fall
under any of the other sub-clauses of Section 5(8).
65. And now to the precise language of Section 5(8)(f). First and
foremost, the sub-clause does appear to be a residuary provision which
is “catch all” in nature. This is clear from the words “any amount” and
“any other transaction” which means that amounts that are “raised”
under “transactions” not covered by any of the other clauses, would
amount to a financial debt if they had the commercial effect of a
borrowing. The expression “transaction” is defined by Section 3(33) of
the Code as follows:
(33) “transaction” includes an agreement or arrangement in
writing for the transfer of assets, or funds, goods or services,
from or to the corporate debtor;
As correctly argued by the learned Additional Solicitor General,
the expression “any other transaction” would include an arrangement in
writing for the transfer of funds to the corporate debtor and would thus
clearly include the kind of financing arrangement by allottees to real
estate developers when they pay instalments at various stages of
construction, so that they themselves then fund the project either partially
or completely.
66. Sub-clause (f) Section 5(8) thus read would subsume within it
amounts raised under transactions which are not necessarily loan
513
transactions, so long as they have the commercial effect of a borrowing.
We were referred to Collins English Dictionary& Thesaurus (Second
Edition, 2000) for the meaning of the expression “borrow” and the meaning
of the expression “commercial”. They are set out hereinbelow:
“borrow-vb 1.to obtain or receive (something, such as money)
on loan for temporary use, intending to give it, or something
equivalent back to the lender. 2. to adopt (ideas, words, etc.) from
another source; appropriate. 3. Not standard. to lend. 4.(intr) Golf.
To putt the ball uphill of the direct path to the hole: make sure you
borrow enough.”
xxx xxxxxx
“commercial. -adj. 1. of or engaged in commerce. 2. sponsored
or paid for by an advertiser: commercial television. 3.having profit
as the main aim: commercial music. 4. (of chemicals, etc.)
unrefined and produced in bulk for use in industry .
5. a commercially sponsored advertisement on radio or
television.”
67. A perusal of these definitions would show that even though
the Petitioners may be right in stating that a “borrowing” is a loan of
money for temporary use, they are not necessarily right in stating that
the transaction must culminate in money being given back to the lender.
The expression “borrow” is wide enough to include an advance given by
the home buyers to a real estate developer for “temporary use” i.e. for
use in the construction project so long as it is intended by the agreement
to give “something equivalent” to money back to the home buyers. The
“something equivalent” in these matters is obviously the flat/apartment.
Also of importance is the expression “commercial effect”. “Commercial”
would generally involve transactions having profit as their main aim.
Piecing the threads together, therefore, so long as an amount is “raised”
under a real estate agreement, which is done with profit as the main aim,
such amount would be subsumed within Section 5(8)(f) as the sale
agreement between developer and home buyer would have the
“commercial effect” of a borrowing, in that, money is paid in advance
for temporary use so that a flat/apartment is given back to the lender .
Both parties have “commercial” interests in the same – the real estate
developer seeking to make a profit on the sale of the apartment, and the
flat/apartment purchaser profiting by the sale of the apartment. Thus
PIONEER URBAN LAND AND INFRASTRUCTURE L TD.
& ANR. v. UNION OF INDIA & ORS. [R.F . NARIMAN, J.]
construed, there can be no difficulty in stating that the amounts raised
from allottees under real estate projects would, in fact, be subsumed
within Section 5(8)(f) even without adverting to the explanation introduced
by the Amendment Act.
68. However, Dr. Singhvi strongly relied upon the report of the
Bankruptcy Law Reforms Committee of November , 2015 and in
particular paragraph 3 of ‘Box 5.2 – Trigger for IRP’ which states that
financial creditors are persons where the liability to the debtor arises
from a “solely” financial transaction. This Committee report, which led
to the enactment of the Code, is an important guide in understanding the
provisions of the Code. However, where the provisions of the Code, as
construed in the light of the objects of the Code, are clear , the fact that
from a huge report one word is picked up to indicate that all financial
creditors must have debtors who owe money “solely” from financial
transactions cannot possibly have the effect of negating the plain language
of Section 5(8)(f) of the Code. In fact, what is important is that the
threshold limit to trigger the Code is purposely kept low –at only one
lakh rupees – making it clear that small individuals may also trigger the
Code as financial creditors(as financial creditors include debenture holders
and bond holders), along with banks and financial institutions to whom
crores of money may be due.
69. That this amendment is in fact clarificatory is also made clear
by the Insolvency Committee Report, which expressly uses the word
“clarify”, indicating that the Insolvency Law Committee also thought
that since there were differing judgments and doubts raised on whether
home buyers would or would not be included within Section 5(8)(f), it
was best to set these doubts at rest by explicitly stating that they would
be so covered by adding an explanation to Section 5(8)(f). Incidentally,
the Insolvency Law Committee itself had no doubt that given the
‘financing’ of the project by the allottees, they would fall within Section
5(8)(f) of the Code as originally enacted.
70. And now some of the other ar guments on behalf of the
Petitioners need to be met. According to learned counsel for the
Petitioners, the expression “means and includes” would indicate that
that the definition section is exhaustive, and this being so, alien subject
matter such as home buyers cannot be inserted therein. For this
proposition, they relied upon P. Kasilingam and Ors. v. P.S.G. College
515
of Technology and Ors. (1995) Supp (2) SCC 348 at paragraph 19
where this Court held as under:
“19. We will first deal with the contention ur ged by Shri Rao
based on the provisions of the Act and the Rules. It is no doubt
true that in view of clause (3) of Section 1 the Act applies to all
private colleges. The expression ‘college’ is, however , not
defined in the Act. The expression “private college” is defined in
clause (8) of Section 2 which can, in the absence of any
indication of a contrary intention, cover all colleges including
professional and technical colleges. An indication about such an
intention is, however, given in the Rules wherein the expression
‘college’ has been defined in Rule 2(b) to mean and include Arts
and Science College, Teachers’ T raining College, Physical
Education College, Oriental College, School of Institute of Social
Work and Music College. While enumerating the various types of
colleges in Rule 2( b) the rule-making authority has deliberately
refrained from including professional and technical colleges in the
said definition. It has been urged that in Rule 2(b) the expression
“means and includes” has been used which indicates that the
definition is inclusive in nature and also covers categories which
are not expressly mentioned therein. We are unable to agree. A
particular expression is often defined by the Legislature by using
the word ‘means’ or the word ‘includes’. Sometimes the words
‘means and includes’ are used. The use of the word ‘means’
indicates that “definition is a hard-and-fast definition, and no other
meaning can be assigned to the expression than is put down in
definition”. (See : Gough v. Gough [(1891) 2 QB 665 : 60 LJ QB
726] ; Punjab Land Development and Reclamation Corpn.
Ltd. v. Presiding Officer, Labour Court [(1990) 3 SCC 682, 717
: 1991 SCC (L&S) 71] .) The word ‘includes’ when used,
enlarges the meaning of the expression defined so as to
comprehend not only such things as they signify according to their
natural import but also those things which the clause declares that
they shall include. The words “means and includes”, on the other
hand, indicate “an exhaustive explanation of the meaning which,
for the purposes of the Act, must invariably be attached to these
words or expressions”. (See : Dilwor th v. Commissioner of
Stamps [1899 AC 99, 105-106 : (1895-9) All ER Rep Ext 1576]
PIONEER URBAN LAND AND INFRASTRUCTURE L TD.
& ANR. v. UNION OF INDIA & ORS. [R.F . NARIMAN, J.]
(Lord Watson); Mahalakshmi Oil Mills v. State of A.P. [(1989)
1 SCC 164, 169 : 1989 SCC (T ax) 56] The use of the words
“means and includes” in Rule 2( b) would, therefore, suggest that
the definition of ‘college’ is intended to be exhaustive and not
extensive and would cover only the educational institutions falling
in the categories specified in Rule 2( b) and other educational
institutions are not comprehended. Insofar as engineering colleges
are concerned, their exclusion may be for the reason that the
opening and running of the private engineering colleges are
controlled through the Board of Technical Education and Training
and the Director of Technical Education in accordance with the
directions issued by the AICTE from time to time. As noticed
earlier the Grants-in-Aid Code contains provisions which, in many
respects, cover the same field as is covered by the Act and the
Rules. The Director of Technical Education has been entrusted
with the functions of proper implementation of those provisions.
There is nothing to show that the said arrangement was not working
satisfactorily so as to be replaced by the system sought to be
introduced by the Act and the Rules. Rule 2(d), on the other hand,
gives an indication that there was no intention to disturb the
existing arrangement regarding private engineering colleges
because in that rule the expression ‘Director ’ is defined to mean
the Director of Collegiate Education. The Director of Technical
Education is not included in the said definition indicating that the
institutions which are under the control of Directorate of College
Education only are to be covered by the Act and the Rules and
technical educational institutions in the State of Tamil Nadu which
are controlled by the Director of Technical Education are not so
covered.”
71. On the other hand, the learned Additional Solicitor General
countered this submission by reference to Krishi Utpadan Mandi Samiti
v. Shankar Industries (1993) Supp (3) SCC 361 (2), where, at
paragraphs 5 and 12, this Court held:
“5. Section 2(a) of the Act defines ‘agricultural produce’ and reads
as under:
“2. ( a) ‘agricultural produce’ means such items of produce of
agriculture, horticulture, viticulture, apiculture, sericulture,
pisciculture, animal husbandry or forest as are specified in the
517
Schedule, and includes admixture of two or more of such items,
and also includes any such item in processed form, and further
includes gur, rab, shakkar, khandsari and jaggery.”
xxxxxxxxx
12. We have considered the ar guments advanced on behalf of
the parties and have perused the record. A perusal of the
definition of agricultural produce under Section 2( a) of the Act
shows that apart from items of produce of agriculture,
horticulture, viticulture, piculture, sericulture, pisciculture, animal
husbandry or forest as are specified in the Schedule, the
definition further ‘includes admixture of two or more such items’
and thereafter it further ‘includes taking any such item in pro-
cessed form’ and again for the third time the words used are ‘and
further includes gur, rab, shakkar, khandsari and jaggery’. It is a
well settled rule of interpretation that where the legislature uses
the words ‘means’ and ‘includes’ such definition is to be given a
wider meaning and is not exhaustive or restricted to the items
contained or included in such definition. Thus the meaning of ‘ag-
ricultural produce’ in the above definition is not restricted to any
products of agriculture as specified in the Schedule but also in-
cludes such items which come into being in processed form and
further includes such items which are called as gur, rab, shakkar,
khandsari and jaggery.”
72. This statement of the law, as can be seen from the quotation
hereinabove, is without citation of any authority. In fact, in Jagir Singh
& Ors. v. State of Bihar & Anr. (1976) 2 SCC 942 at paragraphs 1 1
and 19 to 21 and Mahalakshmi Oil Mills v. State of Andhra Pradesh
& Ors. (1989) 1 SCC 164, at paragraphs 8 and 1 1 (which has been
cited in P. Kasilingam (supra)), this Court set out definition sections
where the expression “means” was followed by some words, after which
came the expression “and includes” followed by other words, just as in
the Krishi Utpadan Mandi Samiti (supra) case. In two other recent
judgments, Bharat Coop. Bank (Mumbai) Ltd. v . Coop. Bank
Employees Union (2007) 4 SCC 685, at paragraphs 12 and 23, and
State of West Bengal and Ors. v . Associated Contractors (2015) 1
SCC 32 at paragraph 14, this Court has held that wherever the expression
“means” is followed by the expression “and includes” whether with or
without additional words separating “means” from “includes”, these
PIONEER URBAN LAND AND INFRASTRUCTURE L TD.
& ANR. v. UNION OF INDIA & ORS. [R.F . NARIMAN, J.]
expressions indicate that the definition provision is exhaustive as a matter
of statutory interpretation. It has also been held that the expression “and
includes” is an expression which extends the definition contained in words
which follow the expression “means”. From this discussion, two things
follow. Krishi Utpadan Mandi Samiti (supra) cannot be said to be
good law insofar as its exposition on “means” and “includes” is concerned,
as it ignores earlier precedents of larger and coordinate benches and is
out of sync with later decisions on the same point. Equally, Dr. Singhvi’s
argument that sub-clauses (a) to (i) of Section 5(8) of the Code must all
necessarily reflect the fact that a financial debt can only be a debt which
is disbursed against the consideration for the time value of money, and
which permeates clauses (a) to (i), cannot be accepted as a matter of
statutory interpretation, as the expression “and includes” speaks of subject
matters which may not necessarily be reflected in the main part of the
definition.
73. In any event, as was correctly ar gued by learned Additional
Solicitor General Mrs. Madhavi Divan, the legislature is not precluded
by way of amendment from inserting words into what may even be an
exhaustive definition. What is an exhaustive definition is exhaustive for
purposes of interpretation of a statute by the Courts,which cannot bind
the legislature when it adds something to the statute by way of amendment.
On this score also, there is no substance in the aforesaid argument.
74. It was then argued, relying on a large number of judgments
that Section 5(8)(f) must be construed noscitur a sociiswith sub-clauses
(a) to (e) and (g) to (i), and so construed would only refer to loans or
other financial transactions which would involve money at both ends.
This, again, is not correct in view of the fact that Section 5(8)(f) is
clearly a residuary “catch all” provision, taking within it matters which
are not subsumed within the other sub-clauses. Even otherwise, in
Controller of Estate Duty v . Kantilal Trikamlal(1976) 4 SCC 643,
this Court has held that when an expression is a residuary one, ejusdem
generis will not apply. It was thus held:
“ 21…W e have also to stress the expression “other right” in the
explanation which is of the widest import and cannot be
constricted by reading it ejusdem generis with “debt”. “Other
right”, in the context, is expressly meant considerably to widen
the concept and therefore suggests a somewhat contrary
intention to the application of the ejusdem generis rule. We may
519
derive instruction from Green’ s construction of the identical
expression in the English Act. [Section 45 (2)]. The learned
author writes:
“A disclaimer is an extinguishment of a right for this purpose.
Although in the event the person disclaiming never has any right
in the property, he has the right to obtain it, this inchoate right is a
‘right’ for the purposes of Section 45(2). The ejusdem generis
rule does not apply to the words ‘a debt or other right’ and the
word ‘right’ is a word of the widest import. Moreover , the
expression ‘at the expense of the deceased’ is used in an ordinary
and natural manner; and is apt to cover not only cases where the
extinguishment involves a loss to the deceased of a benefit he
already enjoyed, but also those where it prevents him from
acquiring the benefit.”
Also, in Subramanian Swamy v. Union of India (2016) 7 SCC
221, this Court held:
“70. The other aspect that is being highlighted in the context of
Article 19(2) is that defamation even if conceived of to include a
criminal offence, it must have the potentiality to “incite to cause
an offence”. To elaborate, the submission is the words “incite to
cause an offence” should be read to give attributes and
characteristics of criminality to the word “defamation”. It must
have the potentiality to lead to breach of peace and public order.
It has been urged that the intention of clause (2) of Article 19 is to
include a public law remedy in respect of a grievance that has a
collective impact but not as an actionable claim under the
common law by an individual and, therefore, the word
“defamation” has to be understood in that context, as the
associate words are “incitement to an offence” would so
warrant. Mr Rao, learned Senior Counsel, astutely canvassed that
unless the word “defamation” is understood in this manner
applying the principle of noscitur a sociis , the cherished and
natural right of freedom of speech and expression which has been
recognised under Article 19(1)(a) would be absolutely at peril.
Mr Narasimha, learned ASG would contend that the said rule of
construction would not be applicable to understand the meaning
of the term “defamation”. Be it noted, while construing the
provision of Article 19(2), it is the duty of the Court to keep in
PIONEER URBAN LAND AND INFRASTRUCTURE L TD.
& ANR. v. UNION OF INDIA & ORS. [R.F . NARIMAN, J.]
view the exalted spirit, essential aspects, the value and philosophy
of the Constitution. There is no doubt that the principle of
noscitur a sociis can be taken recourse to in order to understand
and interpret the Constitution but while applying the principle, one
has to keep in mind the contours and scope of applicability of the
said principle.
71. In State of Bombay v. Hospital Mazdoor Sabha [ State of
Bombay v. Hospital Mazdoor Sabha, AIR 1960 SC 610 : (1960)
2 SCR 866] , it has been held that it must be borne in mind that
noscitur a sociis is merely a rule of construction and it cannot
prevail in cases where it is clear that wider words have been
deliberately used in order to make the scope of the defined word
correspondingly wider . It is only where the intention of the
legislature in associating wider words with words of narrower
significance is doubtful, or otherwise not clear that the said rule of
construction can be usefully applied. It can also be applied where
the meaning of the words of wider import is doubtful; but, where
the object of the legislature in using wider words is clear and free
of ambiguity, the rule of construction in question cannot be pressed
into service.
72. In Bank of India v. Vijay Transport [Bank of India v. Vijay
Transport, 1988 Supp SCC 47 : AIR 1988 SC 151] , the Court
was dealing with the contention that a literal interpretation is not
always the only interpretation of a provision in a statute and the
court has to look at the setting in which the words are used and
the circumstances in which the law came to be passed to decide
whether there is something implicit behind the words actually used
which would control the literal meaning of the words used. For
the said purpose, reliance was placed on R.L. Arora (2) v. State
of U.P. [R.L. Arora (2) v. State of U.P., (1964) 6 SCR 784 : AIR
1964 SC 1230] . Dealing with the said aspect, the Court has
observed thus: ( Vijay T ransport case [ Bank of India v. Vijay
Transport, 1988 Supp SCC 47 : AIR 1988 SC 151] , SCC p. 51,
para 11)
“ 11. … It may be that in interpreting the words of the provision of
a statute, the setting in which such words are placed may be
taken into consideration, but that does not mean that even though
the words which are to be interpreted convey a clear meaning,
521
still a different interpretation or meaning should be given to them
because of the setting. In other words, while the setting of the
words may sometimes be necessary for the interpretation of the
words of the statute, but that has not been ruled by this Court to
be the only and the surest method of interpretation.”
73. The Constitution Bench, in Godfrey Phillips India Ltd. v.
State of U.P. [Godfrey Phillips India Ltd. v. State of U.P., (2005)
2 SCC 515] , while expressing its opinion on the aforesaid rule of
construction, opined: (SCC pp. 550 & 551, paras 81 & 83)
“81. We are aware that the maxim of noscitur a sociis may be a
treacherous one unless the “ societas ” to which the “ socii ”
belong, are known. The risk may be present when there is no
other factor except contiguity to suggest the “societas”. But where
there is, as here, a term of wide denotation which is not free from
ambiguity, the addition of the words such as “including” is
sufficiently indicative of the societas. As we have said, the word
“includes” in the present context indicates a commonality or shared
features or attributes of the including word with the included.
***
83. Hence on an application of general principles of
interpretation, we would hold that the word “luxuries” in Entry 62
of List II means the activity of enjoyment of or indulgence in that
which is costly or which is generally recognised as being beyond
the necessary requirements of an average member of society
and not articles of luxury.”
74. At this juncture, we may note that in Ahmedabad (P)
Primary Teachers’ Assn. v. Administrative Officer [Ahmedabad
(P) Primar y Teachers’ Assn. v. Administrative Officer , (2004)
1 SCC 755 : 2004 SCC (L&S) 306] , it has been stated that
noscitur a sociis is a legitimate rule of construction to construe
the words in an Act of Parliament with reference to the words
found in immediate connection with them. In this regard, we may
refer to a passage from Justice G .P. Singh, Principles of
Statutor y Interpr etation [(13th Edn., 2012) 509.] where the
learned author has referred to the lucid explanation given by
Gajendragadkar , J. We think it appropriate to reproduce the
passage:
PIONEER URBAN LAND AND INFRASTRUCTURE L TD.
& ANR. v. UNION OF INDIA & ORS. [R.F . NARIMAN, J.]
“It is a rule wider than the rule of ejusdem generis ; rather the
latter rule is only an application of the former. The rule has been
lucidly explained by Gajendragadkar, J. in the following words:
‘This rule, according to Maxwell [ Maxwell, Interpretation of
Statutes (11th Edn., 1962) 321.] , means that when two or more
words which are susceptible of analogous meaning are coupled
together, they are understood to be used in their cognate sense.
They take as it were their colour from each other , that is, the
more general is restricted to a sense analogous to a less
general.’”
The learned author on further discussion has expressed the view
that meaning of a word is to be judged from the company it keeps
i.e. reference to words found in immediate connection with them.
It applies when two or more words are susceptible of analogous
meanings are coupled together, to be read and understood in their
cognate sense. [ Principles of S tatutory Interpr etation by G .P.
Singh (8th Edn.) 379.] Noscitur a sociis is merely a rule of
construction and cannot prevail where it is clear that wider and
diverse etymology is intentionally and deliberately used in the
provision. It is only when and where the intention of the
legislature in associating wider words with words of narrowest
significance is doubtful or otherwise not clear , that the rule of
noscitur a sociis is useful.”
75. It is clear from a reading of these judgments that noscitur a
sociis being a mere rule of construction cannot be applied in the present
case as it is clear that wider words have been deliberately used in a
residuary provision, to make the scope of the definition of “financial
debt” subsume matters which are not found in the other sub-clauses of
Section 5(8).This contention must also, therefore, be rejected.
76. It remains to deal with arguments on the effect of a deeming
fiction. Under the explanation added to Section 5(8)(f), any amount raised
from an allottee under a real estate project shall be deemed to be an
amount having the commercial effect of a borrowing.
77. In every case in which a deeming fiction is to be construed,
the observations of Lord Asquith in a concurring judgment in East End
523
Dwellings Co. Ltd. v . Finsbur y Bor ough Council (1952) Appeal
Cases 109 are cited. These observations read as follows:
“If you are bidden to treat an imaginary state of affairs as real,
you must surely, unless prohibited from doing so, also imagine as
real the consequences and incidents which, if the putative state of
affairs had in fact existed, must inevitably have flowed from or
accompanied it…. The statute says that you must imagine a
certain state of affairs. It does not say that, having done so, you
must cause or permit your imagination to boggle when it comes to
the inevitable corollaries of that state of affairs.”
These observations have been followed time out of number by
the decisions of this Court.(See for example, M. Venugopal v .
Divisional Manager, LIC (1994) 2 SCC 323 at page 329).
78. But then it was argued that, relying upon Commissioner of
Income Tax, Bombay v. Bombay Trust Corporation AIR 1930 PC
54 at 55, that the reason that a deeming fiction is introduced is that the
subject matter of that fiction is not so in reality, which why Parliament
requires such subject matter be treated as if it were real. To similar
effect are the observations in K. Kamaraja Nadar v. Kunju Thevar
and Ors. AIR 1958 SC 687 at paragraph 28, where this Court put it
thus:
“The ef fect of such a legal fiction, however , is that a position
which otherwise would not obtain is deemed to obtain under those
circumstances.”
79. It was also argued, relying upon Delhi Cloth & General
Mills Co. Ltd. and Anr. v. State of Rajasthan and Ors. (1996) 2
SCC 449, that a deeming fiction can only be as to facts and cannot be
the deeming of a legal position. It was further argued relying upon Daiichi
Sankyo Company Limited v. Jayaram Chigurupati and Ors. (2010)
7 SCC 449, that a deeming provision cannot be destructive of the main
provision and cannot be construed as such.
80. A closer look at Delhi Cloth & General Mills Co. Ltd .
(supra) would show that the judgment in essence followed this Court’s
judgment in Shri Prithvi Cotton Mills Ltd. & Anr. v . Br oach
Borough Municipality & Ors. 1969(2) SCC 283, in that the validating
PIONEER URBAN LAND AND INFRASTRUCTURE L TD.
& ANR. v. UNION OF INDIA & ORS. [R.F . NARIMAN, J.]
statute in question had not cured the defect that was pointed out. This
becomes clear on a reading of paragraph 16 and 17 of the judgment
which read as follows:
“ 16. The Validating Act provides that, notwithstanding anything
contained in Sections 4 to 7 of the 1959 Act or in any judgment,
decree, order or direction of any court, the villages of Raipura
and Ummedganj should be deemed always to have continued to
exist and they continue to exist within the limits of the Kota
Municipality, to all intents and for all purposes. This provision
requires the deeming of the legal position that the villages of
Raipura and Ummedganj fall within the limits of the Kota Munici-
pality, not the deeming of facts from which this legal consequence
would flow. A legal consequence cannot be deemed nor , there-
from, can the events that should have preceded it. Facts may be
deemed and, therefrom, the legal consequences that follow.
17. Sections 4 to 7 remained on the statute book unamended when
the Validating Act was passed. Their provisions were mandatory.
They had admittedly not been followed. The defect of not
following these mandatory provisions in the case of the villages of
Raipura and Ummedganj was not cured by the Validating Act.
The curing of the defect was an essential requirement for the
passing of a valid validating statute, as held by the Constitution
Bench in the case of Prithvi Cotton Mills Ltd. [(1969) 2 SCC
283 : (1970) 1 SCR 388] It must, therefore, be held that the
Validating Act is bad in law and it must be struck down.”
81. It was in this context that it was stated that the fiction of a
legal consequence cannot be deemed, whereas facts which preceded
such consequence can so be deemed. In the present case, the deeming
provision, as has been held by us, is only clarificatory of the true legal
position as it already obtained. The present case does not concern itself
with validating statutes at all. The ratio of this judgment, therefore, would
have no application to this case.
82. Equally, in Daiichi Sankyo Company Limited(supra), it was
found that the deeming provision contained in sub-clause (2) of Regulation
2(1)(e) of the Securities and Exchange Board of India (Substantial
Acquisition of Shares and Takeovers) Regulations, 1997 flew in the face
of the very idea of “persons acting in concert”, as a result of which it
525
was held that a deeming fiction cannot do away with the very concept
of “persons acting in concert” contained in the main provision. In the
present case however , far from doing away with the concept of a
“financial creditor”, we have already found that the deeming provision is
only clarificatory of the fact that allottees are to be considered as
“financial creditors” for the reasons already given by us hereinabove.
83. Although a deeming provision is to deem what is not there in
reality, thereby requiring the subject matter to be treated as if it were
real, yet several authorities and judgments show that a deeming fiction
can also be used to put beyond doubt a particular construction that might
otherwise be uncertain. Thus, Stroud’s Judicial Dictionary of Words and
Phrases (Seventh Edition, 2008), defines “deemed” as follows:
“ Deemed ”-, as used in statutory definitions “to extend the
denotation of the defined term to things it would not in ordinary
parlance denote, is often a convenient device for reducing the
verbiage or an enactment, but that does not mean that wherever
it is used it has that effect; to deem means simply to judge or
reach a conclusion about something, and the words ‘deem’ and
‘deemed’ when used in a statute thus simply state the effect or
meaning which some matter or things has- the way in which it is
to be adjudged ; this need not import artificiality or fiction; it may
simply be the statement of an indisputable conclusion.”
84. In Hindustan Cooperative Housing Building Society
Limited v . Registrar , Cooperative Societies and Anr. (2009) 14
SCC 302, this Court in dealing with legal fictions generally quoted a
large number of authorities thus at paragraph 17:
“17. “ 13. … It is, as noted above, a deeming provision. Such a
provision creates a legal fiction. As was stated by James, L.J. in
Levy, Re, ex p W alton [(1881) 17 Ch D 746 : (1881-85) All ER
Rep 548 (CA)] : (Ch D p. 756)
‘… When a statute enacts that something shall be deemed to
have been done, which in fact and truth was not done, the court is
entitled and bound to ascertain for what purposes and between
what persons the statutory fiction is to be resorted to.’
After ascertaining the purpose full effect must be given to the
statutory fiction and it should be carried to its logical conclusion
PIONEER URBAN LAND AND INFRASTRUCTURE L TD.
& ANR. v. UNION OF INDIA & ORS. [R.F . NARIMAN, J.]
and to that end it would be proper and even necessary to assume
all those facts on which alone the fiction can operate. [Ed.: This
latter sentence does not form part of what was observed by James,
L.J. in ex p Walton, (1881) 17 Ch D 746 : (1881-85) All ER Rep
548 (CA) but is a paraphrase of what was observed by the
Supreme Court in State of Bombay v. Pandurang Vinayak, 1953
SCR 773 at p. 778. See also Ali M.K. v. State of Kerala, (2003)
11 SCC 632 : 2004 SCC (L&S) 136, SCC at p. 639, para 13.]
[See Hill v. East and W est India Dock Co. [(1884) 9 AC 448
(HL)] , State of T ravancor e-Cochin v . Shanmugha V ilas
Cashewnut Factory [AIR 1953 SC 333] , American Home
Products Corpn. v. Mac Laboratories (P) Ltd. [(1986) 1 SCC
465] and ParayankandiyalEravathKanapravanKalliani Amma
v. K. Devi [(1996) 4 SCC 76] .] In an oft quoted passage, Lord
Asquith stated:
‘If you are bidden to treat an imaginary state of affairs as real,
you must surely, unless prohibited from doing so, also imagine as
real the consequences and incidents which, if the putative state of
affairs had in fact, existed, must inevitably have flowed from or
accompanied it. … The statute [states] that you must imagine a
certain state of affairs; it does not say that having done so, you
must cause or permit your imagination to boggle when it comes to
the inevitable corollaries of that state of affairs.’
(See East End Dwellings Co. Ltd. v . Finsbur y Bor ough
Council [1952 AC 109 : (1951) 2 All ER 587 (HL)] at AC
pp. 132-33.)
‘… The word “deemed” is used a great deal in modern
legislation. Sometimes it is used to impose for the purposes of a
statute an artificial construction of a word or phrase that would
not otherwise prevail. Sometimes it is used to put beyond doubt a
particular construction that might otherwise be uncertain.
Sometimes it is used to give a comprehensive description that
includes what is obvious, what is uncertain and what is, in the
ordinary sense, impossible.’
[Per Lord Radclif fe in St. Aubyn v. Attorney General (No. 2)
[1952 AC 15 : (1951) 2 All ER 473 (HL)] , AC p. 53.]
527
14. ‘Deemed’, as used in statutory definitions [is meant]
‘to extend the denotation of the defined term to things it would not
in ordinary parlance denote, is often a convenient devise for
reducing the verbiage of an enactment, but that does not mean
that wherever it is used it has that effect; to deem means simply
to judge or reach a conclusion about something, and the words
“deem” and “deemed” when used in a statute thus simply state
the effect or meaning which some matter or thing has — the way
in which it is to be adjudged; this need not import artificiality or
fiction; it may simply be the statement of an undisputable
conclusion.’ (Per Windener, J. in Hunter Douglas Australia Pty.
v. Perma Blinds [(1970) 44 Aust LJ R 257] .)
15. When a thing is to be ‘deemed’ something else, it is to be
treated as that something else with the attendant consequences,
but it is not that something else (per Cave, J., in R. v. Norfolk
County Court [(1891) 60 LJ QB 379] ).
‘When a statute gives a definition and then adds that certain things
shall be “deemed” to be covered by the definition, it matters not
whether without that addition the definition would have covered
them or not.’(Per Lord President Cooper in Ferguson v .
McMillan [1954 SLT 109] .)
16. Whether the word ‘deemed’ when used in a statute
established a conclusive or a rebuttable presumption depended
upon the context (see St. Leon V illage Consolidated School
Distt. v. Ronceray [(1960) 23 DLR (2d) 32] ).
‘…. I … regard its primary function as to bring in something
which would otherwise be excluded.’(Per Viscount Simonds in
Barclays Bank v. IRC [1961 AC 509 : (1960) 3 WLR 280 : (1960)
2 All ER 817 (HL)] at AC p. 523.)
‘Deems’ means ‘is of opinion’ or ‘considers’ or ‘decides’ and
there is no implication of steps to be taken before the opinion is
formed or the decision is taken.[See R. v . Brixton Prison
(Governor), ex p Soblen [(1963) 2 QB 243 : (1962) 3 WLR
1154 : (1962) 3 All ER 641 (CA)] at QB p. 315.]” [Ed.: As
observed in Ali M.K. v. State of Kerala , (2003) 1 1 SCC 632 :
2004 SCC (L&S) 136, SCC at pp. 639-40, paras 13-16.]”
PIONEER URBAN LAND AND INFRASTRUCTURE L TD.
& ANR. v. UNION OF INDIA & ORS. [R.F . NARIMAN, J.]
In the present case, it is clear that the deeming fiction that is used
by the explanation is to put beyond doubt the fact that allottees are to be
regarded as financial creditors within the enacting part contained in
Section 5(8)(f) of the Code.
85. It was also argued that an explanation does not enlarge the
scope of the original section and for this purpose S. Sundaram Pillai
(supra) was relied upon. This very judgment recognises, in paragraph
46, that an explanation does not ordinarily enlarge the scope of the original
Section. But if it does, effect must be given to the legislative intent
notwithstanding the fact that the legislature has named a provision as an
explanation. [See Hiralal Ratanlal Etc. v. State of U.P and Anr. Etc.
(1973) 1 SCC 216 at 225, followed in paragraph 51 of Sundram Pillai
(supra)]. In any case, it has been found by us that the explanation was
added by the Amendment Act only to clarify doubts that had arisen as to
whether homebuyers/allottees were subsumed within Section 5(8)(f).The
explanation added to Section 5(8)(f) of the Code by the Amendment Act
does not in fact enlarge the scope of the original Section as homebuyers/
allottees would be subsumed within Section 5(8)(f) as it originally stood
as has been held by us hereinabove. As a matter of statutory
interpretation, that interpretation, which accords with the objects of the
statute in question, particularly when we are dealing with a beneficial
legislation, is always the better interpretation or the “creative
interpretation” which is the modern trend of authority , and which is
reflected in the concurring judgment of Eera (through Dr. Manjula
Krippendorf) v. State (NCT of Delhi) and Anr. (2017) 15 SCC 133
at paragraphs 122 and 127.This argument must, therefore, also be
rejected.
86. We, therefore, hold that allottees/home buyers were included
in the main provision, i.e. Section 5(8)(f) with effect from the inception
of the Code, the explanation being added in 2018 merely to clarify doubts
that had arisen.
Conclusion
i. The Amendment Act to the Code does not infringe Articles 14,
19(1)(g) read with Article 19(6), or 300-A of the Constitution
of India.
ii. The RERA is to be read harmoniously with the Code, as
amended by the Amendment Act. It is only in the event of
529
conflict that the Code will prevail over the RERA. Remedies
that are given to allottees of flats/apartments are therefore
concurrent remedies, such allottees of flats/apartments being
in a position to avail of remedies under the Consumer
Protection Act, 1986, RERA as well as the triggering of the
Code.
iii Section 5(8)(f) as it originally appeared in the Code being a
residuary provision, always subsumed within it allottees of flats/
apartments. The explanation together with the deeming fiction
added by the Amendment Act is only clarificatory of this
position in law.
Postscript
87. We have been informed that most of the S tates and Union
Territories have established/appointed adjudicating of ficers, the Real
Estate RegulatoryAuthority, as well as the Appellate Tribunal as under
the RERA. Yet, despite the fact that 1st May, 2017 has long gone, some
recalcitrant States and Union Territories have yet to do the needful. We
direct that in those States in which the needful has not been done, in that,
only interim or no adjudicating officer/Real Estate Regulatory Authority
and/or Appellate Tribunal have been appointed/established, such States/
Union Territories are directed to appoint permanent adjudicating officers,
a Real Estate Regulatory Authority and Appellate Tribunal within a period
of three months from the date of this judgment. Copies of this judgment
be sent to the Chief Secretaries of all the S tates and Union Territories
immediately. To be placed for compliance by affidavits filed by the Chief
Secretaries of these S tates and Union Territories within 3 months as
aforesaid. Post these matters in the second week of January , 2020.
88. Given the declaration of the constitutional validity of the
Amendment Act, it is absolutely necessary that the NCL T and the
NCLAT are manned with sufficient members to deal with litigation that
may arise under the Code generally , and from the real estate sector in
particular. For this purpose, an affidavit be filed by the Union of India
within three months from today as to the steps taken in this behalf. Copy
of this judgment be sent to the Ministry of Law and Justice, Government
of India immediately. To come up with the compliance report by States
and Union Territories as aforesaid in the second week of January, 2020.
PIONEER URBAN LAND AND INFRASTRUCTURE L TD.
& ANR. v. UNION OF INDIA & ORS. [R.F . NARIMAN, J.]
89. All writ petitions and the civil appeal are disposed of in the
light of this judgment. Stay orders granted by this Court to continue until
the NCLT takes up each application filed by an allottee/ home buyer to
decide the same in light of this judgment. No order as to costs.
Nidhi Jain Matters disposed of.