G H Standard Chartered Bank v. Heavy Engineering Corporation Ltd. & Anr.
RASTOGI, J.
1. Leave granted.
2. The instant appeal is being preferred against the judgment and
order dated 8 th May, 2019 passed by the Division Bench of the High
STANDARD CHARTERED BANK v. HEAVY ENGINEERING
CORPORATION LTD.
Court of Calcutta setting aside the judgment dated 16 th October, 2015
of the Single Bench and accepting claim of the 1 st respondent-plaintiff
holding that the bank guarantees were properly invoked in law a nd
accordingly the decree came to be passed for Rs. 1,10,33,207.00 /- as
claimed in paragraph 18 of the plaint with interest at the rate of 8 per
cent per annum from the date of institution of the suit until payment.
3. Although both the Judges of the Division Bench has delivered
their separate judgment but have expressed a concurring view on the
subject.
4. The dispute primarily arose with regard to two b ank
guarantees amounting to Rs. 71,35,100/- and Rs. 20,32,500/- in terms
of the letters of intent, HEC-CS-1502-81 dated 19 th May, 1981 and
HEC-CS-1502-81 dated 19 th May, 1981 furnished on behalf of the 2 nd
defendant by the appellant Bank(1 st defendant) in favour of the 1 st
respondent-plaintiff “as advance against supply of plant and equipment”
by the 1 st respondent-plaintiff to the 2 nd respondent (defendant no. 2).
The two bank guarantees are on identical terms and the only difference
is the date and the amount which are reproduced as under:-
Bank Guarantee No. 1001/03/100G dated 16 th February, 1983
“We, GRINDLAYS BANK P.L.C., 19 Netaji Subhas Road,
Calcutta 700001 undertake the Indemnity and keep th e
CORPORATION indemnified to the extent of Rs. 71,35,100/-
(Rupees SEVENTY ONE LAKHS THIRTY FIVE
THOUSAND AND ONE HUNDRED ONLY) against any loss
or damage caused to or suffered by the CORPORATION by
reason or any breach or failure by the said SUPPLIER, in due
performance of the aforesaid contract, we shall forthwith on
demand pay to the CORPORATION any sum or sums not
exceeding Rs. 71,35,100/-(RUPEES SEVENTY ONE LAKHS
THIRTY FIVE THOUSAND AND ONE HUNDRED ONLY)
without making any prior reference to the said SUPPLIER with
and exclusion of any action in Court by SUPPLIER.”
Bank Guarantee No. G/1001/84/608 dated 29 th August, 1984
“We, GRINDLAYS BANK P.L.C., 19 Netaji Subhas Road,
Calcutta 700001 do hereby undertake the Indemnity and keep
the CORPORATION indemnified to the extent of Rs.
373
20,32,500(Rupees TWENTY LAKHS THIRTY TWO
THOUSAND FIVE HUNDRED ONLY) against any loss or
damage caused to or suffered by the CORPORATION by reason
or any breach or failure by the said SUPPLIER, in d ue
performance of the aforesaid contract , we shall forthwith on
demand pay to the CORPORATION any sum or sums not
exceeding Rs. 20,32,500/-(RUPEES TWENTY LAKHS
THIRTY TWO THOUSAND FIVE HUNDRED ONLY)
without making any prior reference to the said SUPPLIER with
and exclusion of any action in Court by SUPPLIER.”
(emphasis supplied)
5. The said two bank guarantees were furnished for an d on
behalf of 2 nd respondent towards the sum insured “against any loss or
damage caused to or suffered by the Corporation by reason or any
breach or failure by the said supplier, in due perf ormance of the
aforesaid contract.”
Brief facts of the case :
6. By a letter of intent dated 19 th May, 1981, 1 st respondent
placed an order on 2 nd respondent(Simon Carves India Ltd. ‘SCIL’)
for the complete design, supply of both indigenous a nd imported
equipments, erection and commissioning of requisite civil and
construction works of the Dankuni Coal Complex at a total pri ce of
Rs. 21.10 crores. The letter of intent dated 19 th May, 1981 after
describing 4 sections of the LTC plant at Dankuni stated as under: -
“The above price covers the complete design, supply of both
indigenous and imported equipment , erection and commissioning
with requisite civil and structural works complete in all respects
except land filling upto 4.00 M level, railways siding, roads &
outside drawing and perphorial lighting which will only be outside
your scope or work.
The break up of the total price of Rs. 21.10 crores for purpose
of billing is enclosed.
We have noted the terms of payment proposed by you in your
letter dated 18.05.81. As we have indicated about the terms of
payment agreed to by us, it will not be possible to consider your
proposal for relaxation of the same. However, attempts will be
STANDARD CHARTERED BANK v. HEAVY ENGINEERING
CORPORATION LTD. [RASTOGI, J.]
made to consider some softening of payment terms la ter
depending our own cash flows on this project.
Kindly let us have your detailed technical specifications et c to
enable us to draw up a detailed contract for the work.
Kindly communicate your acceptance of this letter of intent and
furnish us a bank guarantee on approved proforma to relea se
the initial advance of Rs. 15.64 lakhs to you.
In pursuance of the letter of intent two bank guarantees hav e
been furnished by the defendant no. 1 on behalf of the defendant
no. 2 “as advance against the supply of plant and equipment. ”
(emphasis supplied)
7. Pursuant to the letter of intent, a formal Memorandum of
Agreement dated 8 th August, 1985 was executed by and between SCIL.
Thereafter, the 1 st respondent (plaintiff) from time to time advanced
for the said work against several bank guarantees furnished b y SCIL.
It may be noticed that the instant dispute pertains to two bank
guarantees dated 16 th February, 1983 and 29 th August, 1984, which were
advanced to SCIL, the details of which have been indicated above. The
said guarantees furnished by the appellant bank were extended f rom
time to time and revalidated.
8. In due course of time, in breach of contract wit h the 1 st
respondent-plaintiff, SCIL failed to duly complete the supply of
equipment and the other conditions of the letter of intent and fur ther
defective equipments. It is alleged that the work had to be aba ndoned
due to which 1 st respondent suffered huge losses and damages.
Ultimately, a sum of Rs. 139.90 lakhs, was deducted by the 1 st
respondent from final bill which pertained to the apportione d work
handed over to SCIL.
9. In view of the letter dated 6 th November, 1998, 1 st respondent-
plaintiff demanded encashment of both the said guarantees which were
refused by the bank to honour and diverse correspon dence was
exchanged by and between the 1 st respondent -plaintiff and the
appellant-defendant bank. 1 st respondent in continuation made
subsequent demands for encashment of the guarantees by le tter dated
19 th December, 1998 which is reproduced hereunder:-
375
“No.HDC/Proj/Fin/98-343
Dated the 19 th December, 1998
To
The Chief Manager
Corporate Banking
ANZ Grindlays Bank
19, Netaji Subhas Road
Post Box No.2645
Calcutta – 700001
Dear Sir,
With reference to your St. Relationship Manager’s letter d td.
7.12.98 regarding encashment of B.Gs issued by you on behalf
of M/s. SCIL for a total value of Rs.91.68 lakhs you are ver y
much aware that M/s. SCIL owes to H.E.C. Rs.139.90 la khs
due to defective supply of Plant & Equipment as well as no n-
supply of Plant & Equipment and also other contract ual
deficiencies which has caused loss as reflected in the handi ng
over/taking over report of the DCC Project by CIL. You are
also aware that HEC has gone out of the way in supporting SCIL
and getting the Plant completed with minimum damage. It is
within HEC’s full rights to invoke the BG as per Clause No.2 of
the BG’s which is reproduced below; (BG No.G1001/83/1084 dt.
16.8.83 for Rs. 71,35,100.00 and BG No.G1001/84/608 dt.
29.8.84 for Rs. 20,32,500.00).
WE GRINDLAYS BANK PLC 19, Netaji Subhas Road,
Calcutta – 700001 do hereby undertake the Indemnity of
Rs. (Rupees _______________________) against any loss or
damage caused to or suffered by the CORPORATION by reason
or any breach or failure by the said SUPPLIER, in d ue
performance of the aforesaid contract, we shall forthwi th on
demand pay to the CORPORATION any sum or sums not
exceeding Rs. (RUPEES without making any prior reference
to the said SUPPLIER with an exclusion of any action in c ourt
by SUPPLIER.
The failure of M/s. SCIL in fulfilling the contractual obli gation
which includes performance Guarantees of Plant & Equipmen t
STANDARD CHARTERED BANK v. HEAVY ENGINEERING
CORPORATION LTD. [RASTOGI, J.]
are very well documented by HEC & CIL. In fact, the unadjusted
advance of SCIL on account of Plant & Equipment is far in
excess of the loss suffered by HEC. The same has been brought
down to Rs.139.90 lakhs after allowing credit for contractu al
settlement.
Although as per terms of BG we are not bound to explain you
all these things but the above details are furnished so tha t good
sense will prevail and we expect you to live up to your reputation
and honour the beneficiaries claim for encashment.
Thanking you,
Yours faithfully,
T.L.N. SOURI
GENERAL MANAGER (PROJECTS & MNTG)
(emphasis supplied)”
10. This was followed by the letter dated 28 th December, 1998
which is also reproduced hereunder:-
“No.GGM(CM)/ /98
28 th December, 1998
To
The Chief Manager
ANZ Grindlays Bank
CALCUTTA.
(Atten: Shri Vasudeo Kundu)
Fax No.033-2211196
Sub: Encashment of two Bank Guarantees Nos.
1) G/1001/83/108G for Rs.71,35,100/-
2) G/1001/88/608 for Rs.20,32,500/-
Ref: Our letter dated 19.11.1998.
Dear Sir,
We have intimated vide our above letter to encash the above
two Bank Guarantees issued by you on behalf of SCIL India Ltd.,
to HEC.
377
You are requested to encash the above Bank Guarantees and
send the proceeds amounting to Rs.91,67,600/- within 3 days
time. Kindly treat this as most urgent and failing on th e part of
the Bank to honour the beneficiaries demand will be viewed
seriously.
Thanking you,
Yours faithfully,
(L.M. Prasad)”
11. A further complaint was made by way of a letter date d 22 nd
February, 1999 to the Banking Ombudsman, Calcutta. Ultimately , 1 st
respondent-plaintiff was constrained to institute a suit before the High
Court of Calcutta for decree of Rs. 1,10,33,207.07/- along with interest
being the aggregate sum of both the said guarantees.
12. The appellant Bank filed its written statement and primarily
took objection that the invocation of the bank guarantees wa s not in
accordance with either of the said guarantees and contrary to the terms
thereof and accordingly the appellant Bank was not liable to make
payment to the 1 st respondent-plaintiff under either of the said
guarantees. In support of its defence, the appellant Ba nk referred to
the diverse correspondence exchanged between the appellant and 1 st
respondent. In brief, the defence of the appellant Bank was t hat the
invocation of the said bank guarantees was contrary to the t erms or
not in terms thereof.
13. On the pleadings of the parties, the suit in the first instance
came to the dismissed vide judgment & decree dated 16 th October, 2015
which came to be challenged by the 1 st respondent in appeal before
the Division Bench of the High Court of Calcutta. In a concurring
judgment while setting aside the judgment of the Single J udge of the
High Court, it was finally held that the bank guarantees were properly
invoked in law by the 1 st respondent-plaintiff and accordingly passed a
decree of Rs. 1,10,33,207.00/- together with interest at the rat e of 8%
per annum on and from the date of institution of the suit until payment.
14. Learned senior counsel for the appellant Bank, Shri Amit
Sibal submits that the said bank guarantees only covered losses arising
out of supply of plant & equipment and according to the p leadings on
record, the plant stood installed in October, 1990 and this i s the case
STANDARD CHARTERED BANK v. HEAVY ENGINEERING
CORPORATION LTD. [RASTOGI, J.]
where the appellant Bank in its independent capacity, refused the claim
for it being clearly false to its knowledge and also not in ac cordance
with the terms of the guarantee, i.e. beyond the purview of the bank
guarantees and failing to apportion those losses suffered on account of
claims which would be within the terms of the bank guarantee s.
15. Learned counsel further submits that the bank guarantees are
in reference to two category of losses (i) non-supply/defect ive supply
of plant & equipment (ii) “other contractual deficiencies” a nd by the
invocation vide letter dated 19 th December, 1998 claims caused by “non-
supply/defective supply of plant & equipment and other contractual
deficiencies ” is outside the purview of the bank guarantee. Further,
assuming the correctness of the claim, the 1 st respondent if suffered
loss for both (i) non-supply/defective supply of plant and equipment (ii)
“other contractual deficiencies”, it is difficult t o determine the
apportionment between the two categories, because the invocation does
not state how they are apportioned. The invocation is thus i nchoate
and incomplete and this according to the appellant does not constit ute
a valid invocation at all and it has not been properly appreciated by the
Division Bench of the High Court in the impugned judgment and has
to be interfered by this Court.
16. In support of his submission, learned counsel has pl aced
reliance on the judgment of this Court in Hindustan Construction Co.
Ltd. Vs. State of Bihar & Others 1 and Gangotri Enterprises Ltd.
Vs. Union of India and Others 2.
17. Per contra, Ms. Madhavi Diwan, learned ASG appearing on
behalf of the 1 st respondent, while supporting the finding recorded by
the High Court in the impugned judgment submits that as per precedents
laid down by this Court, the question of law is no more res integra and
is well settled that the bank guarantee is an indepe ndent contract
between the bank and the beneficiary and the bank is alway s obliged
to honour its guarantee as long as it is an unconditional and irrevocable
one. At the same time, the dispute between the beneficiary and the
party at whose instance the bank has given the guarantee is immaterial
and is of no consequence and two exceptions to the rule have been
carved out. The first is when there is a fraud of which th e Bank has
notice and a fraud of the beneficiary from which it seeks to benefit.
1 1999(8) SCC 436
2 2016(11) SCC 720
379
The second exception to the general rule of non-intervention is s uch
when there is a ‘irretrievable injury’ or ‘irretrievable injustice’ that would
occur to the Bank.
18. We have heard learned counsel for the parties and with their
assistance perused the material available on record.
19. The law relating to invocation of bank guarantees with the
consistent line of precedents of this Court is well settled and a three-
Judge Bench of this Court in Ansal Engineering Projects Ltd. Vs.
Tehri Hydro Development Corporation Ltd. and Another 3 held thus:-
“4. It is settled law that bank guarantee is an independent and
distinct contract between the bank and the beneficiary and is not
qualified by the underlying transaction and the validity of the
primary contract between the person at whose instance the bank
guarantee was given and the beneficiary. Unless fraud or special
equity exists, is pleaded and prima facie established by strong
evidence as a triable issue, the beneficiary cannot be re strained
from encashing the bank guarantee even if dispute between the
beneficiary and the person at whose instance the bank guarantee
was given by the bank, had arisen in performance of the contract
or execution of the works undertaken in furtherance thereof . The
bank unconditionally and irrevocably promised to pay, on demand,
the amount of liability undertaken in the guarantee without any
demur or dispute in terms of the bank guarantee. The object
behind is to inculcate respect for free flow of commerce and
trade and faith in the commercial banking transactions unhedged
by pending disputes between the beneficiary and the contractor.
5.…..The court exercising its power cannot interfere with
enforcement of bank guarantee/letters of credit except onl y in
cases where fraud or special equity is prima facie made out in
the case as triable issue by strong evidence so as to prevent
irretrievable injustice to the parties.”
(emphasis supplied)
20. A bank guarantee constitutes an independent contract. I n
Hindustan Construction Co. Ltd. Vs. State of Bihar and
Others (supra), a two Judge Bench of this Court formulated the condition
3 1996(5) SCC 450
STANDARD CHARTERED BANK v. HEAVY ENGINEERING
CORPORATION LTD. [RASTOGI, J.]
upon which the invocation of the bank guarantee dep ends in the
following terms:-
“9. What is important, therefore, is that the bank guarantee should
be in unequivocal terms, unconditional and recite that the amount
would be paid without demur or objection and irrespective of any
dispute that might have cropped up or might have been pending
between the beneficiary under the bank guarantee or the person
on whose behalf the guarantee was furnished. The terms of t he
bank guarantee are, therefore, extremely material. Since the bank
guarantee represents an independent contract between th e bank
and the beneficiary, both the parties would be bound by the terms
thereof. The invocation, therefore, will have to be in accordance
with the terms of the bank guarantee, or else, the invocation itself
would be bad.”
21. The same principle was followed in State Bank of India
and Another Vs. Mula Sahakari Sakhar Karkhana Ltd. 4 wherein a
two-Judge Bench held thus:-
“33. It is beyond any cavil that a bank guarantee must be
construed on its own terms. It is considered to be a separ ate
transaction.
34. If a construction, as was suggested by Mr Naphade, is to
be accepted, it would also be open to a banker to put forward a
case that absolute and unequivocal bank guarantee should be read
as a conditional one having regard to circumstances attending
thereto. It is, to our mind, impermissible in law.”
22. Taking note of the exposition of law on the subject in Himadri
Chemicals Industries Limited Vs. Coal Tar Refining Co. 5, a two-
Judge Bench of this Court in Gujarat Maritime Board Vs. Larsen &
Toubro Infrastructure Development Projects Limited an d Another 6
has laid down the principles for grant or refusal for invocation of bank
guarantee or a letter of credit. The relevant paragraph i s as under:-
“ From the discussions made hereinabove relating to the principles
for grant or refusal to grant of injunction to restrain enforcement
4 2006(6) SCC 293
5 2007(8) SCC 110
6 2016(10) SCC 46
381
of a bank guarantee or a letter of credit, we find that the
following principles should be noted in the matter of injunction
to restrain the encashment of a bank guarantee or a lett er of
credit:
(i) While dealing with an application for injunction in the course
of commercial dealings, and when an unconditional bank
guarantee or letter of credit is given or accepted, the
beneficiary is entitled to realise such a bank guarantee or
a letter of credit in terms thereof irrespective of any
pending disputes relating to the terms of the contract.
(ii) The bank giving such guarantee is bound to honour it as
per its terms irrespective of any dispute raised by its
customer.
(iii) The courts should be slow in granting an order of injunction
to restrain the realisation of a bank guarantee or a letter
of credit.
(iv ) Since a bank guarantee or a letter of credit is an
independent and a separate contract and is absolute in
nature, the existence of any dispute between the parties
to the contract is not a ground for issuing an order o f
injunction to restrain enforcement of bank guarantees or
letters of credit.
(v) Fraud of an egregious nature which would vitiate the very
foundation of such a bank guarantee or letter of credit and
the beneficiary seeks to take advantage of the situation.
(vi) Allowing encashment of an unconditional bank guarantee
or a letter of credit would result in irretrievable harm or
injustice to one of the parties concerned.”
23. The settled position in law that emerges from the precedents
of this Court is that the bank guarantee is an independent contract
between bank and the beneficiary and the bank is always obl iged to
honour its guarantee as long as it is an unconditional and irr evocable
one. The dispute between the beneficiary and the par ty at whose
instance the bank has given the guarantee is immaterial and is of no
consequence. There are, however, exceptions to this Rule when there
is a clear case of fraud, irretrievable injustice or spe cial equities. The
STANDARD CHARTERED BANK v. HEAVY ENGINEERING
CORPORATION LTD. [RASTOGI, J.]
Court ordinarily should not interfere with the invocation or encashment
of the bank guarantee so long as the invocation is in terms of the bank
guarantee.
24. The guarantees in the instant case were uncondit ional,
specific in nature and limited in amount. The terms of the guarant ee
categorically covered money which the 1 st respondent had advanced
against supply of the plant and equipment by SCIL. The said guarantees
covered any loss and damage caused to or suffered b y the 1 st
respondent-plaintiff in due performance of the contract for s upply of
plant and equipment. The guarantee documents dated 16 th February,
1983 and 29 th August, 1984, as a whole and clause 2 of the guarantee
document in particular cover the advance which had been p aid by the
1st respondent-plaintiff by reason of any breach or failure by SCIL in
due performance of the aforesaid contracts i.e. against t he contract
for supply of plant and equipment.
25. From the correspondence that has been exchanged by and
between them pertaining to invocation of the said guarantees, it clearly
manifests that the initial letter of invocation written by the 1 st respondent-
plaintiff dated 6 th November, 1998 indeed was per se inadequate and
did not enumerate any condition for invocation of said guarantees save
and except a reference to “a substantial amount to be rec overed from
SCIL”. However, in the later correspondence exchanged between the
parties dated 19 th December, 1998 followed by a letter dated 28 th
December, 1998, 1 st respondent informed the appellant Bank that due
to defective supply of plant and equipment as well as non-s upply of
plant and equipment and also other contractual deficiencies of S CIL,
losses had been suffered by the 1 st respondent and it was duly informed
to the appellant Bank that the losses had been incurred both on account
of supply of plant and equipment and on account of performance of
the supply of plant and equipment. On reading of letters exchanged by
and between 1 st respondent and the appellant Bank pertaining to
invocation of the guarantees, the condition of the guarantees had been
duly complied with.
26. In our considered view, once the demand was made in due
compliance of bank guarantees, it was not open for the appellant Bank
to determine as to whether the invocation of the bank guarantee was
justified so long as the invocation was in terms of the bank guar antee.
The demand once made would oblige the bank to pay under the t erms
383
of the bank guarantee and it is not the case of the appell ant Bank that
its defence falls in any of the exception to the rule of case of fraud,
irretrievable injustice and special equities. In absence thereof, it is not
even open for the Court to interfere with the invocation and encashment
of the bank guarantee so long as the invocation was in term s of the
bank guarantee and this what has been observed by the Division Bench
of the High Court in the impugned judgment and that reflec ted the
correct legal position.
27. It is informed by the learned counsel for the appellant that
the Standard Chartered Bank’s predecessor in interest, ANZ Grindlay’s
Bank had opened a fixed deposit of Rs. 91,67,600/- on 18 th May, 2001,
which was lien marked to HEC(Heavy Engineering Corporation Lt d.)
and is being held under the control of the Registry of the H igh Court
of Calcutta and the current fixed deposit is valued at Rs. 2,32,69,129.71/
- and the total liability under the impugned order as on date will be Rs.
2,78,03,681.64/-. The Registry of the High Court of Cal cutta may
release the money lying in the account in favour of the 1 st respondent
and it is for the appellant Bank(judgment debtor) to settle and satisfy
the decree which is impugned in the instant proceedings.
28. We do not find any merit in the appeal which is he reby
dismissed. No costs.
29. Pending application(s), if any, stands disposed of.
Divya Pandey Appeal dismissed.