Keystone Realtors Pvt. Ltd. v. Shri Anil v. Tharthare & Ors.
DR. DHANANJAYA Y CHANDRACHUD, J.
1. The present Civil Appeal arises from an order da ted 11
February 2019 of the Principal Bench of the National Green Tribunal 1.
In its order, the NGT held that the increase in the total construction
area of the appellant’s project was an “expansion” under a notification
(bearing number S.O. 1533) dated 14 September 2006 2 of the Ministry
of Environment and Forests. The NGT found that the appellant ha d
undertaken an “expansion” as set out in Paragraph 2 of the EIA
Notification without complying with the regulatory procedure prescribed.
The appellant was directed to deposit an amount of Rupees one cr ore
with the Central Pollution Control Board 3. Noting that the construction
at the project site had been completed, the NGT appo inted a five-
member expert committee to study the impact of the appellant’s
expanded project and to suggest remedial measures.
1 NGT
2 EIA Notification
3 CPCB
KEYSTONE REALTORS PVT. LTD. v SHRI ANIL
V THARTHARE
The facts
2. The appellant is the project proponent of a resi dential
redevelopment, called ‘Oriana Residential Project’ situated at CTS no
646, 646 (Pt) Gandhinagar, Bandra (East), Mumbai 400050. On 8 June
2010 the appellant received a Commencement Certificate to c arry out
the development and erect a building situated at the project property.
The appellant began construction. When the construction commenced,
the total construction area was 8,720.32 square metres. The ambi t of
the project was expanded, and the constructed area was inc reased to
32,395.17 square metres. Under the EIA Notification, an Environmental
Clearance 4 was necessary if the total construction area excee ded
20,000 square metres. Hence, the appellant applied for an EC und er
the EIA Notification.
3. The fourth respondent, the State Level Expert Ap praisal
Committee for Maharashtra 5 recommended the grant of an EC for the
project. On 2 May 2013 the third respondent, the St ate Level
Environment Impact Assessment Authority for Maharashtra 6, based on
the recommendations of the SEAC granted an EC. It is not i n dispute
that at the time when the EC dated 2 May 2013 was granted, t he total
construction area of the project was 32,395.17 square metres. The grant
of the EC was conditional on the appellant obtaining a ‘consent for
establishment’ from the Maharashtra Pollution Control Board under the
Air (Prevention and Control of Pollution) Act 1981 a nd the Water
(Prevention and Control of Pollution) Act 1974.
4. By a letter dated 24 September 2013, the appellant inform ed
the Environment Department of the Government of Maharasht ra, the
second respondent, that the construction area was b eing further
increased by 8,085.71 square metres, as a result of which the total
construction area of the project would stand enhanced to 40,480.88
square metres. In its letter, the appellant sought an ‘amendment’ to the
EC dated 2 May 2013 by the third respondent to reflect the inc rease
in the total construction area. On 13 March 2014, the third respondent
granted an ‘amendment’ to the EC dated 2 May 2013 on the ground
that there was only a “marginal increase in built up and construction
4 EC
5 SEAC
6 SEIAA
547
area”. The third respondent noted the changes in the specificat ion of
the project as follows:
Description As per EC
dated 2 May 2013
Amendment
FSI area 16,346.32 sq mts 21,365.54 sq mts
Non FSI area 16,048.85 sq mts 19,115.34 sq mts
Total Construction area 32,395.17 sq mts 40,480.88 sq mts
Nos of tenements Members 64 Sale 61 Members 64 Sale 77
Building Configuration Member 2 Basement Member 2 Basement
5. The first respondent, claiming to be a resident of MIG Colony,
Gandhinagar, Bandra East, Mumbai, challenged the gra nt of the
amended EC dated 13 March 2014 before the Pune Bench of the NGT.
In response, the appellant filed two applications, challenging the standing
of the first respondent and contending that the challenge was barr ed
by limitation. By an order dated 4 May 2016, the Pune Bench of the
NGT rejected the applications questioning the maintainabil ity of the
proceedings and setting up the bar of limitation. The appe llant filed a
writ petition before the High Court of Judicature at Bombay to challenge
the decision of the Pune Bench of the NGT. The Bombay High Court,
allowing the writ petition held by an order dated 12 August 2016, that
the appeal was not maintainable at the behest of the fi rst respondent,
and the challenge against the grant of the amended EC dated 13 March
2014 was barred by limitation. By an administrative order dated 31 July
2018, the dispute was transferred from the Pune Bench of the NGT to
the Principal Bench which heard the parties and delivered the impugned
order.
Relevant clauses of the EIA Notification
6. The present dispute raises important questions regardin g the
interpretation the EIA Notification. The EIA Notification seeks to ensure
the protection and preservation of the environment during the execution
of new projects and the expansion or modernisation of existing projects.
It imposes restrictions on the execution of new projects and on the
expansion of existing projects, until their potential environmental impact
has been assessed and approved by the grant of an EC. Pa ragraph 2
of the EIA Notification reads thus:
KEYSTONE REALTORS PVT. LTD. v SHRI ANIL
V THARTHARE [DR. DHANANJAYA Y CHANDRACHUD, J.]
“2. Requirement for prior Environmental Clearance (EC):
- The following projects or activities shall require prior
environmental clearance from the concerned regulatory authority,
which shall hereinafter be referred to as the Central Government
in the Ministry of Environment and Forests for matters fal ling
under Category ‘A’ in the Schedule and at State level the State
Environment Impact Assessment Authority (SEIAA) for matters
falling under Category ‘B’ in the said Schedule, before any
construction work, or preparation of land by the pr oject
management except for securing the land, is started on the project
or activity:
(i) All new projects or activities listed in the Schedule to
this notification;
(ii) Expansion and modernisation of existing projects
or activities listed in the Schedule to this
notification with addition of capacity beyond the
limits specified for the concerned sector, that is,
projects or activities which cross the threshold
limits given in the Schedule after expansion or
modernisation;
(iii) Any change in product – mix in an existing
manufacturing unit included in Schedule beyond the
specified range.”
(Emphasis supplied)
The Schedule to the EIA Notification classifies potential projects
into Category ‘A’ and Category ‘B’ based on their size and potential
environmental impact. Category ‘A’ projects require project proponents
to secure an EC from the Ministry of Environment, Forests and Climate
Change. Category ‘B’ projects require project proponents to secure an
EC from the SEIAA, based on the recommendations of the SEA C.
Where a project falls within the parameters stipulated in the Schedule,
paragraph 2 of the EIA Notification provides that no construction work
shall begin unless an EC is granted in regard to three types of activity:
(i) new projects or activities provided in the Schedule, (ii) expansion or
modernisation of existing projects or activities provided in the Schedule,
and (iii) changes in the product mix in existing manufacturin g units
provided in the Schedule beyond the specified range. The present
549
dispute raises questions as to how the second type o f activity, the
“expansion” of existing projects, should be construed under the E IA
Notification.
7. In order to secure an EC, the project proponent must subm it
an application in the manner set out in Form 1 and Supplementary Form
1A (if applicable) of the EIA Notification. Under paragraph 7(i) of the
EIA Notification, the project proponent must also submit a pre-feasibility
report. However, in the case of projects under item 8 of th e Schedule,
only a conceptual plan is required to be submitted. Paragra ph 7(ii) of
the EIA Notification states that:
“7(ii) Prior Environmental Clearance (EC) process fo r
Expansion or Modernisation of Change of product mix in
existing projects:
All applications seeking prior environmental clearance f or
expansion with increase in the production capacity beyond
the capacity for which prior environmental clearance has
been granted under this notification or with increa se in
either lease area or production capacity in the case of mining
projects or for the modernisation of an existing unit with increase
in the total production capacity beyond the thresho ld limit
prescribed in the Schedule to this notification through change in
process and or technology or involving a change in the product
mix shall be made in Form 1 and they shall be considered
by the concerned Expert Appraisal Committee or Stat e
Level Expert Appraisal Committee within sixty days, who
will decide on the due diligence necessary includin g
preparation of EIA and public consultation and the application
shall be appraised accordingly for grant of environ mental
clearance.”
(Emphasis supplied)
Clause (ii) of paragraph 2 of the EIA Notification require s the
project proponent to secure an EC from the relevant regulatory
authority prior to undertaking any “expansion” of an existing p roject.
Paragraph 7(ii) further stipulates that all applications for an EC in cases
of “expansion” resulting in the increase of production capacity or lease
area beyond the capacity/area stipulated in the previo us EC shall be
made in the manner set out in Form 1 or 1A (as applicable) .
KEYSTONE REALTORS PVT. LTD. v SHRI ANIL
V THARTHARE [DR. DHANANJAYA Y CHANDRACHUD, J.]
8. The appellant’s application in Form 1 acknowledges that the
project fell under entry 8(a) of Schedule 1 of the EIA Notification. Entry
8 deals with ‘Building and Construction projects having a built-up area
of or greater than 20,000 square metres but less than 1,50,000 square
metres.’ Entry 8 of the Schedule to the EIA Notification is as follows:
8 – Building / Construction projects / Area Develop ment projects and
Townships
8(a) Building and
Construction projects
=20,000 sq mts
and <1,50,000 sq
mts of built-up
area
Built-up area for
covered construction:
in the case of facilities
open to the sky, it will
be the activity area
8(b) Townships and Area
Development
projects
Covering an area
= 50 ha and or
built up area
= 1,50,000 sq mts
All projects under
item 8(b) shall be
appraised as Category
B1
Issue
9. In applying for the original EC, the appellant submitte d an
application in Form 1 as required under the provisio ns of the EIA
Notification. The total construction area identified in the appellant’s Form
1 was 32,395.17 square metres. However, in September 2013 the
appellant informed the second respondent of an increase by 8,08 5.71
square metres as a result of which the total construction ar ea of the
project would be 40,480.88 square metres. In seeking an ‘amendment’
to the EC dated 2 May 2013 the appellant did not submit an u pdated
Form 1. Further, the ‘amendment’ to the EC was granted by the SEIAA
without the recommendations of the SEAC. The issue before this Court
is whether the ‘amended’ EC dated 13 March 2014 granted by the
SEIAA without following the procedure stipulated in paragraph 7(ii) of
the EIA Notification is valid.
Submissions
10. Mr Mukul Rohatgi, learned Senior Counsel appearing on
behalf of the appellant submitted that:
(i) When construction began, the total construction area of
the appellant’s project was 8,720.32 square metres. As
the EIA Notification requires projects with a total built
up area of or more than 20,000 square metres to procure
an EC prior to the start of construction, no EC was
required before construction of the appellant’s project
commenced;
551
(ii) Pursuant to the first increase, when the appell ant’s
project crossed the 20,000 square metre threshold
provided for in the EIA Notification, the appellant
submitted a Form 1 and was granted a valid EC dated
2 May 2013 by the third respondent;
(iii) Pursuant to the second increase, the built up area of the
appellant’s project only marginally increased by 8,085.71
square metres to a total construction area of 40,480.88
square metres, which is within the upper limit of 1,50,000
square metres prescribed by entry 8(a) of the Schedule
to the EIA Notification. Therefore, the second increase
was not an “expansion” within the meaning of clause
(ii) of paragraph 2 of the EIA Notification and no fresh
Form 1 or EC was required at the time of the second
increase;
(iv) Clause (ii) of paragraph 2 only applies to situatio ns
where the project crosses the lower or upper threshold
limits stipulated in the Schedule. Any increase in
production capacity or construction area within the limits
set out in the Schedule would not constitute an
“expansion” within the meaning of Clause (ii) of
paragraph 2 and does not require compliance with the
procedure under paragraph 7(ii) of the EIA Notification;
(v) The increase in the appellant’s project is only marginal
and does not have an adverse impact on the
environment;
(vi) The SEIAA applied its mind to the appellant’s requ est
for an ‘amendment’; noted that the increase in
construction area was only marginal and issued an
amendment to the original EC dated 2 May 2013; and
(vii) The NGT had no basis to impose the fine of Rupees
one crore on the appellant.
11. Joining issue with the above submissions, Mr Aditya Pratap,
learned counsel appearing on behalf of the first respondent subm itted
that:
(i) Under clause (ii) of paragraph 2 read with paragraph
7(ii) of the EIA Notification, any expansion beyond the
KEYSTONE REALTORS PVT. LTD. v SHRI ANIL
V THARTHARE [DR. DHANANJAYA Y CHANDRACHUD, J.]
“threshold limit” requires a fresh EC. The appellant’s
project had crossed the threshold limit of 20,000 square
metres and the second increase of 8,085.71 square
metres constituted an ‘expansion beyond the threshold
limit ’ and hence required a fresh EC;
(ii) Once a project breaches the lower threshold limit set
out in the Schedule to the EIA Notification, any
expansion or modernisation, even within the upper
threshold set out in the Schedule, will require the
submission of a fresh Form 1 and the matter to be placed
before the Expert Appraisal Committee or the SEAC,
as applicable in accordance with paragraph 7(ii) of the
EIA Notification;
(iii) Adopting the appellant’s interpretation of clause (ii) of
paragraph 2 would defeat the object and purpose of the
EIA Notification as a whole. It would allow project
proponents to incrementally increase the construction
area and over time significantly impinge on the
environmental impact of the project without seeking a
fresh EC;
(iv) If the law prescribes an act to be done in a partic ular
manner, it must be done only in that manner and no other.
Under paragraph 7(ii) of the EIA Notification, it was
incumbent on the SEIAA to place the matter before the
SEAC for appraisal and recommendations; and
(v) The EIA Notification is an operationalisation of the
precautionary principle, which forms a part of the
environmental law of India. The EIA Notification must
be read in a manner which gives effect to the
precautionary principle.
Interpreting paragraphs 2 and 7
12. The central controversy between the parties to the present
dispute is the manner in which paragraphs 2 and 7 o f the EIA
Notification should be interpreted. Clause (ii) of paragraph 2 of the EIA
Notification stipulates that a project proponent shall require an EC prior
to the start of construction in the case of an “expansion”. Cl ause (ii)
uses the phrase “expansion…beyond the limits specif ied for the
553
concerned sector”. The first respondent sought to lay emphasis on this
construction to argue that any expansion beyond the lower limit
stipulated in the Schedule would attract the requirement of a pri or EC
under paragraph 2. However, the above language in clause (ii) is further
qualified by the phrase “that is, projects or activitie s which cross the
threshold limits given in the Schedule after expansion or modernisation.”
A plain reading of the second half of clause (ii) would indicat e that it
applies to cases where a project was initially below the threshold limits
stipulated in the Schedule but after the proposed expans ion, would
breach the threshold limits. Clause (ii) of paragraph 2 of the EIA
Notification therefore would not appear to cover a case where a project
had already crossed the lower threshold limit set out in the S chedule
and the expansion does not cross the upper limit stipula ted by the
Schedule.
13. However, clause (ii) of paragraph 2 must be rea d with
paragraph 7(ii) of the EIA Notification. Paragraph 7(ii) la ys down the
exact procedure to be followed by a project proponent in the case of
an expansion. Two crucial points must be noted with respect to
paragraph 7(ii). First, it uses the phrase, “expansion wit h increase in
production capacity beyond the capacity for which prior envir onment
clearance has been granted ”. Second, the qualifying language referring
to breaching the threshold limits “after expansion” is absent. An
“expansion” can occur even after the grant of an EC when the project
first crossed the lower limit stipulated in the threshol d and it is not
necessary for the project to breach the upper limit after the expansion.
Therefore, a close reading of paragraph 7(ii) would support the
interpretation put forth by the first respondent – that even after obtaining
an EC if the project is expanded beyond the limits for w hich the prior
EC was obtained, a fresh application would need to be made ev en if
the expansion is within upper the limit prescribed in the Schedule.
14. The dangers effectively articulated by the learned couns el
for the first respondent are real. If clause (ii) of par agraph 2 does not
cover a case where the expansion is within the limits stipulated by the
Schedule, a project proponent may incrementally keep incre asing the
size of the project area over time resulting in a signif icant increase in
the project size without an assessment of the environment al impact
resulting from the expansion. Such an outcome would defeat the entire
scheme of the EIA Notification which is to ensure that any new or
additional environmental impact is assessed and certified by the relevant
KEYSTONE REALTORS PVT. LTD. v SHRI ANIL
V THARTHARE [DR. DHANANJAYA Y CHANDRACHUD, J.]
regulatory authorities. In the present case, the lower limit of Entry 8(a)
of the Schedule is a built up area of 20,000 square metres and the upper
limit is 1,50,000 square metres. It cannot be doubt ed that the
environmental impact of a construction of 1,50,000 square metres is
drastically more than construction of 20,000 square met res. If the
appellant’s argument is accepted in totality, a project proponent could
potentially secure an EC for constructing 20,000 square metres and by
‘amendment’ steadily increase the area of construction up to 1,50,000
square metres without submitting an updated Form 1 or any substantive
review by the SEAC.
15. We note that subsequent to the EIA Notification being
published in 2006, a draft notification was issued on 19 January 2009. 7
The draft notification proposed the following amendment:
“in para 2 [of the EIA Notification], after sub-para (iii), the
following shall be inserted; namely:-
However modernisation or expansion proposals without an y
increase in pollution load, and, or without any additional water
and or land requirement are exempted from the provisions of this
Notification:
Provided that, a self certification, stating that the proposals shall
not involve any additional pollution load, waste generation or water
requirement, be submitted to the regulatory authority by the
project proponent.”
Prior to adopting the draft notification, hearings were conducted
and written comments were solicited from various stakeholders including:
(i) Central Ministries and Departments, (ii) State Governments and their
Agencies, (ii) Industries and their Associations and (iv) Civil Society
including NGOs. A committee was constituted by the Min istry of
Environment and Forests, Government of India which published a report
in October 2009. The committee specifically recommended against the
adoption of the above amendment, noting:
“The amendments propose to exempt modernisation and
expansion of projects based on a self certification by p roject
authorities that there is no increase in pollution load. It is totally
unacceptable that the modernisation and expansion o f
7 Notification S.O. 195 (E) dated 19 January 2009.
555
projects be removed from the environmental clearanc e
regime, with or without the requirement of self
certification. There are several industries operating in critically
polluted areas or are in violation of their environmental clearance
conditions, which need to be considered before the expansion of
a project is considered. What is to be considered is not just
whether there is an increase in pollution load but also the current
impact of the project and its compliance with environm ental
clearance conditions. We can provide clear examples wherein
the non-compliance of the clearance conditions has not b een
considered while granting clearance for expansion which includes
adding new components to the existing industrial operations etc.
This has allowed several projects to continue their activities and
expand despite blatant non compliance. Finally, it is only wi th
industrial, thermal power and other such related operations that
one can decide on parameters of pollution. Development
projects like highways, airports and other infrastr ucture
projects which seek to expand might have a detrimental
impact due to factors such as change in land use (i .e.
construction over a wetland, grassland or agricultural land
etc). Despite this, the project proponent can certify that there is
no change in pollution load and hence expansion is to be allowed.
The current process seeks a detailed EIA report to
determine whether impacts can be mitigated. If the
amendment is brought into force, it will simply do aw ay
with this critical and necessary step in the environ mental
clearance process. Therefore, this amendment should not be
allowed.
…
The draft notification takes a myopic view of environmental and
social impact of modernisation and expansion. Any
modernisation/expansion projects will necessarily e ntail
increase in production, increase in transportation, incre ase
in pressure on the local infrastructure and local nat ural
resources and increase in the pollution load during the
construction phase. So, even if a modernisation/expansion does
not lead to an increase in the pollution load or water or l and
requirement within the factory premises during the ope ration
KEYSTONE REALTORS PVT. LTD. v SHRI ANIL
V THARTHARE [DR. DHANANJAYA Y CHANDRACHUD, J.]
phase, it will lead to an increase in environmental and soc ial
impact outside the premise.”
(Emphasis supplied)
The draft amendment was not adopted in subsequent amendments
to the EIA Notification. We find considerable merit in the observations
of the committee that the requirement of an EC at the time of expansion
forms a critical step in the environmental clearance regime. According
to the committee, it assists officials not just in evaluating and mitigating
any adverse impact caused by the expansion but also in assessing
whether the project proponent is in compliance with their existing
obligations. Crucially, any form of expansion necessarily puts a strain
on the local environment and infrastructure and needs to b e carefully
evaluated in a holistic manner.
16. In a case where the text of the provisions requ ires
interpretation, this Court must adopt an interpreta tion which is in
consonance with the object and purpose of the legislation or delegated
legislation as a whole. The EIA Notification was adop ted with the
intention of restricting new projects and the expansion of new projects
until their environmental impact could be evaluated and understood. It
cannot be disputed that as the size of the project increase s, so does
the magnitude of the project’s environmental impact. This Court cannot
adopt an interpretation of the EIA Notification which would permit,
incrementally or otherwise, project proponents to i ncrease the
construction area of a project without any oversight from th e Expert
Appraisal Committee or the SEAC, as applicable. It is t rue that there
may exist certain situations where the expansion sought by a project
proponent is truly marginal or the environmental im pact of such
expansion is non-existent. However, it is not for this Court to lay down
a bright-line test as to what constitutes a ‘marginal’ increase and what
constitutes a material increase warranting a fresh Form 1 and scrutiny
by the Expert Appraisal Committee. If the government in its w isdom
were to prescribe that a one-time ‘marginal’ increase (e.g. 5% or 10%)
in project size, within the threshold limit stipulated in the Schedule, could
be subject to a lower standard of scrutiny without diluting the urgent
need for environmental protection, conceivably this Court may giv e
effect to such a provision. This would be subject to any challe nge on
the ground of their being a violation of the precautionary pri nciple.
However, as the EIA Notification currently stands, an expansion within
557
the limits prescribed by the Schedules would be subject to the procedure
set out in paragraph 7(ii).
17. At the time of the second increase, the total construction area
of the appellant’s project was enlarged from 32,395.17 square me tres
to 40,480.88 square metres. As a result of the expansion, the appellant
constructed sixteen additional flats which were sold at the pr evailing
market rate. The appellant did not comply with the procedu re set out
under paragraph 7(ii) of the EIA Notification but rather sought an
‘amendment’ to the EC. The third respondent did not require the
appellant to submit an updated Form 1 nor was the proposal processed
and evaluated by the fourth respondent. The ‘amendment’ to the E C
dated 13 March 2014 does not discuss the potential environmental impact
of the increase in construction area, but merely rec ords that the
construction area now stands at 40,480.88 square me tres. The
procedure set out under paragraph 7(ii) of the EIA Notific ation exists
to ensure that where a project is expanded in size, the environmental
impact on the surrounding area is evaluated holistically considering all
the relevant factors including air and water availability and pollution,
management of solid and wet waste and the urban carrying capaci ty
of the area. This was not done in the case of the appellant’s project. It
was not open to the third respondent to grant an ‘amendment’ to t he
EC without following the procedure set out in paragraph 7(ii) of the
EIA Notification.
18. We further note that as on the date of the impugned order
construction at the project site had already been completed . A core
tenet underlying the entire scheme of the EIA Notific ation is that
construction should not be executed until ample scientific evidence has
been compiled so as to understand the true environmental impact of a
project. By completing the construction of the project, the appe llant
denied the third and fourth respondents the ability to evaluate the
environmental impact and suggest methods to mitigat e any
environmental damage. At this stage, only remedial measure s may be
taken. The NGT has already directed the appellant to depo sit Rupees
one crore and has set up an expert committee to evaluate the impact
of the appellant’s project and suggest remedial measures. I n view of
these circumstances, we uphold the directions of the NGT and direct
that the committee continue its evaluation of the appellant’s project so
as to bring its environmental impact as close as po ssible to that
KEYSTONE REALTORS PVT. LTD. v SHRI ANIL
V THARTHARE [DR. DHANANJAYA Y CHANDRACHUD, J.]
contemplated in the EC dated 2 May 2013 and also su ggest the
compensatory exaction to be imposed on the appellant.
19. The appeal is dismissed. There shall be no order as to costs.
20. Pending application(s), if any, shall stands disposed of.
Devika Gujral Appeal dismissed.