Vasant Chemicals Limited v. the Managing Director, Hyderabad Metropolitian Water Supply and Sewerage Board and Others
R. BANUMATHI, J. 1. These appeals arise out of the judgment
dated 29.10.2003 passed in the Writ Petition Nos.4917 and 5044 of 2000
and order dated 29.12.2003 passed in review petition by the High Court
of Andhra Pradesh at Hyderabad dismissing the writ petitions as well as
the review petitions holding that the levy of sewerage cess levied on the
appellant by the respondent-Board is in accordance with Section 55 of
the Hyderabad Metropolitan Water Supply and Sewerage Act, 1989
(HMWS&S Act) and Clause 16 of the agreement entered into between
the appellant and the Board.
757
2. The facts giving rise to these appeals are that the appellant-M/
s Vasant Chemicals Limited which is an amalgamation of three companies
is engaged in the manufacture and export of dye intermediates and other
organic chemicals in their units at Jeedimetla Industrial E state, Ranga
Reddy District, Hyderabad. The effluents of the appellant industry and
other industries were not of acceptable standards to be let into the sewer
line of the Board and required treatment and therefore, the industrial
units in Jeedimetla Estate decided to establish the Co mmon Effluent
Treatment Plant (CETP). Hence, under the joint efforts of all the chemical
units and other industries including the appellant, a company was formed
namely M/s Jeedimetla Effluents Treatment Limited (JETL) in the year
1987 to get the effluents treated at their own cost to bring the quality of
the effluents to an acceptable level. The appellant and the other industrial
units made investment by way of shares in the said company towards its
capital. According to the appellant, it has invested to the extent of more
than 29% of the shares in JETL towards its equity.
3. After treating the effluents to sewer standards as prescr ibed
under the Water (Prevention and Control of Pollution) Act, 1974 ( Water
Act, 1974 ) and the Environment (Protection) Act, 1986 ( Environment
Act, 1986 ) between 1988 and 1995, JETL was discharging the treated
waste water/effluents into the open drains/nalas in Jeedime tla Area.
After discussion with Hyderabad Metropolitan Water Supply and
Sewerage Board (HMWS&SB-the Board) and the Governmen t of
Andhra Pradesh and APPCB, a dedicated pipeline was laid from the
premises of JETL to connect to the sewerage system of HMW S&SB
which is located at a distance of about 10.38 kilometers at Balanagar at
an estimated cost of Rs.346 lakhs. For the said dedicated pipeline, JETL
paid an amount of Rs.75,00,000/- as its contribution and the balance
amount was contributed by the Board and the Government of Andhra
Pradesh. The pipeline became operational on 31.01.1998. As per the
direction of APPCB, the industries in IDA Jeedimetla are d ischarging
their industrial effluents to JETL, which in turn partially treat effluents
and let into the dedicated pipeline connecting JETL and sewe r line at
Board’s sewer at Kukatpalli, Balanagar and then carried to Sewerage
Treatment Plant (STP) at Amberpet.
4. The appellant has obtained bulk water supply connection from
the respondent-HMWS&S Board and the Board accorded sanction for
supply of 36,200 gallons water per day @ Rs.12 per kilo litre t o the
VASANT CHEMICALS LTD v. MD, HYDERABAD METROPOLITIAN
WATER SUPPLY & SEWERAGE BOARD [R. BANUMATHI, J.]
appellant-Industry. An agreement was entered into by the appellant with
the respondent-Board on 27.04.1995 stipulating the terms and conditions
of supply of water and the payments required to be made in terms thereto.
The agreement provides that HMWS&SB will supply water to the
appellant industry and water charges will be levied for the supply of
water as per the agreement. Clause 16 of the agreement inter alia
provided for payment of sewerage cess and that the appellant is liable to
pay a sewerage cess in accordance with Section 55 of the HM WS&S
Act. Clause 17 of the agreement obligates the appellant t o avail the
sewer facility provided by the HMWS&SB if the premises of the appellant
is located at a distance of less than thirty-five meters from the sewer
line of the HMWS&SB.
5. The appellant made representations between 1998 and February,
2000 stating that levy of sewerage cess was illegal and contra ry to the
provisions of HMWS&S Act as the appellant is not discharging its
effluents into the sewerage system of the Board. Accor ding to the
appellant, the Board insisted upon payment of the arrears and sought
payment of the sewerage cess for the period January, 1998 t o March,
2000 and sought certain amount towards water cess from 1 st January,
1998 to February, 2000 vide two notices dated 25.01.2000. Aggrieved
thereby, the appellant filed writ petitions in WP(C) No.4917/2000 and
WP(C) No.5044/2000 challenging the notices levying of water cess and
sewerage cess respectively. The writ petitions were dismissed by the
High Court by the common judgment dated 29.10.2003 upholding the
levy of sewerage cess by holding that such levy is in terms of Section 55
of HMWS&S Act. The High Court held that though the appellant’s
premises is not directly connected to the sewer line of the Board, the
industrial effluents of the appellant are being carried to JETL and after
partial treatment at JETL, the same is let into the se werage system of
the Board. It was further observed that as per Sect ion 55 of the
HMWS&S Act, the occupier of the premises from where the sewerage
or effluents are let into the sewer facility provided by the Board by any
means, has to pay the sewerage cess irrespective of the fact that whether
or not the area is served by sewerage system of the Board. The High
Court pointed out that this statutory liability is incorporated in Clause 16
of the agreement as per which the appellant has to pay se werage cess
along with water cess @ 20% of the water charges. The Hig h Court
dismissed the writ petitions vide judgement dated 29.10.2003 holding
759
that the demand notices are not arbitrary and that do not suffer from any
legal infirmities.
6. The appellant filed review petitions being Review MP No.33154/
2003 in WP(C) No.4917/2000 and Review MP No.33158/2003 in WP(C)
No.5044/2000 before the High Court which came to be dismissed vide
order dated 29.12.2003 on the ground that the judgment dated 29.10.2003
does not suffer from any error apparent on the face of the record.
7. Mr. V. Giri, learned senior counsel for the appellant submitted
that since the premises of the appellant industry is situated in the area
not served by the sewage system of the Board and in terms of proviso to
Section 55 of the HMWS&S Act, no sewerage cess is leviable. It was
contended that since the appellant is covered under proviso to Secti on
55 of the HMWS&S Act, the statutory liability cannot be imposed on the
appellant on the basis of Clause 16 of the agreement. Without prejudice
to the above contentions, it was urged that under the agreement da ted
31.08.2000 between the JETL and the Board, various charges are levied
on JETL which are in effect sewerage cess and therefore, there cannot
be double levy for the same service/same taxable eve nt which is
impermissible under the law. It was contended that the various documents
produced and the contentions raised by the parties in the review petitions
were not considered by the High Court and the High Court erred in
dismissing the review petitions.
8. Reiterating the above submissions, on behalf of JETL, Mr. Guru
Krishna Kumar, learned senior counsel submitted tha t under the
agreement dated 31.08.2000, five different kinds of charges are levied
on JETL by the Board namely:- (i) capital contribution (c lause 4); (ii)
sewerage connection charges (clause 4); (iii) charg es towards
maintenance of sewer line (clause 28); (iv) sewerage maintenance and
sewerage treatment charges (clause 28); and (v) sewerage s urcharge
for effluents above a certain level (clause 29) and those charges though
not christened as sewerage cess, they are in effect sew erage cess in
terms of Section 55 of HMWS&S Act. It was further contended that
various charges levied on JETL by virtue of the agreement dated
31.08.2000 correspond to the sewerage cess under Se ction 55 of
HMWS&S Act and levy of sewerage cess on the appellant for the same
act of discharging of the same sewage, would therefore amount to a
double levy on the industrial units.
VASANT CHEMICALS LTD v. MD, HYDERABAD METROPOLITIAN
WATER SUPPLY & SEWERAGE BOARD [R. BANUMATHI, J.]
9. On behalf of the respondent Board, learned senior counsel Mr.
Gourab Banerji submitted that the appellant industry, obtaining bulk water
supply from the Board and discharging sewage into the sewer line of the
Board, is liable to pay sewerage cess under Section 55 of the HMWS&S
Act. It was submitted that since after partial treatm ent at JETL, the
effluents are let into the sewer line of the Board through w hich the
effluents are carried to Sewerage Treatment Plant (STP) at Amberpet
for further treatment, the appellant is connected to the sewerage system
of the Board and is liable to pay sewerage cess under Section 55 of the
HMWS&S Act. It was contended that Clause 16 of the agr eement
incorporates the levy under Section 55 of the HMWS&S Act and th e
Rules and Regulations thereunder and as per the terms of the agreement
also, the appellants are liable to pay sewerage cess. Insofar as the plea
of double taxation, it was submitted that the JETL was not a party to the
writ petitions filed by the appellant and the subsequent writ petition in
WP(C) No.17381/2004 filed by the JETL inter alia challenging the
sewerage surcharge under various agreements was already dis missed
for default by the High Court.
10. We have carefully considered the submissions and perused
the impugned judgment and materials on record. The following points
arise for determination in these appeals:-
(i) Whether the appellant is right in contending that the appellant
unit is not connected to the sewerage system of the Board and
so the levy of sewerage cess on the appellant under Section
55 of HMWS&S Act is not sustainable?
(ii) Whether the appellant is right in contending that since the
appellant’s unit is not served by a sewerage system of the
Board, as per proviso to Section 55 of HMWS&S Act, no
sewerage cess can be levied?
(iii) Whether the charges collected from JETL unde r the
agreement dated 31.08.2000 is in effect, sewerage cess in
terms of Section 55 of HMWS&S Act, thereby amounting to
double levy of sewerage cess/charge for the same service/
same taxable amount?
Appellant’s statutory liability to pay sewerage ces s and
Re: contention: Appellant is covered by the proviso to S ection
55 of the Act
761
11. Section 55 of the HMWS&S Act contemplates levy o f
sewerage cess on the occupier of the premises from where the sewage
or industrial effluents, as the case may be, are let into the sewer facility
provided by the Board by any means whatsoever irrespective of fact
whether or not the area is served by sewerage system of t he Board.
Section 55 of HMWS&S Act reads as under:-
“55. Charges towards the use of sewerage cess—
Every occupier of both domestic and non-domestic premises shall
pay to the Board at the rate not exceeding thirty five percent of
the bill charging for the water consumed or at such rate as may
be prescribed by rules, to defray the capital cost of sewerage and
sewage treatment works undertaken by the Board and the
operation and maintenance of the sewerage system from time to
time:
Provided that no such charges shall be levied in any premises
situated in the areas which are not served by the sewerage system
of the Board.”
12. Admittedly, the appellant industry has obtained sanction f or
bulk water supply connection from the Board for the supply of 36,200
gallons of water per day @ Rs.12/- per kilo litre for the manufacture of
dye and other chemicals. In terms of the sanction of water supply to the
appellant, an agreement was entered into with the respondent-Board on
27.04.1995 stipulating the conditions and the payments required to be
made in terms thereto. The agreement provides for payment of sewerage
cess in accordance with Section 55 of the HMWS&S Act. Clause 16 of
the agreement mandates the Board to collect sewerage ces s from the
appellant-industry in terms of Section 55 of the HMWS&S Act. Clause
17 of the agreement makes it obligatory on the part of the appe llant to
avail the facility of the Board if it is located within thirty-five meters
from the Board’s sewerage system. Clauses 16 and 17 read as under:-
“Clause 16. In accordance with the provisions of Section 55 of
the HMWSSA Act, 1989, the consumer shall pay sewerage cess
along with water charges at the rate of 20% of the water charges
or such other rates as may be prescribed and determined by t he
Board from time to time.
Clause 17. It shall be obligatory on the part of the consumer to
avail the sewers facility provided by the Board if the premises of
VASANT CHEMICALS LTD v. MD, HYDERABAD METROPOLITIAN
WATER SUPPLY & SEWERAGE BOARD [R. BANUMATHI, J.]
the consumers are located at a distance less than 35 metres away
from the Board sewer line to any point of the boundary of the
consumer premises.”
13. Appellant industry and other industrial units are producing
chemicals, bulk pharmaceuticals and dye intermediates causi ng heavy
pollution. In order to comply with the provisions of Water Act, 1974, the
industrial effluents discharged by the appellant industry and others are
to be treated otherwise the industrial units will be violating various laws
governing the treatment and disposal of sewage including protection of
environment. The issue pertaining to pollution, discharge of effluents in
the State of Andhra Pradesh including the industrial region of Jeedimetla
was the subject matter of a proceeding before this Hon’ble Court being
Writ Petition (C) No.1056 of 1990, in the matter of Indian Council for
Enviro/legal Action and Others . In the said proceedings, a joint action
plan was proposed by the CPCB, New Delhi and APPCB and a common
effluent treatment plant was ordered to be set up. As th e industries
were sending their untreated effluents into the sewer, dire ctions were
given that the A.P. Pollution Control Board would not accept the effluents
unless these conform to the standards prescribed by the Boar d vide
Indian Council for Enviro Legal Action and others v. Union of India
and others , (1998) 9 SCC 580. Similar problem arose in the case of
World Saviors v. Union of India and others (1998) 9 SCC 247. In
order to comply with the provisions of the Water Act, 1974 and the
Environment Act, 1986 and in order to carry the industrial sewage to the
Board’s sewer trunk, a dedicated pipeline to the extent of 1 0.38 kilo
meters from JETL to Kukatpally and Sanathnagar Main Line was laid.
The cost of laying the pipeline is stated to be Rs.346 lakhs out of which
contribution of the JETL was Rs.75 lakhs and the balance amount was
contributed by the Board and the Government of Andhra Pradesh. This
dedicated pipeline became operational from 31.01.1998. The pipeline
from JETL to Balanagar is a dedicated pipeline used exclusively by the
JETL. As per the agreement entered into with the Board, the management
of the JETL pays the amount to the Board towards su rcharge for
discharging partially treated effluents from JETL into Board sewer and
also for maintenance of the sewerage system. After t he industrial
effluents are partly treated at JETL, the industrial effluents ar e let into
the dedicated pipeline belonging to the Board system at Balanagar and
from there, the sewage is let into 1000 mm diameter sewage trunk main
763
belonging to the Board through which the effluents are carried to
Sewerage Treatment Plant (STP) at Amberpet.
14. “A ‘trunk sewer’ is one which bears the same relation to an
entire sewer system that the trunk of a tree bears to its branches, or the
main stream of a river bears to its tributaries. It is sometimes called a
‘trunk line sewer,’ an ‘intercepting sewer,’ or a ‘trunk line intercepting
sewer”. “ Ref: Environmental & Pollution laws in India by Justice T.
S. Doabia (2 nd Edition-2010) published by LexisNexis Butterworths
Wadhwa, Volume 1 at page no.1054 .” Graphic description of the
sewerage connection is as under:-
15. As per Section 55 of the HMWS&S Act, the following essential
ingredients are to be satisfied for levy of sewerage cess:-
1. There has to be an occupier domestic or non-domestic premise;
2. There should be consumption of water by such occupier;
3. The rate to be charged would be up to 35% of bill for water
consumed or at such rate as may be prescribed by rules; a nd
4. The amount collected is towards:- (a) defraying capital cost of
sewerage and sewerage treatment works undertaken by the
VASANT CHEMICALS LTD v. MD, HYDERABAD METROPOLITIAN
WATER SUPPLY & SEWERAGE BOARD [R. BANUMATHI, J.]
Board; and (b) for operation and maintenance of sewerage
system from time to time.
16. The appellant being an occupier of a “non-domestic premise”
having bulk water supply connection from the Board and “a consumer
of water” and eventually discharging sewage effluents into t he sewer
line of the Board, the essential ingredients of Section 55 are thus satisfied.
The levy of sewage cess by the respondent is a statutory levy which the
appellant is liable to pay under Section 55 of HMWS&S Act. Clause 16
of the agreement provides for payment of sewerage cess i n terms of
Section 55 of the Act which inter alia stipulates that the appellant is
required to pay sewerage cess in accordance with Section 55 of the
Act. The sewerage cess of 35% levied by the Board for carry ing the
sewage of the acceptable quality through its transmission system is thus
both statutory and in terms of the agreement between the appellant and
JETL.
17. Contention of the appellant is that it is not liable to pay sewerage
cess to the Board as it is not letting out the sewage ef fluents to the
sewage system of the Board but is carrying the effluents in the t anker,
lorries and letting it out in the effluent treatment of JETL and thus is not
connected with the sewage line of the Board. Mr. V. Giri, learned senior
counsel for the appellant contended that the appellant industry is not
connected with sewerage system of the Board and therefore, l evy of
sewerage cess under Section 55 of the HMWS&S Act is not sustainable.
Drawing our attention to the finding of the High Court “that there is no
sewerage line of HMWS&SB connecting the appellant’s premises
to the sewerage system of HMWS&SB…..” , the learned senior counsel
for the appellant submitted that since there is no sewer or drainage line
connecting the appellant industry, proviso to Section 55 of the HMWS&S
Act applies and no sewerage cess is leviable. It was further s ubmitted
that even assuming that the dedicated pipeline from JETL for carrying
its treated effluents to the sewerage system of the Bo ard at Balanagar
is a “sewerage system of the Board” which is more than two kilo
meters from the premises of the appellant industry, JETL is separately
paying the surcharge and the appellant is not connected with the sewerage
system and therefore, there cannot be levy of sewerage ces s on the
appellant under Section 55 of the HMWS&S Act.
18. As pointed out earlier, admittedly, the appellant has obtained
bulk water supply connection from the Board for supply of 36,200 gallons
765
of water per day @ Rs.12/- per kilo litre. It is also adm itted that the
appellant is discharging its industrial effluents into the Board sewer line.
The appellant being an occupier of the premises who is consuming water
and discharging sewage into the sewerage system of the Board, in terms
of Section 55 of the HMWS&S Act, is liable to pay sewerag e cess.
Though the pipeline from JETL to Kukutpally/Balanagar is stated to be
the dedicated pipeline, as pointed out earlier, this was laid at the cost of
Rs.346 lakhs, out of which, JETL has paid only Rs.75 lakhs. The rest of
the cost was borne by the Board and the Government of Andhra Pradesh.
It is pertinent to note that Clause 4 of the agreement dated 31.01.1998
between JETL and the Board categorically stipulates that the dedicated
pipeline from JETL to Kukutpally/Balanagar belongs to the Board.
19. As per Section 54 of the Act, sewage which is likely to damage
or interfere with the free maintenance of the sewerage s ystem of the
Board cannot be passed into the Board sewer and sewage trea tment
works. In terms of Section 54 of HMWS&S Act, Clause 19 is als o
incorporated in the agreement dated 27.04.1995 between the appellant
industry and HMWS&SB. As per Clause 19 of the agreeme nt, no
effluents shall be discharged into the Board’s sewerage sys tem unless
such effluents are treated in accordance with the provisions of the Water
Act, 1974. Clause 19 reads as under:-
“19. No effluent shall be discharged into the Board sewer unless
such effluent is treated in accordance with the provisions of Water
(Prevention and Control of Pollution) Act, 1974 rela ting to
discharge and disposal of industrial effluents and other
objectionable effluents. Further, the treatment shall also conform
to the IS specification laid down from time to time for disposal of
effluent into the domestic sewer of the Board.”
Admittedly, JETL is neither a consumer of bulk water supply nor
generating any sewage/industrial effluents of its own. The effluents of
the appellant industry are not of acceptable standards for tra nsmission
system of the Board. Before the effluents of the appellant industry are
to be let into the sewer line of the Board, the appellant industry has to
get the effluents treated at its own cost to bring the quality of the effluents
to an acceptable level. After getting partial treatment from JETL, the
effluents are let into the said dedicated pipeline which be longs to the
Board at Kukutpally/Balanagar and then they are let into 100 0 mm
diameter sewage trunk belonging to the Board through which the effluents
VASANT CHEMICALS LTD v. MD, HYDERABAD METROPOLITIAN
WATER SUPPLY & SEWERAGE BOARD [R. BANUMATHI, J.]
are carried to Sewerage Treatment Plant (STP) at Amberpet measuring
a distance of 18.90 kilo meters. The length of the pipeline from JETL to
Amberpet is 29.28 kilo meters. Though the appellant’s unit is not directly
connected with the Board sewer line, the industrial effluent s of the
appellant unit partially treated at JETL are ultimately let into the Board
sewer line which is finally carried to STP at Amberpet. In the light of
this admitted factual position, the appellant is liable to pay sewerage
cess under Section 55 of the Act. Proviso to Section 55 of t he Act
contemplates that the sewerage cess shall not be levied on the occupier
of the premises if such premises is stated to be in an area wh ich is not
served by the sewerage system of the Board. The proviso implies that
the occupier of such premises cannot use the Board sewer by any means
whatsoever. Therefore, the contention of the appellant that it is not liable
to pay sewerage cess to the Board as it is not directly letting out sewage
effluents into the sewage line of the Board and that it is carrying its
effluents in the tanker, lorries and letting out in the efflue nt treatment
plant of JETL and thus not connected with the sewage system of the
Board, in our view, is wholly untenable. Since the sewage of the appellant
is ultimately let into the sewer line of the Board, the appel lant cannot
contend that it is not covered under Section 55 of the Act and that it is
covered under proviso to Section 55 of the Act.
20. Placing reliance upon Ultra Tech Cement Ltd. v. State of
Maharashtra and another, (2011) 13 SCC 497, learned senior counsel
for the appellant contended that when a particular cess is leviable under
an enactment and the said enactment exempts a specific class of persons
from paying the said cess, the State Government cannot make the lessee
liable to pay the said cess on the ground that the agreement was entered
into under a different enactment. Placing reliance upon paras (12) an d
(20) of the said judgment, it was contended that there is no s ewer or
drainage line connecting the appellant’s units or any other industry in
Jeedimetla Effluent Treatment Limited to the sewerage system of
HMWS&SB and neither the appellant nor other industries disc harge
their sewage into the sewer line of the Board and, therefore, the
appellant’s unit is covered under proviso to Section 55 of the HMWS&S
Act. The learned senior counsel further contended th at any fiscal
extraction is required to be constructed strictly in accordance with the
provisions of the charging section and even if a clause for such payment
is incorporated into the agreement as the agreement is sub ject to the
provision of the relevant charging section.
767
21. The above argument proceeds on the presumptive footing as
if the appellant’s unit is covered under proviso to Section 55 of the
HMWS&S Act. Proviso to Section 55 of HMWS&S Act states that no
charge would be levied in any premises situated outside the sewage
system/not served by the sewerage system of the Board. It has to be
seen whether the appellant is right in contending that the appellant industry
is not connected with the sewerage line of the Board and that no sewage
of the appellant is let into the sewerage system of the Board and therefore,
the appellant is covered under proviso to Section 55 of HMWS&S Act.
22. In the process of letting out effluents, two things are involved
namely – (i) the treatment of industrial effluents to bring down the contents
of the effluents to an agreed specification on one part; and (ii) the
transmission of those partially treated industrial effluents through the
sewerage system of the Board. Parties have entered into various
agreements and there are three sets of agreements which are as under:-
23. Let us now consider the effect of the agreement between the
appellant and JETL on the statutory liability of the appellant under Section
55 of the Act. The agreement between the appellant and JETL for partial
treatment of appellant’s industrial effluents is the internal contractual
agreement between JETL and the appellant. The appellant unit i s to
treat and process the industrial effluents and brin g them down to
permissible standard limits in accordance with the provisions of Water
Act, 1974 and Environment Act, 1986 relating to discharge and disposal
of industrial effluents and other objectionable effluents into sewers before
discharging of the effluents into the Board sewer. The treated effluents
should also have to conform to the IS specification laid down from time
S. No. Parties Date of
Agreement
1. M/s. V asant Chemicals Ltd. and
HMWS&S Board
27.04.1995
2. M/s. V asant Chemicals Ltd. and
Jeedimetla Effluent Treatment Ltd.
(JETL)
22.01.1996
3. Jeedimetla Effluent Treatment Ltd.
(JETL) and HMWS&S Board
31.01.1998
and
31.08.2000
VASANT CHEMICALS LTD v. MD, HYDERABAD METROPOLITIAN
WATER SUPPLY & SEWERAGE BOARD [R. BANUMATHI, J.]
to time for disposal of effluent into the domestic sewer of the Board. To
discharge their contractual obligation in bringing the industrial effluents
to permissible standard limits, the appellant unit entered into an agreement
dated 22.01.1996 with JETL engaging it to treat its industrial effluents in
accordance with the environmental laws in force. The appellant instead
of treating the effluents at its premises at its own cost engaged JETL for
treating its effluents. Thus, for its convenience, the appellant unit has
entered into an agreement with JETL for treating its ef fluents and the
charges paid by them to JETL are towards the treatment of effluents
and bring it to permissible standards. Therefore, the function of JETL is
that of an intermediary with whose assistance, the appellant is discharging
its statutory obligation.
24. Admittedly, the appellant’s industrial effluents are carried to
JETL in closed tankers and after partial treatment at JETL, let into the
Board’s sewer line. Admittedly, the effluents of the appellant’s unit are
not of acceptable standards for transmission through the sewer line of
the Board and therefore, the appellant’s industry and other i ndustries
have to get the effluents treated at their own cost to bring the quality of
the effluents to an acceptable level by treating the same to some extent.
The sewerage cess of 35% levied by the Board is for c arrying the
sewerage of acceptable quality through its sewer line and further treating
it at STP at Amberpet.
25. The sewerage cess aims to recover the cost of treating the
effluents of strength stronger than domestic sewage and to make t he
effluents of acceptable quality. In addition to partial treatment at JETL,
the effluents require further treatment and their transmissi on to Sewer
Treatment Plant (STP) at Amberpet situated at 18.90 kms fr om Bala
Nagar which requires huge finance. The maintenance of sewer line is
highly essential for proper transmission of the effluents fr om JETL to
Board’s sewer system at Amberpet where the Board brings do wn the
industrial effluents to the tolerance limits. It requires huge amount to
maintain the STP treatment of industrial effluents. Further, it requires
high demand of energy, STP personnel to operate and maintain the
system, skilled and unskilled workers for proper maintenance of the plant.
The respondent-Board unless it collects sewerage cess and other charges
cannot meet the heavy expenditure on the operation and maintenance of
sewerage system. The liability of the appellant to pay sewerage cess to
the Board arises from the Statute and also by way of an agreement
which was agreed upon by the appellant. There is no merit in the
769
contention of the appellant unit that its liability has ended upon transferring
the industrial effluents to the respondent-JETL and that it is not connected
to the Board’s sewer line. As discussed earlier, the par tially treated
effluents of the appellant’s unit are ultimately let into the sewer line
provided by the Board which is being carried to Amberpet STP for further
treatment and discharge. After partial treatment at JETL, when appellant’s
effluents are let into the Board’s sewage system, the appel lant is not
justified in contending that it is not connected to the sewer li ne of the
Board and hence, covered under the proviso to Section 55 of the Act.
26. It is well-settled that the normal function of a proviso is to
except something out of the enactment. While consid ering the
interpretation of the proviso, in Romesh Kumar Sharma v. Union of
India and others, (2006) 6 SCC 510, this Court held as under:-
“12. “ 10 . The normal function of a proviso is to except something
out of the enactment or to qualify something enacted therein which
but for the proviso would be within the purview of the enactment.
As was stated in Mullins v. Treasurer of Surrey (1880) 5 QBD
170 (referred to in Shah Bhojraj Kuverji Oil Mills and Ginning
Factory v. Subbash Chandra Yograj Sinha AIR 1961 SC 1596
and Calcutta Tramways Co. Ltd. v. Corpn. of Calcutta AIR
1965 SC 1728 , when one finds a proviso to a section the natural
presumption is that, but for the proviso, the enacting part of the
section would have included the subject-matter of the prov iso.
The proper function of a proviso is to except and to deal w ith a
case which would otherwise fall within the general language of
the main enactment and its effect is confined to that case. It is a
qualification of the preceding enactment which is expressed i n
terms too general to be quite accurate. As a general rule, a proviso
is added to an enactment to qualify or create an exception t o
what is in the enactment and ordinarily, a proviso is not interpreted
as stating a general rule. ‘If the language of the enacting part of
the statute does not contain the provisions which are said to occur
in it you cannot derive these provisions by implication from a
proviso. …’ said Lord Watson in West Derby Union v.
Metropolitan Life Assurance Society 1897 AC 647. Normally,
a proviso does not travel beyond the provision to which it is a
proviso. It carves out an exception to the main provision to which
it has been enacted as a proviso and to no other……”
VASANT CHEMICALS LTD v. MD, HYDERABAD METROPOLITIAN
WATER SUPPLY & SEWERAGE BOARD [R. BANUMATHI, J.]
27. The sewerage cess levied under Section 55 of the HMWS&S
Act is a statutory levy on the appellant as it satisfies the essential
requirements of Section 55 of the Act. The agreement/contract between
the appellant’s unit and JETL does not take away the appellant from the
network of the Board’s sewer line and its “ use and treatment of
sewerage ” of the Board’s sewerage system. Where the appellan t’s
effluents are being eventually sent to the Board’s sewer, the contention
of the appellant that its premises are not served with a sewer line by the
Board defies logic and runs contrary to the object of the Act. The
appellant, being an occupier of non-domestic premises, is consuming the
water provided by the Board, generating the industrial effluents and using
the Board’s sewer to release them after partial tre atment. In such an
admitted position, the appellant cannot escape from the statutory levy by
taking a technical approach and interpreting the proviso as a general
rule where it is merely a qualifying one. As the appellant eventually lets
out its effluents to the Board’s sewerage system, the ap pellant is not
right in contending that it is covered under proviso to Section 55 of the
Act.
28. Re: Contention – Levy of double taxation:- Learned senior
counsel for the appellant contended that even assuming that the dedicated
pipeline of JETL which connects to the sewerage system of the Board
at Balanagar is construed to be “Sewer”, any levy of sewerage cess is
applicable only to JETL and JETL under its agreement with HMWS&SB,
is paying surcharges and sewerage charges to HMWS&SB by collecting
the said amount from the appellants and other industries for the said
taxable event. It was submitted that under Section 55 of HM WS&S
Act, the sewerage cess is collected for the – (i) to defray capital cost of
sewerage; (ii) for sewage treatment works undertaken by the Board;
and (iii) for operation and maintenance of the sewerage syst em. It is
contended that under its agreement dated 31.08.2000 with the Board,
JETL is paying various charges like - (i) sewerage connection charges;
(ii) charges towards maintenance of sewer line; (ii i) sewerage
maintenance and water treatment charges; and (iv) sewerage surcharge
for effluents above a certain level. It was contended that various charges
paid by JETL to the Board is in essence “sewerage cess”, though it is
collected under different head “sewerage surcharge ”.
29. Taking us through Clause 4 of the agreement with Board dated
31.08.2000, Mr. Guru Krishna Kumar, learned senior counsel appearing
771
for JETL submitted that under agreement dated 31.08.2000, vari ous
charges are collected and it additionally provides for levy of surcharge
also. It is contended that even though these charges may not be christened
as a sewerage cess, they are in effect correspond to the es sentials of
“sewerage cess” in Section 55 and a levy of cess from the appellant
for the same act of disposal of the sewage would therefore amount to a
double levy on the industrial units. The learned senior counsel submitted
that sewerage cess cannot be exacted from the appellant b ecause it is
already been paid by JETL. It was urged that various charges levied on
JETL are excessive arbitrary apart from the fact that there is a double
levy.
30. As rightly contended by learned senior counsel for the
respondent-Board, the plea of double payment of sewerage ces s was
never raised in the writ petition filed by the appellant; but it was raised
by way of oral submission before the High Court and thereafter, by way
of review petition. The plea of double levy was rightly rejected b y the
High Court inter alia holding that “ even assuming for a moment that
the petitioner-company is paying some amounts to the JETL, it cannot
be said that it is towards sewerage cess ”.
31. As pointed out by the learned senior counsel for the respondent-
Board, JETL never sought to implead itself as a party respondent in the
writ petition filed by the Board. It is also pertinent to point out that one
Mr. G.K.B. Chowdary who was then the Managing Director of the
appellant-group of companies, was also the Managing Director of JETL.
It passes one’s comprehension as to why JETL whose Managing Director
is the same as the Managing Director of the appella nt Group of
Companies had not taken any step to get themselves impleade d in the
writ petition before the High Court and raise the plea of double taxation.
32. In the Supreme Court, notice was ordered on 07.07.2004 and
permitted the appellant to implead JETL as party respondent . It was
thereafter, JETL filed writ petition in WP(C) No.17381/2004 (24.09.2004)
inter alia for various reliefs:- (i) That clauses 28 and 29 of the agreement
dated 10.06.2003 between the petitioner company Jeedimetla Efflu ent
Treatment Limited and HMWS&SB as shylockin and unconscionable,
usurious, exorbitant, unconstitutional, ultra vires the pow ers of the
HMWS&SB; and (ii) That the action of the HMWS&SB in collecting
various charges under Clause 4 of the agreement and other char ges
levied upon JETL. The said writ petition that kept pendi ng for many
VASANT CHEMICALS LTD v. MD, HYDERABAD METROPOLITIAN
WATER SUPPLY & SEWERAGE BOARD [R. BANUMATHI, J.]
years came to be dismissed by the High Court’s order dated 21.12.2015
for non-prosecution. JETL has also filed WP(C) No.2 0117/2017
challenging the enhancement of sewerage surcharge and the said writ
petition is also said to have been dismissed on 25.06.2014.-
33. Since, elaborate arguments were advanced regar ding
“excessive and arbitrary levy on JETL” as well as the p lea of “double
levy of sewerage cess”, we have also considered the matter on m erits.
Based on three sets of agreements between the parties, ther e are three
kinds of payments as under:-
a) Payment of sewerage cess by the appellant to the Boar d in
terms of Section 55 of the HMWS&S Act and Clause 16 of
the agreement dated 27.04.1995;
b) Payment of treatment and processing service charges by the
appellant unit to JETL as stipulated in Clause 19 of the
agreement between the appellant and JETL dated 01.04.2000;
and
c) Various charges paid by JETL to the Board pursuant to the
agreement dated 31.08.2000 and the earlier agreements.
So far as the payment by the appellant unit to the Board, it is the
statutory liability of payment of sewerage cess in terms of Section 55 of
HMWS&S Act and Clause 16 of the agreement which obligates th e
appellant unit to pay the sewerage cess in terms of Se ction 55 of the
HMWS&S Act. The appellant having bulk water supply connection
from the Board and being “consumer of water” and discharging sewage/
effluents into the sewer line of the Board, the payment of s ewerage
cess by the appellant unit is the statutory liability under Section 55 of the
HMWS&S Act and Clause 16 of the agreement.
34. Insofar as the charges paid by the appellant to JETL for the
treatment and processing of its effluents, it is purely contractual pursuant
to the agreement entered into between the appellant unit and JETL dated
01.04.2000 and the earlier agreement dated 22.01.1996. As pointed out
earlier, the appellant unit is obligated to treat and process the industrial
effluents and bring them down to permissible standard limits in accordance
with the provisions of the Water Act, 1974 and Environment Act, 1986
before they are let into the sewer line of the Board. To disc harge its
statutory as well as contractual obligation, the appellant unit has entered
773
into agreement with JETL for the treatment and processing of appellant’s
effluents before being let into Board’s sewer line. Payment of charges
by the appellant to JETL is purely contractual between the parti es and
the same cannot be considered to be in deference to the statu tory cess/
statutory charge which can only be levied by the Board. In this regard,
the High Court has rightly observed that assuming that the appellant is
paying some amount to JETL, the same cannot be termed as “sewerage
cess”.
35. So far as payment of charges by JETL to the respondent
Board, the same is governed by the terms and conditions of the agreement
between JETL and the Board dated 31.08.2000. JETL’s contention is
two fold: - (i) levy of various charges under the agreement is arbi trary
and exorbitant; and (ii) double levy of sewerage cess. The gi st of the
terms and conditions of the contract dated 31.08.2000 between JETL
and the Board and various charges levied are as under:-
1. Clause 4 specifically stipulated that JETL shall be char ged
towards overall proportionate sewerage maintenance a nd
sewerage treatment charges being incurred by the Board from
time to time on the overall sewerage system of the Board;
2. In terms of Clause 4, the Board has levied sewerage connection
charges @ Rs.4/- per litre for the discharge into the Boar d
sewer (6 equal installments of Rs.23.34 lakhs each by 10 th of
each month) – Total Rs.140.04 lakhs;
3. Clause 18 stipulates that no treated effluent shall be discharged
by JETL unless the same is treated in accordance with the
provisions of the Water and the Air Acts and the various upper
limits of the parameters of the treated industrial effluents shall
be within the permissible standard limits prescribed; Further,
Clauses 22 to 24 give the Board the right to reject effluents of
JETL if they are not found to be consistent with the prescribed
parameters;
4. In terms of Clause 28, an amount of rupees one lakh per month
is to be paid by JETL towards maintenance of the sewer line.
Additionally, JETL has to pay sewerage maintenance and
sewerage treatment charges @ Rs.6 per thousand litres of
treated effluents;
VASANT CHEMICALS LTD v. MD, HYDERABAD METROPOLITIAN
WATER SUPPLY & SEWERAGE BOARD [R. BANUMATHI, J.]
5. Further, as per Clause 29, a surcharge was also levied on JETL
for permitting industrial effluents beyond the limits prescribed
on two important parameters viz. Chemical Oxygen Demand
(COD) and Total Dissolved Solids (TDS); Each parameter/
COD and TDS will be considered independent for levy the
surcharge.
36. In terms of Rule 4 of Sewerage Rules, the Board shall charge
on the applicants seeking to discharge the trade or industri al effluents
etc. Rule 4 reads as under:-
“Sewerage and Industrial Effluents-
4. The Board shall charge on applicants seeking to discharge their
trade or industrial effluents, sullage drain, sewer (other than storm
sewer or combined sewer) of a private party, State Government,
Central Government, or local body or local authority, into Board
sewers, towards the special treatment cost of such sewage a nd
the charges shall be as fixed by the Board from time to t ime,
depending upon the nature of such sewage and cost of treatment
involved to bring the same within tolerance limits of efflue nt
standards etc. The installation and maintenance of required meters
for measuring the volume of effluents shall be insisted at the cost
of the applicants, by the board.”
Subject to the provisions of Water Act, 1974 and Environment
Act, 1986 and subject to the restrictions of Section 54 of HMWS&S Act
and in terms of Rule 4 and other terms and conditions, Board ha s the
right to permit the ‘ applicants’ seeking to discharge their trade or
industrial effluents into the Board’s sewer system and Sewerage
Treatment Plant subject to the imposition of costs. The tr eatment for
letting the trade or industrial effluents into the Board’s sewer shall be
subject to such terms and conditions and in such form of agreement as
may be prescribed in the regulations made by the Board in accordance
with these rules. Having entered into the agreement with the Boar d on
31.08.2000 and on prior dates, JETL cannot turn around and challenge
the terms and conditions imposed upon it by virtue of the agreement.
37. So far as the various payments made by JETL to the Bo ard,
levy is in terms of Rule 4 of the Sewerage Rules and as per the contract
and is purely contractual between JETL and the respondent Board f or
letting partially treated the industrial effluents of the appellant and other
775
units into the Board’s sewer. Likewise, charges paid by JETL to the
Board cannot be said to be in lieu of the sewerage cess that the appellant
unit is liable to pay which is a statutory liability. It is pertinent to note
that many industries about fifty units, apart from the ap pellant unit,
discharge their effluents to the CETP/JETL. The agreeme nt dated
31.08.2000 and the earlier agreements between JETL and the Boar d
are purely contractual consciously entered into between the parties.
38. JETL lets partially treated effluents into the Board’s sewerage
system for further treatment. As discussed earlier, for further treatment
of sewerage, the effluents are to be taken to Sewerage Treatment Plant
(STP) at Amberpet which is situated at the distance of 08.30 kilometres
from Balanagar. It requires huge amount for transmission of the effluents
to Board’s sewer system at Amberpet where the Board brings down the
industrial effluents to tolerance limits. As pointed out earlier, the treatment
of industrial effluents requires high demand of energy, person nel to
operate the system and skilled workers for maintenance of the plant.
Unless the Board collects sewerage charge/sewerage surcha rge, the
Board cannot meet the heavy expenditure on the oper ation and
maintenance of sewerage system. Various other members of JETL
who discharge sewage into JETL which is ultimately let into Board sewer
line, may or may not be consumers of water supply by the Board. That
apart, members of JETL may have their own source of water supply or
they may supplement the supply of water from the Board through different
sources either by extraction of ground water or supply through tankers
which cannot be quantified by the Board. In pursuance of the provisions
of the HMWS&S Act and the Sewerage Rules and pursuant to t he
agreement dated 31.08.2000, the charges are levied on JETL who in
turn collects the charges from its member industrial units who discharge
their effluents into JETL. Therefore, the payments made by JETL to
the Board and the charges in turn collected by JETL from the appellant
and other member units, cannot absolve the appellant unit from its
statutory liability to pay the sewerage cess. We find no merit in the
contention that there is double levy of sewerage cess.
39. Levy of sewerage cess being a statutory levy in terms of
Section 55 of HMWS&S Act and Clause 16 of the agreement wh ich
incorporates the statutory levy under Section 55 of HMWS&S Act, the
learned Single Judge and the Division Bench rightly recorded concurrent
findings upholding the levy. Observing that the appellant being occupier
VASANT CHEMICALS LTD v. MD, HYDERABAD METROPOLITIAN
WATER SUPPLY & SEWERAGE BOARD [R. BANUMATHI, J.]
of the premises, though not directly connected to the sewer line of t he
Board, is ultimately letting into the sewerage system of the Board after
partial treatment at JETL, the High Court was right in holding that the
levy of sewerage cess is in accordance with Section 55 of HMWS&S
Act. The payment of sewerage surcharges and the other charg es by
JETL cannot take away the statutory liability of sewerage cess levied
on the occupier of the premises who consumes water and l ets out the
sewage into the Board sewer system. The payment of sewerage
surcharge and other charges by JETL to the respondent-Board will not
amount to double levy and the High Court rightly dismissed the writ
petitions and also the review petitions filed by the appellant. The impugned
order does not suffer from any infirmity warranting interference.
40. In the result, these appeals are dismissed. The arrears of
sewerage cess, if any, to be paid by the appellant within a period of eight
weeks from today with 6% interest with effect from the d ate cess fell
due. If the arrears are not paid within the stipulated period of eight weeks,
it shall carry interest at the rate of 12% thereafter.
Nidhi Jain Appeals dismissed.