Anil Kumar v. Union of India & Ors.
DR. DHANANJAYA Y. CHANDRACHUD, J.
1. Leave granted.
This appeal arises from the judgment of a Division Bench of the
High Court of Judicature at Patna dated 3 January 2018 in a Let ters
Patent Appeal 1.
2. The father of the appellant, Lalan Pandey, had constructed a
two storied house together with a part of a third floor on Plot No. 1844,
appurtenant to Khata No. 228, ad-measuring 0.06 acres, situated a t
Mauza-Pakri, Ara in the District of Sasaram in Bihar. The land over
which the residential house was constructed was acquired in 2006 for
the Ara-Sasaram Railway Project.
3. On 7 June 2008, the Collector Bhojpur, Ara submitted a list of
persons displaced in consequence of the project undert aken by the
Railways. The name of the appellant’s father occurred at serial no. 8 in
the list of persons whose residential houses had been fully demolished.
A communication was issued on 8 August 2008 by the Executive Engineer
(Construction), East Central Railway, Ara to the Deputy Chief Engineer
recommending the case of the appellant for appointment in service in
terms of a policy circular of the Railway Board dated 19 April 2006.
4. Since the letter dated 7 August 2008 contains a statement of
relevant facts, the letter is extracted below:-
“The house of Sh. Lalan Pandey s/o Late Ram Naresh Pandey
of village Jagdeo Nagar, Pakri, Ara is coming centrally in the
alignment of Ara-Sasaram New Railway line with following land
details:
Khata No. 228 Khesara No. 1844/32
P.S. No. 236 Pakri (ARA)
1 Letters Patent Appeal No. 1929/2016 in Civil Writ Jurisdiction Case No. 25313/2013
1157
The complete demolition of the house is required for construction
of new line at this location.
Sh. Lalan Pandey s/o Late Ram Naresh Pandey has demolishe d
about 90% part of the house constructed in a two kattha land with
covered area approximate 1110 sq. feet. He had two-storied
building with part construction in third story.
Sh. Lalan Pandey, s/o Late Ram Naresh Pandey is a completely
displaced person due to construction of new line and his livelihood
has suffered due to displacement. A report on assessment b y
DLAO/Ara office regarding size and facilities available at his
demolished house is enclosed for reference.
Vide this office letter under reference above the application was
forwarded for consideration for job in Railway as per the extant
provisions.
His case may be considered for job in Railway in terms of Railway
Board’s letter No. E(NG) II/2002/RC-5/4 dated 19.04.2006 (copy
enclosed)”
5. Between 2008 and 2011, before he died, the appellant’s father
had an exchange of correspondence with the authorities for requesting
them that the benefit of the policy circular of 19 April 2006 be granted
since his entire house had been demolished. After his father died on 15
May 2011, the appellant instituted a writ petition before the High Court 2
seeking that relief.
6. After a counter affidavit was filed in the proceedings, the High
Court by its order dated 11 December 2012 directed that the c laim of
the appellant should be considered by the General Manager, East Central
Railways, Vaishali at Hazipur for the grant of Group ‘D’ employment
within a period of three months.
7. The appellant then submitted a representation which was
rejected by an order dated 20 February 2013. The reasons for the
rejection were as follows:-
“(i) As per Annexure-1 (Railway Board Circular No. E(NG) II/
2002/RC-5/4 dated 19.04.2006) “...no cognizance by way of
offering employment to displaced persons should be given wherein
only a strip of land for construction of a line has been acquired...”
2Civil Writ Jurisdiction Case No. 4493/2012
ANIL KUMAR v. UNION OF INDIA & ORS.
[DR. DHANANJAYA Y. CHANDRACHUD, J.]
(ii) In the impugned case a small piece of land measuring 0.06
acre only was acquired in the year 2006 vide Annexure-C (Case
NO.01/2005-06). As such this does not conform to the
requirement of above mentioned Board’s Circular to entitle t he
applicant for job in railway.
(iii) The letter of Executive Engineeer/ Construction No. XEN/C
Ara/AS-6 dated 08.08.2008 cited as Annexure-4 is a r outine
forwarding letter for consideration of the claim for job in railway.
It did not contain any express commitment from administration to
provide job to the claimant.”
8. The appellant then filed a Second Writ Petition 3 challenging an
order of rejection. The Writ Petition was rejected by a lear ned Single
Judge by an Order dated 31 August 2016 which has been affirmed in a
Letters Patent Appeal 4 by the Division Bench.
9. The case of the appellant is based on the policy circulars of the
Union Government in the Ministry of Railways. Initially by a Circular
dated 1 January 1983, the Railway Board dealt with appointment to
Group ‘C’ and ‘D’ posts in the Railways of members of fam ilies who
are displaced as a result of the acquisition of land for the establishment
of projects. Certain guidelines were framed under the policy circular
under which it was envisaged that Zonal Railways and project authorities
may consider applications received from persons displaced on account
of large scale acquisition of land for railway projects, so as to provide
employment to a displaced person or a son, daughter or spouse in Group
‘C’ or Group ‘IV’ posts.
The guidelines are as follows:-
“1. The individual concerned should have been displaced himself
or he should be the son/daughter/ward/wife of a person displaced
from land on account of acquisition of the land by the Railways
for the projects.
2. The dispensation should be limited to recruitments made from
outside in direct recruitment categories and to the first recruitment
or within a period of two years after the acquisition of the l and,
whichever is later.
3Civil Writ Jurisdiction Case No. 25313/2013
4LPA No. 1929/2016
1159
3. It must also be ensured that the displaced person did not derive
any benefit through the State Government in the form of alternative
cultivable land etc.
4. The person concerned should fulfil the qualification for the post
in question and also be found suitable by the appropriate recruitment
committees. In the case of Group C posts for which recruitment
is made through the Railway Service Commission, the Chairman
or the Member of the Railway Service Commission should be
associated in the recruitment.”
10. Subsequently on 19 April 2006, a circular was issued by the
Railway Board in which the earlier guidelines were adverted to and the
issue was revisited. The circular, insofar as it is relevant, reads thus:
“2. The whole issue has been deliberated upon at length in t he
full board meeting and it has been decided that no cognizance by
way of offering employment to displaced persons should be given
wherein only a strip of land (viz., for construction of a line) has
been acquired but the same can be considered in Group D posts
only wherein large area, house or substantial livelihood has been
taken away/snapped in the process.
3. It has further been decided by the board that past cases where
recruitments are already in process or where any commit ment
has been given to provide employment by the competent authority,
such recruitment process should be finalised and employment
provided in Group D posts only to eligible persons.”
11. In the Writ Petition which the petitioner filed before the High
Court, the prayer for mandamus was specifically based on the Railway
Board Circular dated 19 April 2006. The relevant averments in the writ
petition reads thus;
“9. That it is submitted that the Collector, Bhojpur, Ara vide Memo
No. 211 dated 07.06.2008 sent a list of persons whose house was
demolished with recommendation for employment and the list finds
place the name of Lalan Pandey. The Executive Engineer, Cons.,
E.C. Railway, Ara has written a letter dated 08.08.2008 to Dy.
Chief Engineer, Con./E.C. Railway/Danapur mentioning therein
that Lalan Pandey is a completely displaced person due to
ANIL KUMAR v. UNION OF INDIA & ORS.
[DR. DHANANJAYA Y. CHANDRACHUD, J.]
construction of new line and his livelihood has suffered due to
displacement. It was requested for consideration of the
Petitioner’s case for job in Railways in terms of Railway Board’s
letter dated 19.04.2006.”
12. The response of the Railways to the above averment contained
no denial of the averments contained in paragraph 9. Paragraph 10 of
the response reads as follows:-
“10. That with regard to statement made in paragraph 9 of the
writ petition it is stated that the same is a matter of records, hence
there is no comments.”
13. The learned Single Judge rejected the writ petition, observing
that a claim for appointment in service, apart from an ent itlement to
compensation for the acquisition of land, is by way of an exception. The
High Court also held that the policy circular could not be applied since
the acquisition in question was made prior to 2006.
14. The Letters Patent Appeal was rejected by the Division Bench
relying upon the statement of the counsel for the R ailways that
employment had not been provided even in a single case for acquisition
of land for the Ara Sasaram Railway project.
15. Learned counsel for the appellant has, while assailing these
findings submitted that the acquisition was in year 2006 and the case of
the appellant is squarely governed by the policy circular. It was urged
before this Court that the grounds which weighed with the authorities in
rejecting the representation are contained in the speaking order dated 20
February 2013 of the General Manager of the East Central Ra ilway
which was passed in pursuance of the direction of the High C ourt. It
was urged that the policy circular, contrary to what is stated in the order,
would encompass the case of the appellant since the entire ty of the
house belonging to the appellant had been demolished. Hence the fact
that only a strip of land was involved would not disentitle the appellant
for the grant of relief.
16. On the other hand, Ms. Vibha Dutta Makhija, learned senior
counsel appearing on behalf of the respondents submitted that the policy
circular dated 1 January 1983 as well as the subsequent policy circular
dated 19 April 2006 must be read together. It was urged that as a matter
of fact, para 3 of the policy circular dated 19 April 2006 stipulated that
1161
past cases where recruitments were already in proces s and where
commitment had been given to provide employment should be finalised
and employment be provided in Group ‘D’ posts only to th e eligible
persons. In the circumstances, it was urged that the appel lant was not
entitled to the benefit of the policy circular.
17. The policy circular dated 1 January 1983 was specifically
adverted to in the subsequent circular dated 19 April 2006. The subsequent
circular stipulates that the Railway Board had decided that the policy to
offer employment to displaced persons should not cover displaced persons
where only a strip of land had been acquired. At the same time, it stipulated
that the claim can be considered for appointment against a Group ‘D’
post where a “large area, house or substantial livelihood has been taken
away/snapped in the process”. The case of the appellant fell within the
ambit of paragraph 2 of the circular dated 19 April 2006. In rejecting the
application of the appellant, the ground which weighed with the Railway
Authorities was that only a strip of land belonging to the appellant had
been acquired. This is not a correct reading of the circular. The circular
contemplates that when a large area, house or substantial livelihood have
been taken away, the case for providing alternative employ ment in a
Group ‘D’ post would be considered. Those phrases are disjunct ive.
The entire house of the appellant was demolished. It was stat ed that
there was no specific guideline from the Railway authorities to provide a
job in lieu of acquisition of land in Ara-Sasaram project. This was not a
valid ground to reject the claim, once there was a general policy circular
dated 19 April 2006 which held the field.
18. In the counter affidavit that was filed before the High Court,
an additional ground was sought to be urged namely that it was only if an
exception is granted by the Ministry of Railways that t he application
would be considered for appointment in accordance with the prevailing
norms. There is no justification for this submission since it would result
in the exercise of a pick and choose approach, contrary to the policy
circular dated 19 April 2006.
19. For the above reasons, we have come to the conclusion th at
the rejection of the claim of the appellant was contrary to the term s of
the binding policy circular formulated by the Union of India in the Ministry
of Railways. Undoubtedly, the grant of appointment to persons displaced
as a result of acquisition is a matter which is within the purview of the
ANIL KUMAR v. UNION OF INDIA & ORS.
[DR. DHANANJAYA Y. CHANDRACHUD, J.]
policy discretion. No mandamus can lie in the absence of a policy.
However, where a policy has been laid down by the Union government
as in the present case, the terms of the policy can be enforc ed. The
rejection of the claim of the Appellant was for extraneous reasons and
based on irrelevant considerations. Government in the Ministry of
Railways formulated a policy. The failure of implementation results in a
failure of social justice. The policy circulars were substantive attempts
to enhance social welfare. Denial of benefits to the appellant has led to
a long and tortuous road to justice.
20. For the above reasons, we allow the appeal and set aside the
impugned judgment and order of the High Court dated 3 January 2018.
In the facts and circumstances of the case, in consequence, we direct
that the claim of the appellant for appointment to a Group ‘D’ post shall
be implemented within a period of two months from today by granting
an age relaxation, if required.
21. The appeal is, accordingly, allowed. There shall be no order
as to costs.
22. Pending application(s), if any, shall stand disposed of.
Divya Pandey Appeal allowed.