Dr. D.J. De Souza v. Managing Director Cpc Diagnostics Pvt. Ltd.
HEMANT GUPTA, J.
1. Leave granted.
2. The challenge in the present appeals is to a judgment and order
passed by the National Consumer Disputes Redressal Commission 1 on
14.12.2017 and also an order in Review Petition passed on 04.10.2018.
3. The appellant placed an order for purchase of TurboChem 100
Unit in response to quotation submitted by the respondent in the second
week of August 2015. The appellant remitted a sum of Rs. 3, 50, 000/-
towards 50 per cent cost of the instrument. The pre-installation requisite
contemplated the following conditions:
“1. Pre-installation Customer has to
Requisite provide the following:
Efficiently air-conditioned room
1 KVA online UPS for
running of the equipment.
Broadband connection for
“i-track”(Remote
diagnostics Tool)
The equipment will be
provided with “i-track”
Remote, facility at the time
of installation.”
4. The equipment was delivered on 30.09.2015. The se rvice
engineer pointed out that 1000 mv/650 Watt UPS of APC Company
DR. D.J. DE SOUZA v. MANAGING DIRECTOR CPC
DIAGNOSTICS PVT. LTD.
was not suitable and the appellant was advised to purchase 1KVA Online
UPS for usage during power failure. The stand of the appellant i s that
he has got a confirmation from M/s. Awareness Technologies USA, the
manufacturer of the equipment that UPS which the appellant h ad is
suitable but the respondent insisted on installation of 1KVA Online UPS.
The appellant also raised a grievance that there is no on-board laundry
facility present on the instrument, therefore, such instrument is of no use
to him. Therefore, the appellant sought payment of Rs. 3, 50, 000/- along
with 9 per cent interest as well as damages of Rs. 50, 000/-.
5. The District Consumer Disputes Redressal Forum, South Goa
at Margao 2 dismissed the complaint interalia on the ground that the
appellant has not placed copy of the order in support of his plea that on-
board laundry was a part of the equipment. Since, t here was no
commitment on the part of the respondent to supply on-board laundry
facility, the complaint was dismissed. Aggrieved against the order passed
by the District Forum, the appellant filed an appeal before the Goa State
Consumer Disputes Redressal Commission 3. The said appeal was
dismissed on 08.07.2016 when his argument that the respondent has
indulged in restrictive unfair trade practice, was not accepte d. It was
argued that the appellant had one 1KVA UPS purchased on 19.10.2015
but the respondent insisted on installation of Online UPS. The appellant
referred to his correspondence with the manufacturer in USA that UPS
purchased by the appellant is good provided that the instrument i s the
only item hooked up to the UPS.
6. The State Commission found that the appellant placed an order
when the respondent communicated their best offer for Turbochem 100
fully Automated Random-Access Biochemistry Analyser and also
enclosed brochure for reference. It is thereafter, the 50 pe r cent of the
price was paid. In the brochure there is mention of on-board cooling
facility as one of the features but there is no feature of on-board laundry
facility. There is a specific mention of requirement of 1 K VA Online
UPS for running of the equipment. In view of said facts, the l earned
State Commission dismissed the appeal. The further challenge by way
of a Revision before the NCDRC remained unsuccessful. The NCDRC
found that there is no commitment from the respondent about the supply
of instrument with on-board laundry facility and that the appellant has
2 District Forum
3State Commission
381
failed to establish that there was any malfunctioning or manufacturing
defect in the instrument.
7. It was also mentioned that the performance of the instr ument
depends upon the continuous uninterrupted electricity supply which could
be made available through Online UPS. It was advisable to install best
quality Online UPS keeping in view the fluctuation in electricity supply
in the country.
8. Before this Court, the appellant argued that the manufacturer
of the instrument in USA vide an email as Annexure P-10, has
communicated that the UPS purchased by the appellant will be good,
provided the TurboChem 100 is the only item hooked up to the UP S.
Therefore, the insistence of the respondent for installation of 1KVA Online
UPS is arbitrary and is restrictive trade practice.
9. We have heard the appellant and find no merit in the present
appeals. The pre-installation requisite as reproduced ab ove clearly
stipulates that the appellant has to provide: (i) Efficiently air-conditioned
room (ii) 1KVA Online UPS for running of the equipment (iii) Broadband
connection for “i-track” (Remote Diagnostics Tool). The equ ipment
will be provided with “i-track” remote facility at the time of installation.
10. In the brochure supplied to the appellant, there is no commitment
of supply of instrument with on-board laundry facility. Thus, the appellant
could not insist on on-board laundry facility which was never committed
to be delivered to the appellant along with the instrument nor there could
be any installation of the equipment without installation of 1KVA Online
UPS as part of pre-installation requirements. The e mail from the
manufacturer will not override the pre-conditions of installation which
are in view of electricity supply conditions in the country. All the authorities
under the Consumer Protection Act, 1986 4 have found that there is no
deficiency in service or restrictive trade practice.
11. In view of the above, we do not find any error in the orders
passed by the Forums constituted under the Act whic h warrant
interference in the present appeals. The present ap peals are thus
dismissed.
Devika Gujral Appeals dismissed.
4Act
DR. D.J. DE SOUZA v. MANAGING DIRECTOR CPC
DIAGNOSTICS PVT. LTD. [HEMANT GUPTA, J.]