Power Grid Corporation of India v. Tamil Nadu Generation and Distribution Co. Ltd. & Ors. Etc. Etc
N. V. RAMANA, J.
Civil Appeal No.684 of 2007
1. The present appeal arises out of the decisions of the Central
Electricity Regulatory Commission, New Delhi [“CERC”] wherein an
issue relating to capitalization of Foreign Exchange Rate Variation
727
[“FERV”] was determined by the Commission and thereafter affirmed
in a review petition, vide orders dated 30.06.2003 and 04.12.2003
respectively. On appeal, the Appellate Tribunal for Electricity, New Delhi
vide judgment dated 04.10.2006 in Appeal Nos. 135-140 of 200 5,
approved the methodology for ascertaining the FERV; however, with
respect to apportionment of the FERV, the appeal was allowed and FERV
was directed to be apportioned only in respect of debt liability. It is this
judgment of the Appellate Tribunal for Electricity, New Delhi which is in
challenge before us.
2.The appellant is a transmission company which plans, executes
and makes available transmission systems for conveyance of power
from one place to another. The tariff which it charges for the conveyance
is fixed by the CERC. FERV is a pass through which is kept to ensure
that any liability or gain by virtue of fluctuation in foreign exchange rates
passes to the beneficiary in a staggered manner.
3.The limited issue before us is apportionment of FERV into debt
and equity after FERV has been calculated and added to capital cost.
4. The learned counsel on behalf of the appellant contended that
any foreign exchange gets added to the capital cost and not individually
to debt or equity. This capital cost is thereafter divid ed into debt and
equity, on the basis of a normative debt-equity ratio. As a natural corollary,
even the FERV needs to be apportioned both towards debt and equity.
Further, he contends that FERV has been apportioned as such, as a
matter of practice.
5. On the other hand, the learned counsel for respondent no.1
disputed the existence of such practice. He contended that the Electricity
Regulatory Commissions Act, 1998 [“the Act”] was enacted to do away
with such practices. He referred to Regulations 1.3 and 1.7 of T ariff
Regulations, 2001 and argued that liability accrued on account of FERV
can be recovered by the appellants directly from respondent no .1 and
the question of capitalization of FERV does not arise.
6. Having heard the counsels and from a detailed perusal of the
record, at the outset, we note that the present question regar ding the
apportionment of FERV between debt and equity is not a quest ion of
law, much less a substantial question of law. Regulation 1.13(a) of Central
Electricity Regulatory Commission (Terms and Conditions of Tariff)
Regulations, 2001 [“Tariff Regulations, 2001”] which has been ci ted
POWER GRID CORPN. OF INDIA V. TAMIL NADU GEN. AND
DIST. CO. LTD. [N. V. RAMANA, J.]
before us to buttress the argument of apportionment of FERV does not
in fact provide for apportionment of FERV and rather, is restricted only
to the methodology of calculation of FERV. This methodology of FERV
calculation is not in challenge before us and has already been affirmed
by the CERC as well as the Appellate Tribunal for Electr icity, New
Delhi. No rule, regulation, statute or precedent has been cited before us
to substantiate the argument that post calculation FERV needs to be
necessarily apportioned in a debt-equity ratio, much less to substantiate
what exactly this ratio is and on what factors the same is determined.
Thus, on this ground alone, for lack of a substantial question of law,
these appeals ought to be dismissed.
7. In any case, once the FERV is calculated, in term s of
Regulations 1.3 and 1.7 of the Tariff Regulations, 2001, the same can be
recovered by the appellants from respondent no.1 without even filing a
petition before the CERC. Regulations 1.3 and 1.7 of Tariff Regulations,
2001 provide as under:
“1.3 These Regulations shall apply where the capital cost-based
tariff is determined by the Commission.
…
1.7 Recovery of Income Tax and Foreign Exchange Rate
Variation shall be done directly by the utilities fro m the
beneficiaries without filing a petition before the
Commission . In case of any objections by the beneficiaries to
the amounts claimed on these counts, they may file an appropriate
petition before the Commission.”
(emphasis supplied)
8. This has not been done in the present case, i.e., Civil Ap peal
No. 684 of 2007. Further, FERV is sought to be capitalized by the appellant
in the normative debt-equity ratio of 50:50 as a matter of practice, without
citing any rule, regulation, statute or precedential law.
9. This observation becomes pertinent in light of the fact that the
Act was introduced to reform the problems in the power sector prior to
1998, inter alia , the lack of rational retail tariffs, poor planning and
operation, the neglect of the consumer and the absence of an independent
regulatory authority. The Act also aimed at protecting and improving the
financial health of the State Electricity Boards, which were losing heavily
729
on account of irrational tariffs and lack of budgetary support. Thus, noting
the premise on which the Act was enacted and the fact that the Tariff
Regulations, 2001 prescribed under the aegis of this Act do not provide
for apportionment of FERV in a particular debt-equity ratio, this Court is
not inclined to interfere in the matter.
10.Further, the present dispute arises with respect to tariff charged
between 01.04.2001 and 31.03.2004 on account of FERV calculation
and apportionment. Any variation in the apportionment of FERV now,
for the abovementioned period, will consequently be passed on t o the
consumers. This will be unfair to the consumers who were not consumers
for the abovementioned period but will eventually bear the brunt of
transactions which took place 15-18 years ago. This is another ground
for non-interference in the present matter [ See U.P. Power Corpn. Ltd.
v. NTPC Ltd. , (2009) 6 SCC 235].
11. In light of the abovementioned observations, the appeal is
dismissed. No order as to costs.
Civil Appeal No. 13452 of 2015
12. This appeal is preferred against the impugned judgment and
order dated 18.08.2015 passed by the Appellate Tribunal for Electricity
whereby the appeal preferred by the appellant was dismissed. Further,
the order of the CERC was upheld by observing that the CERC has
rightly applied the decision dated 04.10.2006, which is the same order
that is impugned in Civil Appeal No. 684 of 2007, to the instant matter
and directed that the entire FERV should be apportioned only in respect
of debt liability. Thus, the issue being the same, this appeal is also
dismissed in a sequel to the discussion set out above. No ord er as to
costs.
Ankit Gyan Appeals dismissed.
POWER GRID CORPN. OF INDIA V. TAMIL NADU GEN. AND
DIST. CO. LTD. [N. V. RAMANA, J.]