B. K. Ravichandra & Ors. v. Union of India & Ors.
S. RAVINDRA BHAT, J.
1. This appeal by special leave questions a judgment of the
Karnataka High Court 1. The High Court rejected the appellants’ claim
to direct the respondent (hereafter called “the Union”) to v acate their
lands, leaving it open to the latter to initiate appropriate proceedings for
acquisition of certain lands (which belonged to the appellants).
2. Parliament, in exercise of the powers conferred upon the Union,
enacted the Requisitioning and Acquisition of Immovable properties Act,
1952 (hereafter called “the Requisitioning Act”). It was brought into
force on 15.03.1952. 2 The object of the Act was to enable the Union to
1 Dated 11.01.2008 in W.P. 8340/2006
2 By virtue of Section 1(3), the Act was initially temporary, and to remain in force for
six years.
979
requisition or acquire immovable property if the competent authority was
of the opinion that any property was necessary for a public purpose. By
Section 1(3), the Requisitioning Act was to be in force for six years.
Section 3 clothed the Union with the power to requisition properties for
any public purpose; Section 7 provided the procedure to requisition (or
acquire) lands. It also spelt-out the condition precedents for exercise of
the power. Section 8 provided for compensation with regard to property.
Section 8(2) laid out the principles applicable for det ermination of
compensation for the property as a recurring one 3. On 27.02.1958, the
Requisitioning Act was amended and the period of its operation extended.
In the meanwhile, the Defence of India Act, 1962 (hereafter referred to
as “the DIA”) was enacted by Parliament empowering th e Central
Government with powers akin to those enacted under the Requisitioning
Act. The Union invoked its powers under the DIA and requisitioned the
three described properties which belonged to the predecessor of the
appellants (hereafter referred to as “the suit lands”). T hese comprised
of Survey Nos. 101/1 & 101/2 - the two survey numbers aggregating 2
acres 39 guntas and Survey No.104 (2 acre 8 guntas) in Byppanahalli,
Bangalore South Taluk. The then owner, i.e. late B.M. Krishnamurthy,
the appellants’ predecessor handed over the possession of the suit lands
under protest; these were taken over under Section 30 of the DIA. The
competent authority fixed the compensation for these lands by order
dated 18.12.1964. The approval for this compensation fixation was given
much later - in 1968.
3. By Act 48 of 1963, Section 1(3) of the Requisitioning Act was
amended, and the period of operation of the Requisitioning Act was
3 Section 8(2) (a) provided inter alia, as follows:
“a recurring payment in respect of the period of requisition of a sum equal to the rent
which would have been payable for the use and occupation of the property, if it had been
taken on lease for the period.”
Section 8 (2) (b) provided for payment of
(b) such sum or sums, if any, as may be found neces sary to compensate the person
interested for all or any of the following matters, namely:
(i) pecuniary loss due to requisitioning;
(ii) expenses on account of vacating the requisition ed premises;
(iii) expenses on account of reoccupying the premise s upon release from
requisition; and
(iv) damages (other than normal wear and tear) caused to the property during
the period of requisition, including the expenses that may have to be incurred
for restoring the property to the condition in whic h it was at the time of
requisition.
B. K. RAVICHANDRA & ORS. v. UNION OF INDIA & ORS.
[S. RAVINDRA BHAT, J.]
extended till 14.03.1970. In the meanwhile, the DIA lapsed with effect
from 10.01.1968. The Requisitioning Act was amended, incorporating
Section 25, which enacted that the immovable property req uisitioned
under the DIA, which had not been released as on 10.01.1968 was
deemed to have been requisitioned under the Requisition Act. It also
continued the status quo with respect to determination of compensation
completed under the DIA. This Amendment Ordinance was re placed
by an actual amendment, to the Requisitioning Act. The Requisitioning
Act was again amended in 1970 4, to delete Section 1(3) of the main Act.
The Amendment Act also enabled requisitioning of property and stated
that requisitions were to be continued and were to be released after 12
years (subsequently the period of 12 years was extended to 17 years) 5.
4. In late 1972, the predecessor of the appellants felt that the
compensation fixed for the suit lands was inadequate and applie d for
enhancement. This was in terms of the amendment of 1970 (beca use
the land requisitioned in 1963 was deemed to have been continued by
the Act of 1968). As required by Section 8 of the Requisitioning Act, this
dispute was referred to an arbitrator under Section 8(2). The reference
made was in respect of the amount of compensation payable, the recurring
payments in respect of the periods of requisition and the sums equal to
the rent that would have been payable for the occupation and use of the
property and other sums towards 4 years of losses, i.e. pecu niary loss
expense on account of the vacating of the requisition ed premises,
4 Act 1 of 1970. The effect of this amendment Act was to change the temporary
character of the legislation.
5 Section 6(1A) reads as follows:
“ 6. Release from requisitioning.—(1) The Central Government may at any time release
from requisition any property requisitioned under this Act and shall, as far as possible,
restore the property in as good a condition as it was when possession thereof was taken
subject only to the changes caused by reasonable wear and tear and irresistible force:
Provided that where the purposes for which any requisitioned property was being used
cease to exist, the Central Government shall, unles s the property is acquired under
section 7, release that property, as soon as may be, from requisition.
[(1A) Notwithstanding anything contained in sub-section (1), the Central Government
shall release from requisition,—
(a) any property requisitioned or deemed to be requisitioned under this Act before the
commencement of the Requisitioning and Acquisition of Immovable Property
(Amendment) Act, 1970 (1 of 1970), on or before the expiry of a period of [seventeen
years] from such commencement;”
981
expenses on account of re-occupying of premises after relea se from
acquisition and damages other than normal repairs. At that point in time,
Section 6(1A) contemplated retention of property for a total period of 3
years. Therefore, the recurring payment was in respect of a short
duration. The period of requisition under Section 8(2A) 6 for the purpose
of compensation determination was, during the pende ncy of the
reference, increased to five years.
5. The reference was notified in a Gazette notification published
by the Central Government. On 17.07.1975, the Arbitrator pronounced
an Award which determined compensation as 6% per annum on the
capital value of land, assessed at
3 per square foot accepting the land
requisitioned to be in Survey nos.103/2 and 104 in Byppanahalli. The
Central Government had, in the arbitration proceeding, contended that
the suit lands had also been acquired by virtue of a prior notification.
6 “Section 8(2A) reads as follows:
The recurring payment, referred to in clause (a) of sub-section (2), in respect of any
property shall, unless the property is sooner released from requisition under Section 6
or acquired under Section 7, be revised in accordance with the provisions of sub-section
(2-B)—
(a) in a case where such property has been subject to requisition under this Act for the
period of five years or a longer period immediately preceding the commencement of the
Requisitioning and Acquisition of Immovable Propert y (Amendment) Act, 1975—
(i) first with effect from the date of such commenc ement, and
[(ii) secondly with effect from the expiry of five years, and thirdly with effect from the
expiry of ten years, from such commencement;]
(b) in a case where such property has been subject to requisition under this Act
immediately before such commencement for a period s horter than five years and the
maximum period within which such property shall, in accordance with the provisions
of sub-section (1-A) of Section 6, be released from requisition or acquired, extends
beyond five years from such commencement,—
(i) first with effect from the date of expiry of fi ve years from the date on which
possession of such property has been surrendered or delivered to, or taken by, the
competent authority under Section 4, and
[(ii) secondly with effect from the date of expiry of five years, and thirdly with effect
from the date of expiry of ten years, from the date on which the revision made under
sub-clause (i) takes effect;]
[(c) in any other case,—
(i) first with effect from the date of expiry of fi ve years from the date on which
possession of such property has been surrendered or delivered to, or taken by, the
competent authority under Section 4, and
(ii) secondly with effect from the date of expiry o f five years, and thirdly with effect
from the date of expiry of ten years, from the date on which the revision under sub-
clause (i) takes effect.]
B. K. RAVICHANDRA & ORS. v. UNION OF INDIA & ORS.
[S. RAVINDRA BHAT, J.]
The arbitrator considered this contention too and after exami ning the
award of the LAC held:
“From the evidence of RW-2 and also from the copy of the
Ex-R-13 and possession certificate as per Ex.R-14, it is
established that 24 guntas and 29 sq. yards of land in
S. No.103/2 and 8 guntas of land and 22 yards of la nd in
S. No.104 of Byyappanahali were acquired for the pu rpose
of NGEF and possession was taken by NGEF deducting the
said acquired portion of the land in S. No.103/2 and 10 4 of
Byyappanahalli the claimant would be the owner of the said
lands in ARE No.72-73.”
6. In view of the evidence it was also held that the appell ants’
predecessor was entitled to receive compensation in respect of Survey
No.104, deducting the portion of land acquired for the purposes of NGEF.
This Award was made on 17.07.1975.
7. The Requisitioning Act underwent a further amendmen t 7.
Section 8(2B) stated that recurring payment would be revised b y re-
determining the amount 8. As a consequence of this amendment of 1975,
the recurring payment required to be determined and fixed under Section
8(2) had to be first decided and fixed with effect from the date of
commencement of the Act and again with effect from the expiry of five
years from the commencement of the amending Act. The amending Act
came into force on 07.03.1975.
8. To continue the narrative, the arbitrator’s award was appealed
against by the UOI. The award had determined compensation in terms
of the DIA and later – since it lapsed in 1968, also having regard to the
principles spelt-out in Section 8 of the Requisitioning Act as amended.
On 21.07.1978, the Central Government’s appeal was disposed of in
7 Act 2 of 1975, which amended Section 6(1A) and substituted 10 years for the existing
period for compensation determination. It also adde d Section 8(2A) by creating a
deeming fiction that unless the property was released from requisition under Section 6
or duly acquired under Section 7, the recurring payment would be revised under provision
of newly added sub-section (2B).
8 Section 8(2B) reads as follows:
“(2B) The recurring payment in respect of any property shall be revised by re-determining
such payment in the manner and in accordance with the principles set out in sub-section
(1), read with clause (a) of sub-section (2), as if such property had been requisitioned
under this act on the date with effect from which the revision has to be made under such
sub-section (2A)”
983
terms of a joint memo filed by the parties by which it was agreed that
the matter with respect to determination of compensation would be
remanded/remitted for fresh adjudication; however, the c ompensation
fixation of 10.01.1968 was agreed to be final and binding. The only caveat
added was that the question of maintainability of appeals under Section
11 of the Requisitioning Act was pending before this Court in c ertain
proceedings. However, the parties agreed that till disposal of appeal by
the arbitrator, the compensation fixed @
3 per square foot would be
operative. It was further agreed that in case the appeals w ere not held
to be maintainable, the compensation fixed by the award was to be treated
as final. But on the other hand, if the appeal was held to be maintainable,
the arbitrator had to decide the fixation of compensation for the period
prior to 10.01.1968.
9. By a judgment of this Court 9, it was held that an award covering
the period of requisition can be challenged in appeal and that the award
made under DIA was not appealable. Thus, the compensation fixation
for the period upto 10.01.1968 in this case (when the requisition of suit
lands was made under DIA) became final.
10. On 28.01.1985, in the second arbitration proceeding, based on
the fixation of compensation till 10.01.1968, it was held that the fixation
of compensation till 10.01.1968 had to be accepted and basic fixation of
rent was to be increased for over 5 years thereafter. The arbitrator then
proceeded to fix the rental compensation payable per square foot for 3
distinct periods, i.e. 10.01.1968 to 10.01.1973 (@
4.10 per square
foot); 10.01.1973 to 10.01.1975 (@
5.40 per square foot) and
10.01.1978 to 10.01.1985 (
Rs.10.20 per square foot). The parties
appealed against this judgment. By common judgment and order 10 in
MFA 1405/1985, decided on 24.11.1994, a Division Bench of the
Karnataka High Court noted that the issue as to the extent of l and for
which compensation had to be determined was one that required decision
by the arbitrator. The High Court noted that there was no evide nce to
deduce whether notice under the Land Acquisition Act had been served,
and that there was nothing to show when the award was made by the
Collector, to support the Union’s contention about the acquisition of certain
portions of the suit land. These were, therefore, left for enquir y and
fresh decision. The Court proceeded to decide on th e issue of
B. K. RAVICHANDRA & ORS. v. UNION OF INDIA & ORS.
[S. RAVINDRA BHAT, J.]
9 Special Military Estates Officer v. Munivenkataramiah and Anr. 1990 (1) SCR 4
10 Reported as Union of India v B.M. Krishnamurthy 1995 (4) KarLJ 607.
compensation and held that the agreed compensation in terms of the
previous joint memo, i.e. for the period up to 10.01.1968 was final. The
Division Bench further noted that the arbitrator was not bound to treat
the amounts fixed for the period as on 10.01.1968 as the basi c figure
and proceed to increase the rent periodically. It was noted that the question
of fixation for a period of five years arose after Sectio n 8(2A) was
introduced to the Requisitioning Act– thus the recurring compensation
question had to be decided from 10.01.1968 and then from the
commencement of the Amendment Act and again from the expiry of
that Act. It, therefore, held, upon a reading of Section 8(2A) that
“recurring compensation payable in this case from 10.01.1968
to the commencement of the amendment Act 2 of 1975 u pto
07.03.1975 shall be fixed and for the period 07.03. 1975 it
should be done as indicated in Section 8(2A). ’’
11. The award, therefore, was set aside and the mat ter was
remitted for fresh consideration by the arbitrator. In this fr esh (third)
round, the arbitrator published two awards – one dealing with the extent
of land, and the other the compensation payable. After examining all the
evidence, including the documentary evidence, presented by the parties,
as well as the oral testimony, i.e. the oral deposition on beha lf of the
UOI, it was held that Survey nos. 103/1 and 103/2 were not val idly
acquired by the Central Government and that Survey No.104 was validly
acquired. The other award determined the land value and recurring annual
value at different rates, which is set out below in a tabular form:
Sl. No. Period Rate (Capital value) (to be
calculated for 2 acres 39
guntas )
Annual
recurring
rate
1. 10.1.1968 to 07.03.1975 ` 1 per square foot 6% p.a.
2. 07.03.1975 to 07.03.1980 ` 1.5 per square foot 6% p.a.
3. 07.03.1980-07.03.1985 ` 5 per square foot 6% p.a.
4. 07.03.1985-07.03.1990 ` 25 per square foot 6% p.a.
5. 07.03.1990-07.03.1995 ` 45 per square foot 6.5% p.a.
6. 07.03.1995-07.03.2000 ` 100 per square foot 6% p.a.
985
12. Aggrieved by the two awards, both dated 28.02.2000, the Union
preferred an appeal (MFA 2220/2002) before the Karnataka High Court.
During its pendency, the widow of the late BM Krishnamurthy and the
present appellants, her children, filed a writ petition (WP 8340/2006)
claiming that since the period of requisition had ended and the suit lands
had not been acquired, the possession of the Union after 1987 was
untenable in law. In a judgment delivered on 11.01.2008 (i.e. the same
day when the impugned judgment was pronounced) the Division Bench
of the Karnataka High Court rejected the contentions of the Union vis-
a-visits acquisition of suit lands, or any part thereof, and noted that the
court was concerned “only with Sy. Nos. 103/1 and 103/2 for the
period between 1968 and 2000 and so far as Sy. No. 104 is
concerned, between the period 1968 and 1977, as the portion of
the land measuring 11985.24 square feet undisputedl y came to be
acquired”. It upheld the awards of the arbitrator fixing the compensation
in 2000 and held that:
“Accordingly, in view of the discussion and reasoning s tated
above, we confirm the fact that neither Sy. No. 103/1 nor Sy.
No. 103/2 ever came to be validly acquired by the authorities
for the benefit of appellant herein. We hold the re ntal
compensation computed by the arbitrator is just and pro per.”
13. The Union sought special leave to appeal under Article 136 of
the Constitution, against the said judgment dismissing its appea l 11 . By
order dated 10.09.2010, that special leave petition was dismissed, keeping
it open for the Union to acquire the property, in accordanc e with law.
Thus, as regards the question of ownership and the rental payable till the
period 07.03.2000, the issue attained finality. By the impugned judgment
delivered 11.01.2008, the Division Bench after considering the records,
dismissed the appellants’ writ petition and held that
“It is also noticed from the records, originally th e land in
question came to be handed over to the defence authorities It
is also noticed from the records, originally the land in questi on
came to be handed over to the defence authorities by invoking
the provisions of defence of India Act 1962 which a ct came
to be repealed on 10.01.1968. By virtue of Section 25 of the
Requisitioning Act, 1952, whatever has been done under the
Defence Act of India, is presumed to have been done u nder
B. K. RAVICHANDRA & ORS. v. UNION OF INDIA & ORS.
[S. RAVINDRA BHAT, J.]
11 SLP (C) CC No. 12634/2008.
the Requisitioning Act, therefore, u/s 6 of the Requi sitioning
Act, the authorities could not have held the property beyond
08.03.1987 at any cost. We say so because withing th e said
period, of 07.03.1987, apparently, there was no val id
acquisition of properties by the concerned authorities as not ed
above.
It is also brought to our notice that though portions o f land
in different Sy. Numbers adjacent to these lands came to be
acquired in the year 1972 and also on earlier occasions, such
acquisitions never came to be challenged by the resp ective
owners and the defence authorities continued to be in
possession of those properties as beneficiaries after acquiring
the said lands by the competent authority. We notice that f rom
the contentions of the defence authorities right from 1941 till
date, about 600 acres is in possession of them and so me of
the lands are acquired other than the lands in question. This
Sy. No. 103 seems to be in the centre of that 600 acres on this
vast area of 600 acres which is enclosed by a fence by the
authorities. They have put up firing range, buildings, p arade
ground etc.
In that view of the matter, as we noted above already, at this
late hour of the day, it would not be just and proper to dire ct
the respondents to hand over the possession of thos e
properties. In the connected MFA No. 2220/02, we ha ve
already approved the computation of rental compensa tion
awarded by the arbitrator upto 07.03.2000. The petit ioners
are entitled to seek compensation for the subsequent period
in accordance with law.
The Respondents - defence authorities and the State
Government are at liberty to initiate acquisition proce edings
so far as these lands are concerned if they need in respect o f
property in Sy. No. 102/1 and 103/2 as well, for the benefit of
the defence authorities.”
The contentions
14. Mr. Mohan Parasaran, the appellant’s senior counsel, argued
that having upheld the main contentions with respect to the ownership
and title of the suit lands, the impugned judgment erred in law, in refusing
987
to grant the reliefs claimed in the writ proceedings. It was argued that
even if arguendo any acquisition notification had covered any period
upto 1975, with the coming into force of the 1984 amendments to t he
Land Acquisition Act, a period of 2 years was statutorily gran ted by
Parliament to complete the acquisition, i.e. to issue the aw ard. Since
concededly there was no award valid ever made by virtue of the operation
of law, i.e. Section 11A 12 , the question of ownership, which was decided
by the arbitrator in the first and third award, became conclus ive and
binding. It was also urged that the directions of the earlier Division Bench
ruling in B.M. Krishamurthy 13 were specifically to determine the extent
of land acquired; in compliance, the arbitrator, in t he third arbitration
proceedings, by the first award, decided the extent of acquired land.
Those findings of the arbitrator, rendered by virtue of the earlier remand,
became final because the Union’s appeal was rejected by the Division
Bench. Further, the special leave petition against that judg ment was
rejected by this court.
15. It was argued that once the issue of ownership stood set tled
conclusively, the Union had to vacate the suit property, because its
possession was not justified or authorized by law. Learned counsel relied
on the ruling of this court 14 which held, recollecting an earlier judgment
in State of Haryana v Mukesh Kumar 15 that the right to property is
“not only a constitutional or statutory right, but a hum an right”.
This court quoted with approval earlier judgments, which had ruled that
deprivation of possession of one’s property without a law was untenable.
It was argued that the determination of compensation was up to the
period ending in 2000, i.e. 20 years ago. In the meanwhile, the value of
B. K. RAVICHANDRA & ORS. v. UNION OF INDIA & ORS.
[S. RAVINDRA BHAT, J.]
12 Section 11A reads as follows:
“11A. Period shall be which an award within made. - The Collector shall make an
award under section 11 within a period of two years from the date of the publication of
the declaration and if no award is made within that period, the entire proceeding for the
acquisition of the land shall lapse:
Provided that in a case where the said declaration has been published before the
commencement of the Land Acquisition (Amendment) Act, 1984 (68 of 1984), the award
shall be made within a period of two years from such commencement.
Explanation - In computing the period of two years referred to in this section, the period
during which any action or proceeding to be taken in pursuance of the said declaration
is stayed by an order of a Court shall be excluded.”
13 Supra n. 10
14 Vidya Devi v. State of H.P. 2020 (2) SCC 569.
15 2013 (1) SCC 353
property, as well as recurring value of compensatio n had risen
astronomically as the suit lands had great commercial potential.
16. Mr. K.M. Natraj, learned Additional Solicitor General, urged
this court not to interfere with the impugned judgment. Accordi ng to
him, the High Court correctly denied the claim to release of lands, since
it was a dispute which had to be decided by the civil court. The learned
ASG sought to argue that the findings with regard to extent of ownership
were ambiguous and the courts committed errors in ignoring that the suit
lands were acquired through notifications in 1941. Mr. Natraj contested
the submission that the lands were unlawfully occupied, pointing out that
the properties were requisitioned validly and that those orders were never
questioned by either the predecessor of the appellants or th em, in any
properly instituted proceedings.
Analysis and findings
17. From the narration of events, it is clear that first, the suit
properties were requisitioned in 1963, under the DIA. The amendment
to the Requisition Act, which enacted Section 25 in 1968, had the effect
of creating a deeming fiction that requisitions under the DIA were deemed
to be under the Requisitioning Act. Thereafter, due t o successive
amendments to the Requisitioning Act, the period of requisition continued;
it finally ended in 1987. In the meanwhile, the original landowner, late
Krishnamurthy, sought and was granted a reference to arbi tration, on
the issue of compensation payable. The first award made in 1975, decided
both the question of extent of land requisitioned (and also the land owned
by the landowner). The award was questioned, but the a ppeal was
disposed of by the High Court on 21.07.1978, on the basis of a joint
memo. The fresh determination which was made through the award
dated 28.01.1985, again re-determined the compensation payable for
the period after 1.10.1968, using the capital value fixed earli er as the
basis. This led to the judgment of the High Court 16 which held that there
was no evidence to support the Union’s contention that some part of the
suit lands had been acquired. However, on that question as well as the
issue of basis for the recurring compensation (as well as its computation),
the dispute was remitted. This time, the arbitrator rendered two awards-
one, deciding the question of ownership or its extent and the second, on
the question of compensation determination. The Union appealed to the
16 Dated 24.11.1994
989
High Court; that appeal 17 was dismissed by a judgment, delivered on the
same day as the impugned judgment. The Union’s special leave petition
was dismissed 10 years ago (on 10.9.2010). This court left it open to the
Union to take steps in accordance with law, with respect to the property.
The impugned judgment too, held that the question of ownership had
attained finality – and in favour of the appellants. That part of the judgment
has not been appealed against by the Union.
18. The legal effect of requisitioning immovable property, it goes
without saying, is that temporarily- i.e. for the period the requisition order
is in operation, the owner loses her possessory rights, even though the
title remains undisturbed. Since the deprivation of possession is through
authority of law, in keeping with fair procedure, the law (in this case, the
Requisitioning Act) provides for payment of compensation in accordance
with predetermined principles. Yet, the taking of property by definition is
finite: it cannot result in expropriation or deprivation of title altogether,
unless another process for acquiring it, is initiated.
19. Whilst dealing with a similar enactment 18 this court, in Grahak
Sanstha Manch v. State of Maharashtra 19 held through a Constitution
Bench, that requisition, by its nature, is temporar y and that the
landowner’s right to property cannot remain suspended indefinitely, at
the wishes of the state or its agencies:
“16. We find ourselves in agreement with the view taken in
the cases of Collector of Akola [(1968) 1 SCR 401 : AIR 1968
SC 244] and Jiwani Kumar Paraki [Jiwani Kumar
Paraki v. First Land Acquisition Collector, (1984) 4 SCC 612]
that the purpose of a requisition order may be perm anent.
But that is not to say that an order of requisitioning c an be
continued indefinitely or for a period of time long er than
that which is, in the facts and circumstances of the particul ar
case, reasonable. We note and approve in this regard, as did
this Court in Jiwani Kumar Paraki case [Jiwani Kuma r
Paraki v. First Land Acquisition Collector, (1984) 4 SCC 612],
the observations of the Nagpur High Court in the ca se
of Mangilal Karwa v. State of M.P. [ILR 1955 Nag 34 : AIR
1955 Nag 153] which have been reproduced above. That the
B. K. RAVICHANDRA & ORS. v. UNION OF INDIA & ORS.
[S. RAVINDRA BHAT, J.]
17 MFA 2220/2002
18 The Bombay Land Requisition Act, 1948
19 (1994) 4 SCC 192 at page 204
concept of requisitioning is temporary is also indi cated by
the Law Commission in its Tenth Report and, as pointed out
earlier, by the terms of the said Act itself, as it orig inally stood
and as amended from time to time. There is no contradiction
in concluding that while a requisition order can be issued for
a permanent public purpose, it cannot be continued
indefinitely. Requisitioning might have to be resorted to for a
permanent public purpose, to give an example, to ti de over
the period of time required for making permanent pr emises
available for it. The concepts of acquisition and requis ition
are altogether different as are the consequences th at flow
therefrom. A landlord cannot, in effect and substan ce, be
deprived of his rights and title to property without being paid
due compensation, and this is the effect of prolong ed
requisitioning. Requisitioning may be continued onl y for a
reasonable period; what that period should be would depend
upon the facts and circumstances of each case and it would
ordinarily, be for the Government to decide.”
20. When this court had to adjudicate, in Rajendra Kumar Gupta
v. State of U.P 20 on somewhat similar facts, i.e. the requisition having
been resorted to during a national emergency under the DIA, a nd its
continuance under the Requisitioning Act, the question which arose was
the continued possession by the state. The court held that such possession,
long after the requisition period had ceased, was contrary to law and
observed that:
“14. We, therefore, will have to examine the effica cy of the
impugned order from the point of view of its prolon ged
duration uptil now which as seen earlier has been s pread
over more than two decades from the date on which it got its
birth on 29-10-1976. For deciding this question we will assume
with the respondents, for the sake of argument, tha t on the
day on which it was passed it was validly passed unde r the
provisions of Section 23. Even then the moot questi on still
remains whether such an emergency order of requisition which
might be justified in those days when it was passed could
now be permitted to continue indefinitely. For answering this
question we may usefully refer to the decision of t he
20 (1997) 4 SCC 511 at page 525
991
Constitution Bench of this Court in the case of Gra hak
Sanstha Manch [(1994) 4 SCC 192] . The Constitution Bench
has in terms laid down that even though a requisition ord er
can be issued for a permanent public purpose under the
provisions of the Bombay Land Requisition Act, 1948 it cannot
be continued indefinitely. We may usefully refer to the relevant
observations made in this connection by Bharucha, J .
speaking for the majority of the Constitution Bench , in
paragraphs 16 and 17 of the Report: (SCC p. 204)
****** *******
We have already shown that in the context of the emergen cy
provisions of the Act in question the powers which could be
exercised for requisitioning properties under Secti on 23 by
their very nature could not be utilised for requisi tioning
immovable properties for an indefinite period. Such requisition
virtually amounts to acquisition. In the facts and circumstances
of this case it must be held that when years back the parent
Act had ceased to operate and the internal and exte rnal
emergency declarations had stood withdrawn, now obvious ly
there is no rhyme or reason why such a requisition order,
which by efflux of time has become stale and its very purp ose
has become obsolete, should be permitted to be cont inued
any further and the appellants’ properties should b e still
permitted to remain requisitioned and in possession of the
respondents. In the facts and circumstances of the case,
therefore, it must be held that continued requisiti on of the
appellants’ leasehold premises by now at least must be trea ted
to have become unreasonable and it would necessaril y
indicate abuse of power and a colourable exercise thereof. It
must be held that the impugned requisition order ev en
assuming that it was valid and kicking and was not stillborn
when it was passed in 1976, by now it has lost its e fficacy
and has become a dead letter, in the present set of
circumstances obtaining today. Even on this ground the
continuance of the impugned requisition order canno t be
sustained and has to be put an end to. The third point is also,
therefore, answered in the affirmative in favour of the
appellants and against the respondents.
B. K. RAVICHANDRA & ORS. v. UNION OF INDIA & ORS.
[S. RAVINDRA BHAT, J.]
15. In this connection we may also note that it is not the ca se
of the respondents that now they require to acquisi tion the
requisitioned premises on a permanent basis for the purp ose
for which they were initially requisitioned, by exe rcise of
powers under Section 30 of the Act. In fact the said provis ion
could have been pressed in service by Respondent 3, if at all ,
during the currency of the Act which provision is obvi ously
not available to them now. Non-exercise of powers u nder
Section 30 for acquiring these requisitioned properties during
the time the Act was in force itself shows that even acc ording
to the respondents the Government did not require t he said
requisitioned land to be acquired for its purposes o r that it
was felt that the cost of restoration of the requis itioned
property by the Government would be excessive. Durin g the
pendency of these proceedings this Court had earlier directed
by order dated 21-9-1984 that status quo will remain s o far
as the construction in any part of the open space is concerned.
That status quo was continued by an order of 29-10- 1984.
However by a latter order dated 9-2-1987 while gran ting
special leave this Court had refused to grant stay but had
made it clear that the respondents will not be entitled to cla im
the benefit of Section 30 of the Defence and Internal Security
of India Act, 1971 in the event of the appeal being all owed.
Any further construction effected by the respondents will not
be pleaded as defence during the hearing of the app eal.
Under these circumstances, therefore, there cannot remain
any valid defence for the respondents against the restorat ion
of possession of the requisitioned premises to the ap pellants
once the impugned order of requisition is found to be invalid
in view of our findings on the aforesaid points for
determination.
16. In the result the appeal is allowed. The judgment and orde r
of the High Court are set aside. The writ petition filed by the
appellants before the High Court is allowed. The impu gned
order of requisition of the premises in question da ted
29-10-1976 is quashed and set aside. The respondent s are
directed to restore the possession of these requisi tioned
properties forthwith to the appellants by clearing off w hatever
993
construction may be existing on the spot and making available
the requisitioned properties in their original form and s hape
to the appellants. The respondents are directed to comply with
this order within eight weeks from the date of receipt of copy
of this order at their end. In the facts and circumst ances of
the case there will be no order as to costs.”
21. Although the right to property is not a fundamental right
protected under Part III of the Constitution of India 21 , it remains a valuable
constitutional right. The importance of this right has been emphasized
and iterated several times by this court. In Delhi Airtech Services Pvt
Ltd v. State of U.P 22 for instance, this court underlined the issue as
follows:
“30. It is accepted in every jurisprudence and by d ifferent
political thinkers that some amount of property rig ht is an
indispensable safeguard against tyranny and economi c
oppression of the Government. Jefferson was of the view th at
liberty cannot long subsist without the support of prop erty.”
Property must be secured, else liberty cannot subsi st” was
the opinion of John Adams. Indeed the view that pro perty
itself is the seed bed which must be conserved if o ther
constitutional values are to flourish is the consensu s among
political thinkers and jurists.”
Earlier, in State of Rajasthan v. Basant Nahata 23 , this court
highlighted that a property owner’s rights cannot be depriv ed, stating
that:
“59. ..In absence of any substantive provisions contained in
a parliamentary or legislative act , he cannot be refrained from
dealing with his property in any manner he likes. S uch
statutory interdict would be opposed to one’s right of
property as envisaged under Article 300-A 300-A of the
Constitution.”
B. K. RAVICHANDRA & ORS. v. UNION OF INDIA & ORS.
[S. RAVINDRA BHAT, J.]
21 By reason of deletion of Article 19 (1) (f) and Article 31 with sub heading “Right to
Property” which were omitted by the Constitution 44th Amendment Act, 1978. Article
31(1) was in effect, enacted as Article 300A – through an insertion in Chapter IV Part
XII of the Constitution.
22 (2011) 9 SCC 354
23 (2005) 12 SCC 77
The decision in K.T. Plantation Pvt. Ltd. v. State of Karnataka 24
interpreted Article 300A and held that:
“168. Article 300A proclaims that no person can be deprived
of his property save by authority of law, meaning t hereby
that a person cannot be deprived of his property me rely by
an executive fiat, without any specific legal autho rity or
without the support of law made by a competent
legislature. The expression “property” in Article 3 00-A
confined not to land alone, it includes intangible s like
copyrights and other intellectual property and emb races
every possible interest recognized by law.
169. This Court in State of W.B. v. Vishnunarayan a nd
Associates (P) Ltd. 6, while examining the provisions of the
West Bengal Great Eastern Hotel (Acquisition of Undertakin g)
Act, 1980, held in the context of Article 300-A that the State
or executive officers cannot interfere with the right of o thers
unless they can point out the specific provisions of law w hich
authorises their rights.”
22. Other judgments of this court have also highlighted the
importance of the right under Article 300-A, in the context of regulatory
laws and enactments, which do not directly result in expropr iation or
acquisition, but rather, in an oblique and indirect fashion, block the right
to enjoyment of properties, underlining that the essential theme of Article
300-A is unauthorized deprivation, which would result in an indefinite
suspension of the right to property. The court stressed tha t the law (of
development or town planning, of any other such enactment) should be
explicit about the nature and effect of the deprivation, expressing
the intention to do so. Therefore, in T. Vijayalakshmi v. Town Planning
Member 25 , this court observed that:
“13. Town Planning legislations are regulatory in nature. The
right to property of a person would include a right to constru ct
a building. Such a right, however, can be restricted by reason
of a legislation. In terms of the provisions of the Karnataka
Town and Country Planning Act, a comprehensive
development plan was prepared. It indisputably is still in for ce.
24 (2011) 9 SCC 1
25 (2006) 8 SCC 502
995
Whether the amendments to the said comprehensive
development plan as proposed by the Authority would
ultimately be accepted by the State or not is uncertain. I t is
yet to apply its mind. Amendments to a development plan m ust
conform to the provisions of the Act. As noticed hereinbefore,
the State has called for objection from the citizens. Ecolo gical
balance no doubt is required to be maintained and the courts
while interpreting a statute should bestow serious
consideration in this behalf, but ecological aspects, it is trite,
are ordinarily a part of the town planning legislatio n. If in
the legislation itself or in the statute governing the field,
ecological aspects have not been taken into conside ration
keeping in view the future need, the State and the Authority
must take the blame therefor. We must assume that these aspects
of the matter were taken into consideration by the A uthority
and the State. But the rights of the parties cannot be
intermeddled with so long as an appropriate amendmen t in
the legislation is not brought into force.
* * *
15. The law in this behalf is explicit. Right of a person to
construct residential houses in the residential are a is a
valuable right. The said right can only be regulated in ter ms
of a regulatory statute but unless there exists a clear pro vision
the same cannot be taken away. ….”
(emphasis supplied)
This court has also recognized that regulatory laws, which have
the effect of impacting the right to property, should be strictly construed. 26
B. K. RAVICHANDRA & ORS. v. UNION OF INDIA & ORS.
[S. RAVINDRA BHAT, J.]
26 State of U.P. v. Manohar , (2005) 2 SCC 126; Delhi Airtech Services (P) Ltd. (supra);
Bhavnagar University v. Palitana Sugar Mill (P) Ltd. , (2003) 2 SCC 111; Shrirampur
Municipal Council v. Satyabhamabai Bhimaji Dawkher , 2013 (5) SCC 627 : especially
the following observation:
“Shri Naphade’s interpretation of the scheme of Sections 126 and 127, if accepted,
will lead to absurd results and the landowners will be deprived of their right to
use the property for an indefinite period without being paid compensation. That
would tantamount to depriving the citizens of their property without the sanction
of law and would result in violation of Article 300-A of the Constitution.”
Ref. also to Shrirampur Municipal Council v. Satyabhamabai Bhimaji Dawkher , (2013)
5 SCC 627 Chairman, Indore Vikas Pradhikaran v. Pure Industrial Coke & Chemicals
Ltd. , (2007) 8 SCC 705; Ramchandra Ravindra Waghmare v. Indore Municipal
Corporation , (2017) 1 SCC 667; and, more recently in M.C. Mehta v Union of India
2020 SCC Online (SC) 658.
23. In a very recent judgment, D.B. Basnett v. Land Acquisition
Officer, 27 the court approved the findings of the courts below that the
lands were never acquired, because the procedure prescribed wa s not
followed; notice of acquisition had not been given, nor was any amount
proved to have been received. The court also turned down t he state’s
plea of adverse possession, and granted relief in the following terms:
“20. We are conscious that the land is being used b y the
respondent State through Respondent 2 Department. T hat,
however, does not give such a licence to the State Government .
We had endeavoured to refer the matter for mediation, to fin d
an amicable solution, but that did not fructify. We, how ever,
would like to give some time to the respondent State to anal yse
the consequences of this judgment, and, in case they s o desire,
to acquire the land through a proper notification u nder the
said Act, and to take proper recourse in law so as to enabl e
them to keep the land. We grant three (3) months’ time from
the date of the judgment for the respondent State to make up
their mind as to what they want to do. Would they still like to
retain the land by issuing a proper notification, or would the y
like to surrender possession of the land. In either eventualit y,
the question of payment for use and occupation woul d still
arise, which will have to be determined in accordance with
law. Mesne profits would be determined by a Court
Commissioner, to be appointed by the trial court, as a rel ief
in that behalf has been sought in the plaint itself.”
24. To sum up the facts, repeatedly the Union asserted that it had
acquired at least some parts of the suit lands; these were examined by
the High Court on two occasions, and in arbitration proceedings under
the Requisitioning Act, on three occasions. Each time, the factual findings
went against the Union. The Union’s occupation ceased to be la wful,
with the lapse of the Requisitioning Act, in 1987. Yet, it has implacably
refused to hand back possession, each time asserting that it has some
manner of rights over it. The High Court, while noticing that the Union’s
claim had no merits (in both its appeal, which was dismissed, as well as
in the impugned judgment, disposing of the writ petition), nevertheless
refused to issue any direction for the release of the suit lands. The
rationale given was that the adjoining areas had been acquired and
27 (2020) 4 SCC 572 at page 580
997
were used by the Union for defense purposes. What i s more the
impugned judgment granted indefinite time to the Union to take steps to
acquire the suit lands. The Union has not chosen to do so these last 12
years. These facts paint a stark, even sordid picture.
25. The United States of America set up an exclusive court (the
United States Court of Federal claims, since 1866, referred to as “keeper
of the nation’s conscience” to enable citizens to claim justice against
the Federal government with a poignant motto 28 . By contrast, the Indian
experience has been that the governments, taking a cue from the English
experience, initially asserted that they are not subject to the law insisting
upon the continuation of the royal prerogative (by virtue of Article 372
of the Constitution) which enabled the crown in the UK to asser t its
right to insist that it was not bound by the law, unless there was express
statutory intent 29 .Mercifully, a later judgment 30 overruled that
understanding. In Superintendent and Remembrancer of Legal Affairs
(supra, f.n. 29) this court held that
“23. The next question is whether this Court should adopt
the rule of construction accepted by the Privy Coun cil in
interpreting statute vis-a-vis the Crown. There are many
reasons why the said rule of construction is inconsistent w ith
and incongruous. In the present set-up we have no Cr own,
the archaic rule based on the prerogative and perfect ion of
B. K. RAVICHANDRA & ORS. v. UNION OF INDIA & ORS.
[S. RAVINDRA BHAT, J.]
28 The motto of that court aptly summarizes its task, and the duty of the Federal
government:
“It is as much the duty of Government to render prompt justice against itself, in
favor of citizens, as it is to administer the same, between private individuals.”
29 In Director of Rationing and Distribution v. Corporation of Calcutta [(1961) 1 SCR
158] where this Court held that the State was not bound by the provisions of a state law
and was not liable to prosecution for its contrave ntion. Sinha, C.J., spoke for the
majority; Sarkar, J., concurred separately and Wanc hoo, J., recorded his dissent. The
reasoning of Sinha, C.J., is found in the following passage:
“It is well-established that the common law of Engl and is that the King’s
prerogative is illustrated by the rule that the Sovereign is not necessarily bound
by a statutory law which binds the subject…. That was law applicable to India
also, as authoritatively laid down by the Privy Cou ncil in the case referred to
above [(1946) L. Rule 73 I.A. 271]…… it (law in force under Article 372 of the
Constitution) must be interpreted as including the common law of England
which was adopted as the law of this country before the Constitution came into
force.” (At p. 173).
30 Superintendent and Remembrancer of Legal Affairs v. Corpn. of Calcutta , (1967) 2
SCR 170
the Crown has no relevance to a democratic republic; it is
inconsistent with the rule of law based on the doct rine of
equality….”
26. It is, therefore, no longer open to the state: in any of its forms
(executive, state agencies, or legislature) to claim that the law – or the
constitution can be ignored, or complied at its convenience. The decisions
of this court, and the history of the right to property show that though its
pre-eminence as a fundamental right has been undermined, nevertheless,
the essence of the rule of law protects it. The evolving jurisprudence of
this court also underlines that it is a valuable right ensuring guaranteed
freedoms and economic liberty. The phrasing of Arti cle 300-A is
determinative and its resemblance with Articles 21 and 265 c annot be
overlooked- they in effect, are a guarantee of the supremacy of the rule
of law, no less. To permit the state: whether the Union or a ny state
government to assert that it has an indefinite or overriding right to continue
occupying one’s property (bereft of lawful sanction)– whatever be the
pretext, is no less than condoning lawlessness. The courts’ role is to act
as the guarantor and jealous protector of the people’s liberties: be they
assured through the freedoms, and the right to equality and religion or
cultural rights under Part III, or the right against deprivation, in any form,
through any process other than law. Any condonation by the court is a
validation of such unlawful executive behavior which it then can justify
its conduct on the anvil of some loftier purpose, at any future time- aptly
described as a “loaded weapon ready for the hand of any authority
that can bring forward a plausible claim of an urgent nee d.” 31
31 The phrase is quoted from Justice Robert Jackson’s powerful and timeless dissent in
Korematsu v United States 323 US 214 (1944). The full text of the relevant ex tract,
where the judge dissented from the majority of the US Supreme Court, which upheld
the indefinite internment of American citizens of Japanese origin, is reproduced below:
“a judicial construction of the due process clause that will sustain this order is
a far more subtle blow to liberty than the promulgation of the [military] order
itself. A military order, however unconstitutional, is not apt to last longer than
the military emergency. … once a judicial opinion rationalises such an order to
show that it conforms to the Constitution, or rather rationalises the Constitution
to show that the Constitution sanctions such an order, the Court for all times has
validated the principle of racial discrimination in criminal procedure and of
transplanting American citizens. The principle then lies about like a loaded
weapon ready for the hand of any authority that can bring forward a plausible
claim of an urgent need.”
999
27. For the above reasons, this court holds that the impugned
judgment committed an error in refusing relief to the appellants. 33 years
(based upon cessation of the Union’s legal possession) is a long enough
time, even in India, to be kept away from one’s property. The respondent
Union is directed to hand back possession of the suit lands to the appellants,
within three months. Furthermore, it is open to the appellants to seek
compensation based on fresh fixation of capital value and recurring annual
value, based on the different five-year periods for the l ast 20 years.
Such a claim shall be referred to arbitration, within four weeks of receipt
of the reference. The arbitrator shall proceed to pronou nce the award
within six months of receipt of the reference. This is independent of the
Union’s obligation to vacate and hand over peaceful possession of the
suit lands within three months.
28. The appeal is allowed in the above terms; the appellants shall
be paid costs, quantified at
75,000/-.
Kalpana K. Tripathy Appeal allowed.