The Bharat Coking Coal Ltd. & Ors. v. Amr Dev Prabha & Ors.
JUDGMENT
1. Leave Granted.
2. These appeals have been preferred by Bharat Coking Coa l
Ltd. (hereinafter, “BCCL”) being aggrieved by the o rder dated
12.04.2018 passed by a Division Bench of the High Court of Jharkhand
at Ranchi, wherein a writ petition filed by AMR-Dev Prabha (Respondent
No. 1) had been allowed and the auction process conducted by M/s C1
India Pvt Ltd (Respondent No. 4, hereinafter “C1-India”) was set aside
and the resultant award of tender by BCCL to M/s RK Transport Co
(Respondent No. 6) had also been quashed.
FACTUAL B ACKGROUND
3. BCCL, a subsidiary of Coal India Ltd, operates coking coa l
mines in India and as part of its operations regularly out sources many
mining and processing functions to external entities. Such allocation of
tasks is done through competitive bidding processes, with Respondent
No. 4 [M/s C1 India Pvt Ltd (hereinafter “C1 India”) – an online
609
procurement facilitator] being appointed as the service pr ovider for e-
tendering of its contracts.
4. A Notice Inviting Tender (“NIT”) was issued by the appellant
on 09.03.2015 for purposes of ‘ Hiring of HEMM for removal of OB,
extraction and transportation of coal with fire figh ting from XIV,
XII, XI/XII, XII, XI, IX/X, V/VI/VII/VIII, IV/VIII, IV(T), IV(B), III, II
I(T) and I(B) seams at Patch-DE (Mega Project) of Dh ansar-Ena
colliery of Kusunda Area along with crushing of coal by portable
crusher’ (NIT No 312). An initial estimate of Rs 1694.84 crores was
prepared by the appellant, with the aim of contracting the firm which
offered the lowest cost estimate for fulfilment of the tender work.
5. The bidding was slated to be conducted on the online e-reverse
auction platform of C1-India on 04.05.2015 and 05.05.2015, with C1-
India having near complete supervision and autonomy over the auction
process. In turn, C1-India had hosted its server with Tata Communications
Ltd (“TCL”) which was also providing internet connectivity through a
leased line to C1-India. As per terms of the NIT, the auction would close
at 6:00PM on 05.05.2015. However, the auction would automatically
terminate in case any particular bid went unresponded for a period of 30
minutes. In case of any technical faults at the service provi der’s end,
the auction period was to be paused and extended by the period of the
fault; however, bidders were to be responsible for connectivity problems
at their end.
6. Although the auction proceeded smoothly on the first day, on
05.05.2015 at around 12:55PM, C1-India is stated to have received certain
telephone calls from various participants claiming th at there were
connectivity problems leading to failure in submitting bids. An email was
thus sent by C1-India to TCL at 12:59PM stating “ my link is down”. In
response, TCL informed C1-India through an email at 2:11PM that
bandwidth issues had indeed been experienced owing to a dual fiber cut
in their intra-city network as well as a fault in their p atch cord. In the
interregnum, the last bid of Rs 2345 Crores made by M/s AM R-Dev
Prabha (Respondent No. 1) at 12:33PM went unresponded for thirty
minutes, and the auction was automatically closed at 1:03PM.
7. Taking conscious notice of these technical issues communicated
by TCL and estimating that a lower price could be discovered had such
fault not arisen, C1-India (allegedly with the concurrence of BCCL
officials) took a decision to restart the auction process at 2:30PM. Such
THE BHARAT COKING COAL LTD. & ORS. v. AMR DEV
PRABHA & ORS.
resumption, with the possibility of extension of time, was communicated
to all bidders telephonically, as well as through emails se nt between
2:17PM and 2:36PM. Accordingly, various bids were received by many
participants, including numerous bids from the now aggrieved Respondent
No. 1 and the ultimately successful Respondent No. 6. The auction
proceeded to the extended time of 1 hour and 27 minutes (calculated as
being the time of interruption between the erroneous closure at 1:03PM
and subsequent resumption at 2:30PM), and Respondent No. 6 was
declared successful with a bid of Rs 2043 crores at 7:27PM.
8. This was communicated to BCCL, which then after assessing
eligibility of M/s RK Transport (Respondent No. 6, hereinafte r “RK
Transport”), issued Letter of Acceptance (“LOA”) on 30.05.2015. A s
per earlier agreed contractual terms, a Performance Bank G uarantee
had to be submitted within 28 days of receipt of LOA. Respondent No.
6 was unable to do so, and it requested BCCL to provide an additional
two months for compliance. The appellant returned the Earnest Money
Deposit (“EMD”) to all unsuccessful bidders, including Respondent No.
1, through speed post on 18.06.2015. Finally, the requisite guarantees
were submitted after a delay of 49 days, which was condoned by the
appellant and job was started on the ground.
9. Three months after closure of the auction, Respondent No. 1
preferred a Writ Petition before the High Court of Jharkhand at Ranchi
on 10.08.2015, praying for a declaration that it emerged as the successful
L-1 bidder at 1:03 PM on 05.05.2015, and for quashing of the LOA
issued by the appellant to Respondent No. 6 for bei ng arbitrary.
Simultaneously, it was also prayed that directions be issued to BCCL for
awarding the contract to them and for conducting enquiry into the entire
matter.
10. During the pendency of the Writ Petition, Respondent No. 1
invoked Clause 20 of the NIT which provided for an integrity pact under
which two Independent External Monitors (“IEM”) had been appointed.
A report was received from one of these two IEMs on 23.09.2016 which
held that there had been no technical problem and that resumption of the
auction process at 2:30PM was unjustified. It is relevant to mention that
this report was submitted by the first IEM, acting unilaterally and without
according hearing to C1-India and RK Transport.
11. Simultaneously, the appellant approached the second IEM who
post receiving response from all parties presented a divergent report
611
with the observation that there was no possibility of collusion and noting
that the interruption in bandwidth had been established an d thus the
subsequent resumption by C1-India was in consonance with sp ecified
procedure.
12. In light of such conflict, BCCL first approache d the
Standardization, Testing & Quality Certification (STQC) Direc torate
seeking an audit, and later upon them expressing inability to do so owing
to the technical nature of the dispute; the appellant approa ched the
Director General of CERT-In (an independent body under the Ministry
of Communications & IT of the Government of India). An ‘Inc ident
Analysis Report’ was consequently submitted by the CERT-In to BCCL
on 30.12.2015. This report broadly concurred with the observations of
the second IEM and found that the process was not afflicted by collusion,
and confirmed the existence of connectivity problems which necessitated
resumption of the auction process.
13. On 16.08.2017, the learned Single Judge dismissed the first
respondent’s writ, holding that a level playing field had been provided by
BCCL to all bidders; there indeed was a connectivity issue and the
subsequent resumption of auction was as per terms of the NI T; award
of contract to RK Transport was not arbitrary for not only was it L-1 but
also had offered a bid much better than that of AMR-Dev Prabha. Further,
the first respondent was held to have acquiesced to any possible
irregularity in the process by participating in the resumed auction, and
BCCL’s condonation of delay in submission of guarantee by RK Transport
was held to be permissible and in public interest.
14. This was challenged by Respondent No. 1, before a Division
Bench of the High Court. During the pendency of the letters patent
appeal, on 18.09.2017, counsel for AMR-Dev Prabha offered a lower
bid of Rs 1950 Crores for the job, which they portrayed as be ing far
better than their earlier bid of Rs 2345 Crores which they had made at
12:33PM on 05.05.2015. This, however, was refused by the appellant
and instead a work order was issued to Respondent No. 6 on 23.11.2017,
who shortly afterwards commenced work.
15. The Division Bench allowed the appeal vide impu gned
judgment dated 12.04.2018 and quashed the LOA issued by BCCL in
favour of RK Transport and held that all consequent work was invalid.
The Division Bench of the High Court further directed reconduction of
the auction and ordered a vigilance enquiry into the matter. T aking
THE BHARAT COKING COAL LTD. & ORS. v. AMR DEV
PRABHA & ORS.
cognizance of the ratio of RD Shetty v. International Airport Authority
of India 1 and Tata Cellular v. Union of India 2 wherein this Court had
elucidated the breadth and permissibility of judicial revie w in tender
matters, the High Court opined that it was concerned not with the outcome
but only the manner in which the decision to award work-contract was
arrived at.
16. Analysing the terms of the NIT, the High Court held that it
was the bidder’s responsibility to comply with system requirements, with
BCCL not being liable for any technical difficulties or connectivity failures.
Tender could be paused only in case of technological/system failure at
the service provider’s end and once concluded, could only be revoked in
limited circumstances. Not only were the complaints non-actionable for
C1-India was continuously connected to TCL which meant there were
no problems at the service provider’s end, but even otherwise C1-India
failed to pause the auction process during the crucial period which it
ought to have as per the terms of the NIT.
17. Noting the absence of any call records or other proof o f
technical complaints by the bidders, the delay in communica tion of
resumption of auction process (observing how emails were sent till
2:37PM whereas auction resumed at 2:30PM), failure to revoke/cancel
declaration of AMR-Dev Prabha as L1 bidder and erroneous calculation
of the extended time (7:27PM instead of 7:35PM), the Court held that
BCCL and C1-India failed to maintain the sanctity of the auction process
and committed serious illegality which raised doubts on procedur al
propriety and indicated arbitrariness in the decision making process. Such
deviations from terms of the NIT were held to not o nly be mere
aberrations, but indicative of a complete lack of fair play which affected
integrity of the entire process, rendering it contrary to public interest and
consequently illegal.
CONTENTIONS OF P ARTIES
18. Assailing the order of the High Court primarily on preliminary
counts, BCCL vehemently contended that the present case was not one
where judicial review was possible. It highlighted that the scope of writ
jurisdiction in contractual dealings of the State or its instrumental ities
was extremely limited, and deference to commercial wisdom of the
1 (1979) 3 SCC 489.
2 (1994) 6 SCC 651.
613
executive ought to be the norm. The decision making process was shown
as not being illegal as there was no allegation of receipt of ext raneous
gratification or violation of any statute; nor irrational as the decision of
resuming the auction process to arrive at a better price w asn’t such
which would offend the sensibilities of a reasonable person; nor arbitrary
as there was substantial discretion granted by the terms of the NIT.
Respondent No. 1’s participation in the tender process post-resumption
was contended to bind him from making any further judicial challenge,
and alternate remedies under contract and civil law were demonstrated.
It was further stated that the entire process had been upheld by multiple
independent authorities, not least being the CERT-In and one of the two
IEMs.
19. Adopting such stand, Respondent No. 4 (C1-India) contended
that the slight delay in the decision-making process, wherein it did not
immediately take action, was because C1-India as a responsible e-services
provider was first attempting to determine whether the interruption was
at the bidders’ end or its own. By the time a response had been received
from the entity responsible for hosting and connectivity (i.e. TCL), the
auction had stopped by itself. Instead, it was argued that upon receipt of
written response from TCL at 2:11 PM, C1-India expeditiously took a
decision in consultation with BCCL, and started informing all participants
and resumed bidding at 2:30PM. It was underscored that no prejudi ce
had been caused to any bidder. Respondent No.1 had more than an
adequate opportunity of bidding, as it itself submitted eight bids during
the resumed time frame. Further, such participation combined with silence
for three-months afterwards evidenced that AMR-Dev Prabh a did not
consider itself to be L-1 and the present legal challenge was nothing but
commercial opportunism. With regard to the calculation of extended time,
counsel for C1-India submitted that such was immaterial as the quantum
of extension had uniformly been communicated to all bidde rs, and
everyone had the same information and hence an equal opportunity. The
resumption decision was claimed to have been taken in good faith and
upon a judicious consideration of all factors. It was thought t o be in
public interest, and in retrospect, had only resulted in substantial savings
for the public exchequer.
20. Counsel for the appellant, along with that for C1-India
highlighted how the goalpost was being changed by Respondent No .1
throughout the litigation. Whereas before the High Court AMR-D ev
THE BHARAT COKING COAL LTD. & ORS. v. AMR DEV
PRABHA & ORS.
Prabha sought adherence to terms of NIT and strict procedural
compliance, but later they wished to settle the matter a t a lower price
claiming larger public interest. This was claimed to de monstrate how
AMR-Dev Prabha’s interest was, in fact, personal and not pub lic, and
only to win the tender one way or the other and not to maintai n the
sanctity of the auction process. The lack of on-the-spot protest, neither
during the auction process, nor at the time of availing refund of the
Earnest Money Deposit; and the substantial delay in filing the writ petition
(after more than 3 months of close of the auction process and 2 months
from issue of the LOA) was nothing but an afterthought aimed at making
a commercial opportunity out of litigation. Hence, the present proceedings
were claimed to be an abuse of the process of law by AMR-Dev Prabha
and only a chance for arm twisting BCCL to award to it the tender, no
better than a contractual enforcement of private rights.
21. Instead, it was submitted, that any possible infirmity was merely
minor and inconsequential. There had been a substantive compliance of
the tender process and the Clauses of the Notive Inviting Tender (NIT),
and public interest of ensuring the lowest price discovery had been kept
at the forefront. It was contended that hyper technical compliance was
often not possible, nor desirable as often-a-times stri ct procedural
compliance could defeat the ends of substantive equality, like in the
present case.
22. Reliance was placed on the CERT-IN report to demonstra te
lack of any mala fide or tampering in the process. The interruptions at
the end of TCL were claimed to be but natural and a part of operational
inefficiencies which were not unheard of in e-tendering processes.
23. On the other side, Respondent No. 1 claimed that it had been
declared as the lowest bidder (L-1) by virtue of automatic conclusion of
the auction process at 1:03PM, post which any resum ption was
impermissible and contrary to contractual terms. Further, a colour was
sought to be cast, by claiming that such resumption was to benefit
particular parties. The refusal of BCCL to accept the new bid which
was more than Rs 400 crores less than the previous offer was claimed
to demonstrate this. Per AMR-Dev Prabha, public interest ought to be
prioritised, which according to Ram and Shyam Co v. State of
Haryana 3 would entail that the State instrumentality accept the bes t
available price, irrespective of formal technicalities.
3 (1985) 3 SCC 267.
615
24. No adverse inference could be drawn against Respondent 1’s
participation in the resumed bidding process as the resumption itself was
illegal. The auction was closed and not paused, and hence no resumption
of a closed bidding process was possible. Even otherwise, it was asserted
that grant of extension of 1 hour and 27 minutes was wrong. The time
should have been calculated from the time when the internet was affected,
which as per the appellant themselves was from 12:55PM as informed
to them by TCL. Hence an extension of 1 hour and 35 minutes (and not
1 hour and 27 minutes) was appropriate, per which the auction ought to
have concluded at 7:35 PM, and not 7:27 PM. Similarly, emails for
resumption at 2:30PM, were shown as having been sen t to some
participants at 2:17PM and to others at 2:36PM. Further, tw o persons
were claimed to have logged into the system at 2:29PM, that is, one
minute before resumption of the e-auction process, which wrongly gave
them an upper hand in the e-auction process. Other alleg ations were
also made regarding login by one entity using two accounts, which was
contended as being impermissible per the NIT.
25. All this was postulated to cast a serious cloud of doubt over
the entire auction process. Even during the pendency of the writ petition
before the High Court, instead of complying with an order dated
04.11.2015 to produce all relevant records, BCCL was said to hav e
impermissibly referred the matter to CERT-In. However, the first IEM
had held that the server of the appellant was well connec ted to the
server of the TCL and that there was no problem on the appellant’s end
which would necessitate stoppage or resumption of the auction process.
26. On maintainability, although Respondent No. 1 admitted to
having alternate remedies, but it argued that there could be no hard and
fast rule preventing it from approaching writ courts. On the p oint of
delay, in their counter-affidavit, Respondent No. 1 has contended that
the cause of action arose after Respondent No. 6 failed to sub mit the
Performance Guarantee within 28 days per the tender clauses.
27. Substantial emphasis was placed on the offer made by the
Respondent No. 1 to the appellant during the course of hearing of t he
writ petition, the rejection of which was claimed as being c ontrary to
public interest and settled law which aims at prior itising value
maximisation of the public exchequer.
THE BHARAT COKING COAL LTD. & ORS. v. AMR DEV
PRABHA & ORS.
ANALYSIS
28. Two clear issues-in-dispute arise from the above discussion.
The first pertains to the maintainability of the writ considering the nature
of tender processes, and the second concerns application of that standard
to the facts of the present case to determine whether there were la pses
on part of BCCL and C1-India.
(I) Maintainability of Writ Petition
29. The scope of judicial review in tenders has been explore d
in-depth in a catena of cases. It is settled that constitution al courts are
concerned only with lawfulness of a decision, and not its soun dness. 4
Phrased differently, Courts ought not to sit in appeal over decisions of
executive authorities or instrumentalities. Plausible decisions need not
be overturned, and latitude ought to be granted to the State in exercise
of executive power so that the constitutional separation of powers is not
encroached upon. 5 However, allegations of illegality, irrationality and
procedural impropriety would be enough grounds for courts to assume
jurisdiction and remedy such ills. This is especially true given our unique
domestic circumstances, which have demonstrated the need for judicial
intervention numerous times. Hence, it would only be the decision-making
process which would be the subject of judicial enquiry, and not the end
result (save as may be necessary to guide determination of the former).
30. This position of law has been succinctly summed up in Tata
Cellular v. Union of India (supra), where it was famously opined that:
“77. ... Therefore, it is not for the court to determine whethe r
a particular policy or particular decision taken in the
fulfilment of that policy is fair. It is only concer ned with the
manner in which those decisions have been taken. The extent
of the duty to act fairly will vary from case to case. Shortly
put, the grounds upon which an administrative actio n is
subject to control by judicial review can be classified as under :
(i) Illegality: This means the decision-maker must understand
correctly the law that regulates his decision-makin g power
and must give effect to it.
4 Central Coalfields Ltd. v. SLL-SML (Joint Venture Consortium), (2016) 8 SCC 622;
Siemens Aktiengeselischaft & Siemens Ltd. v. DMRC Ltd., (2014) 11 SCC 288.
5 Air India Ltd v. Cochin International Airport Limited (2000) 2 SCC 617.
617
(ii) Irrationality, namely, Wednesbury unreasonablen ess,
(iii) Procedural impropriety.”
31. But merely because the accusations made are against t he
State or its instrumentalities doesn’t mean that an aggrieved person can
bypass established civil adjudicatory processes and direc tly seek writ
relief. In determining whether to exercise their discretion , writ courts
ought not only confine themselves to the identity of the opposite party
but also to the nature of the dispute and of the relief praye d for. Thus,
although every wrong has a remedy, depending upon the nature of the
wrong there would be different forums for redress.
32. In cases where a constitutional right is infringed, writs would
ordinarily be the appropriate remedy. In tender matters, such can be
either when a party seeks to hold the State to its duty of tr eating all
persons equally or prohibit it from acting arbitrarily; or when executive
actions or legislative instruments are challenged for being in contravention
to the freedom of carrying on trade and commerce. However, writs are
impermissible when the allegation is solely with regard to violation of a
contractual right or duty. Hence, the persons seeking writ rel ief must
also actively satisfy the Court that the right it is seeking is one in public
law, and not merely contractual. In doing so, a balance is mai ntained
between the need for commercial freedom and the very real possibility
of collusion, illegality and squandering of public resources.
33. Such a proposition has been noticed by this Court even earlier
in Jagdish Mandal v. State of Orissa 6 in the following words:
“22. Judicial review of administrative action is inte nded to
prevent arbitrariness, irrationality, unreasonablen ess, bias
and mala fides. Its purpose is to check whether cho ice or
decision is made “lawfully” and not to check whether choice
or decision is “sound”. When the power of judicial review is
invoked in matters relating to tenders or award of contract s,
certain special features should be borne in mind. A con tract
is a commercial transaction. Evaluating tenders and awarding
contracts are essentially commercial functions. Princi ples of
equity and natural justice stay at a distance. If the decision
relating to award of contract is bona fide and is i n public
interest, courts will not, in exercise of power of judici al review,
6 (2007) 14 SCC 517.
THE BHARAT COKING COAL LTD. & ORS. v. AMR DEV
PRABHA & ORS.
interfere even if a procedural aberration or error in
assessment or prejudice to a tenderer, is made out. The power
of judicial review will not be permitted to be invoked to protect
private interest at the cost of public interest, or to decide
contractual disputes. The tenderer or contractor wi th a
grievance can always seek damages in a civil court. Atte mpts
by unsuccessful tenderers with imaginary grievances ,
wounded pride and business rivalry, to make mountains out
of molehills of some technical/procedural violation or s ome
prejudice to self, and persuade courts to interfere by exercising
power of judicial review, should be resisted. Such
interferences, either interim or final, may hold up public w orks
for years, or delay relief and succour to thousands and millions
and may increase the project cost manifold.”
(emphasis supplied)
34. Such conscious restraint is also necessary because judic ial
intervention by itself has effects of time and money, which if unchecked
would have problematic ramifications on the State’s ability to enter into
contracts and trade with private entities. Further, it i s not desirable or
practicable for courts to review the thousands of contracts entered into
by executive authorities every day. Courts also must be cognizant that
often-a-times the private interest of a few can clash with public interest
of the masses, and hence a requirement to demonstrate effect on ‘public
interest’ has been evolved by this Court. 7
35. It is thus imperative that in addition to arbitrariness, illegality
or discrimination under Article 14 or encroachment of freedom under
Article 19(1)(g), public interest too is demonstrated befo re remedy is
sought. Although the threshold for the latter need not be high, but it is
nevertheless essential to prevent bypassing of civil court s and use of
constitutional avenues for enforcement of contractual obligations.
36. In the present case, although it is clear that the Division Bench
of the High Court was cognizant of these principles surrounding scope
of judicial review, however, it failed to effectively evaluate whether larger
public interest was being affected. On the contrary, we feel that the
interest of Respondent No. 1 was purely private and monetary in nature.
7 Jagdish Mandal v. State of Orrisa, (2007) 14 SCC 517 ¶ 22.
619
37. First, AMR-Dev Prabha’s initial prayer sought to nullify the
award of contract, which if granted, would have increased the sums
payable by the State instrumentality from Rs 2043 crores to Rs 2345
crores. Second, the conduct of Respondent No. 1 over the course of
the present proceedings, as highlighted by the appellants, further bolsters
the lack of public interest. Whereas initially the fi rst respondent was
seeking quashing of the LOA issued to Respondent No. 6 owing to
arbitrariness on part of BCCL and on the ground that sanctity of the
auction process had been violated; later, before the Division Bench,
Respondent No. 1 sought to make a new offer of Rs 1950 Crores. This
shows how AMR-Dev Prabha’s priority was only to secure the contract
and not to uphold the law or protect larger public interest.
38. Even otherwise, granting such a prayer means that Respondent
No. 1 would have gotten a special opportunity of negotiation, to t he
detriment of all other participants, which would probably be a more
egregious violation of equality envisaged under Article 14 t han the
procedural adherence which they were initially seeking to protect.
39. Additionally, we are not impressed with the first respondent’s
argument that there is a certain public interest at stak e whenever the
public exchequer is involved. There are various factors in play, in addition
to mere bidding price, like technical ability and timely completion which
must be kept in mind. And adopting such interpretation would permanently
blur the line between contractual disputes involving the State and those
affecting public law. This has aptly been highlighte d in Raunaq
International Ltd. v. IVR Construction Ltd. 8
“11. When a writ petition is filed in the High Court challenging
the award of a contract by a public authority or the State, the
court must be satisfied that there is some element o f public
interest involved in entertaining such a petition. If, for
example, the dispute is purely between two tenderers, the court
must be very careful to see if there is any element of public
interest involved in the litigation. A mere differe nce in the
prices offered by the two tenderers may or may not be decisive
in deciding whether any public interest is involved in
intervening in such a commercial transaction . It is important
to bear in mind that by court intervention, the proposed proj ect
may be considerably delayed thus escalating the cost far more
8 (1999) 1 SCC 492.
THE BHARAT COKING COAL LTD. & ORS. v. AMR DEV
PRABHA & ORS.
than any saving which the court would ultimately ef fect in
public money by deciding the dispute in favour of one tenderer
or the other tenderer. Therefore, unless the court is sati sfied
that there is a substantial amount of public interes t, or the
transaction is entered into mala fide, the court sh ould not
intervene under Article 226 in disputes between two rival
tenderers.”
(emphasis supplied)
40. Further, the first respondent has failed to demonstrate which
public law right it was claiming. The main thrust of AMR-Dev Prabha’s
case has been on the fact that at 1:03PM on 05.05.2015 it was declared
the lowest bidder (or L-1). However, being declared the L-1 bidder does
not bestow upon any entity a public law entitlement to aw ard of the
contract, as noted in Maa Binda Express Carrier v. North-East
Frontier Railway 9:
“8. The scope of judicial review in matters relating to award
of contracts by the State and its instrumentalities is se ttled by
a long line of decisions of this Court. While these decis ions
clearly recognise that power exercised by the Gover nment
and its instrumentalities in regard to allotment of contract is
subject to judicial review at the instance of an aggrieved p arty,
submission of a tender in response to a notice invit ing such
tenders is no more than making an offer which the State or it s
agencies are under no obligation to accept. The bidders
participating in the tender process cannot, therefor e, insist
that their tenders should be accepted simply because a given
tender is the highest or lowest depending upon whet her the
contract is for sale of public property or for execution of works
on behalf of the Government. All that participating bidders
are entitled to is a fair, equal and non-discriminatory treatment
in the matter of evaluation of their tenders. It is a lso fairly
well settled that award of a contract is essentially a commercial
transaction which must be determined on the basis o f
consideration that are relevant to such commercial decision.
This implies that terms subject to which tenders are in vited
are not open to the judicial scrutiny unless it is found that the
same have been tailor-made to benefit any particular tenderer
9 (2014) 3 SCC 760.
621
or class of tenderers. So also, the authority inviting tenders
can enter into negotiations or grant relaxation for bona fide
and cogent reasons provided such relaxation is perm issible
under the terms governing the tender process.”
(emphasis supplied)
41. Instead, precedent laid down by this Court in Master Marine
Services (P) Ltd v. Metcalfe & Hodg Kinson (P) Ltd, 10 illustrates that
if a prayer for re-bidding is on account of a desire to get a better price,
then involvement of Article 14 of the Constitution would not be made
out.
42. Further, regular recourse was made over the cou rse of
proceedings by learned senior counsel for the first respondent on terms
of the NIT. Findings in the impugned order too were based upon disputed
interpretation of such contractual terms. Thus, it is clear that there was
neither any public law right of the first respondent which was affected,
nor was there any public interest sought to be furthered.
(II) Infirmities in the auction process
43. On merits also, we do not feel that the impugned order is
correct in its conclusion that there were substantial procedural lapses on
part of BCCL and C1-India which amount to arbitrariness, and ought to
be remedied by way of judicial review.
44. Instead, having the benefit of a detailed inquiry report of the
Central Vigilance Commission (“CVC”), we are of the firm opinion that
both the appellant and Respondent No. 4 acted in a bona f ide manner
and as per their abilities. Even if it is true that BCCL could have assumed
more responsibility and C1-India could have exercised a more proactive
role in checking for internet issues, yet the possibility of improvement
can’t be a ground for striking down an authority’s action. Additionally,
no allegation of the decisions being accentuated by illegal gratification,
or otherwise being fraudulent or contrary to a statute have eithe r been
clearly made or established.
45. It would thus be apt at this stage to reproduce the concluding
passage of fact finding enquiry conducted by CVC, which rea ds as
follows:
10 (2005) 6 SCC 138.
THE BHARAT COKING COAL LTD. & ORS. v. AMR DEV
PRABHA & ORS.
“It is significant to place on record that the noti fication of
closure of the reverse auction generated by system at 13:03:47
hrs on 05.05.2015 submitted by M/s AMR Dev Prabha, in
fact, belongs to another bidder M/s. Montecarlo Ltd. Neither
BCCL nor C1 India Pvt. Ltd. have ever placed such
notification on record. It remaims unclear as to how and when
M/s. AMR Dev Prabha got possession of this document, which
actually belonged to M/s. Montecarlo Ltd. and which became
the basis for M/s. AMR Dev Prabha to stake their cl aim of
being the lowest bidder at 13.03.47 hrs. It is also se en that
this important fact, of generation of notification of closure of
the auction by the system at 13:03:47 Hours, as the bid of M/
s AMR Dev Prabha remained unresponded for the specifie d
period of 30 minutes, was neither reported by C1 In dia to
BCCL nor to the participating bidders. Such, notifica tion of
closure of the auction, even though generated durin g the
period of interruption in connectivity of the bidders with t he
server, should have been declared as ‘null and void ’ before
restarting the auction process. Even, BCCL did not de mand
any report from C1 India Pvt. Limited for the inter ruption
period so as to take a call before proceeding furth er for
restart of the reverse auction process. Further, co nsidering
that during this period BCCL was aware of the connect ivity
problem being faced by the bidders, it should have exercis ed
intense real time monitoring which have not been done. Failure
to do so is a reflection of the fact the adequate i ncident
management system was not put in place by the servi ce
provider M/s. C1 India Pvt. Ltd. to handle such event uality
effectively.
While there was lack of control and supervision on p art of
BCCL, however, the Committee has not come across an y
evidence suggesting mala-fide on their part. As reg ards to
C1 India Pvt. Ltd., their conduct has been found to be far
from satisfactory.”
46. We do not deem it necessary to venture into the existence of
technical problems of limited bandwidth, for the same is a question of
fact. However, given the concurrent finding of the second IEM, CERT-
In, TCL, as well as the CVC, we feel that the Division Bench err ed in
623
holding that there were no technical difficulties. Further more, such a
conclusion is at odds with subsequent occurrences. A finding that there
were no internet problems implies that no other bidde r deemed it
appropriate to counter the bid of Rs 2345 crores offered by Respondent
No. 1 at 12:33PM and that it was the competitively determined lowest
price. However, it is obvious that minutes into the resu mption of the
auction process bids started coming in and more than a dozen bids were
received subsequently, with the last bid of Rs 2043 crores having been
made mere seconds before closure of the auction at 7:27 PM.
47. With regard to other allegations concerning condonation of
Respondent No. 6’s delay in producing guarantees, we would onl y
reiterate that there is no prohibition in law against publ ic authorities
granting relaxations for bona fide reasons. In Shobikaa Impex (P) Ltd.
v. Central Medical Services Society 11 , it has been noted that:
“… the State can choose its own method to arrive at a decision
and it is free to grant any relaxation for bona fide reaso ns, if
the tender conditions permit such a relaxation. It h as been
further held that the State, its corporations, instrumental ities
and agencies have the public duty to be fair to all concerned.
Even when some defect is found in the decision-maki ng
process, the Court must exercise its discretionary powers under
Article 226 with great caution and should exercise it only in
furtherance of public interest and not merely on th e making
out of a legal point.”
48. Even if there had been a minor deviation from explicit terms
of the NIT, it would not be sufficient by itself in the absence of mala fide
for courts to set aside the tender at the behest of an unsuccessful bidder. 12
This is because notice must be kept of the impact of over turning an
executive decision and its impact on the larger public interest in the form
of cost overruns or delays.
49. There is also no need to venture into questions concerning
quantum of extension of time. It is clear that the same m essage was
communicated by CI–India to all, stating that the auction process would
be extended by a period equivalent to the time between closure of auction
at 1:03PM and resumption at 2:30 PM. Not only did such unif orm
communication put all bidders on an equal footing, but there was no
11 (2016) 16 SCC 233.
THE BHARAT COKING COAL LTD. & ORS. v. AMR DEV
PRABHA & ORS.
possibility of any confusion given the clear wordings of the email. When
it is not the case of Respondent No. 1 that they thought that auction
would close at 7:35PM and hence they were taken by surprise at the
early closure, nor did they in fact highlight or object to such interpretation
over the course of the resumed auction process, the question is moot
and a finding ought not to be given on it.
50. Additionally, we also do not see merit in the justification for
delay in filing writ proffered by the first respondent. It is claimed that the
cause of action arose when Respondent No. 6 failed to submit guarantees
within a period of 28 days. However, we do not see how that w ould
allow AMR-Dev Prabha to challenge the entire process of aucti on, or
overcome the settled legal principle of privity of contr act between
Respondent No. 6 and the appellant.
(III) Deference to authority’s interpretation
51. Lastly, we deem it necessary to deal with another fundamental
problem. It is obvious that Respondent No. 1 seeks to only enforce terms
of the NIT. Inherent in such exercise is interpretation of cont ractual
terms. However, it must be noted that judicial interpretation of contracts
in the sphere of commerce stands on a distinct footing than while
interpreting statutes.
52. In the present facts, it is clear that BCCL and C1-India have
laid recourse to Clauses of the NIT, whether it be to justify condonation
of delay of Respondent No. 6 in submitting performance bank guarantees
or their decision to resume auction on grounds of technical failure. BCCL
having authored these documents, is better placed to apprec iate their
requirements and interpret them. 13
53. The High Court ought to have deferred to this understanding,
unless it was patently perverse or mala fide. Given how BCCL’s
interpretation of these clauses was plausible and not abs urd, solely
differences in opinion of contractual interpretation ought not to have
been grounds for the High Court to come to a finding that the appellant
committed illegality.
CONCLUSION
54. In light of the above discussion, the appeal filed by B harat
Coking Coal Ltd, as well as connected appeals filed by M/s RK Transport
13 Afcons Infrastructure Ltd v. Nagpur Metro Rail Corporation Ltd, (2016) 16 SCC 818
at ¶ 15.
625
and M/s C1 India Pvt Ltd, are allowed. Resultantly, the appeal filed by
AMR-Dev Prabha is dismissed. The Division Bench judgment of the
High Court dated 12.04.2018 is set-aside and the writ petition filed by
AMR-Dev Prabha is dismissed. No order as to costs.
Ankit Gyan Appeals disposed of.
THE BHARAT COKING COAL LTD. & ORS. v. AMR DEV
PRABHA & ORS.