Adani Gas Limited v. Petroleum and Natural Gas Regulatory Board and Ors.
DR DHANANJAYA Y CHANDRACHUD J.
1. In 2018 the Petroleum and Natural Gas Regulatory Board 1
conducted theninth round of bidding for City or Local Natural Gas
Distribution Networks 2. On 14 September 2018, a press release was
placed on the Board’s website notifying details of the successful bidders
in various Geographical Areas 3. The contest in the present batch of
appeals has arisen over the grant of authorisation for layi ng, building,
operating or expanding CGD networks in the following GAs:
(i) GA 51 - Puducherry District;
(ii) GA 61 - Kanchipuram District; and
(iii) GA 62 – Chennai & Tiruvallur Districts.
2. The Appellate Tribunal for Electricity 4wasseized of two appeals
– Appeal No 292 of 2018, instituted by Adani Gas Limited and Appeal
No 323 of 2018, instituted by IMC Limited. These appeals were instituted
before the APTEL under Section 30(1) of the Petroleum and Na tural
Gas Regulatory Board Act 2006 5. By their separate judgments dated 28
February 2019, the Chairperson and Member Technical (Petroleum and
Natural Gas) rendered divergent findings, following which the
Chairperson directed that the proceedings in the two appeals be placed
before the judicial member. The judicial member recusedfrom hearing
the appeals on 7 March 2019. This led to the institution of the pres ent
appeals before this Court. Noting that no other judicial memb er was
available in the APTEL to conduct the hearing, this Court by it s order
dated 1 April 2019 admitted the appeals and issued directions in exercise
of its powers under Article 142 of the Constitution for the transfer of the
proceedings before the APTEL to this Court in order to bring finality to
the present dispute. In assessing the merits, the Court has had the benefit
of appraising the differing views which have been expresse d by the
Chairperson and by the Member Technical (Petroleum and Natural Gas).
3. The APTEL has been constituted in terms of sub-Section (1)
of Section 30 of the PNGRB Act which is extracted below:
1 “the Board”
2 “CGD Networks”
3 “GAs”
4 “APTEL” or “Tribunal”
5 “PNGRB Act”
121
“30 . Appellate Tribunal. (1) Subject to the provisions of this
Act, the Appellate Tribunal established under section 110 of the
Electricity Act, 2003 (36 of 2003) shall be the Appellate Tribunal
for the purposes of this Act and the said Appellate Tribunal shall
exercise the jurisdiction, powers and authority conferred on it by
or under this Act:
Provided that the Technical Member of the Appellate Tribunal for
the purposes of this Act shall be called the Technical M ember
(Petroleum and Natural Gas) and shall have the qualifications
specified in sub-section (2) of section 31.”
Section 33 stipulates that any person aggrieved by an order or
decision of the Board has recourse to an appeal to the Tribunal . The
jurisdiction of the APTEL while hearing an appeal is spelt out in sub-
Section (6) of Section 33 in the following terms:
“33.(6) The Appellate Tribunal may, for the purpose of examining
the legality or propriety or correctness of any order or decision of
the Board referred to in the appeal filed under sub-sectio n (1),
either on its own motion or otherwise, call for the records relevant
to disposing of such appeal and make such orders as it thinks fit.”
An appeal lies to this Court against an order of the APTEL, other
than an interlocutory order, under Section 37 on the grounds set out in
Section 100 of the Code of Civil Procedure 1908. With this background,
we now turn to the PNGRB Act under the aegis of which the nin th
round of CGD bidding occurred.
PNGRB Act and regulations
4. The content of the PNGRB Act is summarised by its long title
as:
“An Act to provide for the establishment of Petroleum and Natural
Gas Regulatory Board to regulate the refining, processing, storage,
transportation, distribution, marketing and sale of petrole um,
petroleum products and natural gas excluding production of crude
oil and natural gas so as to protect the interests of consumers and
entities engaged in specified activities relating to petr oleum,
petroleum products and natural gas and to ensure uninterrupted
and adequate supply of petroleum, petroleum products and natural
gas in all parts of the country and to promote competitive markets
and for matters connected therewith or incidental thereto.”
ADANI GAS LTD. v. PETROLEUM AND NATURAL GAS
REGULATORY BOARD [DR. DHANANJAYA Y CHANDRACHUD J.]
The PNGRB Act came into force, in terms of the provisio ns
contained in Section 1(3) on 1 October 2007, save and except for Section
16. Section 16 which provides for the authorisation for buildin g or
expanding CGD Networks, came into force on 15 July 2010. Section 16,
insofar as is material contains the following stipulations:
“16. Authorisation .—No entity shall—
(a) lay, build, operate or expand any pipeline as a common carrier
or contract carrier,
(b) lay, build, operate or expand any city or local natural gas
distribution network, without obtaining authorisation under this Act:
… ’’
Under Section 19 of the PNGRB Act, the Board may grant an
authorisation for a city or local natural gas distribution network either on
the basis of an application or suo moto . Before it does so in a specified
GA, the Board is under a mandate to give wide publicity of its intent to
do so. Upon inviting applications from interested parties, the Board may
select an entity “in an objective and transparent manner as specified by
regulations for such activities”.
5. On 19 March 2008, the Petroleum and Natural Gas Regulatory
Board (Authorizing Entities to Lay, Build, Operate or Expa nd City or
Local Natural Gas Distribution Networks) Regulations 200 8 6 were
notified. The CGD Authorisation Regulations were amended on 21 June
2013, 7 April 2014 and 6 April 2018. The CGD Authorisation Regulations,
as amended in 2018, substituted new criteria for bidding which applied
to the ninth round of bidding with which the present batch of appeals is
concerned.
6. Regulation 6 of the CGD Authorisation Regulations provides
for the invitation by the Board for laying, building, operating or expanding
of a CGD network in a specific city or GA. The procedure stipulated in
Regulation 5 is to apply, except for those aspects relating to expressions
of interest. Under Regulation 5(6), the Board can scrutinise only those
bids which are received in response to an advertisement and from entities
which fulfil certain minimum eligibility criteria. Regulation 5(6)(b) spells
out the criteria, which are designed to ensure that the entity b idding is
technically capable of laying and building a CGD network in the
6 “CGD Authorisation Regulations”
123
relevant city or GA. Regulation 5(6)(c) enunciates criteria which ensure
that the entity is technically capable of operating and maintaining a
CGD network. Besides the technical criteria, the Regulations also spell
out certain financial criteria which potential bidde rs must satisfy.
Regulation 5(6)(e) provides:
“(6) The Board shall scrutinise the bids received in re sponse to
the advertisement in respect of only those entities which fulfil the
following minimum eligibility criteria, namely:-
…
(e) the entity has adequate financial strength to exe cute the
proposed project, operate and maintain the same in the authorised
area and shall meet the following financial criterion to qualify for
bidding for a single CGD network namely:-
Population in the geographical
area as per 2011 Census of
India
Minimum net worth of the bidder entity
(1) (2)
5 million or more Rs. 1,500 million for a population of 5 million,
plus additional Rs. 300 million for each 1
million of population or part thereof, in excess
of 5 million (refer Note-3)
2 million or more but less than 5
million
Rs.1,000 million
1 million or more but less than 2
million
Rs. 750 million
0.5 million or more but less than
1 million
Rs. 500 million
0.25 million or more but less
than 0.50 million
Rs. 250 million
0.1 million or more but less than
0.25 million
Rs. 100 million
Less than 0.1 million Rs. 50 million
’’
The minimum net-worth of the bidding entity is thus linked to the
population of the GAthe entity is bidding for, as set out in2011 Census
data.
7. Regulation 7 of the CGD Authorisation Regulations provides
the criteria for determining how the Board should evaluate rival bids for
the same GA. Regulation 7 is quoted below, in its entirety:
“7. Bidding criteria.
ADANI GAS LTD. v. PETROLEUM AND NATURAL GAS
REGULATORY BOARD [DR. DHANANJAYA Y CHANDRACHUD J.]
1(a) The Board, while considering the proposal for authorisation,
shall tabulate and compare all financial bids meeting the minimum
eligibility criteria, as per the bidding criteria speci fied below,
namely:-
Sl.
No
Bidding Criteria Weightage
%
Explanation
1 Lowness of transportation
rate for CGD – in rupees per
million British Thermal Unit
(Rs./MMBTU)
10 Bidder is required to quote
transportation rate for CGD
only for the first contract year
which shall not be less than
Rs.30/MMBTU. Rates for the
subsequent contract years
shall be derived considering
the quoted rate and escalation
as per Note.
2 Lowness of transportation
rate for CNG – in rupees per
kilo gram (Rs./kg)
10 Bidder is required to quote
transportation rate for CNG
only for the first contract year
which shall not be less than
Rs.2/kg. Rates for the
subsequent contract years
shall be derived considering
the quoted rate and escalation
as per Note.
3 Highness of number of CNG
stations (online and
daughter booster stations) to
be installed within 8 contract
years from the date of
authorisation
20 -
4 Highness of number of
domestic piped natural gas
connections to be achieved
within 8 contract years from
the date of authorisation
50 -
5 Highness of inch -kilometre
of steel pipeline (including
sub-transmission steel
pipelines) to be laid within 8
contract years from the date
of authorisation
10 -
Note – Annual escalation shall be considered from the seco nd contract year and
onwards based on the “Wholesale Price Index (WPI) Data (2011-12 =100)” for “All
Group/ Commodity”, as normally available on the web site of the Office of the
Economic Adviser, Government of India, Ministry of Commerce and Industry,
Department of Industrial Policy and Promotion (DIPP ) on the link
“http://eaindustry.nic.in/home.asp.”
Provided that in the case of the geographical areas of (i) Bilaspur,
Hamirpur and Una Districts; (ii) Panchkula (Except area already
authorised), Shimla, Solan and Sirmaur Districts and (iii) Barmer, Jaisalmer
and Jodhpur Districts, it is not mandatory to supply natural gas through
steel-pipes. However natural gas has to reach in all cha rge areas. The
bidding parameters and their respective weightage will, accordingly, be
as under:-
125
Sl.
No
Bidding Criteria Weightage
%
Explanation
1 Lowness of transportation
rate for CGD – in rupees
per million British
Thermal Unit
(Rs./MMBTU)
10 Bidder is required to quote
transportation rate for CGD
only for the first contract year
which shall not be less than
Rs.30/MMBTU. Rates for the
subsequent contract years
shall be derived considering
the quoted rate and escalation
as per Note.
2 Lowness of transportation
rate for CNG – in rupees
per kilo gram (Rs./kg)
10 Bidder is required to quote
transportation rate for CNG
only for the first contract year
which shall into be less than
Rs.2/kg. Rates for the
subsequent contract years
shall be derived considering
the quoted rate and escalation
as per Note.
3 Highness of number of
CNGstations (online and
daughter booster stations)
to be installed within 8
contract years from the
date of authorisation
25 -
4 Highness of number of
domestic piped natural gas
connections to be achieved
within 8 contract years
from the date of
authorisation
55 -
Note: Annual escalati on shall be considered from the second contract yea r and
onwards based on the “Wholesale Price Index (WPI) Data (2011-12=100)” for “All
Group / Commodity”, as normally available on the we bsite of the Office of the
Economic Adviser, Government of India, Ministry of Commerce and Industry,
Department of Industrial Policy and Promotion (DIPP ) on the link
“http://eaindustry.nic.in/home.asp.”
1(b) Successful bidder shall be required to achieve the year-wise
work programme within 8 contract years as per details given below,
namely:-
PNG Connections
(cumulative)
CNG stations
(cumulative)
Inch -km of steel pipeline
(cumulative)
By the
end of
contract
year
% of work
programme
By the
end of
contract
year
% of work
programme
By the
end of
contract
year
% o f work
programme
1st Nil 1st Nil 1st 5
2
nd
10 2
nd
15 2
nd
20
3rd 20 3rd 30 3rd 40
4
th
30 4
th
45 4
th
60
5th 40 5th 60 5th 70
6
th
60 6
th
75 6
th
80
7
th
80 7
th
90 7
th
90
8
th
100 8
th
100 8
th
100
Note: - In case derived numbers are in fraction, the same s hall be rounded off to the
nearest whole number and fraction 0.5 shall be roun ded off to next higher whole
number.
ADANI GAS LTD. v. PETROLEUM AND NATURAL GAS
REGULATORY BOARD [DR. DHANANJAYA Y CHANDRACHUD J.]
Provided that in the case of the geographical areas of (i) Bilaspur,
Hamirpur and Una Districts; (ii) Panchkula (Except area already
authorised), Shimla, Solan and Sirmaur Districts and (iii) Barmer,
Jaisalmer and Jodhpur Districts, successful bidder shall be required
to achieve the year-wise work programme within 10 contract years
as per details given below, namely:-
PNG Connections (cumula tive) CNG stations (cumulative)
By the end of
contract year
% of work
programme
By the end of
contract year
% of work programme
1st Nil 1st Nil
2
nd
10 2
nd
10
3rd 20 3rd 20
4
th
30 4
th
30
5th 40 5th 40
6th 50 6th 50
7
th
60 7
th
60
8th 70 8th 70
9th 80 9th 80
10 th 100 10 th 100
Note – In case derived numbers are in fraction, the same shall be rounded off to the
nearest whole number and fraction 0.5 shall be round ed off to next higher whole
number.
(2) ***********
(3) Bidder entity with the highest composite score, consideri ng
the criteria under sub-regulation (1) and as illustrated in Schedule
C (1), shall be declared as successful bidder.
Provided that in case of tie in the evaluated composite score, the
successful bidder shall be decided based on the high ness of
numbers of PNG connections among the tied bidding entities. In
case there is tie on number of PNG connections also, highness of
inch-kilometer steel pipeline shall be considered and thereafter in
case of tie in inch-kilometer as well, highness of numbers of CNG
stations shall be considered;”
Under Regulation 7, the Board while considering proposals for
authorisation,shall tabulate and compare all financial bids which meet
the minimum eligibility criteria in accordance with the bidding criteria set
out as enunciated. The table set out in Regulation 7(1)(a) prov ides for
the tabulation of all eligible financial bids on the basis of five parameters.
The table enunciates the five bidding criteria and the weightage which is
to be ascribed to each of them. The criteria are as follows:
127
(i) The first criterion is the ‘lowness’ of the transportat ion rate
for CGD computed in rupees per million for a British
Thermal Unit. The weightage ascribed to this criterion is
10 per cent. The explanation stipulates that a bidder is
required to quote the transportation rate for CGD only for
the first contract year at a rate not less than Rs 30 per
MMBTU;
(ii) The second criterion is the ‘lowness’ of the transpor tation
rate for CNG expressed in rupees per kilogram.The
weightage ascribed to this criterion is 10 per cent. The bidder
is required to quote the transportation rate only for the first
contract year at a rate of not less than Rs 2 per kilogram;
(iii) The third criterion is the ‘highness’ of the number of CNG
stations to be installed within eight contract years from the
date of authorisation. The weightage ascribed to th is
parameter is 20 per cent;
(iv) The fourth criterion is the ‘highness’ of the number o f
domestic piped natural gas connections to be achieved within
eight contract years from the date of authorisation. The
weightageascribed to this criterion is 50 per cent; and
(v) The fifth criterion is the ‘highness’ of the inch-kilometre of
steel pipeline to be laid within eight contract years from the
date of authorisation. The weightage ascribed to this
parameter is 10 per cent.
Regulation 7(1)(b) sets out a year-wise work programme indicating
the progress which must be achieved by the successful bidde r every
year during the course of eight contract years from the date of
authorisation. Under Regulation 7(3), a bidding entity with the highest
composite score, in terms of the criteria contained in sub-regulation (1),
is to be declared as the successful bidder. This is illustrated in Schedule
C(1) of the CGD Authorisation Regulations. Schedule C(1) contains the
following illustration of the manner in which the weightage for PNG
connections is to be ascribed:
“(E) Number of PNG domestic connections
Let,
ADANI GAS LTD. v. PETROLEUM AND NATURAL GAS
REGULATORY BOARD [DR. DHANANJAYA Y CHANDRACHUD J.]
P1 = Number of PNG domestic connections by the 1 st entity
P2 = Number of the PNG domestic connections by the 2 nd
entity
P3 = Number of the PNG domestic connections by the 3 rd
entity
Assume P1 is higher than P2 and P2 is higher than P3.;
The highest number of PNG domestic connections bid (HP1) shall
be given a score of 100% and the number of the other PNG
domestic connections bids shall be given a score in relati on to
HP1 on a pro-rata basis as under :-
HP1 = 100%
HP2 = 100 % x (P2 ÷ P1)
HP3 = 100 % x (P3 ÷ P1)
’’
This illustration shows that the entity which has quoted the highest
number of PNG domestic connections to be achieved is allotted a score
of 100 per cent. The entities below the highest will be assigned a score
in relation to the first entity on a proportionate basis.
8. Under Regulation 9, the grant of an authorisation is to be issued
to a successful entity after it furnishes a performance bond. The quantum
of the performance bond is based on the population o f the GA as
determined with reference to the census data of 2011. Regula tion 9
states:
“9. Performance bond.
(1) Grant of authorisation shall be issued to the successful entity
after it furnishes the performance bond in the form of dem and
draft or pay order or bank guarantee from any scheduled bank
for the amount as per details given below, namely:-
129
Serial
Number
Population in the
Geographical Area, as pre
2011 Census of India
Amount of
Performance
Bond (Rupees)
1 5 million or more 500 million
2 2 million or more but less
than 5 million
330 million
3 1 million or more but less
than 2 million
250 million
4 0.5 million or more but less
than 1 million
150 million
5 0.25 million or more but less
than 0.50 million
80 million
6 0.1 million or more but less
than 0.25 million
30 million
7 Less than 0.1 million 15 million
’’
Under Regulation 10, the successful entity is to be issued a letter
of intent 7 upon the finalisation of the bid. Under the CGD
Authorisation Regulations, the authorised entity must also obtain
financial closure for the projectfrom a bank or financial institution
within 270 days of authorisation.
9. The period of implementation of the project under the nint h
round of CGD bidding is 2018 to 2026. The period for commercial
operation is between 2018 and 2043.
10. From an analysis of the CGD Authorisation Regulations, it
becomes evident that the 2011 census figures have been utilised to peg
the net-worth requirement in Regulation 5(6)(e) and the valu e of the
performance bond to be submitted to the Board post authorisation in
Regulation 9. Significantly, Regulation 7, which provides a table specifying
7 “LOI”
ADANI GAS LTD. v. PETROLEUM AND NATURAL GAS
REGULATORY BOARD [DR. DHANANJAYA Y CHANDRACHUD J.]
the five bidding criteria to evaluate competing bids, does not link the said
criteria with the census figures of 2011.
Facts of the present appeals
11. On 12 April 2018, the Board initiated the bidding process for
authorising entities to lay, build, operate or expand CGD networks for
the ninth round. The bids were invited by means of an application-cum-
bid-document for each GA.8 The bidding process covered various GAs,
including those of (i) GA 51 - Puducherry District; (ii) GA – 61
Kanchipuram District; and (iii) GA 62 -Chennai-Tiruvallur.
12. Clause 1.1. of the Bid Document was titled ‘Geographical
area and related information’. Clause 1.1.1 stipulated that the Board
had identified a GA and was accordingly inviting applications-cum-bids
for the grant of authorisation for developing a CGD network in t he
GA.Each GA was depicted in a map at Annexure-1 of the Bid Document
for the relevant GA. Under Clause 1.1.3, it was the responsibil ity of
each bidder to obtain all information related to the prese nt gas supply
availability, pipeline connectivity and information about existing customers,
if any, in the specified GA. Clause 1.1.3 stated:
“1.1.3. It is the bidder’s responsibility to obtain all
information related to the present gas supply availability
and pipeline connectivity and also existing customer s, if
any, in the specified geographical area. The bidder can also
refer to list of NOCs/Permissions granted by PNGRB to various
entities under the provisions of the Internal Guidelines for grant of
NOC/Permission for (i) supply/distribution of CBM/natural gas
through cascades; and (ii) setting up of CNG/LNG Dau ghter
Booster Stations (DBS), in theareas where the Board has not yet
authorized any entity for developing or operating CGD networks
at http://www.pngrb.gov.in/CGD-NOCs.html.”
(Emphasis supplied)
The scope of work was defined in Clause 1.2 of the Bid Document:
“The entities bidding for this work shall be required to lay, build,
operate or expand the CGD networks to meet requirement of
8 With respect to the relevant GA, “Bid Document”
131
natural gas in domestic, commercial and industrial segments
including Natural Gas in the vehicular segment in the sai d
geographical area to be authorized and also comply with the
relevant regulations notified from time to time.
The entities shall be required to carry out the development of
CGD project in line with the regulations laid down by the
PNGRB.”
13. Clause 2.1.1 required the bidders to examine the contents of
the Bid Document and the regulations of the Board. C lause 2.1.2
described Annexure-1 as the map depicting the GA and charge are as.
Under Clause 2.2.1, any clarifications were required to be obtained from
the Secretary of the Board on or before the bid closing date. Clause 4.2
stipulated that all financial bids would be tabulated and compared in
accordance with the bidding criteria specified in Regul ation 7 and
Schedule-C(1) of the CGD Authorisation Regulations. Moreover, the
bidder with the highest composite score would be declared as successful
in the bid. Under Clause 4.4 of the Bid Document, the Board reserved
the right to accept or reject any bid which it cons idered to be
“unreasonably high or low”:
“4.4 PNRGB’S RIGHT TO ACCEPT OR REJECT ANY
OR ALL APPLICATION-CUM-BIDS
4.4.1 PNRGB reserves the right to reject any Application-cu m-
Bid comprising quoted work programme considered by it to be
unreasonably high or low.”
On 31 May 2018, Addendum-1 to the Bid Documentwas issued
by the Board. Clause 14.2, inserted as a result of Addendum-1, contained
the following clarification:
“14.2 What should be considered to be the level of “unreasonably
high” or “unreasonably low” quotes shall be decided by Board at
the time of bid evaluation on a case to case basis after considering
the relevant factors.”
According to the above stipulation, the Board clarified that the
determination of an unreasonably high or low quote would be made by
the Board at the time of bid evaluation on a case to case basis after
considering the relevant factors.
ADANI GAS LTD. v. PETROLEUM AND NATURAL GAS
REGULATORY BOARD [DR. DHANANJAYA Y CHANDRACHUD J.]
14. On 10 July 2018, three bid evaluation committees 9 were
nominated by the Board for evaluating the bid documents. On 12 July
2018, a press release was issued by the Board setting out the date and
time for the opening of technical bids for different GAs. The technical
bids for GA 51 (Puducherry) were to be opened on 16 July 2018 at
14.00 hours; for GA 61 (Kanchipuram) on 17 July 2018 at 12.30 hours;
and for GA 62 (Chennai-Tiruvallur) on 17 July 2018 at 13.30 hours. The
technical bids were opened by the Board in the presence of the bidders’
representatives.
15. On 23 July 2018, a note 10 was moved for the approval of the
members of the Board with a view to encourage serious bidders and to
avoid unrealistic/unreasonable bidding in terms of Clause 4.4.1 of the
Bid Document. The Board Note, insofar as is material provided:
“Subject: Reasonability of Bidding Parameters
Bid evaluation for technical bid is under progress for all 86 GAs.
Technical bid queries are being issued and it is expected that the
Financial bid opening may be started from this week (24 th July
onwards) for various GAs. The bidding parameters have been
completely changed in current round.
In order to promote serious bidders and to avoid any unrealistic/
unreasonable bidding number committed by entity, PNGRB has
included a rejection clause in Para 4.4.1 of application-cum-bid
documents. The clause is reproduced below:
“PNGRB reserves the right to reject any Application-cum-Bi d
comprising quoted work programme considered by it t o be
unreasonably high or law.”
Since technical bids for some of the GAs are about to be concluded,
it is essential to decide upon the reasonability of the b idding
parameters which are constituting work programme. In this regard,
following is proposed:
1. No of PNG Domestic connections:
Lower Limit: Ministry of Petroleum and Natural Gas
(MoP&NG) vide letter No L-16021/9/2013-GP-1 (pt.) dated
16 th August 2016, constituted a committee to examine the
9 (“BECs”)
10 “Board Note”
133
City Gas Distribution (CGD) bidding related issues. The
committee in its report recommended minimum work
programme (MWP) for inter-alia PNG domestic
connections as 7.5% of within district headquarters /
municipal limit. Prior to 9 th round, MWP for PNG domestic
connections was fixed for 5 % total household. Considering
above it is proposed that 2 % of total Household (Census
2011 data) may be considered as minimum.
Maximum Limit: In order to reach at maximum value
various possibilities has been discussed in house which
includes conversion of LPG to PNG, maximum penetration
at present in GAs etc. It is proposed to keep maximum
limit of PNG Domestic connections as 100 % of Household
(Census 2011 data). Beyond 100 % household may be
treated as unreasonable quote.”
The Board Note was approved by the members of the Board
including the Chairperson. Between 24 July 2018 and 18 August 2018,
the financial bids submitted by the bidders for various GAs were opened
by the Board.
16. The Board Note of 23 July 2018 adopted the Census 2011
data on the total number of households as the basis for computing th e
minimum and maximum limits for the purpose of deter mining
unreasonably low or unreasonably high quotes. The Board Note stipulated
that 2 per cent of the total households in terms of the Census 2011 data
would be regarded as the minimum quote. Anything below 2 per cent
would be considered unreasonably low. Similarly, on the upper end of
the spectrum, the Board Note proposed that 100 per cent of the t otal
households in terms of the Census 2011 data would be regarded as the
maximum. A quotation beyond this upper limit would be construed to be
unreasonably high. Now, two features of the note of the Board Note
dated 23 July 2018 must be noted. First,the Board Note was generated
after the last date for the submission of bids. Second, the Board Note
was an internal document of the Board which was not notified to the
bidders.
17. The Board commenced the process of opening the financial
bids on 24 July 2018. On 2 August 2018, an agenda note was prepared
for the Board. The agenda note outlined that three BECs were nominated
for evaluating the bids received. Technical bids submitted by the bidders
ADANI GAS LTD. v. PETROLEUM AND NATURAL GAS
REGULATORY BOARD [DR. DHANANJAYA Y CHANDRACHUD J.]
were evaluated by ICF, a consultant, based on the requirements of the
Regulations and the Bid Documents. A summary sheet of the technical
bid evaluation was prepared and checked by the BEC. Thirty-eight entities
had submitted bids against 86 GAs. The financial bids of techn ically
eligible bidders were recommended for opening. The agenda note dated
2 August 2018 spelt out the stipulation contained in paragraph 4.4.1 of
the Bid Document, and of the previous decision of the Board, to adopt 2
per cent of the total households as the minimum and 100 per cent as the
maximum, both on the basis of 2011 Census data. The agenda note
contained a tabulation of the bids of technically qualified entities. The
agenda note indicated that for four GAs: 35, 46, 48 and 49 where tw o
bids had been received for each, the highest bidder ha d quoted an
unreasonably low number of projected PNG connections at the end of
eight contract years. Where the bid below 2 per cent was the sole bid
for the GA, the bid was accepted as the GA would have gone ‘dr y’
otherwise. The agenda note proposed the adoption of three courses of
action with respect to the remaining bids:
(i) Rejection of the bids received for the above four GAs as
being unreasonably low;
(ii) Acceptance of the bids for the four GAs by extending to
them the same logic that was applied for single bid GAs; or
(iii) Inviting the concerned entities with the highest scores f or
each of the GAs for negotiation to improve the quoted work
programme.
18. The agenda note dated 2 August 2018 was presented before
the Board for deliberation on 3 August 2018. In its meeting, the Board
accepted the proposal for the issuance of LOIs to entit ies of 48 GAs
mentioned in table 3 of the agenda note. The proposal to invite entities
with the highest scores which had submitted unreasonably low bids for
each of the GAs for negotiations and to improve the quo ted work
programme was approved. Accordingly, on 3 August 2018, the Board
issued a press release recording that it had approved the i ssuance of
LOIs to 18 successful bidders for 48 GAs. The press release indicated
that the remaining GAs were being evaluated and the outcome would be
notified shortly.
19. On 9 August 2018, an agenda note was issued by the Board
noting that in pursuance of the decisions which were taken by the Board
135
on 3 August 2018, letters have been addressed to the entities which had
obtained the highest composite score but had quoted unreasonably low
PNG connections, to confirm their acceptance of the minimum
requirement of 2 per cent of households as per the 2011 Census d ata.
Table5 to the agenda note contained a tabulation of bids which were
liable to be rejected due to unreasonably high or as t he case may
be,unreasonably low quotes. Among these bids were the bids received
from H1 bidders who had quoted unreasonably high PNG connections
for thethreeGAswhich form the subject matter of the pres ent appeals.
These were:
“Table -5
Sl No GA
No.
Name of GA Name of
bidding
entities
Quote Remarks
11. GA 61 Kanchipuram
District
Consortium of
AG&P LNG
Marketing Pte
Ltd. & Atlantic
Gulf & Pacific
Company of
Manila Inc.
114% of
total HH
7 other
valid bids
remains
12. GA 62 Chennai &
Tiruvallur
Districts
Torrent Gas
Private Limited
157.00% of
total HH
9 other
valid bids
remains
13. GA 63 Coimbatore
District
IMC Limited 107.06% of
total HH
12 other
valid bids
remains
…
From the above Table-5, it can be seen that in 3 GAs have
unreasonably High PNG Connections quoted have been received
& also happens to be H1 bidder and are liable for rejection.”
20. At this stage it may also be necessary to note that ta ble4
contained a tabulation of bids among them being those of bidders who
were treated as not “Not-Qualified”. The agenda note recommende d
that in threeGAs, the bids of the highest bidders were liable to be rejected
since they had quoted an unreasonably high number of PNG connections
to be achieved at the end of eight contract years. Consequentl y, the
ADANI GAS LTD. v. PETROLEUM AND NATURAL GAS
REGULATORY BOARD [DR. DHANANJAYA Y CHANDRACHUD J.]
names of the entities which were to be declared as success ful bidders
were tabulated in table 6 of the agenda note. According to the agenda
note, after the names of the entities with the highest bids were removed,
IMC Limited was recommended for being declared as the succe ssful
bidder for GA 61 (Kanchipuram District). Similarly, for GA 62 (Chennai
& Tiruvallur Districts), Adani Gas Limited was recommended to be the
successful bidder after the highest bid was declared as “Not Qualified”.
The agenda note was prepared by the Authorisation Division and records
that it was concurred with by the Member (I&T) and Member (C&M)
and was approved by the Chairperson “for deliberations and approval of
the Board”.
21. On 10 August 2018, a meeting was held by the Board. The
minutes of the Board meeting recorded that out of four cases where the
quotes for projected PNG domestic connections were higher than 100
per cent of the households under the 2011 Census, one of the bidders for
GA 63 was not under consideration as its composite score was not the
highest amongst the bids received for the GA. The other three bidders
who had quoted more than 100 per cent of the households for PNG
domestic connections were reflected in the following table:
“
’’
The minutes of the meeting went on to record that:
“During deliberations in the Board, the Board referred to clause
4.4.1 of ACBD which reads, “PNGRB reserves the right to
Sl
No.
GA
No.
GA name Bidding Entity Quoted for PNG
Domestic
connections as %
of households as
per 2011 census
1. 61 Kanchipuram Distt. Consortium of
AG&P LNG
marketing Pte Ltd.
and Atlantic Gulf
& Pacific
Company of
Manila Inc.
114%
2. 62 Chennai & Tiruvallur
Districts
Torrent Gas Pvt
Ltd.
157%
3. 72 Medchal,
Rangareddy&Vikarabad
Districts
Torrent Gas Pvt
Ltd.
220%
137
reject any application cum bid comprising quoted work program
considered by it to be unreasonably high or low.” In terms of
this clause vide note dated 23.07.2018 (i) lower and upper limits
were decided for PNG domestic connections (ii) lower limits
was decided for CNG Stations and (iii) no limit (higher or lower)
was decided for Inch-KM of Steel pipeline. The Boar d
deliberated that though lower and upper households were
decided, the same need not be a mechanical exercise and an
opportunity be given to affected entities to explai n
reasonableness of their quotes.”
22. The Board thus took a decision that the disqualification o f
bidders on the basis of the lower and upper thresholds of 2 per cent and
100 per cent of the 2011 households which it had decided earlier “need
not be a mechanical exercise”. Hence, a decision was taken to offer to
the three affected entities for GAs 61, 62 and 72, an opportunity to
present their case on why their bids should not be rejected f or being
unreasonably high. The Board appears to have done so on the basis that
the rejection of their bids, without an opportunity to present their case
would not be “legally correct”. This is reflected in the following decision
which was taken by the Board on 10 August 2018:
“(a) To call the bidding entities for GA- 61, GA-62 and GA-72
which quoted for PNG domestic connections higher than fixed
vide note that 23.07.2018 for discussion on 14.08.2018 to present
their case as to why the bids submitted by them for PNG domestic
connections be not considered unreasonably high. The Board also
decided that under these circumstances, it would not be legal ly
correct to reject their bids without providing them a chance to
present their case.”
23. On 10 August 2018, a press release was issued by the Board.
In pursuance of the decision which was taken by the Board, on 14 August
2018 presentations were made before it by the three entities for GAs61,
62 and 72 which had quoted more than 100 per cent of the number of
2011 households. Apart from the above three GAs, the financial bid for
Puducherry (GA 51) was opened on 18 August 2018. The bidder with
the highest composite score for GA 51 had also quoted more than 100
per cent of the total 2011 households and was called on 23 August 2018
for a presentation before the Board.
ADANI GAS LTD. v. PETROLEUM AND NATURAL GAS
REGULATORY BOARD [DR. DHANANJAYA Y CHANDRACHUD J.]
24. On 28 August 2018, an agenda note was prepared with respect
to the Board’s decision on four GAs: 51, 61, 62 and 72. The agenda note
contained a summation of the submissions made by each of th e four
bidders who had been called upon to explain why their bids in excess of
100 per cent of the total number of households as per 2011 Census data
should not be considered unreasonably high. The agenda note contained
a tabulation of the percentage of PNG penetration in t he projected
households in 2026 with respect to the number of households as per the
2011 Census. The comparative table is extracted below:
Sl No. G
ID
GA PNG
connection
s quoted by
the bidder
HH as
per 2011
Census
i.e. Upper
Limit of
PNG
Connecti
ons fixed
by
PNGRB
Projected
HH in
2026*
PNG
penetration
in 2026 as
per
PNGRB
upper limit
PNG
penetration
in 2026 as
per H1
bidder
A B C D E F G=(E/F)
*100
H=(D/F)
*100
1 51 Puducherry 2,75,000 2,31,513 3,91,852 59% 70%
2 61 Kanchipuram 11,51,111 10,06,245 20,89,765 48% 5 5%
3 62 Chennai 12,70,391 20,87,729
Tiruvallur 10,63,109 21,34,971
Total (Chennai &
Tiruvallur)
33,00,000 23,33,500 41,87,734 56% 79%
4 72 Ranga Reddy
(except authorised
area) Presently,
Medhchal,
Rangareddy&Vikar
abad Districts
10,05,300 4,56,557 10,17,097 45% 99%
25. The Board held a meeting on 29 August 2018. During the
meeting, the Board approved the submission of the following three bidders
who had made presentations before the Boardwith res pect to the
reasonableness of their quotes:
“GA-51: Consortium of SKN Haryana City Gas Distribution Pvt.
Ltd.
139
GA-61: Consortium of AG&P LNG Marketing Pte Ltd. & Atlantic
Gulf & Pacific Company of Manila Inc.
GA-62: Torrent Gas Private Limited.”
The Board however rejected the submission of Torrent Gas Private
Limited in respect of the reasonableness of its quote fo r GA72 and
decided to award the LOI to Megha Engineering & Infrastructure Private
Limited, the entity with the highest composite score after Torrent Gas
Private Limited was disqualified. The basis of the decision of the Board
is contained in the following extracts from the minutes of 29 August
2018 meeting:
“2. The Board further deliberated as under:
(a) Following the earlier decisions, the three bidders i.e. Torrent
Gas Private Limited, Consortium of AG&P LNG and SKN
Haryana City Gas Private Limited were called for discussion
on 14 th and 23 rd August 2018 to explain reasonableness of
high PNG connections quoted by them for the above GAs.
(b) The Board referred to table in Para 15 of the agenda note
wherein quoted PNG domestic connections for the above four
GAs were compared with the upper limit fixed vide noted
dated 23.07.2018 and projected households in 2026
(considering the number of households as per 2011 Census
and the historical growth rate during 2001 to 2011 as per census
data of 2001 to 2011). It was observed that penetration of
PNG domestic connections based upon upper limit fixed by
PNGRB with reference to projected number of households
in 2026 varied from 45% to 59%. However, penetration of
PNG domestic connections based upon quoted PNG
connections with reference to projected number of households
in 2026 varied from 55% to 99%. The variation between two
sets of numbers is 7% to 54%.
(c) The Board observed that the highest variation of 54% is in
GA-72, which is based on untenable assumptions made by
the bidder as described in Para 14.3 of the agenda note. Due
to this, 10,05,300 PNG domestic connections quoted by the
bidder are 99% of the projected households by PNGRB in
2026, which is unreasonably high. It was also observed that
for the remaining 3 GAs, the variation between two sets of
ADANI GAS LTD. v. PETROLEUM AND NATURAL GAS
REGULATORY BOARD [DR. DHANANJAYA Y CHANDRACHUD J.]
numbers given in para 15 of the Agenda note is 7% to 23% of
projected number of households in 2026 and PNG penetration
would be in the range of 55% to 79%.
(d) The Board also referred to regulation 16(2) of C GD
Authorisation Regulations, which provides for rates of pre-
determined penalty for shortfall in achieving cumulative work
program targets for each contract year. The entities bidding
aggressive number of PNG domestic connections would be
liable to pay pre-determined penalties under afore-mentioned
regulation 16(2).
(e) In view of the above, it was decided to accept the quoted
PNG domestic connections and award the Chennai &
Tiruvallur District GA (GA-62) to Torrent Gas Private Limited,
Kanchipuram District GA (GA-61) to Consortium of AG & P
LNG Marketing Pte. Ltd & Atlantic Gulf & Pacific Co. of
Manila Inc. and Puducherry District GA (GA-51) to
Consortium of SKN Haryana City Gas Distribution Pvt. Ltd.
and Chopra Electricals to the bidders with highest composite
score for respective GAs, where the variation in two sets of
numbers is in the range of 7 to 23%. Regarding Medchal,
Rangareddy (except area already authorised) & Vikarabad
District GA (GA-72), where the variation is around 54% and
the bid by Torrent Gas Pvt. Ltd. is based on untena ble
assumptions and incorrect map, the bid of the entity with
highest composite score may be considered as unreasonably
high and rejected in terms of Clause 4.4.1 of ACBD.
Accordingly, the GA may be awarded to the bidder with second
highest composite score and LOI may be issued to Megha
Engineering & Infrastructure Pvt. Ltd. Subsequently, on receipt
of PBG, authorisation letter (Schedule D) may be issued to
the above entities.”
The Board issued LOIs to SKN Haryana City Gas Distributi on
Private Limited and Chopra Electricals 11 , AG&P LNG Marketing Private
Limited and Atlantic Gulf & Pacific Company of Manila 12 and Torrent
Gas Private Limited on 30 August 2018 as successful bidders for GAs
51, 61 and 62 respectively. On 6 September 2018 Adani Gas Limite d
11 “SKN Haryana”
12 “AG & P LNG”
141
wrote to the Board requesting a copy of the decision with respect to the
issuance of LOIs for the above three GAs. Subsequently, the Board
uploaded the details of the successful bidders under the ninth CGD round
on its website on 14 September 2018.
26. On 19 September 2018, Appeal No 292 of 2018 was instituted
before the APTEL by Adani Gas Limited, aggrieved by:
(i) The decision to award LOIs, in respect of the three GA s –
51 (Puducherry District), 61 (Kanchipuram District), and
62 (Chennai & Tiruvallur Districts) on the ground that the
successful bids were beyond the unreasonably high limit
adopted by the Board; and
(ii) The action of the Board in issuing the LOIs without uploading
the decision on the website and without communicating it
to Adani Gas Limited.
Following the institution of proceedings by Adani Gas Limited,
IMC Limited also instituted proceedings before the APTEL (Appeal No
323 of 2018) challenging the grant of authorisation by the Board in respect
of GA 61. The prayers in both appeals were identical and the Tribunal
heard both appeals together.
27. During the pendency of the appeal, by an order dated
11 October 2018 the APTEL directed the Board to file an a ffidavit
explaining its decision taken on 23 July 2018 and the reasons on the
basis of which bids were rejected, including on the ground of high and
low quotes. In pursuance of the above order, the Board filed an affidavit
by which it disclosed the Board Note dated 23 July 2018 together with a
compilation of documents containing board agenda notes, minu tes of
meetings and press releases. On a perusal of the documents submitted
by the Board, the competing standing of the various bidders is summarised
below for convenience:
GA No Area H1 Bidder H2 Bidder
51 Puducherry SKN Haryana Torrent Gas Private
Limited
61 Kanchipuram AG&P LNG IMC Limited
62 Chennai –Tiruvallur Torrent Gas Private Limited Adani Gas Limited
ADANI GAS LTD. v. PETROLEUM AND NATURAL GAS
REGULATORY BOARD [DR. DHANANJAYA Y CHANDRACHUD J.]
In GA 51, Adani Gas Limited was the sixth highest bidder and in
GA 61 Adani Gas Limited was the third highest bidder. In Appeal No
292 of 2018 Adani Gas Limited challenged the grant of authorisation in
GAs 51, 61 and 62 and in Appeal No 323 of 2018 IMC Limited challenged
the grant of authorisation in GA 61.
28. On 28 February 2019, the APTEL pronounced a split decision.
While the Chairperson allowed the appeals filed by Adani Gas Limited
and IMC Limited, the Member Technical (Petroleum and Natural Gas)
dismissed the appeals. In view of the divergence of opinion between the
Chairperson and Member Technical (Petroleum and Natural Gas), the
appeals were referred to the Judicial Member of the APTEL. The Judicial
Member recused from hearing the appeal on 7 March 2019, as a result
of which proceedings were instituted before this Court. As noted earlier,
the appeals pending before the APTEL have been transferred to this
Court.
Analysis
29. Having set out the facts, we now turn to the issues raised by
the present dispute before this Court. The first aspect which forms the
subject matter of the controversy is the relevance of the 2011 Census
data in the bidding process. The primary plank on which the appellants
contend that the 2011 Census data was relevant to the bidding process
was the reference to population/household figures derived fr om 2011
Census data in the map annexed to the Bid Document.
30. Dr A M Singhvi, learned Senior Counsel appearing on behalf
of Adani Gas Limited, submitted that:
(i) The map which was attached to the Bid Document did not
only describe the land area but also the population and
households comprised in it;
(ii) The rationale for this was that the authorisation is to lay the
CGD network in a defined land area and to service the
defined households in that area;
(iii) The figures for population and number of households in the
map attached to the Bid Document were drawn from the
2011 Census;
143
(iv) In several areas out of the 86 GAs which were a part of
the ninth round of bidding, certain parts of the GAs were
excluded from the zone of authorisation;
(v) Whenever certain parts of the GAs were excluded from
the zone of authorisation, the population/household number
was proportionally reduced to reflect the populatio n/
households as per the reduced area. Examples of the above
are Surendranagar (GA-8); and Medchal-Ranga
Reddy(GA-72).
(vi) In GA 72, Medchal-Ranga Reddy:
(a) The original map attached to the Bid Document showed
the entire district with a corresponding number of
households of 13,47,118 according to the 2011 Census;
(b) The Bid Document was amended to exclude the area
in which an existing entity was already laying a CGD
network as a result of which not only was the land
area reduced but even the number of households was
reduced to 4,56,557;
(c) Torrent Gas Limited Private Limited, which was the
highest bidder for the reduced area had bid 10,05,300
PNG connections, which worked out to 74.6 per cent
of the original number of households (13,47,118) and
220 per cent of the reduced number of households
(4,56,557);
(d) The Board, at its meeting on 29 August 2018 rejected
the H1 bidder for GA 72 on the ground that the bid of
220 per cent of the households was unreasonably high;
and
(e) The bid of the H1 bidder for GA 72 was in fact 99 per
cent of the estimated households for 2026 but was yet
rejected as the ‘unreasonably high’ norm was with
reference to the 2011 census and not 100 per cent of
the 2026 estimate because if it was the latter, the H1
bidder would have been declared to be successful.
ADANI GAS LTD. v. PETROLEUM AND NATURAL GAS
REGULATORY BOARD [DR. DHANANJAYA Y CHANDRACHUD J.]
(vii) The map annexed to the Bid Document depicted not only
the land area but also the population/number of households
which were intrinsically intertwined in the bid parameters;
(viii) Clause 1.1.3 of the Bid Document mandated bidders to look
at the “existing population”. Hence, it is incorrect to suggest
that the bidders had to keep in mind the population in the
GAs in 2018. On the contrary, Clause 1.1.1 required bidders
to bear in mind the population/households as given in the
map annexed to the Bid Document; and
(ix) The reference to ‘charge areas’ in Clause 1.1.2 of the Bid
Document means designated sub-areas which are part of
the authorised GAs. The designation of ‘charge areas’ is
only to facilitate the Board in determining whether the
authorised entity has created its network in all the GAs for
which it is authorised.
31. Opposing the above submissions, Mr Paras Kuhad, learned
Senior Counsel appearing on behalf of the Board submitted a wri tten
note, explaining the amendments that were made to t he CGD
Authorisation Regulations after they were notified initially on 19 March
2008:
(A) 2008 CGD Authorisation Regulations :
Regulation 7 of the 2008 CGD Authorisation Regulations
prescribed a four-fold criterion for bidding:
(i) Criteria (a) was the lowness of the present value of
the overall unit network tariff with a weightage of 40
per cent;
(ii) Criteria (b) prescribed the lowness of the prese nt
value of the compression charge for CNG for
dispensing in the CNG stations with a weightage of
10 per cent;
(iii) Criteria (c) prescribed the highness of the present
value of the inch-kilometre of steel pipelines proposed
to be laid in the CGD network during the period of
exclusivity with a weightage of 20 per cent; and
145
(iv) Criteria (d) prescribed the highness of the present
value of the number of domestic customers proposed
to be connected by PNG with a weightage of 30 per
cent.
Under the Regulations, no upper or lower ceiling was provided
for bidding inrespect of the Criteria (a) to (d) of Regulation 7.
(B) 2013 Amendment to the CGD Authorisation
Regulations 13 :
(i) The 2013 amendment amended criteria (a) and (b)
and substituted bidding criteria (c) and (d) with criteria
(c);
(ii) The successful bidder was required to achieve a
Minimum Work Programme 14 in respect of the PNG
domestic connections and inch-kilometres of steel
pipeline;
(iii) The minimum number of PNG domestic connections
to be achieved within the first five years of
authorisation was to be worked out by the Board.
This was based on the total number of households to
be calculated as per the basic data sheet of the
respective districts of the GA and the population
according to the latest census data;
(iv) The weightage of bidding was shifted to 70 per cent
for criteria (a) and 30 per cent for criteria (b). No
weightage was given to PNG domestic connections
and inch-kilometres of pipeline; and
(v) The successful bidder was to achieve a target of 15
per cent by the second year, 50 per cent by the third
year, seventy per cent by the fourth year and 100
per cent by the fifth year.
(C) 2014 Amendment to the CGD Authorisation
Regulations 15 :
13 21 June 2013
14 “MWP”
15 7 April 2014
ADANI GAS LTD. v. PETROLEUM AND NATURAL GAS
REGULATORY BOARD [DR. DHANANJAYA Y CHANDRACHUD J.]
(i) The 2014 amendment substituted criteria (c) once
again;
(ii) Under the 2014 amendment, the Board was to work
out the target for infrastructure for PNG domestic
connections as 5 per cent of the households of the
respective GAs to be achieved by the successful
bidder during the first five years from the grant of
authorisation; and
(iii) No weightage was given to criteria (c) – PNG
domestic connections and inch-kilometres.
(D) On 16 August 2016, the Ministry of Petroleum and Natural
Gas constituted a committee to examine alternative models
for the bidding criteria to grant authorisation for CGD
networks. The committee in its report recommended a MWP
for PNG domestic connections at 7.5 per cent, within district
headquarters/municipal limits. Prior to the ninth round, the
MWP was fixed at 5 per cent of the total households.
(E) 2018 Amendment to the CGD Authorisation
Regulations 16 :
(i) The 2018 amendment substituted new criteria for
bidding applicable to the ninth round. The present
batch of appeals deals with the ninth round of bidding;
and
(ii) Under the new criteria applicable to the ninth round
of CGD bidding, 50 per cent weightage was given to
PNG domestic connections. Moreover, no minimum
or maximum limits were set for PNG domestic
connections in the 2018 amendment.
Responding to the appellant’s submissions on the binding nature
of the Board Note dated 23 July 2018 and the legality of the Board’s
decision tohear only the highest bidder, Mr Paras Kuhad urged
that:
(i) The agenda note dated 9 August 2018 is not binding
on the Board as itclearly states that the contents of
16 6 April 2018
147
the agenda note aresubject to the deliberations and
approval of the Board;
(ii) Regulation 7 sets out five parameters on which the
bids are to be evaluated.Once a bidder fulfils the
criteria set out in Regulations 5 and 7 and emerges
as the highest bidder, they have a statutory right to
be selected;
(iii) The CGD Authorisation Regulations do not set out
criteriafor determining “unreasonably high or low”
bids and no such criteria can be read into the
Regulations and enforced on the Board;
(iv) Clause 4.4.1 read with Addendum 1 explicitly states
that the Board’s power to determine “unreasonably
high or low” bids would be exercised on a “case to
case basis after considering the relevant factors”;
(v) The challenge made by the appellants is an adversarial
challenge and not a Public Interest Litigation. The
appellants cannot try and advance their case by
relying on decisions taken in relation to separate GAs
which are not presently under challenge; and
(vi) The calculations made by the appellantswith respect
to the growth rate and projected number of
households are based on irrelevant factors.
32. Mr Gopal Subramanium, learned Senior Counsel appearing
on behalf of Torrent Gas Private Limited, supported the arguments urged
by the Board and further submitted that:
(i) Torrent Gas Limited has attended the hearing before
the Board, explained its methodology in calculating
its quoted number of PNG connections, and the
quoted figure has been accepted by the Board as
reasonable;
(ii) The Board Note dated 23 July 2018 had been
formulated subsequent to the submission of bids.At
the time of submitting its bid, the only criteria known
to Torrent Gas Private Limited were those specified
in Regulation 7 and the Bid Document, which did not
ADANI GAS LTD. v. PETROLEUM AND NATURAL GAS
REGULATORY BOARD [DR. DHANANJAYA Y CHANDRACHUD J.]
prescribe a maximum number of PNG connections;
and
(iii) There is no condition in either the CGD Authorisation
Regulations or the Bid Document which require the
quoted number of PNG connections to be calculated
on the basis of 2011 Census data.
33. Mr Gopal Sankaranarayanan, learned Senior Counsel appearing
on behalf of SKN Haryana, urged that:
(i) Adani Gas Limited was neither the second nor third
placed bidder in GA 51on the basis of the composite
score, and therefore has no standing to challenge the
LOI granted to SKN Haryana for GA 51;
(ii) Clause 14.2 of the First Addendum makes it clear
that there were no fixed parameters on which an
“unreasonably high or low” bid would be determined,
and specified that such determination would take place
on a case to case basis; and
(iii) According to the calculation of composite scores in
Schedule C(1), the bidder with the highest number
of PNG connections is at 100% and all other bidders
are reduced in proportion to the highest bidder’s score.
If 100% of the 2011 Census data was a ‘hard upper
limit’ on the quoted number of PNG connections, the
calculation in Schedule C(1) would be rendered
redundant.
34. Mr Kapil Sibal, learned Senior Counsel appearing on behalf of
AG & P LNG, submitted as follows:
(i) AG & P had quoted a figure of 11.51 lakh in its bid
for GA 61. According to the 2011 Census figures,
the number of households in GA 61 was only 10.06
lakhs. However, the Tamil Nadu Generation &
Distribution Corporation Limited (the state electricity
board) noted that as of 2018, there existed 15.91 lakh
households in GA 61;
(ii) In GA 37, Indian Oil Corporation had quoted a number
of PNG connections below the 2% threshold and was
149
the highest bidder. The Board awarded the GA to
Bharat Gas Resource Limited, which had quoted
above the 2% threshold. However, Indian Oil
Corporation has not challenged this decision of the
Board before the APTEL or any court, therefore the
appellants cannot rely on the case of GA 37; and
(iii) Each GA is a separate tender having its own unique
geographical and socio-economic factors. Therefore,
one cannot compare cases of other GAs with the
GA of Kanchipuramwhere AG & P LNG has been
awarded the authorisation.
35. The submission which has been urged on behalf o f the
appellants in regard to the relevance of the 2011 census data must first
and foremost be assessed in the context of the CGD Authori sation
Regulations as amended on 6 April 2018. The Regulations postulate that
bidders must submit both technical and financial bids. The pro cedure
specified in Regulation 5 applies to an invitation by the Board for laying,
building, operating or expanding a CDG network. Regulation 5(6) requires
the fulfilment of minimum eligibility criteria. For a technical bid to pass
muster, the minimum eligibility criteria require the bidder to be qualified
both with reference to technical and financial parameters. This is evident
from Regulation 5(6) under which the Board is to scrutinise the bids of
only those entities which fulfil the minimum eligibility c riteria. The
minimum eligibility criteria include the technical capability of the bidding
entity to (i) lay and build; and (ii) operate and maintain a CGD network.
Both of them are defined with reference to qualifying criteria. Besides
the technical criteria, the minimum eligibility requ irements under
Regulation 5(6)(e) incorporate the financial ability to execute the project
and to operate and maintain it in the authorised area. The financial criteria
are defined with reference to the minimum net-worth of the bidding
entity. The net-worth required is dependent on the population of the GA
under the 2011 Census. The minimum net-worth required is specifically
defined with reference to the 2011 census figures of population for the
GA. The bidding entity is also required to submit a bid bond in the form
of a performance bond guarantee. The quantum of the guarant ee is
dependent on the population of the GA.
36. Regulation 7 requires the Board to tabulate all financial bids
which meet the minimum eligibility criteria, in accordance with the bidding
ADANI GAS LTD. v. PETROLEUM AND NATURAL GAS
REGULATORY BOARD [DR. DHANANJAYA Y CHANDRACHUD J.]
criteria specified in the table. The Table incorporated in the Regulation
provides five-fold criteria for the tabulation and comparison of financial
bids. The five criteria are:
(i) ‘Lowness’ of transportation rate for CGD;
(ii) ‘Lowness’ for transportation rate for CNG;
(iii) ‘Highness’ of the number of CNG stations to be installed in
eight years from authorisation;
(iv) ‘Highness’ of the number of domestic PNG connections to
be achieved within eight years of authorisation; and
(v) ‘Highness’ of inch-kilometre of steel pipeline to be laid within
eight years of authorisation.
The third and fourth criteria together account for 70 per cent of
the total composite score. Among them, the fourth criterion – ‘highness’
of the number of domestic PNG connections accounts for 50 per cent of
the total composite score. Significantly, the bidding criteria in Regulation
7 are not linked to the 2011 Census figures.There are two signi ficant
facets of Regulation 7:
(i) The absence of a linkage of the projected number o f
domestic PNG connections with the 2011 Census data; and
(ii) The absence of a cap or ceiling on the ‘highness’ norm
both in relation to the third and the fourth criteria (iii and iv
above).
37. Regulation 7 (1)(b) requires the successful bidder to achieve
the target in terms of an annual work programme within eight contract
years. The programme is distributed between the first and eighth years
for PNG connections’, CNG stations’ and Inch-kilometres of steel
pipelines. For PNG connections, the successful bidder must c omplete
10 per cent of the work programme at the end of the second year, 20 per
cent at the end of the third year, 30 per cent at the end of fourth year, 40
per cent at the end of the fifth year, 60 per cent at the e nd of the sixth
year, 80 per cent at the end of the seventh year and 100 per cent at the
end of the eighth year. Under Regulation 7(3), a bidding entity with the
highest composite score in terms of the criteria specified in sub-regulation
(1) of Regulation 7 is to be declared as the successful bidder.
151
38. The provisions contained in the 2008 CGD Authorisation
Regulations, as amended on 6 April 2018, indicate that where a specific
linkage was sought with reference to the 2011 Census data, a clear and
categorical provision was made to that effect. Such provisionsare found
in regard to the financial capability of a bidder as part of the minimum
eligibility criteria in Regulation 5(6)(e) and the extent of the performance
bond in Regulation 5(6)(h).
39. Absent a condition in Regulation 7 linking the ‘highness’ of the
number of PNG connections to be achieved within eight years from the
date of authorisation with the 2011 Census data, it would be contrary to
basic principles of interpretation to read such a restriction into the CGD
Authorisation Regulations. A conditionality which h as not been
incorporated in Regulation 7 cannot be introduced as a matter of
construction.The court must first and foremost read the Regulati on in
accordance with its plain and natural meaning. There is evidently a reason
why Regulation 7 did not introduce a ceiling or provide for a linkage with
theCensus data of 2011. Consumers or users, as the case may be, in a
CGD network broadly comprise of four categories namely:
(i) Domestic;
(ii) Commercial;
(iii) Industrial; and
(iv) Vehicular.
40. The Board has submitted with justification that in a model of
cross/subsidisation, the viability of the project has to be perceived from
a twenty- five-year perspective.Gains in one category of users can offset
the losses in another category. The CGD Authorisation Regulations are
intended to subserve the object of establishing the infrastructure necessary
for setting up an operational CGD network. In creating the infrastructure,
the successful entity is contractually bound to set up a p roject for the
future.The infrastructure so created would be of service to consumers
or, as the case may be, users. Infrastructural projects cater to future
needs and can legitimately be forward looking. It is from this perspective
that except for the tariff in the first two bidding criteria of Regulation 7
(the transportation rates for CGD and CNG), no ceiling was provided by
the Board for the criteria set out in Regulation 7. More part icularly,
Regulation 7(3) provided for a mandate to tabulate and compa re the
bids of all entities which had met the minimum eligibility criteria upon
ADANI GAS LTD. v. PETROLEUM AND NATURAL GAS
REGULATORY BOARD [DR. DHANANJAYA Y CHANDRACHUD J.]
their qualifying in a competitive bidding process. The Regulations did not
contemplate the disqualification of a bidder with referenc e to a norm
which would limit a bid to 100 per cent of the population figures provided
by the 2011 Census data. For the Board to stipulate an absolute norm to
that effect, when it has not been specifically inco rporated in the
Regulations would have rendered the decision making process vulnerable
to a challenge on the ground that it was not consistent with Regulation 7.
41. Now it is in this background, that it becomes necessary to
evaluate the Bid Document. Clause 1.1.1 incorporates a refere nce to
the GA as depicted in the map set out inAnnexure-1, forwhich the Board
was inviting bids for the grant ofan authorisation to develop a CGD
network. The main plank of the submissions of the appellants is that the
map contained a reference to population and household figures on the
basis of the 2011 Census. Clause 1.1.3 places the responsibility on the
bidder to obtain information about the present gas supply availability, the
pipeline connectivity and the existing customers in the GA. Significantly,
the scope of work in Clause 1.2 required bidding entities “to lay, build,
operate or expand the CDG networks” to meet the requirement of natural
gas “in domestic, commercial and industrial segments including natural
gas in the vehicular segment in the said Geographical Area to be
authorised.” Bidders are required under Clause 2.1.1 to examine the
contents of the Bid Document including instructions, terms and conditions
and regulations of the Board. The bidder was required to carefully study
the GA and the charge area before submitting the bid. In other words,
bidders were on notice of the actions required to be taken to implement
the Regulations. The Bid Document necessarily had to be in conformity
with the CGD Authorisation Regulations. The map, at b est was a
compendium of the latest official record of the GA. The map did not
dictate how the number of domestic PNG connections was to be
calculated. There is no such indication particularly in Clause 1 of the Bid
Document where the map is referenced. The mere attachme nt of a
map to the Bid Document would not result in the imposition of conditions
of eligibility or qualification. These have been provided in the Regulations
which have a statutory character. The depiction of the GA in a map
attached to the bid document does not over-ride the specific requirements
of the bidding criteria as defined in Regulation 7.
42. The next basis of the challenge by the appellants is t hat the
decision which was taken in the form of the Board Note dated 23 July
153
2018 had categorically stipulated a range of 2 per cent to 100 per cent of
the number of households as per the 2011 Census as the minimum/
maximum thresholds to judge the reasonableness of the bids. It has been
urged that despite this, the decision of the Board dated 10 August 2018
virtually reversed the earlier decision recorded in the Board Note of 23
July 2018, thereby tainting the decision-making process with arbitrariness.
The nuances to this challenge have been brought out in the submissions
of Dr AM Singhvi, Mr Vikas Singh, learned Senior Counsel on behalf of
Adani Gas Limited and Mr KV Vishwanathan and Mr Bud dy
Ranganathan, learned Senior Counsel on behalf of IMC Limited and
can broadly be catalogued in the form of the following points:
(i) The 2- 100 per cent criterion based on the 2011 Census
datais the basis on which the bids for 79 out of 86 GAs
were evaluated;
(ii) In respect of the bids for four GAs (out of the
remainingseven GAs) where the highest bidder had bid a
number of PNG connections below 2 per cent of the number
provided by the 2011 Census, those four bidders were
furnished with an opportunity to improve their bids and
match the 2 per cent threshold;
(iii) It is only for the three bidders with the highest composite
scores in GAs 51,61 and 62 that the bids were evaluated
with reference tothe projected number of households in
2026;
(iv) For example, in GA-62 (Chennai-Tiruvallur), there were
ten bidders of whom the bids of nine were evaluated with
reference to the 2011 Census data on the number of
households, whereas the bid of one bidder (Torrent Gas
Private Limited) has been evaluated with reference to the
number of projected households in 2026;
(v) The agenda note dated 9 August 2018 which was approved
by three out of the four Board members recommended that
Torrent Gas Private Limited was not qualified and Adani
Gas Limited be declared as the successful bidder.Yet on 10
August 2018, the four Board members including the three
who had approved the Board Note concluded that, though
the lower and upper thresholds were decided “the same
need not be a mechanical exercise”;
ADANI GAS LTD. v. PETROLEUM AND NATURAL GAS
REGULATORY BOARD [DR. DHANANJAYA Y CHANDRACHUD J.]
(vi) Neither the Bid Document nor the CGD Authorisatio n
Regulations contain any provision allowing the Board to call
upon bidders to improve their bids;
(vii) The Board Note dated 23 July 2018 which defined the
minimum and maximum threshold (2-100 per cent of the
number of households as per the 2011 Census) without any
caveat or provision for relaxation has been virtually reversed
on 10 August 2018, thereby upsetting the level playing field
between bidders;
(viii) The only reason for the reversal of the decision, which is
that the criterion need not be a mechanical exercise is not
supported by reasons and this volte face introduced un-
canalized subjectivity in the process which was earli er
considered to be objective and definite;
(ix) The Board decision dated 28 August 2018 wrongly adopts
the 2011 Census number as 23,33,500 whereas in the Board
Note, the number of households as per the 2011 census is
21,01,931;
(x) There has been a breach of the principles of natural justice
for the following reasons:
(a) In the Board decision dated 10 August 2018, it was decided
to give a hearing to all affected parties;
(b) The Board undertook the exercise of hearing only Torrent
Gas Limited, AG&P LNG and SKN Haryana; and
(c) The violation of natural justice lies in the fact that these
“not-qualified” bidders were heard on why their bids were
reasonable despite being above 100 per cent of the 2011
Census household data. Neither Adani Gas Limited nor any
of the other unsuccessful bidders were heard on why the
bids of the “not-qualified” bidders were actually
unreasonable.
(xi) This Court is justified in reviewing the process adopted by
the Board in evaluating the bids for the ninth round of CGD
bidding. It is well settled that judicial review cannot be denied
even in contractual matters to prevent arbitrariness.
155
43. Our analysis of the CGD Authorisation Regulatio ns, as
amended on 6 April 2018, as explained earlier, reveals that the Regulations
did not contain any stipulation determining a range of 2 to 100 per cent
of the number of households under the 2011 Census as the criterion to
evaluate bids. The Regulations in fact do not link the ‘highness’ factor of
domestic PNG connections to the 2011 Census data. In Clause 4.4.1 of
the Bid Document, the Board reserved to itself the right t o reject any
unreasonably high or low bid. In Addendum-1 to the Bid Document, the
Board clarified to all prospective bidders that the evaluation of whether
a bid was unreasonably low or high would be conducted on a case to
case basis at the time of bid evaluation.
44. It is in the above background that the Board Note dated 23
July 2018 must be assessed. The Board Note was formulated after the
last date for the submission of bids. The criterion which the Board Note
proposed had not been notified to bidders. Bidders were not on notice
that this would be the basis on which their bid would be evaluated. The
Board Note took notice of Clause 4.4.1 of the Bid Docum ent and
stipulated that since technical bids for some GAs were ab out to be
evaluated, it was necessary to decide upon the reasonableness of the
bidding parameters which constituted the work programme. It was in
this background that the Board Note proposed that; “…2 per cent of
total households (as per the 2011 Census data) may be considered as
minimum”. As regards the maximum, the Board note proposed that:
“beyond 100 per cent households may be treated as unreasonably
quote”
(Emphasis supplied)
The terminology adopted by the Board Note indicates that the 2-
100 per cent range was not laid down as an absolute or inflexible basis
for disqualifying bids below the minimum or in excess of the maximum.
On the contrary, the use of the expression “may be” is one indicator that
a bid which was below 2 per cent or in excess of 100 per cent may
trigger the exercise of the power which the Board had reserved to itself
in clause 4.4.1 of the Bid Document. On its plain terms, the Board Note
cannot be construed to have laid down an absolute norm by which bids
quoting below the minimum of 2 per cent or above the ceiling of 100 per
cent of the number of households under the 2011 Census data w ould
automatically be rejected as unreasonable.
ADANI GAS LTD. v. PETROLEUM AND NATURAL GAS
REGULATORY BOARD [DR. DHANANJAYA Y CHANDRACHUD J.]
45. If the Board Note of 23 July 2018 were to be construed in the
manner in which the learned Senior Counsel for the appellants urged ,
the automatic disqualification of bidders based on a criterion introduced
by the Board Note would raise serious doubts about its fairness and
legality. This is because the Board Note was not notified to bidders as a
basis for the evaluation of bids before the date for the submission of the
bids had closed. To disqualify a bidder on the basis of a criterion which
was not notified and of which bidders had no knowledge would be arbitrary
and would constitute an infraction of Article 14. The Board was th us
correct in determining that the automatic disqualification of a bid on the
basis of a criterion specified in the Board Note (which was never notified
to the bidders) would not be “legally correct”. Hence, i t would be
reasonable to interpret the Board Note dated 23 July 2018 as being the
formulation of a guideline for the Board.As a guideline in the process of
evaluation, the decision taken by the Board on 23 July 2018 was not to
the effect that every bid below 2 per cent or above 100 per cent would
necessarily stand disqualified. Consistently with the use of the word
‘may be’, as already noticed, the decision of the Board meant that the
power which the Board reserved to itself in Clause 4.4.1 could be invoked
if it came to the conclusion that the bid had not been justif ied to be
reasonable. In other words, the breaching of the range of 2-100 per cent
was a trigger for the Board to scrutinise the bid and determine whether
the power under Clause 4.4.1 should be invoked. Hence, the course of
action which the Board followed of calling upon the bidders w ith the
highest composite scores in GAs 51, 61 and 62 to justify their bids in
terms of their reasonableness cannot be faulted. On the contrary, if the
Board had rejected these bids solely on the ground that they were above
the limit of 100 per cent of households under the 2011 Census data, the
decision would have been seriously flawed for having applied a criterion
which was not a part of the Regulations, was not embodied in the Bid
Document and in any event, was not notified to bidders before they had
submitted their bids.
46. Another limb of the submission is that, with respect to GA 62,
three out of the four members of the Board had in the Boar d agenda
dated 9 August 2018 recommended that Torrent Gas Private Limit ed
was not qualified and that Adani Gas Limited be dec lared as the
successful bidder. This, in our view, is an incorrect reading of the agenda
note. What this submission misses is the last paragraph of the Board
agenda note which states:
157
“20. This Agenda note has been prepared by Authorization
Division, concurred by Member (I&T) & Member (C&M) and
approved by Chairperson for deliberations and approval of the
Board .”
(Emphasis supplied)
The agenda note dated 9 August 2018 was a recommendation
which was prepared on the basis of the 2–100 per cent criterion contained
in the Board Note dated 23 July 2018. Obviously in the light of that
decision, a recommendation was made which was still to be deliberated
upon by the Board as a body. When the Board met on 10 August 2018,
it correctly came to the conclusion that the lower and upper thresholds
were not to be applied mechanically to disqualify bidders. This decision,
as we have indicated earlier, was justified not only by the terms of t he
Board Note dated 23 July 2018 but was intrinsic to a fair exerci se of
power by the Board. The Board decided that it would call the bi dders
with the highest composite score to explain the reasonableness of their
bids. This was a fair opportunity which was granted to the bidders who
had the highest composite score to justify the basis of their computation
of projected households over the eight-contract years.
47. There is no merit in the submission that there was a breach of
the principles of natural justice in calling only the bidders with the highest
composite score to explain the reasonableness of their bid s. None of
these bidders was being called upon to revise or improve their bids. In
terms of the CGD Authorisation Regulations, the bidder with the highest
composite score has to be declared as the successful bidder. I f despite
having the highest composite score, a bidder was being considered for
rejection by the Board, it was that bidder who was justifiably called to
explain the reasonableness of the bid. The other bidders had no locus to
participate in the process. It is a settled principle of law that the rules of
natural justice are attracted where a decision affects a r ight of a party
against whom the decision has to be made. After the composite score of
all bidders is calculated, the second highest bidder has no rights vis-à-vis
the highest bidder or the Board unless the method of calculati ng the
highest composite score itself is impugned. Calling upon the bidders with
the highest composite score to explain the reasonableness of their bid
did not alter the composite score of the H1 bidders or any other bidder
for the same GA. The question of hearing any other bidder would have
arisen only if the H1 bidder stood disqualified, and the bidder with the
ADANI GAS LTD. v. PETROLEUM AND NATURAL GAS
REGULATORY BOARD [DR. DHANANJAYA Y CHANDRACHUD J.]
next highest composite score also breached the 2-100 per cent range ,
thereby warranting scrutiny from the Board. In the present situation,
when the Board decided to call the bidders with the highest composite
score in order to allow them an opportunity to explain reasonableness of
their bid, the administrative decision taken by the Board cannot be faulted
as being in violation of the principles of natural justice.
48. At the 82 nd meeting of the Board, which was held on 29 August
2018, the reasonableness of the bids submitted for GAs 51,61,62 and 72
came up for consideration. In GA 62 (Chennai-Tiruvallur) Torrent Gas
Private Limited, relied on the current LPG domestic connections
(41,73,073) according to the statistics of the Tamil Nadu gove rnment.
This was extrapolated until 2026 taking the growth rate at 5 per cent per
annum. On this basis, Torrent Gas Private Limited as the H 1 bidder
justified before the Board its quoted figure of PNG connections of thirty-
three lakhs. For GA 61 (Kanchipuram), AG & P LNG explained that its
computation was based on:
(i) The urbanisation rates in the Kanchipuram district;
(ii) Extrapolations of the number of households based on historical
growth rates;
(iii) The twin city status of Chennai and Kanchipuram; and
(iv) The per capita income growth in Kanchipuram district.
On this basis, AG & P LNG justified its number for projec ted
PNG connections. For GA-51 (Puducherry), SKN Haryana based its
computation on the compound yearly growth of households in the previous
twenty years. Based on this growth rate, the bidder ca lculated the
projected households till 2026 and accordingly presented this computation
to the Board when called upon.
49. In its minutes dated 29 August 2018, the Board noted that the
four GAs: 51, 61, 62 and 72 were compared with the upper limit fixed by
the agenda note dated 23 July 2018 and projected households in 2026.
The penetration of PNG domestic connections based on the upper limit
fixed by the Board with reference to the projected number of households
in 2026 varied from 45 per cent to 59 per cent. However, the penetration
of PNG domestic connections based on quoted PNG connections with
reference to the projected number of households in 2026 varied from 55
per cent to 99 per cent. The variation between the two sets of numbers
159
was between 7 per cent to 54 per cent. The Board noted that it was in
GA 72 where the highest variation of 54 per cent took place.T he bid
submitted by Torrent Gas Private Limited for GA 72 was consequently
rejected. The Board observed that the computation for GA72 by Torrent
Gas Private Limited was based on untenable assumptions as described
in para 14.3 of the agenda note. According to these assumptions, the
PNG domestic connections quoted by the Torrent Gas Private Limitedwas
99 per cent of the projected households by 2026 which was taken as an
unreasonably high penetration figure. However, for the remaining
threeGAs, the variation was between 7 per cent to 23 per c ent of the
projected households in 2026, and PNG penetration would be in the range
of 55 per cent to 79 per cent. This exercise was carried out by the
Board to enable it to consider the reasonableness of the bid s. Torrent
Gas Limited, whose bid was accepted for GA 62, was however not
considered for acceptance for GA 72 since its computation of the number
of projected households and penetration rate was deemed unreasonable.
In our view, the Board has certainly given a possible basis for coming to
the conclusion that the bids submitted by the bidders wi th the highest
composite score for GAs 51, 61 and 62 were reasonable and ought not
to be rejected.
50. The agenda note dated 9 August 2018 merely tabled discussion
on the disputed GAs. The highest bidders for GAs 61 and 62 were heard
by the Board on 14 August 2018. The highest bidder for GA 51 was
heard by the Board on 23 August 2018. The final decision to award
authorisation in GAs 51, 61 and 62 to AG & P LNG, Torrent Gas Private
Limited and SKN Haryana (the highest bidders) respectively was finally
taken by the Board in its meeting on 29 August 2018. This decision was
taken after hearing the bidders on whether their bids were reasonable or
not. The Board did not reject all other bidders or presumptively announce
these entities as successful bidders before making a determination as to
the reasonableness of their bids. In light of this chronology of events, at
no point did the Board reverse its decision with respect to th e GAs in
question.
51. The appeals before APTEL pertained to GAs 51, 61 and 62.
The present proceedings were not in the nature of a public interest litigation
instituted under Article 226 of the Constitution before a High C ourt
challenging the entirety of the tendering process. Both before this Court
and APTEL, it was contended that the Board had rejected bids in other
ADANI GAS LTD. v. PETROLEUM AND NATURAL GAS
REGULATORY BOARD [DR. DHANANJAYA Y CHANDRACHUD J.]
GAs which were not-qualified on the ground that they were either below
2 per cent or above 100 per cent of the number of households as per the
2011 Census figures. The Member Technical (Petroleum and Natura l
Gas) at APTEL examined the submission in paragraph 60 of the decision
and held:
“60. Though the appeal pertains to only GAs, 51, 61 & 62, the
Appellant also submits that the Board rejected 37 numbers of
bids which were not qualified because their bids were below 2%
and higher than 100% of 2011 census figures as per the Board’s
Press Release dated 10.08.2018 uploaded in its website. Though,
the instant appeal also strictly pertains to only highness of PNG
domestic connections, still for the sake of completeness, le t me
understand the status of these bids. On clarification, the B oard
has stated that there were only 9 bids with H-1 bidders quoting
below 2% and above 100% limits of 2011 census. These 9 bids
were accordingly highlighted to the Board, and final decisions were
taken on these 9 bids by the Board after proper applicat ion of
mind, hearing the parties and taking an objective decision. Out of
9 bids, 4 bids having lower than 2% connections were accepte d
after raising their bids through discussions with the bidders,
otherwise, these GAs would have gone dry. In GA-37, IOC’s bid
was rejected because of lower than 2% quote, but this decision of
the Board has not been challenged by IOC. Out of the remaining
4 GAs where H-1 bidders quoted more than 100% of PN G
connections of 2011 census household numbers for 3 GAs (51, 61
& 62), H-1 bidders were declared successful bidders after hearing
them on their reasonableness of quotes. For the 4th GA (GA No.
72), the bid of the H-1 bidder who is the R-2 in the instant case
was rejected having found its bid unreasonable and the GA was
awarded to the next highest bidder and the H-1 bidder has not
challenged this decision.”
This clarification by the Board as well as the findings which have
been recorded by the Member Technical (Petroleum and Natural
Gas) commends itself for acceptance.
52. In addition to their submissions with respect to the bindi ng
nature of the 2 – 100 per cent range set out in the Board Note dated 23
July 2018, the appellants also argued that the Compounded Annual
161
Growth Rate 17 considered by the Board for the period between 2001
and 2011 was higher than the actual annual growth rate, leading the
Board to project a higher number of households for 2026 than may actually
exist. It was alleged that the Board used the figure of 23,33,500 as the
number of households existing in 2011 instead of 21,01,931 in calculating
the growth rate, resulting in an inflated growth rate. This h igh growth
rate, according to the appellants, led the Board to accept the submissions
made by Torrent Gas Private Limited in justifying an “unreasonably high”
quote for the number of households for the year 2026.
53. In his judgement, the Member Technical noted that the appellant
had in fact calculated the CAGR using overall population growth instead
of using household growth. Evidently, for the purpose of projecting the
number of PNG connections within a GA, it is the number of households
and not the overall population that is relevant as each household is unlikely
to have more than one PNG connection. Moreover, as neither the CGD
Regulations nor the Bid Document required the number of projec ted
households to be calculated on the basis of 2011 Census data, the decision
of the Board to accept the justification provided by the bidder s cannot
be attacked on the ground that the figures provided did not strictly match
the numbers extrapolated from the 2011 Census data. Lastly, the Member
Technical (Petroleum and Natural Gas) observed:
“51. … Moreover, the calculations have been done by an expert
body (the Board) which has been constituted as per Statutory
Act. In addition, the estimates on future PNG domestic
connections made by the 3 bidders based on various
parameters are only estimates. These are not meant to be
arrived at by any specified formula or direct mathematical
precision. The power to weed out unreasonably high or low
quote is only an enabling power and not a yardstick or
parameter for evaluation. ”
(Emphasis supplied)
The power granted to the Board under Clause 14.2 of the Bid
Document is an enabling clause that allows the Board to apply its mind
to a quote and determine its reasonableness. The quotes submitted by all
bidders with respect to the projected number of households in 2026 are
admittedly estimates. Similarly, the Board’s own determ ination of a
ADANI GAS LTD. v. PETROLEUM AND NATURAL GAS
REGULATORY BOARD [DR. DHANANJAYA Y CHANDRACHUD J.]
17 “CAGR”
baseline for comparing the reasonableness of various quotes is also an
estimate. Therefore, the Board’s use of the baselin e figure and its
consequent acceptance of the reasonability of a quote cannot be faulted
because it did not strictly adhere to one particular methodology of arriving
at a number of projected households unless the methodology u sed is
arbitrary, having no correlation with the result sought to be a chieved.
We therefore approve of the finding of the Member Technica l with
respect to the calculation of the number of households.
54. The present batch of appeals arises from two divergent opinions
of the Chairperson and the Member Technical (Petroleum and Natural
Gas) of the APTEL. Several arguments urged by the appellants before
us find voice in the opinion of the Chairperson. Therefore, for the sake
of completeness it is necessary to briefly advert to the o pinion of the
Chairperson allowing the appeals. The Chairperson observed as follows:
“136. … On 23.07.2018 certain criteria/parameters were indicated
by this so called Evaluation Committee in the Agenda Note. …
This indicates that the exercise so far as criteria/ parameters was
uniform for all the bids. …. The report on Agenda Note dated
09.08.2018, in fact, recommended that the highest bidders
of GA 51, 61, and 62 were disqualified since their quote of
PNG connections were beyond 100% of the total households of
2011 census. … However, the Minutes of the Board dat ed
10.08.2018 indicate that the four members of the Board out of
which three had approved Agenda Note, changed their opinion so
far as disqualification of highest bidder of these three GAs 51, 61
and 62. It’s also noticed from the affidavit of the Board fil ed
09.11.2018 that the Board has correctly applied the
unreasonable low criteria to all the bidders whose bid w as
below 2%, but surprisingly the bids which were beyond t he
limit of 100% of 2011 census, the Board thought it f it to
relax the criteria by calling the high bidders for negotiation. If
the Board thought it fit to hear the affected parties , then it
ought to have invited all the affected parties of the sa id GA
i.e., all the bidders who stand to lose the bid, since such
procedure was exercised so far as unreasonably low criteria to
all bidders who quoted below 2% of 2011 census. Assessment
of reasonability of a bid cannot be equated with the concept
of rejection of a bid as not qualified for a particular criteria.
163
Reasonability of a bid has reference to subjective assessm ent/
satisfaction. The assessment of a bid based on the available material
would amount to objective assessment.”
(Emphasis supplied)
It is evident from the above extract that the Chairperson’s findings
are based on three key assumptions:
(i) The Board Note dated 23 July 2018 was binding on the
Board and the agenda note dated 9 August 2018 was
evidence of the Board Note’s binding nature;
(ii) Because the Board disqualified certain other bidders b y
applying the 2 – 100 per cent range, it was bound to do so
against the successful bidders in GAs 51, 61 and 52; and
(iii) Because the assessment of reasonability was a “su bjective
assessment”, the Board was obligated to hear other bidders
in the disputed GAs before declaring successful bidders.
55. As noted previously, on a bare construction of the Board Note
dated 23 July 2018 and the fact that the Board Note was formulate d
after the last date for the submission of bids, the Board Note did not set
out absolute criteria for disqualification of bids. The agenda note dated 9
August merely tabled a proposal to apply the criteria of 2-100 per cent
range but the Board did not subsequently adopt this course of action, a
decision within its power and indeed necessary to preserve the integrity
of the bidding process. Having established that the Board Note was not
an absolute binding criteria, and the Tribunal was approached only with
respect to GAs 51, 61 and 62, the Board’s treatment of other GAs cannot
be decisive in determining the legality of the authorisations granted in
GAs 51, 61 and 62, especially where the Board’s actions in re spect of
these other GAs have not been independently challenged. Lastl y, the
Chairperson has construed the assessment of the reasonabili ty of the
highest bidder’s quote as a decision affecting the rights and liabilities of
all other bidders for the GAs, thus requiring them to be heard. As noted
previously, the assessment of the reasonability of the bid was a matter
solely between the highest bidder and the Board. Such an assessmen t
would not alter the scores of the highest bidder vis-à-vis the scores of
the other bidders. The sole question was whether the highest bidder ’s
quote was reasonable, and the power to determine such reasonab ility
resided solely with the Board by virtue of Clause 14.2 o f the Bid
ADANI GAS LTD. v. PETROLEUM AND NATURAL GAS
REGULATORY BOARD [DR. DHANANJAYA Y CHANDRACHUD J.]
Document. Thus, the presence and hearing of other bidders wa s not
necessary.
56. For the above reasons, we disagree with the opinion of the
Chairperson and concur with the view which was taken by the Member
Technical (Petroleum and Natural Gas) to dismiss the appe als. The
Appeals are accordingly dismissed. Transferred Cases Nos 27 of 2019
and 26 of 2019 are disposed of. There shall no order as to costs.
57. Pending application(s), if any, shall stand disposed of.
Kalpana K. Tripathy Appeals dismissed.