Hamid Ali Khan (d) Through Lrs. & Anr. v. State of U.P. & Ors.
K. M. JOSEPH, J.
1. The original appellants who stand substituted by their lega l
representatives unsuccessfully challenged notifications dated 11.4.2008
and 9.4.2009 issued under the Land Acquisition Act, 1894 (hereinafter
referred to as “the Act”). By virtue of the first notificat ion the powers
under Section4 and 17(4) of the Act came to be invoked in regard to the
property of the appellants. The Division Bench by the impugned judgment
dismissed the writ petition.
2. A notification under Section 4(1) of the Act dated 8.10.2004
coupled with notification under 17(4) was issued in regard to 52.361
hectares of land for the construction of a residential colony und er the
name of Bulandshhar Khurja Development Authority, Bulandshehar. Plot
No.881 and 914 belonging to appellants children were included.The
appellants did not raise any objection as the requirement of Section 5A
of the Act stood dispensed with. Declaration under Section 6 of the Act
was published on 7.10.2005. It is the specific case of the appellants that
despite the urgency clause being invoked, the possession was taken only
in January 2006. The award was passed on 29.4.2009 only for plot 914
(belonging to the children of appellants). In regard to plot No. 881 which
was also acquired, the compensation was not paid, it was averred. It is
stated that till date on the spot neither any construction under the residential
scheme has been started nor it ‘appears to be’ in the near future. The
writ petition it must be remembered was filed in the year 2009. Even the
allotment process, it is averred,was not started in r egard to 52.81
hectares.Writ petitioners-appellants alleged that they were running a cattle
market in Sy.880 and Sy.893. It is their case that in order to grab more
HAMID ALI KHAN (D) THROUGH LRS. & ANR. v. STATE OF
U.P. & ORS.
land, the second respondent namely, the Authority started proceeding to
acquire more land allegedly needed for the Commercial cum Residential
Scheme which included the property in question. On 6. 1.2006 the
possession of the lands acquired earlier were taken. Allegation of demand
for money by respondent no.3 is made if the appellants wanted plots 880
and 893 to be exempted. On 10.10.2006, the respondent no. 2 (Authority)
wrote a letter to the Under Secretary about the existing construction on
the land. In the letter dated 6.10.2006 and 10.10.2006 there is denial of
existence of any cattle market and declaration under Section 143 of UP
Zamindari Abolition & Land Reforms Act, 1950 in regard to Plot No.880
and 893. It is complained that the said letters gave a wh olly false and
incorrect report to the State Government and Distri ct Magistrate
respectively. Appellants-Writ Petitioners filed repr esentation dated
18.12.2006. They filed writ petition No. 12379 of 2007 challenging the
letters of the Collector dated 6.10.2006 and that of Vice Chairma n of
the Authority dated 10.10.2006. The said writ petition washowe ver
dismissed as withdrawn on 10.9.2008 when the impugned notification
under Section 4 and 17(4) was issued on 11.4.2008. There is reference
to the letters dated 3.1.2008, 8.2.2008 and 8.3.2008. On 27.3.2008 it is
alleged that the 3 rd respondent again sent false information that there
are 13 houses over the land in dispute which was again false and against
the spot position (Annexure 14 in W.P.). Reliance was placedon the
layout plan, the photocopy of which is annexed in Annexure 15. It was
contended on the strength of the same that plot No. 880 and plot No.
893 are situated at the end of Khurja city facing the Aligrah- Khurja
National Highway, that is, the G.T. Road and it is not in the centre of the
scheme as alleged by respondent No. 3 in his report. It is sp ecifically
averred that plot No.880 and plot No. 893 are not located in the centre
of the scheme as alleged in the report dated 6.10.2006 and 10.10.2006.
They are alleged to be located at the one end of the city fac ing G.T.
Road. If a huge boundary wall is erected, the plots can be s eparated
from the residential area without disturbing the expansion pl an of the
scheme. They are ready to put up the wall. There is als o no need for
plots in question for the alleged expansion.There is reference to the
letter dated 29.3.2008 written by the 3 rd respondent to the effect that
due to the nature of land it was exempted from the acquisi tion made
earlier for the main scheme. It is alleged that base d on the wrong
contradictory information sent by the vice Chairman , the State
Government issued the impugned notification dated 11.4.2008 purporting
207
to be under section 4 of the Act and also invoking the urgen cy clause
under Section 17(4) taking away the right conferred under Section 5A
of the Act. Respondent No.1 also issued notification dated 9.4.2009
invoking Section 17(4) of the Act.
3. A short counter affidavit was filed on behalf of the 2 nd
Respondent Authority. Therein the case set up is as follows:
The Development Authority under the notifications issued
under 2004 and 2005 has constructed roads and dividers fo r
approaching all the plots which are being sold as developed plots
for making residential and commercial construction. The Authority
also developed trunk sewer line which would connect sewer line
with the buildings to be constructed by the purchasers. The further
development carried out is pointed out to be electrification of the
colony by getting poles fixed along with roads. A sub-station of 33
KVA was also got constructed. A copy of the chart of the detailed
development and construction was produced along with the
affidavit. Water supply system and also an overhead tank of 2000
kilolitres was also constructed. Development work it is stated was
completed in Rahankhand, Madhavkhand, Udhavkhand,
Govindkhand and Keshavkhand. In the remaining parts
development work is going on. Nearly Rs. 20 crores was already
spent. From the plots advertised, 1016 applicants were allo tted
developed plots, 60 of whom have got sale deeds registered i n
their names. Five per cent of the total land to be developed was to
be allotted for the persons living below the poverty line and landless
persons had to be allotted land free of cost. Poor persons of city
living below poverty line are to be given constructed houses in
terms of a scheme, and towards the same construction work was
being made over 5% of the land. It is thereafter stated that for the
development of the compact colony, it was considered essential
to acquire the land involved in the writ petition. The appellant-writ
petitioners filed a rejoinder affidavit. It is inter alia stated that the
theory of additional requirement to supplement the earlier
acquisition of 2004-2005 was a farce.
4. A perusal of the impugned judgment of the Division Benc h
reveals that two submissions alone were made on behalf of the apellants.
The second submissionwas that there was no urgency to dispense with
HAMID ALI KHAN (D) THROUGH LRS. & ANR. v. STATE OF
U.P. & ORS. [K. M. JOSEPH, J.]
the inquiry under Section 5A of the Act. The Division Bench dealt with
the submission in the following manner:
“A short counter affidavit has been filed by the Authority
showing that the development work has been done for the Yojna.
The rod, dividers, sewer line, water line, electric poles, and electric
sub station have been constructed. The plots have been allotted.
The total bond money for the Yojna is Rs.24.09 crores. Out of this
amount the most of development has been done and Rs.19.74
crores have been disbursed. A rejoinder affidavit has been filed
but there is no specific denial of the same. It is not correct to say
that no work has been done. The satisfaction regarding urgency
is not vitiated on this account.”
5. The first submission was based on the Government Order which
interdicted the acquisition of land having an area less than 10 acres. This
is rejected as the government order was found to be a mere guideline.
Thereafter it is noted:
“8. A map of the sport has been annexed along with the
writ petition. A detailed map was also produced before the Court.
The map shows that the property in dispute is covered from three
side by the land of the Yojna and on the fourth side, there is road.
It shows that the land is necessary for proper implementation of
the Yojna, it is eminently suited.
9. the petitioner run a cattle market over the property in
dispute. It may not be appropriate to run it between reside ntial
area. However, compensation be provided expeditiously so that
the petitioner may make alternative arrangements.”
The writ petition was dismissed.
6. We heard Mr. Abhay Kumar, learned counsel onbehalf of the
appellant and Mr. R.K. Raizada, learned senior counsel for the first
respondent and Shri Ravindra Kumar, learned Counsel for the Second
Respondent.
7. Learned counsel for the appellants no doubt contended that the
property in question was excluded from the first acquisition. There was
no need to acquire the property and he further contended that deprivation
of the right under Section 5A was wholly unjustified. He adverted to the
map and pointed out that the property in question was not in the middle
209
of the Scheme area and, in fact, no work was actually done pursuant to
the first notifications. Referring to the dates on which events took place,
he would contend that the invoking of the urgency powers and dispensing
with the inquiry under Section 5A was entirely unjustified. It is the
contention of the appellants that small pieces of land coul d not have
been acquired in subsequent acquisition without any genuine need much
less for the alleged purpose of preventing any particular use that is
unauthorised construction and or existence of cattle market. There is no
imminent requirement. It is a case of malafides. The appellants lay store
by Om Prakash And Another v. State OF U.P. And Others 1, Anand
Singh And Another v. State Of Uttar Pradesh And Others 2 and Radhy
Shyam (dead) through LRS. and Others v. State of Uttar Prades h and
Others3.
8. Per contra, Mr. Ravindra Raizada learned Senior Coun sel
appearing on behalf of the first respondent, on the other hand contended
that there was a public need and the enquiry under Section 5A was
dispensed with on the basis of proper material. He would contend that
the jurisdiction of the writ court to judicially review the decision taken
under Section 17 to dispense with Section 5A was limited. The decision
rests on the subjective satisfaction of the Authority. He a lso produced
additional documents which contain the inputs allegedly relied upon to
justify the dispensing with the inquiry under Section 5A of th e Land
Acquisition Act, 1894.
9. Counter Affidavit is filed by the Second Respondent. In t he
written submission based on the same the following stand is made.
The present case is concerned with the Master Plan of Khurja
2001. The town of Khurja is an important town in the Delhi Howrah
Line. The town known for its pottery work witnessed population
growth of 22.5% between 1991-2001. It caused an extr eme
housing shortage.
In a meeting held on 03.05.2002 it approved a proposal to acquire
52 hectares of land for the Kalindi Kunj Residential Scheme. After the
approval of the scheme the appellants unauthorisedly constructed 13
number of shops. There were notices issued in this regard. The state
HAMID ALI KHAN (D) THROUGH LRS. & ANR. v. STATE OF
U.P. & ORS. [K. M. JOSEPH, J.]
1 1998 (6) SCC 1
2 2010 (11) SCC 242
3 2011 (5) SCC 553
government called upon the second respondent to deposit by a letter
dated 24.09.2003 Rs. 2,29,17,8000 representing 10 perc ent of the
appropriate compensation. The collector sent a proposal on 08.10.2004
recommending the invoking of the urgency clause. At that time the plots
in controversy in this case that is plot no. 880 and 893 were l eft out
because the appellants then represented that there was a Mas jid and
Petrol Pump in the said plots. It was not a case where the plots in question
were included and then excluded by the declaration. The NCRPB
prepared the Master Plan on 13.12.2004 for this city .The NCRPB
sanctioned a loan on Rs.57.34 crores for the Kalindi Kunj Residentia l
Scheme having a total area of 55.453 hectares. The Respondent no. 2
was incurring interest liability of Rs. 82000/- per day. The Kalindi Kunj
Scheme was intended to have a model infrastructure and am enities.
The Second Respondent deposited the total amount of Rs. 25 crores by
December pursuant to letter dated 30.12.2004 issued by the land
acquisition officer. The Regional Plan 2021 of the NCR came to be
approved on 17.09.2005. This included the U.P. Sub Regional Plan
interalia taking in the city of Khurja. The Section 6 declaration wa s
issued on 17.10.2005. On 08.02.2008 the State government called upon
the second respondent to explain why an area of 2.692 hectare w as
required. The second respondent responded by pointing out that the land
was sought to be acquired as part of the residential scheme and the land
falls in the midst of the development area. On 11.04.2008 the department
recommended for approval of sanction by the Minister which was granted
and the notification was issued in respect of the propert ies in dispute.
On 11.04.2008 notification under Section (4) read with Section (17) was
issued. The appellants did not challenge this notification. The notification
under Section 6 read with Section 17 was issued on 09.04.2009. The
Writ Petition was filed by the appellant on 20.05.2009. It is the further
contention of the Second Respondentthat theWrit was dismissed on
28.05.2009. On 06.07.2009 the SLAO offered possession of the land. It
was taken over by the State and handed over to the Second Respondent
on 27.07.2009.Land was mutated in its name on 16.09.2009. While issuing
notice on 06.11.2009, this Court granted status quo. Housing has been
accepted as a public purpose. Reliance is placed on the Constitution
Bench Decision in 1975 (1) SCR 802. It is contended that there is delay
and latches in so far as the notification dated 11.04.2008 was challenged
only on 20.05.2009. What is relevant is the decision-making process.
The land is lying fully vacant with no construction. The appellants are
211
not residing thereon. The only use is to put it for holding a c attle fair
which use would be contrary to public interest and environment. With
reference to the state of the case law the second respondent seeks to
essentially draw support from State of U.P. V. Smt. Pista Devi and
others4 and Chameli Singh and others v. State of U.P. And Another 5.
Radhey Shyam (supra) is distinguishable. It is contended that in the said
case there was special allegation of discrimination. In the present case
there is no case of discrimination. There is no case of malafides. There
is no allegation of malafides. It is contended that the decision in Radhey
Shyam case (supra) did not discuss the dicta in Rajasthan Housing
Board and Others v. Shri Kishan and Others 6. It is further contended
that inviting objection in the present case would have been a n empty
formality. This is for the reason that the appellant has not come out with
any objection either in the writ petition or the SLP whic h they would
have advanced in the event a hearing under Section 5A took place. The
project had to be completed in a time bound manner. The land wa s
required under the supplementary plan. This is clear fr om the map
produced before the High Court. The concept of prejudice is pre ssed
into service to contend that appellants would not be prejudiced. It is
further contended that urgency in the present case continues. Free plots
are allotted to landless etc. though it is subject to a limit of 5 percent of
the total area. Lastly it is contended that the land of the appellantsfall in
the midst of the development scheme. It is contended that th e land in
plots no. 880 and 893 is required for widening of the road of NH 9,
school, park, health care centre and creation of 26 nos. of re sidential
plots of 160 square meter size and 10 plots of 200 square meter size etc.
THE STATE OF THE LAW REGARDING SECTION 5A
BEING DISPENSED WITH
10. In Narayan Govind Gavate and Others v. State of
Maharashtra and Others 7, a Bench of 3 learned Judges was dealing
with a notification issued under Section 17(4).The public purpose recited
in the notification was development and utilisation of the lan d as a
residential and industrial area. The lands were described as waste and
arable land and urgency provision was invoked resulting in the notification
being issued. This court interalia held:
HAMID ALI KHAN (D) THROUGH LRS. & ANR. v. STATE OF
U.P. & ORS. [K. M. JOSEPH, J.]
4 (1986) 4 SCC 251
5 (1996) 2 SCC 549
6 (1993) 2 SCC 84
7 (1977) 1SCC 133
“10. It is true that, in such cases, the formation of an opinion is a
subjective matter, as held by this Court repeatedly with regard to
situations in which administrative authorities have to form certain
opinions before taking actions they are empowered to take. They
are expected to know better the difference between a right or
wrong opinion than courts could ordinarily on such matter s.
Nevertheless, that opinion has to be based upon some releva nt
materials in order to pass the test which courts do impose. That
test basically is: Was the authority concerned acting w ithin the
scope of its powers or in the sphere where its opinion and discretion
must be permitted to have full play? Once the court comes to the
conclusion that the authority concerned was acting within the scope
of its powers and had some material, however meagre, on which
it could reasonably base its opinion, the courts should not and will
not interfere. There might, however, be cases in which the power
is exercised in such an obviously arbitrary or perverse fashion,
without regard to the actual and undeniable facts, or, in other words,
so unreasonably as to leave no doubt whatsoever in the mind of a
court that there has been an excess of power. There may also be
cases where the mind of the authority concerned has not been
applied at all, due to misunderstanding of the law or some other
reason, to what was legally imperative for it to consider.
24. Coming back to the cases before us, we find that the High
Court had correctly stated the grounds on which even a subjective
opinion as to the existence of the need to take action under Section
17(4) of the Act can be challenged on certain limited grounds.
But, as soon as we speak of a challenge we have to bear in mind
the general burdens laid down by Sections 101 and 102 of the
Evidence Act. It is for the petitioner to substantiate the grounds
of his challenge. This means that the petitioner has to either lead
evidence or show that some evidence has come from the side of
the respondents to indicate that his challenge to a notification or
order is made good. If he does not succeed in discharging tha t
duty his petition will fail.
30. In the cases before us, if the total evidence from whichever
side any of it may have come, was insufficient to enable t he
petitioners to discharge their general or stable onus, their petitions
could not succeed. On the other hand, if, in addition to the bare
213
assertions made by the petitioners, that the urgency contemplated
by Section 17(4) did not exist, there were other fa cts and
circumstances, including the failure of the State to indicate facts
and circumstances which it could have easily disclosed if the y
existed, the petitioners could be held to have discharged their
general onus.
40. In the case before us, the public purpose indicated is the
development of an area for industrial and residential purpose s.
This, in itself, on the face of it, does not call for any such action,
barring exceptional circumstances, as to make immed iate
possession, without holding even a summary enquiry under Section
5-A of the Act, imperative. On the other hand, such schem es
generally take sufficient period of time to enable at least summary
inquiries under Section 5-A of the Act to be completed without
any impediment whatsoever to the execution of the schem e.
Therefore, the very statement of the public purpose for which the
land was to be acquired indicated the absence of such urgency,
on the apparent facts of the case, as to require the elimination of
an enquiry under Section 5-A of the Act.
42. All schemes relating to development of industri al and
residential areas must be urgent in the context of the countr y’s
need for increased production and more residential accommodation.
Yet, the very nature of such schemes of development does not
appear to demand such emergent action as to eliminate summary
enquiries under Section 5-A of the Act. There is no indication
whatsoever in the affidavit filed on behalf of the State t hat the
mind of the Commissioner was applied at all to the question whether
it was a case necessitating the elimination of the enquiry unde r
Section 5-A of the Act. The recitals in the notifications, on the
other hand, indicate that elimination of the enquiry under Section
5-A of the Act was treated as an automatic consequence of the
opinion formed on other matters. The recital does not sa y at all
that any opinion was formed on the need to dispense with the
enquiry under Section 5-A of the Act. It is certainly a ease in
which the recital was at least defective. The burden, theref ore,
rested upon the State to remove the defect, if possible, by evidence
to show that some exceptional circumstances which necessitated
the elimination of an enquiry under Section 5-A of the Act and
HAMID ALI KHAN (D) THROUGH LRS. & ANR. v. STATE OF
U.P. & ORS. [K. M. JOSEPH, J.]
that the mind of the Commissioner was applied to this essenti al
question. It seems to us that the High Court correctly applied the
provisions of Section 106 of the Evidence Act to place the burden
upon the State to prove those special circumstances, although i t
also appears to us that the High Court was not quite corre ct in
stating its view in such a manner as to make it appear that some
part of the initial burden of the petitioners under Sections 101 and
102 of the Evidence Act had been displaced by the failure of the
State to discharge its duty under Section 106 of the Act. The
correct way of putting it would have been to say that the fai lure
of the State to produce the evidence of facts especially within the
knowledge of its officials, which rested upon it under Section 106
of the Evidence Act, taken together with the attendant facts and
circumstances, including the contents of recitals, had enabled the
petitioners to discharge their burden under Sections 101 and 102
of the Evidence Act.”
(Emphasis supplied)
11. In Pista Devi (supra), a Bench of two learned Judges came to
consider the case involving dispensing with the enquiry under Section
5A of the Act. The court noted the case related to Meerut city located in
a densely populated part of the Uttar Pradesh which was found t o be
growing very fast.The problem of town planning and urban development
had to be tackled. The Collector on the basis of proposal sent to him by
the Meerut Development Authority wrote letter dated 13.12.1979 to the
Commissioner and Secretary, Housing and Urban Development, Uttar
Pradesh regarding acquisition of approximately 412 acres for a Housing
Scheme. There was an acute shortage of houses, it was found. The
collector gave the requisite certificate. The Government p ublished a
notification under section 4(1) of the Act and also dispensed with the
enquiry under Section 5A which was published on 12th July, 1980. This
was followed up by the declaration under Section 6 on 1.5.1981. The
possession came to be taken and handed over to the Meerut Development
Authority in July, 1982. It is in these circumstances that the notification
under Section 17 of the Act was challenged. This Court distinguishe d
Narayan Govind Gavate (supra) in the following words:
“..The provision of housing accommodation in these days
has become a matter of national urgency. We may take judic ial
notice of this fact. Now it is difficult to hold that in t he case of
215
proceedings relating to acquisition of land for providing house sites
it is unnecessary to invoke Section 17(1) of the Act and to dispense
with the compliance with Section 5-A of the Act. Perhaps, at the
time to which the decision in Narayan Govind Gavate v. State
of Maharashtra [(1977) 1 SCC 133 : 1977 SCC (Cri) 49 : AIR
1977 SC 183 : (1977) 1 SCR 763] related the situation might have
been that the schemes relating to development of residential areas
in the urban centres were not so urgent and it was not necessary
to eliminate the inquiry under Section 5-A of the A ct. The
acquisition proceedings which had been challenged in that case
related to the year 1963. During this period of nearly 23 yea rs
since then the population of India has gone up by hundreds of
millions and it is no longer possible for the Court to take the view
that the schemes of development of residential areas do not
“appear to demand such emergent action as to eliminate summary
inquiries under Section 5-A of the Act...”.
7.…In a case of this nature where a large extent of land is being
acquired for planned development of the urban area it would not
be proper to leave the small portions over which some s uper-
structures have been constructed out of the development scheme.
In such a situation where there is real urgency it would be difficult
to apply Section 5-A of the Act in the case of few bits of land on
which some structures are standing and to exempt the rest of the
property from its application. Whether the land in question is waste
or arable land has to be judged by looking at the general na ture
and condition of the land…”
(Emphasis supplied)
12. Thus, a discordant note came to be struck in Pista Devi (supra).
In Rajasthan Housing Board (supra), again a Bench of two learned
Judges was dealing with a notification to acquire a total of 2570 bighas
for the benefit of the Rajasthan Housing Board. The notification dated
13.01.1982 under Section 4(1) of the Rajasthan Act was followed by a
notification dated 09.02.1982 dispensing with enquiry under Section 5
(a). Possession was taken over according to the Gove rnment on
24.05.1982 and 26.05.1982. This Court relied upon Pista Devi (supra)
and opined that the views expressed in said judgment as c ontained in
paragraph 7 represented the correct view.The paragraph which is apposite
to the controversy in our case is paragraph 14.
HAMID ALI KHAN (D) THROUGH LRS. & ANR. v. STATE OF
U.P. & ORS. [K. M. JOSEPH, J.]
“14. Shri Thakur further argued that the construction of
houses by Housing Board is not of such urgency as to call for the
invocation of the said power. We are not satisfied. Firstly, on this
question the decision of the Rajasthan High Court is against the
writ petitioners. The learned Single Judge negatived it as well as
the Division Bench following the opinion of the third Judge.
Secondly, we are satisfied that there was material befo re the
Government in this case upon which it could have and did form
the requisite opinion that it was a case calling for exerc ise of
power under Section 17(4). The learned Single Judge has referred
to the material upon which the Government had formed the said
opinion. The material placed before the Court disclosed that the
Government found, on due verification, that there was an acute
scarcity of land and there was heavy pressure for construction of
houses for weaker sections and middle income group people; that
the Housing Board had obtained a loan of Rs 16 crores under a
time-bound programme to construct and utilise the said am ount
by March 31, 1983; that in the circumstances the Government
was satisfied that unless possession was taken immediately, and
the Housing Board permitted to proceed with the construction,
the Board will not be able to adhere to the time-bound programme.
In addition to the said fact, the Division Bench referred to certain
other material also upon which the Government had formed the
said satisfaction viz., that in view of the time-bound programme
stipulated by the lender, HUDCO, the Board had already appointed
a large number of engineers and other subordinate sta ff for
carrying out the said work and that holding an inquiry under Section
5-A would have resulted in uncalled for delay endangering the
entire scheme and time-schedule of the Housing Board. If mus t
be remembered that the satisfaction under Section 17(4) is a
subjective one and that so long as there is material upon w hich
the Government could have formed the said satisfaction fai rly,
the Court would not interfere nor would it examine the material
as an appellate authority. This is the principle affirmed by decisions
of this Court not under Section 17(4) but also generally with respect
to subjective satisfaction.”
(Emphasis supplied)
217
13. In Chameli Singh case (supra), a bench of 3 learned Judges
again considered the question. The notification under Section 4 was dated
23.07.1983 and the declaration under section 6 was also published on
the strength of notification under Section 17(4). Regarding the challenge
to the notification under Section 17(4) this Court inter alia held as follows:
“3..When the Government forms an opinion that it is necessary to
require immediate possession of the land for building houses for
the Dalits, it forms the opinion of urgency to take imme diate
possession for the said purpose. Accordingly it is entitled to direct
dispensing with the inquiry under Section 5-A and publish the
declaration under Section 6 after the date of the publica tion of
Section 4(1) notification.
4. It is settled law that the opinion of urgency formed by t he
appropriate Government to take immediate possession, is a
subjective conclusion based on the material before it and it is entitled
to great weight unless it is vitiated by mala fides or co lourable
exercise of power. Article 25(1) of the Universal Declaration of
Human Rights declares that “everyone has the right to a standard
of living adequate for the health and well-being of himself and his
family including food, clothing, housing, medical care and necessary
social services”.
15. The question, therefore, is whether invocation of urgency
clause under Section 17(4) dispensing with inquiry under Section
5-A is arbitrary or is unwarranted for providing housing construction
for the poor. In Aflatoon v. Lt. Governor of Delhi [(1975) 4 SCC
285] (SCC at p. 290), a Constitution Bench of this Court had
upheld the exercise of the power by the State under Section 17(4)
dispensing with the inquiry under Section 5-A for the planned
development of Delhi. In Pista Devi case [(1986) 4 SCC 251]
this Court while considering the legality of the exercise of the
power under Section 17(4) exercised by the State Government
dispensing with the inquiry under Section 5-A for acquiring housing
accommodation for planned development of Meerut, had held that
providing housing accommodation is national urgency of which
court should take judicial notice. The pre-notification and post-
notification delay caused by the officer concerned does not create
a cause to hold that there is no urgency. Housing conditions of
Dalits all over the country continue to be miserable even till date
HAMID ALI KHAN (D) THROUGH LRS. & ANR. v. STATE OF
U.P. & ORS. [K. M. JOSEPH, J.]
and is a fact of which courts are bound to take judicial notice. The
ratio of Deepak Pahwa case [(1984) 4 SCC 308 : (1985) 1 SCR
588] was followed. In that case a three-Judge Bench of this Court
had upheld the notification issued under Section 17(4), even though
lapse of time of 8 years had occurred due to inter-departm ental
discussions before receiving the notification. That itsel f was
considered to be a ground to invoke urgency clause. It was further
held that delay on the part of the lethargic officials to take further
action in the matter of acquisition was not sufficient to nullify the
urgency which existed at the time of the issuance of the notification
and to hold that there was never any urgency. In Jage Ram v. State
of Haryana [(1971) 1 SCC 671] this Court upheld the exercise
of the power of urgency under Section 17(4) and had held that
the lethargy on the part of the officers at an early stage was not
relevant to decide whether on the day of the notification there
was urgency or not. Conclusion of the Government that there
was urgency, though not conclusive, is entitled to create weight.
In Deepak Pahwa case [(1984) 4 SCC 308 : (1985) 1 SCR 588]
this Court had held that very often persons interested in the land
proposed to be acquired may make representations to the
authorities concerned against the proposed writ petition that is
bound to result in multiplicity of enquiries, communications and
discussions leading invariably to delay in the execution of even
urgent projects. Very often delay makes the problem more a nd
more acute and increases urgency of the necessity for acquisition.
In Rajasthan Housing Board v. Shri Kishan [(1993) 2 SCC 84]
(SCC at p. 91), this Court had held that it must be remembe red
that the satisfaction under Section 17(4) is a subjective one and
that so long as there is material upon which Government could
have formed the said satisfaction fairly, the Court woul d not
interfere nor would it examine the material as an appellate authority.
In State of U.P. v. Keshav Prasad Singh [(1995) 5 SCC 587]
(SCC at p. 590), this Court had held that the Government was
entitled to exercise the power under Section 17(4) invoking urgency
clause and to dispense with inquiry under Section 5-A when the
urgency was noticed on the facts available on record. In Narayan
Govind Gavate case [(1977) 1 SCC 133 : 1977 SCC (Cri) 49 :
(1997) 1 SCR 763] a three-Judge Bench of this Court had held
that Section 17(4) cannot be read in isolation from Section 4(1)
219
and Section 5-A of the Act. Although 30 days from the notification
under Section 4(1) are given for filing objections under Section
5-A, inquiry thereunder unduly gets prolonged. It is difficult to see
why the summary inquiry could not be completed quit e
expeditiously. Nonetheless, this Court held the existence of prima
facie public purpose such as the one present in those cases before
the Court could not be successfully challenged at all by the
objectors. It further held that it was open to the authority to take
summary inquiry under Section 5-A and to complete inquiry very
expeditiously. It was emphasised that: (SCC p. 148, para 38)
“… The mind of the officer or authority concerned has to be
applied to the question whether there is an urgency of such a
nature that even the summary proceedings under Section 5-A of
the Act should be eliminated. It is not just the existence of an
urgency but the need to dispense with an inquiry under Section
5-A which has to be considered.”
(Emphasis supplied)
14. This Court proceeded to consider the decisions in Gavate,
Pista Devi and Rajasthan Housing Board. As far as Gavate was
concerned, this Court pronounced as follows:
16. It would thus be seen that this Court emphasised the holding
of an inquiry on the facts peculiar to that case. Very often the
officials, due to apathy in implementation of the po licy and
programmes of the Government, themselves adopt dilatory tactics
to create cause for the owner of the land to challenge the validity
or legality of the exercise of the power to defeat the urgency
existing on the date of taking decision under Section 17(4) t o
dispense with Section 5-A inquiry.
17. It is true that there was pre-notification and post-notification
delay on the part of the officers to finalise and pu blish the
notification. But those facts were present before the Government
when it invoked urgency clause and dispensed with inquiry under
Section 5-A. As held by this Court, the delay by itself accelerates
the urgency: Larger the delay, greater be the urgency. So long as
the unhygienic conditions and deplorable housing needs of Dalits,
Tribes and the poor are not solved or fulfilled, the urgency continues
to subsist. When the Government on the basis of the material,
HAMID ALI KHAN (D) THROUGH LRS. & ANR. v. STATE OF
U.P. & ORS. [K. M. JOSEPH, J.]
constitutional and international obligation, formed its opinion of
urgency, the court, not being an appellate forum, would not disturb
the finding unless the court conclusively finds the exercise of the
power mala fide. Providing house sites to the Dalits, Tribes and
the poor itself is a national problem and a constitutional obligation.
So long as the problem is not solved and the need is not fulfilled,
the urgency continues to subsist. The State is expending money
to relieve the deplorable housing condition in which they live by
providing decent housing accommodation with better sanitary
conditions. The lethargy on the part of the officers for pre a nd
post-notification delay would not render the exercise of the power
to invoke urgency clause invalid on that account.
18. In every acquisition by its very compulsory nature for public
purpose, the owner may be deprived of the land, the means of his
livelihood. The State exercises its power of eminent domain for
public purpose and acquires the land. So long as the exercise of
the power is for public purpose, the individual’s right of an owner
must yield place to the larger public purpose.
(Emphasis supplied)
15. In Om Prakash and Anr. vs. U.P and Others (supra) relied
upon by the appellants, a Bench of two learned Judges uph eld the
complaint of the land owners against the dispensing of inquiry unde r
Section 5A of the Act. This Court distinguished Rajasthan Housing Board
(supra) noticing the contents of paragraph 14 in the said judgment and
found that the said decision was rendered in the peculiar fact s of the
case before the Court. As far as the decision in Pista Devi (supra) is
concerned, the Bench took the view that the decision in Pista Devi
could not have laid down any legal proposition contrary to the earlier
judgment in Gavate (supra). It is true that the decision in Chameli Singh
(supra) rendered also by a Bench of three learned Judges was not noticed.
16. We need to notice the decision of this court rendered by a
bench of two learned Judges and reported in Radhy Shyam (supra).
Therein this Court after an exhaustive survey of decisions inc luding
Gavate, Pista Devi and Rajasthan Housing Boards, Chameli Si ngh
(supra) which appears to be the representatives of t wo streams of
perspectives summed up its conclusions as follows: -
221
“Para77. From the analysis of the relevant statutory provisions
and interpretation thereof by this Court in different cas es, the
following principles can be culled out:
(i) Eminent domain is a right inherent in every sovereign to take
and appropriate property belonging to citizens for public use. To
put it differently, the sovereign is entitled to reassert its dominion
over any portion of the soil of the State including private property
without its owner’s consent provided that such assertion is on
account of public exigency and for public good — Dwarkadas
Shrinivas v. Sholapur Spg. and Wvg. Co. Ltd. [AIR 1954 SC
119], Charanjit Lal Chowdhury v. Union of India [AIR 1951
SC 41] and Jilubhai Nanbhai Khachar v. State of Gujarat [1995
Supp (1) SCC 596].
(ii) The legislations which provide for compulsory acquisition of
private property by the State fall in the category of expropriatory
legislation and such legislation must be construed strictly — DLF
Qutab Enclave Complex Educational Charitable Trust v. State
of Haryana [(2003) 5 SCC 622] ; State of Maharashtra v. B.E.
Billimoria [(2003) 7 SCC 336] and Dev Sharan v. State of
U.P. [(2011) 4 SCC 769 : (2011) 2 SCC (Civ) 483]
(iii) Though, in exercise of the power of eminent domain, the
Government can acquire the private property for public purpose,
it must be remembered that compulsory taking of one’s property
is a serious matter. If the property belongs to eco nomically
disadvantaged segment of the society or people sufferin g from
other handicaps, then the court is not only entitled but is duty -
bound to scrutinise the action/decision of the State with gre ater
vigilance, care and circumspection keeping in view the fact that
the landowner is likely to become landless and deprived of the
only source of his livelihood and/or shelter.
(iv) The property of a citizen cannot be acquired by the State
and/or its agencies/instrumentalities without complying with the
mandate of Sections 4, 5-A and 6 of the Act. A public purpos e,
however laudable it may be does not entitle the State to i nvoke
the urgency provisions because the same have the eff ect of
depriving the owner of his right to property without being heard.
Only in a case of real urgency, can the State invoke the urgency
HAMID ALI KHAN (D) THROUGH LRS. & ANR. v. STATE OF
U.P. & ORS. [K. M. JOSEPH, J.]
provisions and dispense with the requirement of hear ing the
landowner or other interested persons.
(v) Section 17(1) read with Section 17(4) confers extraordinary
power upon the State to acquire private property without complying
with the mandate of Section 5-A. These provisions can be invoked
only when the purpose of acquisition cannot brook the delay of
even a few weeks or months. Therefore, before excluding the
application of Section 5-A, the authority concerned must be fully
satisfied that time of few weeks or months likely to be taken in
conducting inquiry under Section 5-A will, in all probability, frustrate
the public purpose for which land is proposed to be acquired.
(vi) The satisfaction of the Government on the issue of urgency is
subjective but is a condition precedent to the exercise of p ower
under Section 17(1) and the same can be challenged on the ground
that the purpose for which the private property is sought t o be
acquired is not a public purpose at all or that the exercise of power
is vitiated due to mala fides or that the authorities concerned did
not apply their mind to the relevant factors and the records.
(vii) The exercise of power by the Government under Section
17(1) does not necessarily result in exclusion of Section 5-A of
the Act in terms of which any person interested in land can file
objection and is entitled to be heard in support of his obje ction.
The use of word “may” in sub-section (4) of Section 17 makes it
clear that it merely enables the Government to direct that the
provisions of Section 5-A would not apply to the cases covered
under sub-section (1) or (2) of Section 17. In other words, invoking
of Section 17(4) is not a necessary concomitant of the exercise of
power under Section 17(1).
(viii) The acquisition of land for residential, commercial, industrial
or institutional purposes can be treated as an acquisition for public
purposes within the meaning of Section 4 but that, by itself, does
not justify the exercise of power by the Government under Sections
17(1) and/or 17(4). The court can take judicial notice of the fact
that planning, execution and implementation of the schemes relating
to development of residential, commercial, industrial or institutional
areas usually take few years. Therefore, the private p roperty
cannot be acquired for such purpose by invoking the urgency
223
provision contained in Section 17(1). In any case, exclusion of the
rule of audi alteram partem embodied in Sections 5-A(1) and (2)
is not at all warranted in such matters.
(ix) If land is acquired for the benefit of private persons, the court
should view the invoking of Sections 17(1) and/or 17(4) with
suspicion and carefully scrutinise the relevant record before
adjudicating upon the legality of such acquisition.”
(Emphasis supplied)
17. In the said case the notification was issued dated 12.03.2008
under Section 4 of the Act. The public purpose projected was the planned
industrial development project in the district. The court took the view
that even if the planned industrial development project of t he district
was considered as public purpose, there was no urgency justifying invoking
the power under Section 17 (4) of the Act.
18. In Anand Singh case (supra), a Bench of two learned Judges
dealt with an acquisition for a residential colony for the Gorakhpur
Development Authority. The notification was issued under Section 4 in
2003 and 2004. By the said notifications power was invoked under Section
17 (4), and the declaration also came to be issued under Secti on 6 on
28.12.2004. The contention of the Gorakhpur Development Authority
was that many steps were taken in developing the land ac quired in as
much as water, land, electric lines, sewerage line, drainag e etc. were
laid and roads constructed out of the total outlay of merely R s. 8 to 9
crores. An amount of excess of Rs. 5 crores were already spent and 60
per cent of the work was completed. The Court referred to Gavate,
Pista Devi, Rajasthan Housing Boards, Chameli Singh and Om
Prakash (supra) and held as follows: -
“41. The power of eminent domain, being inherent in the
Government, is exercisable in the public interest, general welfare
and for public purpose. Acquisition of private property by the State
in the public interest or for public purpose is nothing but an
enforcement of the right of eminent domain. In India, the Ac t
provides directly for acquisition of particular property for public
purpose. Though the right to property is no longer a fundamental
right but Article 300-A of the Constitution mandates that no person
shall be deprived of his property save by authority of l aw. That
Section 5-A of the Act confers a valuable right to an individual is
HAMID ALI KHAN (D) THROUGH LRS. & ANR. v. STATE OF
U.P. & ORS. [K. M. JOSEPH, J.]
beyond any doubt. As a matter of fact, this Court has tim e and
again reiterated that Section 5-A confers an important right in
favour of a person whose land is sought to be acquired.
42. When the Government proceeds for compulsory acquisition
of a particular property for public purpose, the only right that the
owner or the person interested in the property has, is to submit his
objections within the prescribed time under Section 5-A of the
Act and persuade the State authorities to drop the acquisition of
that particular land by setting forth the reasons su ch as the
unsuitability of the land for the stated public purpose; the grav e
hardship that may be caused to him by such expropri ation,
availability of alternative land for achieving public purpose, etc.
Moreover, the right conferred on the owner or person interested
to file objections to the proposed acquisition is not only an important
and valuable right but also makes the provision for compulsory
acquisition just and in conformity with the fundamental principles
of natural justice.
43. The exceptional and extraordinary power of doing away with
an enquiry under Section 5-A in a case where possession of the
land is required urgently or in an unforeseen emergency is provided
in Section 17 of the Act. Such power is not a routine power and
save circumstances warranting immediate possession it shou ld
not be lightly invoked. The guideline is inbuilt in Section 17 itself
for exercise of the exceptional power in dispensing with enquiry
under Section 5-A. Exceptional the power, the more circumspect
the Government must be in its exercise. The Government obviously,
therefore, has to apply its mind before it dispenses with enquiry
under Section 5-A on the aspect whether the urgency is of such a
nature that justifies elimination of summary enquiry under Section
5-A.
44. A repetition of the statutory phrase in the notification that the
State Government is satisfied that the land specifie d in the
notification is urgently needed and the provision contained in
Section 5-A shall not apply, though may initially raise a presumption
in favour of the Government that prerequisite condition s for
exercise of such power have been satisfied, but such presumption
may be displaced by the circumstances themselves having no
reasonable nexus with the purpose for which the power has been
225
exercised. Upon challenge being made to the use of power under
Section 17, the Government must produce appropriate material
before the Court that the opinion for dispensing with the enquiry
under Section 5-A has been formed by the Government after due
application of mind on the material placed before it.
46. As to in what circumstances the power of emergency can be
invoked are specified in Section 17(2) but circumst ances
necessitating invocation of urgency under Section 17(1) are not
stated in the provision itself. Generally speaking, the development
of an area (for residential purposes) or a planned development of
city, takes many years if not decades and, therefore, there is no
reason why summary enquiry as contemplated under Section 5-A
may not be held and objections of landowners/persons interested
may not be considered. In many cases, on general assumption
likely delay in completion of enquiry under Section 5-A is set up
as a reason for invocation of extraordinary power in dispensing
with the enquiry little realising that an important and valuable right
of the person interested in the land is being taken away and with
some effort enquiry could always be completed expeditiously.”
(Emphasis supplied)
19. Thereafter, the court noticed the conflict between Gavate
and Pista devi (supra) and held as follows: -
“47. The special provision has been made in Section 17 to eliminate
enquiry under Section 5-A in deserving and cases of real urgency.
The Government has to apply its mind on the aspect that urgency
is of such nature that necessitates dispensation of enquiry under
Section 5-A. We have already noticed a few decisions of this
Court. There is a conflict of view in the two decisions of this
Court viz. Narayan Govind Gavate [(1977) 1 SCC 133: 1977
SCC (Cri) 49] and Pista Devi [(1986) 4 SCC 251]. In Om
Prakash [(1998) 6 SCC 1] this Court held that the decision in Pista
Devi [(1986) 4 SCC 251] must be confined to the fact situation in
those days when it was rendered and the two-Judge Bench could
not have laid down a proposition contrary to the dec ision
in Narayan Govind Gavate [(1977) 1 SCC 133: 1977 SCC (Cri)
49]. We agree.
HAMID ALI KHAN (D) THROUGH LRS. & ANR. v. STATE OF
U.P. & ORS. [K. M. JOSEPH, J.]
48. As regards the issue whether pre-notification a nd post-
notification delay would render the invocation of urgency power
void, again the case law is not consistent. The view of this Court
has differed on this aspect due to different fact situation prevailing
in those cases. In our opinion such delay will have material bearing
on the question of invocation of urgency power, particularly in a
situation where no material has been placed by the appro priate
Government before the Court justifying that urgency was of such
nature that necessitated elimination of enquiry under Sect ion
5-A.
49. In a country as big as ours, a roof over the head is a dista nt
dream for a large number of people. The urban development
continues to be haphazard. There is no doubt that p lanned
development and housing are matters of priority in a developing
nation. The question is as to whether in all cases of “planne d
development of the city” or “for the development of resi dential
area”, the power of urgency may be invoked by the Government
and even where such power is invoked, should the enq uiry
contemplated under Section 5-A be dispensed with invariably. We
do not think so. Whether “planned development of cit y” or
“development of residential area” cannot brook delay of a f ew
months to complete the enquiry under Section 5-A? In our opinion,
ordinarily it can. The Government must, therefore, do a balancing
act and resort to the special power of urgency under Section 17 in
the matters of acquisition of land for the public purpos e viz.
“planned development of city” or “for development of residential
area” in exceptional situation.
51. It must, therefore, be held that the use of the power of urgency
and dispensation of enquiry under Section 5-A by the Government
in a routine manner for the “planned development of city” or
“development of residential area” and thereby depriving the owner
or person interested of a very valuable right under Section 5-A
may not meet the statutory test nor could be readily sustained.”
(Emphasis supplied)
20. The court in the said case permitted the appellants to represent
to the state’s authority under Section 48 of the Act for rele ase of their
land.
227
21. No doubt in State OF Haryanav. Eros City Developers
Private Limited and Others8, this Court took the view that public interest
must receive primacy when it conflicts with private interest. The stand
of the state and the Second Respondent appears to be that the judgment
rendered by two judges’ bench which deviated from the judgment in
Pista Devi (supra) and Chameli Devi (supra) were not correctly decided.
ANALYSIS AND FINDINGS
22. We may cull out the principles at play. What is required of the
authority is to form a subjective opinion. This does not mean t hat the
opinion can be whimsical or capricious. There must be materials before
the authority. The materials must be relevant. The authority must apply
his mind to the material. This is apart from the requirement that action
must not be malafide. Undoubtedly the purpose must be a public purpose.
But merely because the purpose of the acquisition is found to be a public
purpose, the duty of the authority does not end. He must be satisfied that
there is real agency such that the invaluable right vouchsafed to a person
to ventilate his grievances against the acquisition is not unjustifiably
extinguished. Section 5A of the Act guarantees a right to the p erson
interested in the property which was the only statutory s afeguard to
stave off of a compulsory acquisition of his property. The power under
Section 17 (4) is discretionary. Being a discretion it must be exercised
with due care. It is true that if there is relevant material however meagre
it may be and the authority has without being guided by extraneo us
considerations applied his mind and taken a decision,then the court would
adopt a hands-off approach. In the ultimate analysis as wit h any other
decision a balancing of conflicting interests is inevitable. The authorities
must remain alive and alert to the precious right created in favour of the
citizens which is not meant to be a mere empty ritual.
23. It is true again that the decisions in this Court appear to convey
conflicting signals. However, there is a certain element of consensus on
fundamental principles. The dichotomy essentially has to be resolved by
carefully attending to the facts of each case. The decision of a Bench of
three Judges in Gavate (supra) enunciates the principles relating to the
manner in which a challenge to a notification under Section 17(4) must
be approached in the matter of discharging the burden of proof. When a
challenge is made to the invocation of power under Section 17 (4) t he
HAMID ALI KHAN (D) THROUGH LRS. & ANR. v. STATE OF
U.P. & ORS. [K. M. JOSEPH, J.]
8 (2016)12 SCC 265
writ applicant cannot succeed on bare and bald assertions. The facts
which are specifically within the exclusive knowledge of the state must
be laid before the court on the basis of the principle in Section 106 of the
Evidence Act. Existence of the exceptional circumstances jus tifying
invoking of Section 17 (4) must be established in the wake of a challenge.
The true concept unravelled by this Court in Gavate(supra) is the total
evidence theory. In other words, on an appreciation of the evide nce
made available by all the parties it is open to the court to conclude that
no occasion arose for resorting to the power under Section 17 (4) which
indeed must be read as an exception to the general rule that the acquisition
of property is made after affording an opportunity the person adversely
affected to demonstrate that the acquisition was unjustified.
24. In the meeting held on 3.5.2002 by decision/item/21, there
was a proposal to acquire 52 hectares of land for t he scheme. In
implementation of the said decision, letters were addressed on 6.6.2003
and 18.6.2003 by the second respondent. By letter 24.9.2003 the officer
directed the Authority to deposit an amount towards acquisition. On
18.7.2003, second respondent sent a proposal to acquire 52.361 hectares
of land and on 31.1.2004 deposited about 10% of approximate value of
land. Certain deficiencies were pointed out by letter dated 13.12.2004.
The second respondent thereafter deposited the remaining cost . State
Government issued notification on 8.10.2004 under section 4 of the Act
also invoking Section 17(4). The declaration under section 6 came to be
published on 7.10.2005. A perusal of a communication issued date d
29.3.2006 addressed to the In-charge of Land Acquisition by the second
respondent would show as follows:
“In Gata No.880 and —893, Painth (Cattle
Market) was being put for the animals, and that is why e arl~er
these Gatas have been kept separate from the acquisitio n, but
now in these Gatas shops have been constructed and the land of
these Gatas are being sold for residential houses, hence as these
numbers are contiguous with the Plan, these gatas are also required
ta_ be acquired after preparing an amended proposal.”
25. Based on the 32 nd Board Meeting of the Authority held on
8.9.2005, a Committee was constituted. A proposal was sent to in regard
to Survey No. 880 and 893, situated allegedly in the middle of the total
area of the scheme. Based on the 33rd Board Meeting held on 29.05.2006
229
the third respondent Vice Chairman of the second respondent wrote to
the Collector, Bulandshehar on 6.10.2006. Herein, he refers to the 33rd
Board Meeting of the second respondent held on 29.05.2006 and that it
was decided to forward a proposal for acquiring the land in question
apart from other lands. It is further mentioned by the third r espondent
about the 13 shops, in the application which is referred to as the let ter
dated 2.9. 2006 written by the appellants were illegally const ructed
againstwhich action was taken. It is further stated as follows:
“For the animals coming in Painth (Cattle Market) there is no
Shed, Khor or Kundia for drinking water etc. are present at he
spot. In the revenue records, in the above both Gatas inst ead of
entering Painth (Cattle Market), the names of Shri Hamid A li
Khan and Shri Jahid Ali Khan sons of Mohd. Hussain Ali Khan
has been entered and it has also beenentered that those land ar e
declared non-cultivatedland under Section 143.”
26. Thereafter on 10.10.2006 the third respondent again wrote to
the Deputy Secretary, Housing & Urban Planning. It is essent ially a
reiteration of letter dated 06.10.2006. It is further pointed out the area of
the Mosque and Petrol pump in Survey No.880-and the area of Mazhar
in survey No. 893 has been left out in the final proposal. It is lastly
pointed out inter alia that in Bulandshehar except Khurja cattle market
are being put at very large level in many other Kasbas/N agars. The
cattle market is stated to be in the middle of the total ar ea of 52.361
hectares. It is specifically pointed out that in view of the requirement of
clean environment the work of cattle market in between housing area of
any residential area will not be proper. There is refe rence to a further
letter 7.1.2007. On 3.1.2008 again the Vice Chairman of the second
respondent wrote to the Special Secretary reiterati ng the earlier
communications hereinbefore. On 8.2.2008, it is pointed outby the Vice
Chairman that the land to be acquired will be developed as par t of the
scheme. Reference is made to a request for notification for a cquiring
the land. On 8.3.2008 the Special Secretary wrote to the Vice Chairman
of the second respondent. He sought information in terms of Government
order dated 19th October, 2001 what is the purpose to require only 2.692
hectares land for the residential/commercial scheme. The appe llants
would point out that this was replied to by communication dated 27.3.2008
by the vice Chairman. Again, it is inter alia stated as follows:
HAMID ALI KHAN (D) THROUGH LRS. & ANR. v. STATE OF
U.P. & ORS. [K. M. JOSEPH, J.]
The said Painth (Cattle Market) in question is situated at the middle
of the Planning area and in view of the clean environment, putting of
Painth (Cattle Market) for the animals under thehousing scheme is not
proper from any angle. According to the record avai lable in the
authority,on the land in question only on one day Painth (Cattle Market)
is being put for the animals. In the Gatas in -question the areas of Mosque
and. Mazarare being kept free from acquisition.
27. A perusal of the files made available would reveal tha t on
14.1.2008, there is reference to the clarification by the Vice chairman as
to the justification for acquiring of 2.692 hectares for the development
of residential and commercial scheme and from the plannin g point of
view. Thereafter referring to letter 8.2.2008 from the Vice chairman of
the second respondent it is found that the land is situated in the middle of
land acquired earlier and that the Vice chairman has requeste d that
notification be issued at the earliest. The matter was put up before the
Ministerfor issuance of the notification under section 4(1)/17 for acquiring
the land. This is dated 19.2.2008. On 2.3.2008, the Special Secretary
found that there was some request seeking exemption of the some land
sought to be acquired which was examined by the Government i n the
enclosed file 2033LA/2006. The proposal for exemption was not allowed.
The Principal Secretary (Planning) had referred to the rejection of
application for exemption and therefore the matter wa s put up for
notification under section 4(1)/17. On the very same day, the signature
of the Minister was obtained. From this we are to infer that the Minister
approved the proposal for issue of notification and it was issued thereafter
on 11.4.2008.
28. The minutes of meeting of the second respondent authority
29.5.2006 inter alia under itemNo.31/3 states as follows:
Item No.(31/3): – Regarding the land acquisition plan proposed
by the authority: – It was expected by the committee constituted
by the board meeting, that keeping in view the financial position
and plans of the authority, by showing the “profit – loss”
justification, the detailed description should be prepared b y the
developed authority and should be put up in the next board meeting,
so that it can be considered by the members of the board/
committee constituted at the time of the board meeting. The site
inspection was conducted by the committee on 03.12.2 005,
15.12.2005 and 05.04.2006 of the Kalindi Kunj residential scheme,
231
situated in Khurja and transport Nagar commercial scheme and
Ganga Nagar residential/commercial schemes, situate d in
Bulandsahar and the Gata numbers left out from the scheme were
inspected. In this regard, it was informed by the vice ch airman
that a plot left out and that time, under the Kalindi Kunj residential
scheme i.e. Gata number 880, area 1.383 ha and Gata number
893, area 1.309 ha with total area of 2.692 ha, the supplementary
proposal for the same has been sent to the special land acquisition
officer, Bulandsahar. The proposal for issuing the Section – 4/17
notification for land acquisition of the Ganga Nagar resident ial
scheme and transport Nagar scheme Bulandsahar is presently
under consideration of the government and efforts are being made
to take necessary action regarding its pronouncemen t by
establishing the coordination with the government level. As per
the instructions received from government of India, New Delhi,
since the “Commonwealth Games” are to be arranged in New
Delhi in the year 2010 and for providing residential and commercial
facilities and in order to control the population pressure within the
NCR region, development of residential and commercial schemes
is absolutely necessary, in the broad interest of the public and the
authority. It may be mentioned regarding the unavailability and
necessary of both the schemes that in accordance wi th the
instructions of the NCR planning board, demand survey work for
these schemes was started from 02.01.06 to 10.02.2006, in which
demand was received for 642 plots as against 685 plots and the
estimated amount of Rs. 2.67 crore was received as 10%
registration charges. From this it is seen that the above schemes
of the authority will be very profitable for the authority and their
implementation is necessary in the broad public interest. Therefore,
changes have been sent in the proposal for land acquisition for
both these schemes, land development under the scheme, public
interest and broad interest of the authority. The proposal for issue
of Section – 4/17 notification for both the schemes is under
consideration of the government, in which there appears to be no
need for any amendment/stains. Therefore, it is necessary in public
interest and broad interest of the authority that action should be
taken for the pronouncement of Section – 4/17 notification of
these schemes by establishing the coordination at the government
level…”
HAMID ALI KHAN (D) THROUGH LRS. & ANR. v. STATE OF
U.P. & ORS. [K. M. JOSEPH, J.]
29. A perusal of the file notings would reveal that on 24.3.2009 it
was noticed that as per the rules the notification under section 6/17 had
to be issued before 11.4.2009 in view of the notification issue d under
4(1)/17(4) on 11.4.2008. There is reference to Rs.37,76,711/- having
been deposited by the second respondent constituting u nnecessary
expenditure, if the acquisition lapsed. On the said basis it was stated in
view of the unavoidable situation of issuing the section 6/17 notification
before 11.4.2009 it was proposed to issue the notification. Thereafter, it
was found that in view of the elections being underway and enforcement
of the election code, permission of the officer had to be obt ained. The
approval/signature of the Principal Secretary had to be obtained for issuing
the Section 6/17 declaration. It is thereupon that the notification under
Section 6 came to be issued on 9.4.2009.
30. On the basis of the declaration, the possession of the land
according to the second respondent was taken over on 27.7.2009 and
the name of the second respondent was entered in the revenue r ecord.
31. In this connection, the specific stand set up by the appellants
in the writ petition as to the location of the market, which is comprised
survey nos. 880/893, is as follows:
“That the Vice Chairman again sent false information vide letter
dated 27.3.2008 to the Special Secretary, that there are 13 houses
overthe land in dispute, which was wholly false andagainst spot
position. The true copy of reportdated 27 .3.2008 is being filed
herewith asAnnexure No. 14 to this Writ Petition.
That it is respectfully submitted that the said plot nos. 880 and 893
are not situated in the centre of Scheme as alleged in the reports
dated 6.10.2006 and 10.10.2006. They are situated at the one end
of city facing G.T. Road and if a huge boundary wall is erected on
these plots by the petitioners the said plots can very well be
separated from theresidential area without disturbing the expansion
plan of the Scheme. It is respectfully submitted that the petitioners
are ready to erect a boundary wall on their own expense if t hey
are permittedand assured that no such acquisition would bemade
as depicted in the letter issued from theoffice of respondent nos.
2/3 dated 10.10.2006.
That the layout plan of respondent no. 2 itself show that on plot
no.-880 there is a plan i.e.Cattle market and this fact is also proved
233
fromthis layout plan that both the plots in questionare at the end of
scheme which is facing G.T. Road. It is not in any case situated in
the centre of the Scheme.
That the layout plan of respondent no. 2 also shows that the end
of plots in questions have beenintended to be used for commercial
purposes inthe whole layout plan, entire commercial activities have
been projected all along the National Highway. The resident ial
area in the Scheme isbehind this commercial area.”
32. A short counter affidavit was filed by the second respondent.
There is no specific denial of the case set up by the appellants in paragraph
23, 24 and 27. If that be so on the unrebutted allegations an inf erence
could be drawn that the case set up by the respondents that the properties
in question were situated in the middle of the scheme area is incorrect.
33. We must notice certain salient features. Perusa l of the
impugned notification under section 17(4) and even Section 6 declaration
shows that the land in question is recited as being required for the public
purpose of the Bulandshehar-Khurja Development Authority or for the
Kalindi Kunj residential/commercial (supplementary). It is further recited
that as the Governor was convinced about the great necessi ty of the
land and the provision of section 17 (1) of the Act being applicable and in
view of the necessity, inquiry under section 5A was not applied on the
basis that ‘possibility of delay may be abandoned ’. It is further stated
that land is required for Kalindi Kunj residential/commercial scheme. A
perusal of the revised lay out plan inter alia would show that the scheme
was a residential cum commercial scheme. It was to cons ist of park,
community facilities such health, post office, social and cultural centre
and educational centre. The land which was reserved for the residential
area is shown as constituting 38.57% of the area of the scheme . The
commercial part of the Scheme was to consist of 4.9% of the total area
of the scheme. We make this observation to record our finding that the
scheme is not a pure residential scheme. Secondly, the only case which
the respondents have further is that under a scheme 5% of the plots are
reserved for the landless.Therefore, this fact may stand out in sharp
contrast with the scheme which fell for consideration before this Court
in Chameli Singh (supra) wherein the power under section 17(4) was
invoked for land for building houses for the dalits. Initially, the land in
question, was not proposed to be acquired. The total land which was
proposed to be acquired was fixed at 52 and odd hectares.
HAMID ALI KHAN (D) THROUGH LRS. & ANR. v. STATE OF
U.P. & ORS. [K. M. JOSEPH, J.]
34. A perusal of the communication dated 29.3.2006 from the
second respondent Authority reveals that according to it, survey nos.
880 and 893 were being used for keeping a cattle market and therefore
the lands were not required. It is further found that in the sur vey 13
shops were constructed and the land inthese surveyw ere sold for
residential house. Being contiguous with the scheme area, these lands
were projected as required on preparing an amended proposal. However,
in the communication dated 06.10.2006 issued by the third respondent
he refers to requirement of clean environment and therefore a cattle
market of the animalsin the housing area may not be proper. The same
position is again reiterated as already noted in communicat ion dated
10.10.2000 as well. The appellants had given a repre sentation on
08.12.2006 to the Chief Secretary praying that the property may not be
taken for the residential/commercial scheme. Therein, it i s inter alia
stated that the cattle market is located at one corner of the acquired land
of 52.361 hectares. The appellants state about their readiness to construct
a separate boundary wall. It is stated to be their only source of income.
35. It is to be noticed that the declaration under section 6 was
issued only on the eve of expiry of one year from 11.4.2008. The urgency
indicated in the file is to tide over the bar of issuance of declaration
under section 6 beyond one year from 11.4.2008 the date on which
notification under 4/17 was issued. There is no indication in the file about
the urgency for issuing the declaration immediately after the notification
under Section 4. In other words, the file does not reveal any urgency at
all associated with the need to acquire the land immediat ely which
constitutes the foundation for invoking the urgency clause.
36. We are at a loss as to what was the material whic h was
relevant to a decision under section 17(4) of the Act. In this regard we
may notice the following:
Notification was issued under section 17(4) in October 2004 regard
to 52 and odd hectares of land. The Section 6 declaration is made
only in October 2005. The survey numbers in question in this case
according to the respondent is located in the middle. However, it
is not acquired on the basis that the said land was being used as
cattle market (see communication dated 29.3.2006). The appellants
have a definite case that possession itself was taken desp ite the
availability of power to take possession immediately, only on
6.1.2006. The proposal to take the further land was taken in
235
March, 2006 if not earlier. The reason given for acquiring the land
is alleged construction of shops by the appellants and the contiguity
of the land covered by the land earlier acquired with the land in
question. On the other hand, the third respondent refers further to
the need for clean environment which is in contradiction to the
communication dated 29.3.2006.
37. What is relevant for the purpose of this case is to find t he
following:
(1) Whether there were relevant material before the Government
to invoke power under section 17(4)?
(2) Lastly, whether the government applied its mind?
38. We have noticed the material which consists of the
communications addressed to the second respondent a nd the
communications by the third respondent. Apart from the same, the usual
certificates/forms indicating inter alia that there was no place of worship
located in the scheme was no doubt available. But the point i s only
whether there was material for dispensing with the inquiry under Section
5A and even, more importantly, whether the authority applied its mind to
it. Even the notification under section 17(4) came to be issued af ter
more than two years of the proposal sent sometime in Mar ch, 2006 if
not earlier. We have already noted the fact that declaration under section
6 came to be issued only on 9.4.2009, just two days prior to the fir st
anniversary of the date of notification under section 4. More importantly,
we have noticed what finally impelled Government to issue the
notification, namely, the apprehension that if it is not issued within one
year of the section 4 notification the acquisition would lapse. This had
nothing to do with urgency which would have manifested in the section
6 declaration being issued much earlier.This must also be viewed in the
background that though the Section 4(1)/(17) Notification was e arlier
issued in regard to 52.361 hectares on 08.10.2004, the declaration under
Section 6 was issued only on 07.10.2005.
39. The statutory authority under section 5A of the Act is expected
to give a fair hearing. It can stand between an uncalled for proposal to
acquire property. Disputed questions of facts in regard to the property to
acquire the property are to be considered by the same Auth ority. Yet
another pertinent aspect is the fact that the subject matter of the second
HAMID ALI KHAN (D) THROUGH LRS. & ANR. v. STATE OF
U.P. & ORS. [K. M. JOSEPH, J.]
acquisition was 2 and odd hectares. It was apparently just the appellants,
who had to be given a hearing.
40. We would therefore think that in the facts of this case, having
regard to the nature of the scheme, the delay with which s ection 6
declaration was issued, possession taken and the nature of the material
on the basis of which the proposal was processed, the appell ants are
justified in contending that the notification under 17(4) dispensing with
the inquiry under Section 5A was unjustified.
41. We may notice another aspect. This appeal arises from the
order passed by the High Court in the year 2000. While issuing notice,
this Court in the SLP stage ordered status quo as on 6. 11.2009 be
maintained. Thereafter, the leave was granted on 27.1.2012. The interim
order was however directed to continue. It is after nearly 12 years that
the case is finally being disposed of. In the meantime, the Land Acquisition
Act was repealed and the Right to Fair Compensation and Transparency
in Land Acquisition, Rehabilitation and Resettlement Act, 2013 has taken
its place. Therefore, there is no question of the matter being considered
for an inquiry being held under section 5A. We have also noted t hat
there is no denial of the allegation in the writ petition about the lie of the
property, viz., it not being in the middle of the scheme area.
42. The appeal is allowed. The impugned judgment is set aside
and the writ petition filed by the appellants shall stand allowed and the
impugned notifications and proceedings based on the same shall stand
quashed. The property shall be returned back to the appellants. This will
be without prejudice to the rights/powers available to the res pondents
under law.
Nidhi Jain Appeal allowed.