B.L.A. Industries Private Limited v. Union of India and Another
HIMA KOHLI, J.
1. The petitioner has approached this Court under Article 32 of
the Constitution of India raising a grievance against the respondent No.1
– Ministry of Coal, Union of India 1 for having included its name and
mining lease area in the Schedules appended to the Coal Mines (Special
Provisions) Ordinance, 2014 2, even though, the Screening Committee
constituted by the Ministry of Coal, Union of India had not allocated any
coal block to it.
2. A quick glance at the relevant chronology of events, as narrated
in the petition, are considered necessary. The petitioner had submitted
an application dated 8 th November, 1994 under Section 2 of the Forest
(Conservation) Act, 19803 to the District Collector, Narsinghpur District,
Narsingpur, Madhya Pradesh for permission to undertake coal mining
on forest land. On 21 st November, 1994, the petitioner applied to the
respondent No.2 – State of Madhya Pradesh4 in Form-I under the Mineral
Concession Rules, 19605 for grant of a mining lease. On 7th April, 1995,
the petitioner submitted an application to the respondent No.1 – UOI
under Section 5(2) of the Mines and Minerals (Devel opment &
Regulation) Act, 19576 for approval of the mining plan.
3. On 15 th May, 1995, the District Collector, Narsinghpur
forwarded the petitioner’s application to the Principal Secretary of the
respondent No.2 – State Government with a recommendation for grant
of a mining lease in its favour. In the very same month, in reply to a letter
dated 5th May, 1995 received from the respondent No. 1 – UOI seeking
essential details regarding the approval of the mining plan, the petitioner
furnished the necessary information under cover of letter dated 19th
May, 1995. On 15th December, 1995, the respondent No. 1- UOI issued
a letter to the petitioner calling upon it to appear before the Screening
Committee in a meeting scheduled on 20th December, 1995 for screening
the proposals relating to captive mining by power generation companies
and companies engaged in the manufacture of iron and steel. Accordingly,
1 For short ‘UOI’
2 For short ‘Ordinance’
3 For short ‘FC Act’
4 For short ‘State Government’
5 For short ‘MC Rules’
6 For short ‘MMDR Act’
191
the petitioner participated in the 9 th Meeting held by the Screening
Committee on 20th December, 1995.
4. On 23rd December, 1995, the Department of Mineral Resources
of the respondent No.2 – State Government addressed a letter to the
respondent No.1 – UOI for seeking prior approval under Section 5(1) of
MMDR Act for grant of mining lease for coal in favour of the petitioner
for a period of 30 years over an area measuring 249.243 hectares situated
in Villages Mohapani, Richhai and Chargaonkhurd. On 21st June, 1996,
the respondent No.1 – UOI wrote a letter to the petitioner in forming it
that the Screening Committee had identified “Gotitoria (East & West)
Coal Blocks” in Mohapani Coalfield, Madhya Pradesh to meet the coal
requirements of the captive power plant and that the peti tioner should
approach the authorities for obtaining a mining lease of t he specified
blocks. Pertinently, a copy of the aforesaid letter was not marked by the
respondent No.1 – UOI to the respondent No.2 – State Government.
Instead, the same was marked to the Chief Secretary, Gover nment of
Maharashtra, Mumbai. The fact that the said letter was not endorsed to
the respondent No.2 – State Government was also confirmed b y the
respondent No.1 – UOI in its reply dated 10 th April, 2015 to a query
raised in an application under the Right to Information Act, 20057.
5. On its part, the petitioner responded to the let ter dated
21st June, 1996 sent by the respondent No.1 – Union of India by writing
back on 3rd July, 1996, stating inter alia that it had already applied to the
State Government in the prescribed form for grant of a mi ning lease
through the District Collector, Narsinghpur, Madhya Pradesh and the
said proposal had been recommended by the respondent No. 2 – State
Government to the Ministry of Coal for grant of approval. The petitioner
requested that the approval to the proposal forwarded by the respondent
No.2 – State Government for grant of a mining lease be accorded by the
respondent No.1 – UOI at the earliest.
6. Finally, vide letter dated 27 th August, 1997, addressed by the
respondent No.1 – UOI to the respondent No.2 – State Government,
approval was accorded by the Central Government for grant of a mining
lease in favour of the petitioner under Section 5(1) of the MMDR Act.
Pursuant to the aforesaid letter, the mining lease for the area in question
was executed by the respondent No.2 – State Government in favour of
the petitioner on 21 st May, 1998. On the petitioner setting up a coal
7 For short ‘RTI’
B.L.A. INDUSTRIES PRIVATE LIMITED v. UNION OF INDIA
AND ANOTHER [HIMA KOHLI, J.]
washery operation in September, 2001, coal mining operations w ere
finally commenced in October, 2004.
7. After passage of almost a decade, a group of petitions in the
nature of Public Interest Litigations were filed before this Court with the
grievance that coal blocks had been arbitrarily allocate d between the
years 1993 to 2011 without adhering to the mandatory legal procedure
prescribed under the MMDR Act and in breach of the relevant provisions
of the Coal Mines (Nationalization) Act, 1973 8, to favour ineligible
companies tainted with mala fides and corruption. The said group of
petitions were decided by a three Judges Bench of this Court, by a
detailed judgment dated 25th August, 20149 in Manohar Lal Sharma v.
Principal Secretary and Others 10 wherein, the prayer regarding
quashing of the allocation of coal blocks to private companies made by
the Central Government between 1993 to 2011, was con sidered
extensively and it was held that the exercise undertaken by the Central
Government of allocation of coal blocks, was neither traceable to the
MMDR Act or the CMN Act and the practice and procedure adopted
by the Central Government for allocation of coal blocks to the beneficiaries
through the Screening Committee Route, was inconsistent with the extant
law already enacted and the Rules framed. Consequently, this Court
declared that the entire allocation of coal blocks, as per the
recommendations made by the Screening Committee constituted by the
respondent No.1 – Union of India from 14th July, 1993 onwards and the
allocations made through the Government Dispensation Route after 1993
suffered from the vice of arbitrariness and were illegal.
8. The outcome of the illegal allocations were the subject matter
of the subsequent judgment dated 24 th September, 201411 delivered in
the same case 12. After carefully examining all the consequences of
cancellation of the coal blocks, as put forth by the responde nt No.1 –
UOI and the learned counsel appearing for the allottees, this Court divided
the coal block allotments in two categories on the basis of the documents
that were furnished by the respondent No.1 – UOI. The first cat egory
was of allotments other than those that were mentioned by the respondent
No.1 – UOI in Annexure-1 and Annexure-2, filed by it. The second
8 For short ‘CMN Act’
9 For short ‘First Judgment’
10 (2014) 9 SCC 516
11 For short ‘Second Judgment’
12 (2014) 9 SCC 614
193
category comprised of 46 coal blocks mentioned in Annexure-1 and
Annexure-2 that could possibly be “saved” from cancellation on imposition
of certain terms and conditions. The first category of the allotments
was quashed outright by the Court as patently illegal and arbitrary. This
left the second category of coal block allotments that had come into
production or were likely to come into production.
9. Out of 46 coal blocks, mentioned in Annexure-1 and Annexure-
2, 42 coal blocks were cancelled with a grace period of six m onths
granted for the said cancellation to take effect. Pertine ntly, the coal
blocks allocated to the petitioner herein were mentioned at Sr. No.22
and 23 of Annexure-1 that was extracted at the end of t he Second
Judgment. Besides deferment of cancellation, this Court i ssued the
following directions:
“38. In addition to the request for deferment of cancellation, we
also accept the submission of the learned Attorney General t hat
the allottees of the coal blocks other than those covered by t he
judgment and the four coal blocks covered by this order must pay
an amount of Rs 295 per metric tonne of coal extracted as a n
additional levy. This compensatory amount is based o n the
assessment made by CAG. It may well be that the cost of extraction
of coal from an underground mine has not been taken into
consideration by CAG, but in matters of this nature it is difficult to
arrive at any mathematically acceptable figure quantifying the
loss sustained. The estimated loss of Rs 295 per metric tonne of
coal is, therefore, accepted for the purposes of these cases . The
compensatory payment on this basis should be made within a period
of three months and in any case on or before 31-12-2014. The
coal extracted hereafter till 31-3-2015 will also attract the additional
levy of Rs 295 per metric tonne.”
10. We have been informed in the course of arguments that the
coal blocks in question allocated to the petitioner have alrea dy been
allocated to a third party. Learned counsel for the petitioner states that
the only issue that survives for consideration in this petition relates to the
liability of the petitioner to pay compensation towards the coal extracted
as an additional levy demanded by the respondent No.1 – UOI, in terms
of the directions issued in para 38 of the Second Judgment extra cted
above. Notably, respondent No.1 – UOI has filed a contempt pe tition
registered as Contempt Petition (Criminal) No. 7/2016 alleg ing inter
B.L.A. INDUSTRIES PRIVATE LIMITED v. UNION OF INDIA
AND ANOTHER [HIMA KOHLI, J.]
alia that the petitioner herein is in willful disobedience of the First and
Second Judgments that had directed payment of addit ional levy
compensatory amount @ Rs. 295 per MT on the allottees of the coal
blocks which was to be paid latest by 31st December, 2014. Stating that
respondent No. 1 – UOI had already filed Contempt Petition No. 2/2015
against prior allottees, the captioned contempt petition has been filed
against the petitioner herein on account of its failure to pay the additional
levy for the second phase, i.e., for coal produced from 25 th September,
2014 till 31 st March, 2015 that was directed to be paid by 30 th June,
2015.
11. Mr. Abhimanyu Bhandari, learned counsel for the petitioner
has argued that the erroneous inclusion of the name of the petitioner in
the list of 46 allottees of coal blocks and its mining leas e area in the
Schedule appended to the Ordinance as also the erroneous inclusion of
its name at serial No. 22 and 23 in Annexure-1 filed by the respondent
No. 1 – UOI before this Court, has resulted in cancellation /quashing of
the lease that was validly granted in its favour. The petitioner was neither
the beneficiary of the Screening Committee Route nor of the Government
Dispensation Route. It had followed the correct procedure presc ribed
under the MMDR Act/MC Rules by submitting an application for grant
of a lease directly to the respondent No. 2 - State Government and only
after the latter had processed the application and recommended the same
for approval to the respondent No.1 – UOI, was the mining lease granted
in favour of the petitioner. Therefore, the petitioner ought not to be saddled
with any compensation/levy towards the coal extracted. Learned counsel
submitted that had an opportunity of hearing being granted to the petitioner,
the above position would have been clarified but no such opp ortunity
was given.
12. Per Contra, Mr. Balbir Singh, learned ASG appearing for the
respondent No.1 – Union of India explained that the levy has be en
imposed in principle on the beneficiaries of illegal allocation just like the
petitioner herein. The additional levy is in the nature of penalty as well
as compensation for the loss caused to the public exchequer. He stated
that the object and purpose of imposition of the additional levy was that
since the process of allocation was found to be fundamentally flawed by
this Court therefore, all the beneficiaries of the said fl awed process
including the petitioner herein ought to suffer the consequenc es and
compensate the public exchequer for the loss caused. Stating tha t as it
195
was the Screening Committee constituted by the respondent N o. 1 –
UOI that had identified Gotitoria (East and West Blocks) in Mohapani
Coalfield in Madhya Pradesh for captive mining by the petitioner herein
to meet the coal requirements of the captive power plant vide allocation
letter dated 21 st June, 1996, the petitioner was covered under both the
judgments but it has failed to pay any amount towards additional levy in
the first phase that was to be paid on or before 31st December, 2014 and
the second phase that was to be paid on or before 30 th June, 2015. He
specifically referred to the First Judgment in particular, para 125 thereof
to urge that the petitioner’s name was mentioned along with some other
allottees in the 11 th Meeting of the Screening Committee held on 26 th-
27th September, 1997 and once the allocations made by the Centra l
Government on the recommendations of the Screening Committee have
been held by this Court to be illegal, the petitioner cannot claim any
different treatment from that extended to the other allottees . To rebut
the contention of the learned counsel for the petitioner that principles of
natural justice have been violated in the instant case, as the petitioner
was not afforded an opportunity of hearing, learned ASG had drawn the
attention of this Court to the observations made in the Second Judgment
to the effect that all parties who were adversely affec ted, were duly
given a hearing before the First Judgment was pronounced. He submitted
that the petitioner was afforded an opportunity of hearing along with
several other allottees and only thereafter the First and Second Judgments
were passed.
13. In his rejoinder, learned counsel for the petit ioner has
vehemently opposed the submission made on behalf of the respondent
No. 1 – UOI that the petitioner was afforded an opportunity of hearing
by the Court which he submits is quite apparent from a perusal of para
24 of the Second Judgment, where this Court has itself observed that
“The judgment did not deal with any individual case. It d ealt only
with the process of allotment of coal blocks and found it to be illegal
and arbitrary.” He reiterated the fact that the mining lease was granted
in favour of the petitioner in the same manner and sequence as w as
approved by this Court in the First Judgment and therefore the petitioner’s
case did not fall foul of the said judgment. To reinforce t he aforesaid
stand, learned counsel also alluded to the counter affidavit filed by the
respondent No. 2 – State Government on 09 th February, 2016 which
supports the plea of the petitioner that the State Government’s decision
to grant a mining lease in its favour was not the result of any allocation
B.L.A. INDUSTRIES PRIVATE LIMITED v. UNION OF INDIA
AND ANOTHER [HIMA KOHLI, J.]
letter issued by the Central Government and/or the Screening Committee,
but was based on its own independent consideration done strictly under
the provision of MMDR Act read with the MC Rules.
14. We have heard the rival submissions advanced by learn ed
counsel for the parties and perused the records in the b ackdrop of the
First Judgment dated 25th August, 2014 and the Second Judgment dated
24th September, 2014 rendered in the case of Manohar Lal Sharma
(supra). The issue that requires to be answered in the instant c ase is
whether the petitioner was allocated coal mines through the Screening
Committee Route and/or the Government Dispensation Route. Only if
the answer to the said question is in the affirmative, would the respondent
No. 1 – UOI be entitled to claim compensatory payment fr om the
petitioner in terms of the Second Judgment and not otherwise.
15. A perusal of the First Judgment leaves no manner of doubt
that this Court held that the practice and procedure adopt ed by the
respondent No. 1 – UOI for allocation of coal blocks t hrough the
administrative route was not consistent with the statute and the Rules
and that the legal regime under the MMDR Act imposes a st atutory
obligation upon the State Governments to recommend or not to
recommend to the Central Government, grant of prospecting license or
mining lease for coal. This Court also questioned the entire exercise of
allocation of coal mines through the Screening Committee Route and
observed that it suffered from the vice of arbitrariness; that there was
no evaluation on merits and no inter se comparison of the applicants;
that the determination of the Screening Committee was subjective and
most of the companies which had been allocated coal blocks, were not
engaged in the production of steel, power or cement at the t ime of
allocation and nor did they disclose in their applications whether or not
the power, steel or cement plants were operational. Noting the aforesaid
legal flaws that went to the root of the matter, the entire allocation of the
coal blocks in terms of the recommendations made by the Scree ning
Committee in 36 meetings conducted by it from 14thJuly, 1993 onwards
and the consequential allocation through the Central Government
Dispensation Route were struck down as being unfair, ambiguous and in
gross breach of the guidelines.
16. To test the veracity of the submission made by the petitioner
that in its case, the procedure laid down was followed “to th e T” for
allocation of the coal blocks, it is imperative to examine the chronology
197
of the events and the documents placed on record. Admitte dly, the
petitioner had submitted a mining lease application to the Collector
(Mining), Narsingpur, Madhya Pradesh on 8th November, 1994. The said
application was forwarded to the Tehsildar, Gadarwara and the Mining
Inspector, Narsingpur for seeking an inspection report for the area applied
for. Ground work was done by the Tehsildar and the Mining Inspector
who submitted a report of the proposed area which in turn was confirmed
by the Mine Surveyor. The map of the applied area submitte d by the
petitioner was also certified by the Divisional Forest Officer and a consent
from Chief Conservator of Forest was obtained. Additionally, a mineral
analysis report was sought from the petitioner and after all the
aforementioned information was gathered and analyzed, the Collector,
Narsingpur addressed a letter dated 15 th May, 1995 to the Principal
Secretary, Mineral Resource Department, Bhopal (Madhya P radesh)
stating inter alia that if no Government authorized unit was prepared to
operate in the area and the petitioner is granted the lease, it would result
in development of the area and generation of employment. The refore,
the Collector (Mining) recommended grant of a mining lease for a period
of 30 years to the petitioner in accordance with the Rules and the policy
of the Government. Based on the aforesaid input received fro m the
Collector (Mining), Narsingpur, the respondent No. 2 – State Government
wrote a letter dated 23 rd December, 1995 to the respondent No. 1 –
UOI specifically stating inter alia that the petitioner had furnished all
the relevant information as required under Rule 22 (3) (d) (e) (f) and (g)
of the MC Rules, 1960 along with the coal mining plan of the specified
area and after examination, the petitioner was found to be eligible under
the Rules for grant of a mining lease. Stating that prior approval of the
Central Government was necessary under Section 5(1) of t he MMDR
Act, the respondent No. 2 – State Government requested the respondent
No. 1 – UOI to grant requisite approval in favour of the petit ioner. It
was in the aforesaid background that the recommendation received from
the respondent No. 2- State Government was acted on by the respondent
No. 1 – UOI and the letter dated 27th August, 1997 was issued granting
approval of the mining lease in favour of the petitioner.
17. The aforesaid sequence of events belies the plea taken by the
respondent No. 1 – UOI that the mining lease was granted in favour of
the petitioner solely on the basis of the recommendations made by the
Screening Committee. Simply because the petitioner had participated in
the meetings conducted by the Screening Committee cannot b e held
B.L.A. INDUSTRIES PRIVATE LIMITED v. UNION OF INDIA
AND ANOTHER [HIMA KOHLI, J.]
against it. Participation in the said meetings can also not be taken to
mean that the petitioner had applied directly to the respondent No. 1 –
UOI for grant of the mining lease. In fact, the records r eveal that the
letter dated 21st June, 1996 issued by the respondent No. 1 – UOI stating
that the petitioner’s proposal for identification of the captive mining block
for supply of coal to the 24 MW captive power plant in Madhya Pradesh
was considered in the meeting of the Screening Committee and was
approved, never found its way to the respondent No. 2 – State
Government. This position is borne out on a perusal of the copies of the
said letter endorsed by the respondent No. 1 – UOI to different authorities.
At Serial No. (iv), the name of the “Chief Secretary, Gove rnment of
Maharashtra, Mumbai” has been endorsed instead of t he “Chief
Secretary, Government of Madhya Pradesh” which fact stand confirmed
from the reply dated 10th April, 2015 issued by the respondent No. 1 –
UOI to an RTI query received by it. A similar stand has been taken by
the respondent No. 2- State Government in its reply dated 6th April, 2015
to an RTI query received by the concerned department. The peti tioner
had also clarified that it had applied to the State Government for grant of
a mining lease through the District Collector, Narsingpur, Madhya Pradesh
in the prescribed form and it was the said proposal that had been
recommended by the State Government to the respondent No. 1 – UOI
for necessary approval. The said position is apparent from the letter
dated 3rd July, 1996 addressed by the petitioner to the respondent No. 1
– UOI. The letter dated 27th August, 1997 issued by the respondent No.
1 – UOI to the respondent No. 2 – State Government, contents whereof
are extracted below for ready reference, is also on similar lines: -
“13011/1/96-CA Dated : 27.08.1997
To,
Shri A.K. Trivedi,
Under Secretary,
Department of Mineral Resources,
Government of Madhya Pradesh,
Ballav Bhawan,
Bhopal
Subject: Grant of mining lease over 2.49 sq. kms. of Mohpani
Block M/s BLA Industries-communication of Prior approval of
the Central Government Regarding.
199
Sir,
I am directed to refer to the endorsement of this
Ministry’s letter of even number dated 08.07.1997, addressed
to Shri Anup Kumar Agarwalla, President, BLA Industries,
wherein it was stated that fresh recommendation of the State
Government for grant of Mining lease over 2.49 Sq. kms will
be required. However, this has been re-examined in this
Ministry. It has been decided to consider the recommendations
of the State Government dated 23.12.95 for grant of mining
lease over 2.49 sq. kms. Particularly in view of the fact th at
the area over which the mining plan has been prepared and
approved and the area which as been recommended by the
State government for grant of mining lease, are same, though
the date of recommendation precedes substantially the date of
communication of the Central Government’s approval on the
mining plan.
2. In view of the above, the Central Government, on consideration
of the recommendations of the State Government vide their
letter No. 3-72/95/12/2/5 dated 23.12.95 for grant of mining
lease over an area of 249 .243 hectares in Mohapani and two
other villages in Narsinghpur District of Madhya Pradesh, the
approval of the Central Government for grant of mining lease
in favour of M/s BLA Industries over an area of 249.243
hectares as recommended is hereby accorded under section
5(1) of the Mines and Minerals (Regulation and Development)
Act, 1957.
3. The area co-ordinates of the mining block of 2.49 Sq. Kms.
Over which the approval of the Central Government has been
communicated for grant of mining lease are detailed in the
Annexure for accurate and correct physical identification of
the Coal Mining block. These may appropriately be incorporated
in the mining lease deed executed between the State
Government and M/s BLA Industries Limited. A copy of the
lease deed may also be furnished to the Ministry of Coal.
Yours faithfully,
Sd/-
(A. Banerjee)
Director”
B.L.A. INDUSTRIES PRIVATE LIMITED v. UNION OF INDIA
AND ANOTHER [HIMA KOHLI, J.]
18. Another relevant aspect that tips the scale in favour of t he
petitioner is the counter affidavit filed by the respondent No. 2 – State
Government which is in consonance with the plea taken by the petitioner
that the decision to grant the mining lease in its favour was not based on
any allocation letter issued directly by the Central Government and/ or
the Screening Committee, but was founded on an inde pendent
consideration of the petitioner’s application made by the State Government
and done in accordance with the provisions of the MMDR Act rea d
with the MC Rules. Respondent No. 2 – State Government has also
referred to its earlier affidavit dated 28th October, 2013 filed before this
Court in the connected matters decided by the First Judgment, wherein
it had explained the procedure adopted for allocation of coal blocks by
the Screening Committee constituted by the Central Government and
had categorically averred that the said procedure was followed i n all
cases “Other than one”, where the application was made directly to
the State Government and not to the Central Government. The said one
case was explained to be that of the petitioner herein.
19. In other words, the respondent No. 2 – State Government has
affirmed the stand taken by the petitioner that the procedure of allocation
of the coal block through the Screening Committee Route/Government
Dispensation Route had not been followed in the case of the petitioner
and therefore there was no illegality in allocation of the speci fied coal
mines in its favour, unlike the other cases. In the light of the afo resaid
stand taken by the respondent No. 2 – State Government which can be
co-related with the correspondence placed on record, the plea of the
respondent No. 1 – UOI that the case of the petitioner was consi dered
by the Screening Committee in its 9 th, 10 th, 14 th, 15 th, 16 th and 20 th
meetings, would not make the allocation illegal. No parity can be drawn
between the petitioner and the other allottees of the coal blocks when
the petitioner followed the correct procedure of applying through proper
channel for grant of a mining lease which application on being received,
was routed by the Office of the Collector (Mines), Narsingp ur to the
Mineral Resource Department, Government of Madhya Pradesh and
onwards to the respondent No. 1 – UOI, for prior approval.
20. Given the aforesaid facts and circumstances of the insta nt
case, we find force in the submission made by the learned c ounsel for
the petitioner that the mining lease granted in favour of the petitioner
was not tainted by mala fides, as was the case of the other allottees. It
201
was the respondent No. 2 – State Government that had undertak en a
diligent exercise to examine the petitioner’s appli cation before
recommending its case to the respondent No. 1 – UOI for grant of the
mining lease. Founded on the said recommendations, the respondent
No. 1 – UOI had issued the letter allocating the coal block to the petitioner
and not the other way round. Given the aforesaid position, the respondent
No. 1 - UOI ought not to have included the name of the petitioner and
the coal blocks allotted to it in Annexure – 1 filed before this Court that
forms a part of the Second Judgment. Taking the contents of t he said
Annexures – 1 and 2 filed by the respondent No. 1 – UOI as true and
correct, this Court passed the consequential order directing payment of
compensation as an additional levy. The fact that the petitioner did not
get an opportunity to inform the Court about the error on the part of the
respondent No. 1 – UOI of including its name in Annexure – 1 can be
discerned from the observations made in para 24 of the Second Judgment
to the effect that the Court had not dealt with any individual case but
only with the process of allotment of coal blocks which was found to be
fatally flawed.
21. It is therefore held that allocation of the coal block made in
form of the petitioner did not run foul of the procedure prescribed in the
MMDR Act and the MC Rules. The petitioner was not allocated the
coal block either through the Screening Committee Route or the Central
Government Dispensation Route, which fact was not pointed out by the
respondent No. 1 – UOI at the appropriate stage, that led to painting the
petitioner with the same brush as the other allottee listed in Annexures –
1 and 2. Having held that the petitioner was not a beneficiary of the
flawed process, the consequences spelt out in the Second Judgmen t
would not apply to it and therefore, it cannot be called upon to pay penalty
as compensatory payment, as demanded by the respondent No . 1 –
UOI.
22. The upshot of the aforesaid discussion is that the respondent
No. 1 – UOI is not entitled to claim payment of an additional levy for the
coal extracted by the petitioner from the subject mine. Any such demand
raised by the respondent No. 1 – UOI is hereby quashed and set aside .
The writ petition is allowed on the aforesaid terms. Contempt P etition
(Crl.) No.7 of 2016 is dismissed as meritless.
23. Before parting with this matter, we are constrained to make
certain observations regarding the conduct of the respondent no. 1 –
B.L.A. INDUSTRIES PRIVATE LIMITED v. UNION OF INDIA
AND ANOTHER [HIMA KOHLI, J.]
UOI. Here is a case where a private party followed all the rules and the
law, as applicable, before investing large sums of money t o undertake
business. In fact, it appears from the facts of the case t hat it was the
respondent no. 1 – UOI that did not follow the letter of the law. B ut
ultimately, it was the private party that had to suffer the c onsequences
of the careless and callous approach of the respondent no. 1 – UOI. To
compound the petitioner’s woes, the respondent no. 1 – UOI file d an
affidavit before this Court including the petitioner in the list of errant
mine owners, based on its own unlawful conduct. It did not undertake
the necessary due diligence to determine as to whether the p etitioner
had been allotted the mine through the lawful procedure. As a result of
this callous, careless and casual approach of the respondent no. 1 –
UOI, the present petitioner had to suffer loss and ignominy.
24. Therefore, litigation costs quantified at ` 1,00,000/- (Rupees
one lakh) shall be paid by the respondent No.1 – UOI to the petiti oner
within four weeks.
Divya Pandey Writ petition allowed and contempt peti tion dismissed.