Bses Rajdhani Power Ltd. v. Delhi Electricity Regulatory Commission
S. ABDUL NAZEER, J.
1. These two appeals have been filed by BSES Rajdhani Power
Ltd. (C.A. No.4324 of 2015) and BSES Yamuna Power Ltd. (C .A.
No.4323 of 2015) (hereinafter referred to as ‘Appellants’) challenging
certain findings of the Appellate Tribunal for Electricity, N ew Delhi
(‘APTEL’) in the common judgment and order dated 28 .11.2014
(‘Impugned Order’) passed in Appeal Nos.61 and 62 of 2012 (‘Ta riff
Appeals’). The Tariff Appeals were filed by the appellant s before the
APTEL challenging certain findings of the Delhi Electricity Regulatory
Commission (‘DERC’) in the Tariff Order dated 26.08.2012 for Truing
Up of financials for FY 2008-09 and FY 2009-10 and Aggregate Revenue
Requirement (‘ARR’) for FY 2011-12. DERC has also filed appeals
(C.A. Nos.8660-61 of 2015) challenging certain findings in the common
impugned order and the said appeals will be heard and decided separately.
2. The Appellants are Distribution Licensees (“Discoms”) in terms
of Section 2(17) of the Electricity Act, 2003 (‘2003 Act’). The primary
function of a Discom is to give supply to any premises upon an application
being made by a consumer in compliance with the applicable l aws,
including paying requisite charges, except where prevented by f orce
majeure conditions like cyclones or floods.
3. The Appellants purchase 90% to 95% of the power from Central
and State Generating Companies. Tariff of Central Generating Stations
is determined by the Central Electricity Regulatory Commission (‘CERC’)
and, therefore, the Appellants have no control over the tariff to be paid
to the Central Generating Stations. Simultaneously, the tariff for the State
Generating Companies is determined by the State Regulator i.e. DERC.
799
4. It is the case of the Appellants that since privatization, the ARR
determined by the DERC was not even sufficient to meet the actual
power purchase cost which has led to creation of a huge revenue gap. It
is also contended that the DERC in repeated disregard to its statutory
regulations and its own statutory advice has refused to make p eriodic
increase in the tariff rate. The actions of the DERC have resulted in a
situation where the Appellants are deeply indebted and have been forced
to borrow/take loans to fund their day-to-day operations which, in turn,
have also dried up leaving the Appellants without adequate mon ies to
pay their suppliers.
5. The Appellants have challenged the finding of the APTEL in
the Impugned Order on the following issues:
A. Change in methodology in computation of Aggregate
Technical and Commercial (AT&C) losses [Issue 14 in
Impugned Order]
B. Change in methodology for computation of Depreciation
[Issue 15 in Impugned Order]
C. Disallowance of salary for Fundamental Rules and
Supplementary Rules (FR/SR) structure [Issue 23 in
Impugned order]
D. Disallowance of interest accrued on Consumer Security
Deposit retained by Delhi Power Corporation Limited
(DPCL) [Issue 29 in Impugned Order]
E. Disallowance of Fringe Benefit Tax [Issue 34 in Impugned
Order]
F. Reduction in Million Units (MUs) in relation to Enforcement
sale for the purpose of calculation of AT&C Loss [Issue 14
in Impugned Order]
6. It is to be noticed that the above-mentioned Issue ‘C’ has been
challenged only by BSES Rajdhani Power Ltd. in C.A. No.4324 of 2015
while the remaining issues have been challenged by both BSES Rajdhani
Power Ltd. and BSES Yamuna Power Ltd. and are subject-matter of
C.A. No.4324 of 2015 and C.A.No. 4323 of 2015.
7. The Tariff Appeals were filed by the Appellants challengi ng
the disallowances in their respective Tariff Orders dated 26.08.2012
passed by the DERC for:
BSES RAJDHANI POWER LTD. v. DELHI ELECTRICITY
REGULATORY COMMISSION [S. ABDUL NAZEER, J.]
(a) Determination of ARR and Tariff for FY 2011-12; and
(b) Truing up of financials for FY 2008-09 and FY 2009-10.
8. According to the appellants, the present Civil Appeals give rise
to substantial questions of law under Section 125 of the 2003 Act on six
issues. It is contended that the said substantial questions of law have
arisen primarily because the DERC has, inter alia, deliberately refused
to follow statutory regulations while truing up. Further, it is contended
that APTEL’s Impugned Order has failed to note the illegal manner of
truing up followed by DERC and, more importantly, APTEL has failed
to follow its own rulings in previous cases.
9. However, the respondents have contended that the appellants
have entirely failed to establish the existence of any substantial question
of law as required under Section 125 of the 2003 Act, read with Section
100 of the Code of Civil Procedure, 1908 (‘CPC’) on any of the above
issues.
10. Before considering the detailed submissions on each of the
above issues, it is necessary to provide an overview of the c urrent and
historical legal framework of electricity laws in India, including the tariff
determination process, and the role and powers of the DERC in the
tariff determination process.
11. Prior to independence, the Indian Electricity Act, 1910 (‘1910
Act’) governed the supply and use of electrical energy in India. Part-II
of the 1910 Act was related to supply of electricity and contained
provisions concerning:
(a) Grant of license for supply of electricity by the State
Government in consultation with the State Electricity Boards
(“SEB”) and
(b) Obligation and rights of licensees, consumers, etc. al ong
with other modalities.
Part-III of the 1910 Act dealt with Supply, Transmission and Use
of Energy by Non-licensees. Part-IV of the 1910 Act provid ed for
constitution, duties of advisory boards at the State and Central lev els
along with other authorities such as electrical inspectors and Central
Electricity Board (“CEB”). CEB, under Section 37 of the 1910 Act, was
empowered to make rules to regulate the generation, transmission, supply,
and use of energy.
801
12. On 10.09.1948, the Electricity (Supply) Act, 1948 (“Supply
Act, 1948”) was notified to provide for: (a) the rationalization of the
production and supply of electricity, (b) taking of measures conducive to
electrical development; and (c) all matters incidental to the above. The
Supply Act, 1948 was a more detailed and comprehensive code and
provided for establishment of SEBs to control generation, distribution,
and utilization of electricity within their respective states and the Central
Electricity Authority (‘CEA’) for planning and development of the national
power system.
13. On 02.07.1998, the Electricity Regulatory Commissions Act,
1998 (‘Commissions Act, 1998’) was notified with effect from 25.04.1998
as an Act to provide for the establishment of a Centr al Electricity
Regulatory Commission (“CERC”) and State Electricity Regul atory
Commission (“SERC”), for rationalization of electricity tariff, transparent
policies regarding subsidies, promotion of efficient and environmentally
benign policies and other matters connected therewith or incident al
thereto. Chapter-VI of the Commissions Act, 1998 was related to energy
tariff and provided for the determination of tariff by Central and Stat e
Commissions.
14. Insofar as the National Capital Territory (“NCT”) of Delhi is
concerned, on 08.03.2001, the Delhi Electricity Reforms Act , 2000
(“Reforms Act, 2000”) was notified to:
(a) provide re-structuring of the electricity industry (unbundling
of generation, transmission, and distribution),
(b) increasing avenues for participation of private sector i n the
electricity industry; and
(c) generally, for taking measures conducive to the development
and management of the electricity industry in an ef ficient,
commercial, economic, and competitive manner in the NCT of
Delhi and for matters connected therewith or incidental thereto.
15. With effect from 01.07.2002, pursuant to the unbundling,
restructuring and reform of the erstwhile Delhi Vidyut Board (“DVB”)
and privatization of distribution of electricity, the appellants succeeded
to the respective Distribution Undertakings and Business in their area of
supply. The appellants have been granted Distribution and Retail Supply
License by DERC to undertake distribution (wheeling) and retail supply
of electricity in their respective areas of supply in the NC T of Delhi.
BSES RAJDHANI POWER LTD. v. DELHI ELECTRICITY
REGULATORY COMMISSION [S. ABDUL NAZEER, J.]
From 01.07.2002 till 31.03.2007, the Delhi Transco Ltd. (“DTL”) was
entrusted with the responsibility of bulk procurement and bulk supply of
power in the NCT of Delhi.
16. In the year 2003, the Parliament repealed the previous thre e
laws viz., the 1910 Act, the Supply Act, 1948 and the Commissions Act,
1998, and enacted a comprehensive consolidated law called the Electricity
Act, 2003. The objectives of the Act are:-
(a) to consolidate the laws relating to generation, transmiss ion,
distribution, trading and use of electricity,
(b) taking measures conducive to development of electr icity
industry, promoting competition therein, protecting interest of
consumers and supply of electricity to all areas,
(c) rationalization of electricity tariff, ensuring transparent policies
regarding subsidies, promotion of efficient and environmentally
benign policies,
(d) constitution of the CEA, Electricity Regulatory Commissions,
and establishment of an Appellate Tribunal and for matters
connected therewith or incidental thereto.
17. The scheme of the 2003 Act is predicated on consolidating all
laws governing electricity and repealing the existing laws. The legislative
policy of distancing the Government from the tariff determination was
carried forward in the 2003 Act. The intent and purpose of the 2003 Act
is to liberalize the electricity sector and to ensure that the distribution
and supply of electricity is conducted on commercial principles . The
legislature intended to promote factors that encoura ge and reward
efficiency, competition, economical use of resource s and optimum
investments and safeguard the interest of the consu mers vis-à-vis
recovery of cost of electricity in a reasonable manner as envisaged under
Section 61 of the 2003 Act.
18. Being regulated licensees responsible for distribution and retail
supply of electricity in their designated areas within the NCT of Delhi in
terms of Section 12 of 2003 Act, the annual revenue requirement of the
Appellants to conduct the licensed business and consequently the tariff
to be recovered from the consumers, is regulated by the DERC, being
the State Electricity Regulatory Commission. DERC is ve sted with a
substantial set of divergent powers – legislative, executive, adjudicatory
803
and advisory – each being distinctly defined and governed by law. One
of the critical issues arising in these Civil Appeals relates to sanctity of
each such function and their interplay. In this regard, it is noteworthy
that Section 3 of the 2003 Act provides as under:
“Section 3. National Electricity Policy and Plan. -
(1) The Central Government shall, from time to time, prepare the
National Electricity Policy and tariff policy, in consultation with
the State Governments and the Authority for development of the
power system based on optimal utilisation of resources s uch as
coal, natural gas, nuclear substances or materials, h ydro and
renewable sources of energy.
(2) The Central Government shall publish National electricity Policy
and tariff policy from time to time.
(3) The Central Government may, from time to time in consultation
with the State Governments, and the Authority review or revise
the National Electricity Policy and tariff policy referred to in sub-
section (1).
(4) The Authority shall prepare a National Electricity Pl an in
accordance with the National Electricity Policy and notify such
plan once in five years.
Provided xxx xxx xxx
(5) The Authority may review or revise the National Elect ricity
Plan in accordance with the National Electricity Policy.”
19. Section 14 of the 2003 Act provides for grant of licences on
application made under Section 15 of the Act - (a) to transmit electricity
as a transmission licensee; or (b) to distribute electricity as a distribution
licensee; or (c) to undertake trading in electricity as an electricity trader,
in any area which may be specified in the licence.
20. Section 43 of the 2003 Act provides for the universal supply
obligation of the Discoms, which is as under:
“43. Duty to supply on request –
(1) Save as otherwise provided in this Act, every distributio n
licensee, shall, on an application by the owner or occupier of any
premises, give supply of electricity to such premises, within one
month after receipt of the application requiring such supply.
BSES RAJDHANI POWER LTD. v. DELHI ELECTRICITY
REGULATORY COMMISSION [S. ABDUL NAZEER, J.]
Provided xxx xxx xxx
(2) & (3) xxx xxx xxx”
21. Section 61 of the 2003 Act lays down the guiding principles
for tariff which are as under:
“61. Tariff regulations.- The Appropriate Commission shall, subject
to the provisions of this Act, specify the terms and conditions for
the determination of tariff, and in doing so, shall be guided by the
following, namely:-
(a) the principles and methodologies specified by the Central
Commission for determination of the tariff applicable to
generating companies and transmission licensees;
(b) the generation, transmission, distribution and supply of
electricity are conducted on commercial principles;
(c) the factors which would encourage competition, efficiency ,
economical use of the resources, good performance and
optimum investments;
(d) safeguarding of consumers’ interest and at the same time,
recovery of the cost of electricity in a reasonable manner;
(e) the principles rewarding efficiency in performance;
(f) multi-year tariff principles;
(g) that the tariff progressively reflects the cost of sup ply of
electricity and also, reduces cross-subsidies in the manner
specified by the Appropriate Commission;
(h) the promotion of co-generation and generation of electricity
from renewable sources of energy;
(i) the National Electricity Policy and tariff policy:
Provided that the terms and conditions for determination of tariff
under the Electricity (Supply) Act, 1948, the Electricity Regulatory
Commission Act, 1998 and the enactments specified i n the
Schedule as they stood immediately before the appointed date,
shall continue to apply for a period of one year or until the terms
and conditions for tariff are specified under this section, whichever
is earlier.”
805
22. Sections 62 and 64 of the 2003 Act lay down the procedure
for determination of tariff for, inter alia, wheeling and retail sale of
electricity as under:
“62. Determination of tariff.-
(1) The Appropriate Commission shall determine the tari ff in
accordance with the provisions of this Act for –
(a) supply of electricity by a generating company to a distribution
licensee:
Provided that the Appropriate Commission may, in case of
shortage of supply of electricity, fix the minimum an d
maximum ceiling of tariff for sale or purchase of electricity
in pursuance of an agreement, entered into between a
generating company and a licensee or between licensees,
for a period not exceeding one year to ensure reasonable
prices of electricity;
(b) transmission of electricity;
(c) wheeling of electricity;
(d) retail sale of electricity:
Provided that in case of distribution of electricity in the same area
by two or more distribution licensees, the Appropriate Commission
may, for promoting competition among distribution licensees, fix
only maximum ceiling of tariff for retail sale of electricity.
(2) The Appropriate Commission may require a licensee or a
generating company to furnish separate details, as may be specified
in respect of generation, transmission and distribu tion for
determination of tariff.
(3) The Appropriate Commission shall not, while determining the
tariff under this Act, show undue preference to any consumer of
electricity but may differentiate according to the consumer’s load
factor, power factor, voltage, total consumption of electricity during
any specified period or the time at which the supply is required or
the geographical position of any area, the nature of supply and the
purpose for which the supply is required.
(4) No tariff or part of any tariff may ordinarily be a mended,
more frequently than once in any financial year, except in respect
BSES RAJDHANI POWER LTD. v. DELHI ELECTRICITY
REGULATORY COMMISSION [S. ABDUL NAZEER, J.]
of any changes expressly permitted under the terms of any fuel
surcharge formula as may be specified. The Electricity Act, 2003.
(5) The Commission may require a licensee or a gene rating
company to comply with such procedures as may be specified for
calculating the expected revenues from the tariff and cha rges
which he or it is permitted to recover.
(6) If any licensee or a generating company recovers a pric e or
charge exceeding the tariff determined under this section, the
excess amount shall be recoverable by the person who has p aid
such price or charge along with interest equivalent to the ba nk
rate without prejudice to any other liability incurr ed by the
licensee.”
“64. Procedure for tariff order.-
(1) An application for determination of tariff under sectio n 62
shall be made by a generating company or licensee in such manner
and accompanied by such fee, as may be determined by regulations.
(2) Every applicant shall publish the application, in such abridged
form and manner, as may be specified by the Appropri ate
Commission.
(3) The Appropriate Commission shall, within one hundred and
twenty days from receipt of an application under sub-section (1)
and after considering all suggestions and objections received from
the public,-
(a) issue a tariff order accepting the application with such
modifications or such conditions as may be specified in that
order;
(b) reject the application for reasons to be recorded in writing
if such application is not in accordance with the provisions of
this Act and the rules and regulations made thereunder or the
provisions of any other law for the time being in force:
Provided that an applicant shall be given a reasona ble
opportunity of being heard before rejecting his application.
(4) The Appropriate Commission shall, within seven days of making
the order, send a copy of the order to the Appropriate Government,
the Authority, and the concerned licensees and to the person
concerned.
807
(5) Notwithstanding anything contained in Part X, the tariff f or
any inter-State supply, transmission or wheeling of electricity, as
the case may be, involving the territories of two States may, upon
application made to it by the parties intending to undertake such
supply, transmission or wheeling, be determined under this section
by the State Commission having jurisdiction in respect of the
licensee who intends to distribute electricity and make payment
therefor.
(6) A tariff order shall, unless amended or revoked, continue to be
in force for such period as may be specified in the tariff order.”
23. ARR of the Appellants, and consequently the tariff to b e
recovered from the consumers, is regulated by the DERC, and determined
under Section 62 read with Section 61 of the 2003 Act.
24. Section 86 of the 2003 Act lays down the functions of the
State Commissions i.e. DERC in this case, and the rule-making power
of the Central Government is set out in Section 176 thereof.
25. Before considering the other questions, let us consider the
preliminary objection raised by learned counsel for the respondent-DERC
as to whether the appeals involve any substantial question of law as
required under Section 125 of the 2003 Act read with Section 100 of the
CPC?
26. Section 125 of the 2003 Act provides for an appeal to this
Court against the decision or order of the APTEL which reads as under:
“125. Appeal to Supreme Court. -
Any person aggrieved by any decision or order of the Appellate
Tribunal, may, file an appeal to the Supreme Court within s ixty
days from the date of communication of the decision or order of
the Appellate Tribunal, to him, on any one or more of the grounds
specified in section 100 of the Code of Civil Procedure,1908 (5 of
1908):
Provided that the Supreme Court may, if it is satisfied th at the
appellant was prevented by sufficient cause from filing the appeal
within the said period, allow it to be filed within a further period
not exceeding sixty days.”
27. Thus, an appeal to this Court under Section 125 could be filed
on the grounds specified in Section 100 of the CPC. Under Section 100
BSES RAJDHANI POWER LTD. v. DELHI ELECTRICITY
REGULATORY COMMISSION [S. ABDUL NAZEER, J.]
of the CPC, an appeal could be filed only when the case involves ‘a
substantial question of law’, as may be framed by the appe llate court.
Thus, the existence of a ‘substantial question of law’ aris ing from the
judgment of the APTEL is sine qua non for exercise of jurisdiction by
this Court under Section 125 of the 2003 Act.
28. The expression ‘appeal’ has not been defined in the CPC.
Black’s Law Dictionary (10th Edn.) defines an ‘appeal’ as “a proceeding
undertaken to have a decision reconsidered by bringing it to a higher
authority.” An appeal is judicial examination of a decision of a subordinate
court by a higher court to rectify any possible error(s) in the order under
appeal. The law provides the remedy of an appeal in recognition of the
fact that those manning the judicial tiers too may commit errors.
29. The test to determine whether a question is a sub stantial
question of law or not was laid down by a Constitution Bench of t his
Court in Sir Chunilal V . Mehta & Sons Ltd. v. The Century Spg. &
Mfg. Co. Ltd. 1 as under : (AIR p. 1318, para 6)
“6. … The proper test for determining whether a question of law
raised in the case is substantial would, in our opinion, be whether
it is of general public importance or whether it dir ectly and
substantially affects the rights of the parties and if so whether it is
either an open question in the sense that it is not finally settled by
this Court or by the Privy Council or by the Federal Court or is not
free from difficulty or calls for discussion of alternative views. If
the question is settled by the highest court or the general principles
to be applied in determining the question are well settled and there
is a mere question of applying those principles or that the plea
raised is palpably absurd the question would not be a substantial
question of law.”
30. Thus, the word ‘substantial’ as qualifying ‘question of law’
means, of having substance, essential, real, of sound worth, important or
considerable. It is to be understood as something in contra distinction
with technical, of no substance or consequence, or academic. For
determining whether a case involves substantial question of law, the test
is not merely the importance of the question, but its importance to the
case itself necessitating the decision of the question. The appropriate
test for determining whether the question of law raised in the case is
1 1962 Supp (3) SCR 549 : AIR 1962 SC 1314
809
substantial would be to see whether it directly and substantially affects
the rights of the parties. If it is established that the decision is contrary to
law or the decision has failed to determine some material issue of law or
if there is substantial error or defect in the decision of the case on merits,
the court can interfere with the conclusion of the lower court or tribunal.
The stakes involved in the case are immaterial as long as the impact or
effect of the question of law has a bearing on the lis between the parties.
31. Thus, in a second appeal, the appellant is entitled to point out
that the order impugned is bad in law because it is de hors the pleadings,
or it was based on no evidence or it was based on misreading of material
documentary evidence or it was recorded against the provision of law or
the decision is one which no Judge acting judicially could reas onably
have reached. Once the appellate court is satisfied, after hearing the
appeal, that the appeal involves a substantial question of l aw, it has to
formulate the question and direct issuance of notice to the respondent/s.
32. Now, let us consider as to whether the present appeals involve
any substantial question(s) of law.
33. The APTEL has recorded findings on 35 issues raised by the
appellants. According to the appellants, six issues decided by the APTEL
give rise to substantial question of law which are as follows:
1. Change in methodology in computation of AT&C Losses.
2. Change in methodology for computation of Depreciation.
3. Disallowance of salary for FR/SR Structure.
4. Disallowance of interest incurred on Consumer Security
Deposit retained by DPCL.
5. Disallowance of Fringe Benefit Tax.
6. Reduction in MUs in relation to Enforcement sale for the
purpose of calculation of AT&C Losses (this issue deals
with theft/unauthorized use of electricity).
34. Mr. Arvind P. Dattar and Mr. Dhruv Mehta, learned senior
counsel appearing for the appellants, would submit that the findings of
the APTEL on Issue Nos.1, 2, 3 and 5 are contrary to the binding DERC
Tariff Regulations. It is argued that the Regulator cannot ‘chang e the
rules of the game after it has begun’ in the ‘truing up exercise’. In this
regard, they have taken us through the findings of the DERC in the
BSES RAJDHANI POWER LTD. v. DELHI ELECTRICITY
REGULATORY COMMISSION [S. ABDUL NAZEER, J.]
Tariff Order and also the findings of the DERC after the truing up stage.
It is further argued that the tariff order is in the nature of a quasi-judicial
determination and that in the guise of truing up, the DERC cannot amend
a tariff order.
35. On the other hand, Mr. Nikhil Nayyar, learned senior counsel
appearing for the respondent-DERC, submits that one of the facet s of
the tariff determination exercise is the process of ‘truing up’. Since the
initial tariff order is prepared by the DERC, based on the pro jections
submitted by the Discoms as its ARR petition, the subsequent tariff order
is issued after the financial year pursuant to the ‘truing up’ exercise. It is
also pointed out that the findings on the aforesaid six issues are neither
contrary to law nor opposed to any regulations.
36. Having considered the submissions of the learned counsels
for the parties and after perusing the Impugned Order, we a re of the
view that these appeals involve the following substantial qu estions of
law:
“On Issue No.1
(a) Whether the impugned findings on Issue No.1 are contrary
to the mandate of Sections 3, 61(b), (c), (d) and (e), 62, 64
(read with the Tariff Policy) and 86(3) of the 2003 Act in
terms of which:
(i) Tariff must ensure recovery of all costs of undertaking
distribution of electricity with reasonable return,
rewarding efficiency in performance?
(ii) Regulator cannot “change the rules of the game after
it has begun” in the ‘truing up exercise’?
(b) Whether the impugned findings violate the principles and
methodology for tariff determination specified in the binding
DERC’s Tariff Regulations?
On Issue No.2
(a) Whether the impugned Findings on Issue No.2 are contrary
to the mandate of Sections 3, 61(b), (c), (d) and (e), 62, 64
(read with the Tariff Policy) and 86(3) of the 2003 Act in
terms of which:
811
(i) Tariff must ensure recovery of all costs of undertaking
distribution of electricity with reasonable return,
rewarding efficiency in performance?
(ii) Regulator cannot “change the rules of the game after
it has begun” in the ‘truing up exercise’?
(b) Whether the impugned findings violate the principles and
methodology for tariff determination specified in the binding
DERC’s Tariff Regulations?
On Issue No.3
(a) Whether the impugned Findings on Issue No.3 are contrary
to the mandate of Sections 3, 61(b), (c), (d) and (e), 62, 64
(read with the Tariff Policy) and 86(3) of the 2003 Act in
terms of which:
(i) Tariff must ensure recovery of all costs of undertaking
distribution of electricity with reasonable return,
rewarding efficiency in performance?
(ii) Regulator cannot “change the rules of the game after
it has begun” in the ‘truing up exercise’?
(b) Whether the impugned findings violate the binding statutory
Transfer Scheme and the Tri-Partite Agreements between
the GONCTD, the DVB and the Employees’ Unions, which
form the basis of the privatization of Discoms?
On Issue No.4
(a) Whether the impugned findings on Issue No.4 are contrary
to the mandate of Sections 3, 61(b), (c), (d) and (e), 62, 64
(read with the Tariff Policy) and 86(3) of the 2003 Act in
terms of which tariff must ensure recovery of all costs of
undertaking distribution of electricity with reasonable return,
rewarding efficiency in performance?
On Issue No.5
(a) Whether the impugned Findings on Issue No.5 are contrary
to the mandate of Sections 3, 61(b), (c), (d) and (e), 62, 64
(read with the Tariff Policy) and 86(3) of the 2003 Act in
terms of which:
BSES RAJDHANI POWER LTD. v. DELHI ELECTRICITY
REGULATORY COMMISSION [S. ABDUL NAZEER, J.]
(i) Tariff must ensure recovery of all costs of undertaking
distribution of electricity with reasonable return,
rewarding efficiency in performance?
(ii) Regulator cannot “change the rules of the game after
it has begun” in the ‘truing up exercise’?
(b) Whether the impugned findings violate the principles and
methodology for tariff determination specified in the binding
DERC’s Tariff Regulations?
On Issue No.6
(a) Whether the impugned Findings on Issue No.6 are contrary to
the mandate of Sections 3, 61(b), (c), (d) and (e), 62, 64 (read
with the Tariff Policy) and 86(3) of the 2003 Act in terms of
which Tariff must ensure recovery of all costs of undertaking
distribution of electricity with reasonable return, rewarding
efficiency in performance?
(b) Whether the impugned findings are against settled law that
when a statute creates a legal fiction i.e. energy as sessed is
“deemed” to be consumed, the same has to be given effect to
with all its consequences i.e. same quantum of energy is to be
accounted for as supplied?
37. One of the substantial questions of law raised on four issues
(Issue Nos.1, 2, 3 and 5) is whether it is permissible to amend the tariff
order made under Section 64 of the 2003 Act during the ‘truing up’
exercise which needs to be answered before answering each of the
aforesaid issues.
38. Section 82 of the 2003 Act envisages the constitution of a
State Electricity Regulatory Commission. By virtue of Section 84 of the
Act, such State Commission comprises of a Chairperson and Members,
being persons possessing “ ability, integrity and standing who have
adequate knowledge of, and have shown capacity in, d ealing with
problems relating to engineering, finance, commerce , economics,
law or management”, with the Chairperson being a person who is, or
has been, a Judge of a High Court.
39. DERC, constituted under Section 82 of the 2003 Act, is an
expert body vested with wide powers and functions under the Act. This
includes the power to frame regulations and the power to dete rmine
tariff.
813
40. Under Section 86 of the 2003 Act, the State Commission
carries out various functions including determination of “ the tariff for
generation, supply, transmission and wheeling of el ectricity,
wholesale, bulk or retail, as the case may be, within the State”. The
process of determination of tariff in the present case, as pa rt of the
broader regulatory power of the Commission, is to be done in accordance
with Section 62 and 64 of the 2003 Act. As per Section 62, the Appropriate
Commission (the State Commission in the present case) shall determine
the tariff in accordance with the provisions of the Act for inter alia
retail supply of electricity.
41. In addition to the above functions, the State Commission is
also vested with the power to make regulations, under Section 181 of
the 2003 Act, - dealing with inter alia “the terms and conditions for
determination of tariff under Section 61” and “ issue of tariff order
with modifications or conditions under sub-section (3) of Section
64”.
42. It is pertinent to note that while framing the Regulations, the
State Commission is required to be guided by the principles specified in
Section 61 of the 2003 Act.
43. In framing such regulations, the Commission, as an expert
policy making body, is entrusted with the duty of striking a bal ance
between the various competing concerns and interests. This balance is
expressed in the DERC (Terms and Conditions for Determination of
Wheeling Tariff and Retail Supply Tariff) Regulations, 2007 (“2007 MYT
Regulations”) which are the relevant regulations governing the issues in
the present case.
44. DERC, for a given Multi-Year period (also called the Control
Period), frames regulations for determination of tarif f. DERC then
determines the ARR for the said Control Period in a Tariff Order known
as the Multi-Year Tariff Order based on the data available.
45. It is also necessary to note that sub-section (6) of Section 62
of the 2003 Act mandates that the Tariff Order shall continue to be in
force for such period as may be specified in the Tariff Orde r unless
amended or revoked. Therefore, if any of the parties are aggrieve d by
any of the clauses in the Tariff Order, they are at lib erty to seek its
amendment or revocation under this provision. Secondly, the said order
is also appealable under Section 111 of the 2003 Act before the Appellate
BSES RAJDHANI POWER LTD. v. DELHI ELECTRICITY
REGULATORY COMMISSION [S. ABDUL NAZEER, J.]
Tribunal and thereafter before this Court under Section 125. The Tariff
Order made under Section 64 is quasi-judicial in nature and it is binding
as-it-is on the parties unless it is amended or modified in a process
known to law.
46. Mr. Arvind Datar and Mr. Dhruv Mehta, learned senior counsel
appearing for the appellants have submitted that ‘truing u p’ cannot be
used to upset the methodology used for determination of ARR. According
to them, such a conduct essentially amounts to ‘changing the rules of the
game after the game has started’ or ‘changing the goal post’ with the
sole intention to deny legitimate allowances to the appellants. It is also
argued that ‘truing up’ stage is not an opportunity for the DERC to re-
think de novo on the basic principles, premises and issues involved in
the initial projections of revenue requirement of the licensee. It was also
argued that DERC has no unfettered power to control the tariff
determination process as well as ‘truing up’ exercise.
47. On the other hand, Mr. Nikhil Nayyar, learned senior counsel
appearing for the respondent-DERC, has submitted that one of the facets
of tariff determination exercise is the process of ‘truing up’. Since the
initial tariff order is prepared by the DERC based on projections submitted
by the Discoms with its ARR petition, the subsequent tariff o rder is
issued after the financial year pursuant to the ‘truing up’ exercise. The
process of ‘truing up’ requires the DERC to carry out a prudence check.
A prudence check is not a mere accounting or mathematical exercise. A
prudence check requires a scrutiny of reasonableness of the expenditure
incurred or proposed to be incurred by the Discoms and also such other
factors that the DERC considers appropriate for determination of tariff.
DERC being an expert body, due deference ought to be given to their
understanding as recorded in various regulations. It is argued tha t the
controlling factor throughout the entire ‘truing up’ exercise is the MYT
Regulations itself. It is further argued that the tariff determination exercise
carried out by the DERC is a continuous process. The tariff determination
exercise includes the initial tariff order - in the instant case it is 23.02.2008
--- a ‘truing up’ inter alia the ARR and Multi-Year Tariff Order for the
years, F.Y. 2007-08 to F.Y.2010-11, as well as the subsequent Tariff
Order dated 26.08.2011, inter alia, ‘true up’ for F.Y. 2008-09 and F.Y.
2009-10. Mr. Nayyar has placed reliance on the judgment of this Court
in Gujarat Urja Vikas Nigam Limited v. Tarini Infrastr ucture
Limited & Others 2 in support of his submissions.
2 (2016) 8 SCC 743
815
48. We have carefully considered the submissions of the learned
senior counsel for the parties. We have already noticed that the State
Electricity Regulatory Commissions constituted under Section 82 of the
2003 Act are a multi-member body comprising a Chairpe rson and
members being persons having adequate knowledge, of ability, integrity
and standing who have adequate knowledge, and have shown capacity,
in dealing with problems relating to engineering, finance, commerce,
economics, law or management, with the Chairperson being a pe rson
who is or has been Judge of a High Court. Under Section 86 of the 2003
Act, the State Commission carries out various functi ons including
determination of tariff for generation, supply, transmission and wheeling
of electricity in wholesale, bulk or retail as the case may be within the
State. The process of determination of tariff has to be done in accordance
with Sections 62 and 64 of the 2003 Act. It is well sett led that the
Commission (in this case, the DERC) performs a quasi-judicial function
while determining tariff. This has been expressly recognize d by the
Constitution Bench of this Court in PTC India Limited v. Central
Electricity Regulatory Commission, Through Secretary 3 as under:
“50. Applying the above test, price fixation exercise is rea lly
legislative in character, unless by the terms of a particular statute
it is made quasi-judicial as in the case of tariff fixation under Section
62 made appealable under Section 111 of the 2003 Act, though
Section 61 is an enabling provision for the framing of regulations
by CERC. If one takes “tariff” as a subject-matter, one finds that
under Part VII of the 2003 Act actual determination/fixation of
tariff is done by the appropriate Commission under Section 62
whereas Section 61 is the enabling provision for fra ming of
regulations containing generic propositions in accordance with
which the appropriate Commission has to fix the tariff. This basic
scheme equally applies to the subject-matter “trading margin” in
a different statutory context as will be demonstrated by discussion
hereinbelow.”
49. The DERC determines the tariff of the licensee under Section
62 in such a manner as determined by the 2007 MYT Regulations. This
function is governed, inter alia, by safeguarding all consumers’ interest
and at the same time recovering the cost of electricity i n a reasonable
manner, such that ‘distribution and supply of electricity are conducted
3 (2010) 4 SCC 603
BSES RAJDHANI POWER LTD. v. DELHI ELECTRICITY
REGULATORY COMMISSION [S. ABDUL NAZEER, J.]
on commercial principles’ which encourage and reward compet ition,
efficiency, economic use of resources, good performance and optimum
investments.
50. DERC determines ARR of the licensee i.e. costs of undertaking
the licensed business which are permitted in accord ance with the
requirement specified by DERC which is to be recovered from the tariff
in the year end. ARR determined by DERC is based on projectio ns.
Since the tariff and the ARR are regulated, the Discoms cannot recover
anything more than from its consumers than what is allowed by the
DERC.
51. As noticed above, a tariff order is quasi-judicial in nature which
becomes final and binding on the parties unless it is amended or revoked
under Section 64(6) or set aside by the Appellate Authority. Apart from
this, we are also of the view that at the stage of ‘truing up’, t he DERC
cannot change the rules/methodology used in the initial tariff determination
by changing the basic principles, premises and issues involve d in the
initial projection of ARR.
52. ‘Truing up’ has been held by APTEL in SLDC v. GERC4 to
mean the adjustment of actual amounts incurred by the Licensee against
the estimated/projected amounts determined under the ARR. Concept
of ‘truing up’ has been dealt with in much detail by the AP TEL in its
judgment in NDPL v. DERC5 wherein it was held as under:-
“60. Before parting with the judgment we are constrained to
remark that the Commission has not properly understood th e
concept of truing up. While considering the Tariff Petition of the
utility the Commission has to reasonably anticipate the Revenue
required by a particular utility and such assessment should be
based on practical considerations. … The truing up exercise is
meant (sic) to fill the gap between the actual expenses at the end
of the year and anticipated expenses in the beginning of the year.
When the utility gives its own statement of anticipated expenditure,
the Commission has to accept the same except where the
Commission has reasons to differ with the statement of the utility
and records reasons thereof or where the Commission is able to
suggest some method of reducing the anticipated expenditure.
4 2015 SCC Online APTEL 50 [Para. 17]
5 2007 ELR (APTEL) 193
817
This process of restricting the claim of the utility by not allowing
the reasonably anticipated expenditure and offering to do the
needful in the truing up exercise is not prudence.”
53. This view has been consistently followed by the APTEL in its
subsequent judgments and we are in complete agreement with the above
view of the APTEL. In our opinion, ‘truing up’ stage is not an opportunity
for the DERC to rethink de novo on the basic principles, premises and
issues involved in the initial projections of the revenue requirement of
the licensee. ‘Truing up’ exercise cannot be done to retrospectively change
the methodology/principles of tariff determination and re -opening the
original tariff determination order thereby setting the tariff determination
process to a naught at ‘true-up’ stage.
54. In Gujarat Urja Vikas Nigam Ltd. (supra), this Court was
considering a case where tariff was incorporated in the power purchase
agreement between a generating company and a distribution lice nsee.
This Court held that it is not possible to hold that the tariff agreed by and
between the parties, though finding a mention in a contractual context, is
the result of an act of volition of the parties which can, in no case, be
altered except by mutual consent. We are of the view that this judgment
is not applicable to the facts of the present case.
55. Revision or re-determination of the tariff already determined
by DERC on the pretext of prudence check and truing up would amount
to amendment of the tariff order, which can be done only as per the
provisions of sub-Section (6) of Section 64 of the 2003 Act within the
period for which the Tariff Order was applicable. In our view, D ERC
cannot amend the tariff order for the period 01.04.2008 to 31.03.2010 in
the guise of ‘true-up’ after the relevant financial year i s over and the
same is replaced by a subsequent tariff Order. This would amount to a
retrospective revision of tariff when the relevant period for s uch tariff
order is already over. Therefore, we hold that it is not permiss ible to
amend the tariff order made under Section 64 of the 2003 Act during the
‘truing up’ exercise.
56. Issue Nos. 1, 2, 3, and 5: We have already noticed that one
of the substantial questions of law involved in Issue Nos.1, 2, 3 and 5 is
whether the Regulator can ‘change the rules of the game after it has
begun’ in the ‘truing up exercise’.
BSES RAJDHANI POWER LTD. v. DELHI ELECTRICITY
REGULATORY COMMISSION [S. ABDUL NAZEER, J.]
57. Issue No. 1: In the original MYT determination (Tariff Order
dated 28.05.2009), the DERC took into account the full late payment
surcharge (‘LPSC’) revenue as also the DVB arrears while computing
the targets of Collection Efficiency as under:-
“3.10. An analysis of the components of AT&C loss level
indicates that the revenue collection on account of sale of energy
was Rs.2810.3 Crs. However, this amount could not be verified
from the audited accounts of the petitioner. The petitioner has,
instead, submitted a daily collection sheet to substantiate its
collection of Rs.2810.3 Crs.
3.11 The Commission is not receptive to the methodology of
verifying the collection from the Daily Collection Sheet a s
proposed by the petitioner. Accordingly, the petitioner was
directed during the validation session to reconcile the amount
of cash collected bases on the opening levels of debtors, sales
made during the year, DVB arrears collected and the closing
level of debtors, with the total collections shown for FY 07-08.
However, the petitioner expressed inability to reconcile t he
figures using this methodology.
3.12. The petitioner was, thereafter, directed to provide a copy
of the daily collection sheet duly audited by its Statu tory
Auditors. The petitioner was also directed that the Statuto ry
Auditors should establish that the amount mentioned in the Daily
Collection Sheet does not included any collections on account
of other sources of revenue like sale of power through bilateral,
intra-state, UI, etc. and revenue from operations (non-energy).
3.13. In response to the above, the petitioner submitted a copy
of its Statutory Auditor’s certificate certifying the Day -wise
Collection Statement for FY 07-08 vide its letter no.RCM/08-
09/245 dated 16th February, 2009. The Certificate clarified the
exclusion of collections made on account of trading of energy,
non-energy charges, subsidy received from GoNCTD, etc. and
inclusion of LPSC, electricity duty, amount collected by BYPL
on behalf of BRPL, etc.
3.14. Accordingly, based on the clarifications provided in the
statutory auditor’s certificate and the audited fin ancial
statements, the amount mentioned in the Daily Collection Sheet
submitted by the petitioner has been taken into account.
819
…
3.24. In the light of the above background, the revised AT&C
loss levels of the petitioner for the first year of the Control
Period i.e. FY 07-08 is as summarized in the Table 6 below:
Table 6: Trued-up AT&C loss for FY 07-08 (Rs.crs.)
Particulars Amount
Add:
Theft Collection 60.4
Subsidy 48.4
Rebate 47.8
DVB Arrears collected from Government
Bodies by DPCL
64.5
Total Other Collections during FY 07-08 221.0
(A) Total Collections in FY 07-08 3031.27
(B) Billed Revenue considered for AT&C 2889.99
(C) Collection Efficiency (A/B) 104.89%
Distribution Loss Level FY 07-08 30.89%
AT&C Loss for FY 07-08 27.51%”
58. However, while truing up for the year in question, the DERC
has retrospectively sought to take away part of the LPSC reven ue by
deducting the Financing Cost on LPSC in comparing the actual Collection
Efficiency with the projected Collection Efficiency. Hence, allowing the
Financing Costs on LPSC revenue and then deducting it from the LPSC
revenue would tantamount to giving by one hand and taking it away by
the other. This order of the DERC is contrary to the original MYT
determination.
59. Issue No.2 : In the Original Determination Order dated
28.05.2009 (F.Y. 2008-09), DERC has allowed depreciation on the assets
funded by consumer contributions. However, DERC cha nged the
methodology of computation of ARR at the stage of true up. According
to the learned counsel for the respondent, DERC had inadvertently made
an error and adopted an approach contrary to the mandate of 2007 MYT
Regulations while computing the depreciation when originally issuing
the tariff order, which was rectified in the true up exerci se. However,
learned counsel for the appellants submit that no error has been committed
by the DERC in the tariff order dated 28.05.2009 and it is only after
considering the relevant MYT Regulations that depreciat ion to the
BSES RAJDHANI POWER LTD. v. DELHI ELECTRICITY
REGULATORY COMMISSION [S. ABDUL NAZEER, J.]
appellants on the assets that were funded by consumer contributi ons
was allowed.
60. Perusal of the Tariff Order dated 28.05.2009 would clearly
indicate that after considering the contentions of the parties the aforesaid
depreciation has been allowed. We have already held tha t it is not
permissible to amend the tariff order during true up exercise. O n the
pretext of prudence check and truing up, DERC could not have amended
the tariff order.
61. Issue No.3 : During projection of expenses for the entire
control period, the Tariff Order dated 23.02.2008 had projected employee
expenses considering inter alia the impact of the anticipated Sixth Central
Pay Commission Report. The relevant portion of the said Tariff Order is
as under:
“4.99 The Petitioner has submitted the employee expenses for
FY07 as Rs 137.60 Cr and has considered the same as the
base for the Control Period. The Petitioner has con sidered
the following factors while projecting the escalati on factor
for the employee expenses for the Control Period:
(a) Anticipated 6th Pay Commission report
(c) Research of lead HR consultants on salary trend s in the
country
(c) Initiatives undertaken to retain quality manpow er and
demand for employees in the power industry.
(d) Inflation during last 12 months € increase in employees to
cater to growth of consumers.
4.100 The Petitioner has projected its total employee expens es
for the Control Period considering different escalat ion rates
for different components of the employee expenses. The annual
growth rates for various components of employee exp enses
as proposed by the Petitioner are given below:
(a) Basic Salary: The year on year increase in basi c salary
for all the employees during the Control Period has been
estimated at 23.2%, 11.1%, 11.3%, and 11.5% for FY08 ,
FY09, FY10 and FY11 respectively.
(b) Dearness Allowance (DA): Annual estimated increa se in
DA is considered as 9%, 6%, 6%, and 6% for FY08, FY 09,
FY10 and FY11 respectively.
821
(c) Terminal Benefits: Contribution to terminal ben efits/
liability fund is considered at 26% of basic salary and
dearness allowance for each year of the Control Per iod.
(d) Other Allowances and expenses including HRA: Considered
in proportion to the basic salary.”
62. The DERC, while projecting employee expenses for the entire
control period in its MYT Tariff Order dated 23.02.2008, had categorically
acknowledged the uncontrollable nature of the Sixth Central Pay
Commission Report as well as the impact of the same on the salaries of
FR&SR employees and held that since the salary of FR&SR employees
was an uncontrollable item and that it would be trued up on actuals as
under:
“4.108 During the privatization process, part of the employ ees
of the erstwhile DVB were transferred to BRPL. As p er the
Transfer Scheme, the terms and conditions of servic e
applicable to the erstwhile Board employees in the Transfe ree
Company shall in no way be less favourable than or inferior
to that applicable to them immediately before the T ransfer.
Further, their services shall continue to be governed by variou s
rules and laws applicable to them prior to privatization. Thu s
the salary/compensation and promotion of the erstwhile DVB
employees in BRPL are still governed by the rules a nd pay
scales as specified by the GoNCTD.
4.109 In consideration of the above, the Commission has
recognized the uncontrollable nature of the 6 th Pay
Commission recommendations in determination of empl oyee
expenses during the Control Period. The Commission has
assumed that the revision in pay, if any, shall be applicable
from January 1, 2006. The Commission has considered an
increase of 10% in total employee expenses for the values in
FY06 (3 months) and FY07 due to the same.
…
4.112 Similarly, the increase in salaries has been consi dered
for each year, but the impact of such increase has only been
taken from FY09 onwards. The Commission shall true-up the
impact on account of 6 th Pay Commission recommendations
based on the actual impact of the same.
BSES RAJDHANI POWER LTD. v. DELHI ELECTRICITY
REGULATORY COMMISSION [S. ABDUL NAZEER, J.]
4.113 The summary of the revised employees expenses
considering the effect of 6 th Pay Commission recommendations
is given below:
Table 72: Revised Employee Expenses for FY06 and FY 07
(Rs Cr)
Particulars FY06 FY07
Employee Cost Approved in True up 167.54 184.05
Less: SVRS Amortization approved (46.41) (46.45)
Net Employee Expenses 121.13 137.60
Employee expenses pertaining to DVB
employees
75.64 85.92
Employee expenses pertaining to Non-DVB
employees
45.50 51.68
10% escalation due to Pay Commission
recommendations
1.89 8.60
Revised Employee Expenses 123.02 146.19
4.114 For the calculation of the employee expenses for the
Control Period, the Commission has considered the following:
(a) Revised employee expenses for the base year hav e been
escalated as per the escalation factors mentioned in Table 67
to arrive at the employee expenses for the Control Period .
(b) All arrears due to the impact of the 6 th Pay Commission
recommendations would be payable in FY09. For the purpose
of projecting the arrears arising due to recommenda tion of
the 6 th Pay Commission for FY08, the Commission has
considered the difference between the employee expenses for
FY08 arrived by escalating the revised employees ex penses
for FY07 (i.e. Rs 146.19 Cr) and the employees expenses f or
FY08 arrived by escalating the trued up employee ex penses
(net of SVRS amortization) for FY07 (i.e. Rs 137.60 Cr).”
63. However, contrary to its own undertaking, the DERC in Tariff
Order dated 26.08.2011 has erroneously changed its own methodology
at the stage of truing up, by not allowing employee expenses of FR/SR
employees as per actuals. The DERC, at the stage of truing up, has
changed the methodology and disallowed the actual salary of FR&SR
employees, which is impermissible. The DERC in the Tariff Order dated
26.08.2011 has acted contrary to its own undertaking of truing up the
impact of employee expenses on account of the Sixth Central Pay
Commission Report.
823
64. Issue No.5 : This issue is in relation to disallowance of fringe
benefit tax. The DERC has allowed fringe benefit tax in the MYT Order
dated 23.02.2008. Relevant extract of the MYT Order dated 23.02.2008
is as under:
“Commission’s Analysis
4.242 The Commission is of the opinion that project ing the
actual tax liability for the Control Period is diff icult and
complex. Thus for simplicity, the Commission provis ionally
approves Rs 5.00 Cr each year towards income tax and fringe
benefit expenses. The Commission would, however, true-up
the tax expenses based on the actual tax liability at the e nd of
each year of the Control Period.The Commission has allocated
the tax expenses into Wheeling and Retail Supply in the rati o
of 20:80, respectively.”
65. The DERC, at the stage of truing up for the F.Y. 2008-09, has
changed the methodology and disallowed the fringe benefit tax incurred
by the appellants.
66. We have already taken a view that DERC cannot re-open the
basis of determination of tariff at the stage of ‘truin g up’. Revision or
redetermination of the tariff already determined by the DERC on the
pretext of prudence check and truing up would amount to amendment of
tariff order, which is not permissible in law. Truing up stage is not an
opportunity for DERC to re-think de novo the basic principles, premises
and issues involved in the initial projection of the revenue requirements
of the licensee.
67. Therefore, the findings of the DERC, as confirmed by the
APTEL in the impugned order, on issue nos. 1, 2, 3 and 5 are contrary to
the order of the original MYT determination (Tariff Order( s) dated
23.02.2008 and 28.05.2009) which are accordingly set aside. In view of
the above, it is unnecessary for us to consider the other su bstantial
questions of law on the aforesaid four issues.
68. Issue No.4: This issue relates to disallowance of interest
incurred on Consumers Security Deposit retained by De lhi Power
Company Limited (‘DPCL’). The DERC in the tariff or der dated
26.08.2011 has disallowed the interest on Consumers Security Deposit
paid for pre-privatization period received by DVB, which is y et to be
transferred to the appellants. The APTEL has confirmed this order of
BSES RAJDHANI POWER LTD. v. DELHI ELECTRICITY
REGULATORY COMMISSION [S. ABDUL NAZEER, J.]
the DERC. It is to be stated here that, at the time of unbu ndling of the
erstwhile DVB (w.e.f. 01.07.2022), the quantum of Consumers Security
Deposit reflected in the opening balance-sheet notified in terms of
statutory transfer scheme, was not transferred by the DPCL (the Holding
Company wholly owned by the Government of NCT of Delhi) to the
appellants and other successor private Discoms. The appell ants being
distribution licensees under the 2003 Act are requi red to and are
continuing to pay interest on the said Consumers Security Deposi t in
terms of Section 47(4) of the 2003 Act even though the principal sum
was never transferred to them in its entirety by DPCL.
69. The DERC by its order dated 23.04.2007 has held that it does
not have power to issue any directions to DPCL.
70. Learned counsel for the respondent-DERC submits that the
appellants have sought transfer of deposits along with interest from DPCL
and the issue of DPCL to make this payment is pending before the Delhi
High Court in W.P. (Civil) No.2396/2008. It is further submitted that,
should the appellants succeed in their claim against DPCL and receive
the deposit amount along with interest, the amount would be made over
to the appellants along with interest. As such, if the expenses were to be
presently allowed in the ARR, and interest burden was passed on to the
consumers presently, the Discoms would, in effect, receive double benefit
at the time of disposal of the writ petition since the cons umers would
have already borne the costs of interest which would also be then made
over by DPCL to the appellants. It is argued that, as a Regulator , it is
incumbent upon the DERC to protect the consumers’ interest.
71. We are of the view that disallowing interest paid by the
appellants towards Consumers Security Deposit held by DPCL i n the
ARR of the appellants is wholly misconstrued. Interest on consumers’
deposit which is being paid by the appellants is a legitimate expense. It is
not in dispute that the security deposit was not transferred by the DPCL
to the appellants. However, the appellants were required to b ear the
costs of the same. In case, the principal sum on Consumers Securi ty
Deposit held by DPCL is transferred to the appellants with interest, the
appellants would, subject to their legitimate expenditure s, retain such
interest and benefit of any balance of excess interest receive d by the
appellants would be passed on to the consumers in tariff. Ther efore,
there is no merit in the contention of the learned counsel for the respondent
that if the interest burden is passed on to the consumers pres ently, the
appellants would, in effect, receive a double benefit in case they succeed
in the writ petition pending before the High Court.
825
72. Therefore, we hold that the appellants are entitled to recover
interest on Consumers Security Deposit as held by the DPCL. We direct
the DERC to allow the interest on Consumers Security Deposit held by
the DPCL and impact thereof to the appellants. The findings of the
DERC and the APTEL in this regard are set aside.
73. Issue No.6: This issue pertains to enforcement sales i.e.
sales which are deemed to have been occurred in cases of e lectricity
theft. The question for consideration is whether the impugned findings in
the order of the APTEL are against the legal principle that when the
statute creates a legal fiction i.e. energy assessed is ‘ deemed’ to be
consumed, the same has to be given effect to with all its consequences
i.e. same quantum of energy is to be accounted for as supplied?
74. Electricity transmitted may be stolen or used unauthorizedly.
While theft/unauthorized use was approximately 60% before privatization,
it has now been brought down to 7 to 8%. Unauthorized use and theft
are dealt with in Section 126 of the 2003 Act, relevant clauses whereof
are as under:
“Section 126: (Assessment): — (1) If on an inspection of any
place or premises or after inspection of the equipments, gadgets,
machines, devices found connected or used, or after inspection of
records maintained by any person, the assessing officer comes to
the conclusion that such person is indulging in unauthorized use of
electricity, he shall provisionally assess to the best of his
judgement the electricity charges payable by such per son
or by any other person benefited by such use.
[…]
[(5) If the assessing officer reaches to the conclus ion that
unauthorised use of electricity has taken place, the assessmen t
shall be made for the entire period during which such unauthorized
use of electricity has taken place and if, however, the period during
which such unauthorised use of electricity has taken place cannot
be ascertained, such period shall be limited to a period of twelve
months immediately preceding the date of inspection.]
(6) The assessment under this section shall be made at a
rate equal to twice the tariff rates applicable for the relevant
category of services specified in sub-section (5).”
(Emphasis supplied)
BSES RAJDHANI POWER LTD. v. DELHI ELECTRICITY
REGULATORY COMMISSION [S. ABDUL NAZEER, J.]
75. The Vigilance/Enforcement Department detects th eft/
unauthorized use of electricity. After giving due opportunity, the bills are
generated for electricity stolen/unauthorized use. Th ese are called
enforcement sales/assessed sales. The statutory charge for such theft/
unauthorized use is twice the normal rate.
76. While settling enforcement cases of small consumers, Lok
Adalats often provide discounts to errant consumers on the asse ssed
equivalent of the rupee amount and not on the assessed units of energy.
The assessment of units of energy as deemed to be sales to the consumers
is in accordance with Section 126 of the 2003 Act read with provisions
for such assessment specified by the DERC itself.
77. In a particular case of unauthorized use of electricity under
Section 126, suppose using the ‘LDHF formula’ (specified by DERC
itself), the appellants assess the consumer as having consumed 100 units
of electricity.
(a) By virtue of the Supply Code Regulations framed by the
DERC itself, these 100 units are to be treated as “sales”.
(b) Upon the assessment of 100 Units, the Appellant raises a
bill on the said consumer. Under Section 126 of the
Electricity Act, the bill has to be raised at twice the normal
billing rate. If the normal ABR were Rs. 5 per Unit, the
Section 126 Bill will be raised for Rs 1,000 (i.e. 100×[Rs
5×2]);
(c) By virtue of a Settlement which is entered into betwee n
the Appellant and the consumer before the Lok Adalat etc.,
suppose the Appellant agrees to give up Rs 200, the
Appellant then recovers Rs 800/- rather than Rs 1,000/-.
(d) Now, though the settlement is only for the Rupee equivalent
of the Assessed Bill and not the ‘Units sold’, the DERC
now takes Rs 800, divides it by Rs 10 (i.e. twice the ABR)
and arrives at an imaginary ‘sales’ figure of electrical energy
of 80 Units.
(e) This is in complete contrast to the Assessment of Energ y
sold of 100 Units in terms of the LDHF Formula specified
by the DERC itself according to which the sales are
“deemed to be” 100 units.
(f) Therefore, by entering into a settlement before the Lok
Adalat (which is in harmony with the entire Lok Adalat
827
philosophy), the Appellant first loses Rs 200 in monetary
terms and then loses 20 Units of electricity which t he
Appellant is deemed to have sold such consumer in the
first place.
78. Learned counsel for the appellants submit that when the statute
creates a legal fiction, i.e. energy assessed is deem to be consumed, the
same has to be given effect to with all its consequences i.e. same quantum
of energy is to be accounted for as supplied. However, learned counsel
appearing for the respondent DERC submitted that that concurrent findings
of the DERC and the APTEL cannot be reversed and the methodology
adopted by the Commission has to be maintained.
79. Having considered this question in detail, we ar e not in
agreement with the stand taken by the respondent. We are of t he view
that the methodology adopted by the DERC is contrary to the s ettled
principle of law that when the law deems a certain imaginar y state of
affairs as real, DERC would not let its imagination boggle at treating the
100 units as sales. We are of the view that such imaginary s tate of
affairs must be taken to its logical end and commend the tre atment of
100 units as ‘sales’.
80. We are of the view that the assessed energy has to be
considered as supply by the appellants in enforcement cases. Therefore,
we direct the DERC to consider assessed energy for calculat ion of
enforcement sales and allow the impact of the same along with carrying
costs. In view of our conclusion as above, we do not deem it necessary
to answer the other contentions on this issue.
81. The substantial questions of law are answered accordingl y.
Resultantly, the appeals are allowed and the order(s) of the DERC and
the judgment of the APTEL impugned herein, to the extent mentioned
above. are hereby set aside. Parties to bear their respe ctive costs.
Nidhi Jain Appeals allowed.
(Assisted by : Tamana, LCRA)
BSES RAJDHANI POWER LTD. v. DELHI ELECTRICITY
REGULATORY COMMISSION [S. ABDUL NAZEER, J.]