D. Swamy v. Karnataka State Pollution Control Board and Ors
INDIRA BANERJEE, J.
This appeal, under Section 22 of the National Green Tribunal Act
2010, is against a final order dated 10th May 2017 passed by the National
Green Tribunal, Southern Zone, Chennai, dismissing the Applicat ion
No.169 of 2016 (SZ) filed by the Appellant under Section 18(1) read
with Section 14 of the National Green Tribunal Act 2010, whereby the
Appellant had prayed for a direction for closure of the C ommon Bio-
Medical Waste Treatment Facility run by the Respondent No.3, on the
ground of alleged non-compliance of the provisions of the Environmental
Impact Assessment Notification 2006, hereinafter referred to as “the
2006 EIA Notification” as amended on 17th April 2015.
D. SWAMY V. KARNATAKA STATE POLLUTION CONTROL
BOARD AND ORS.
2. In the meanwhile, by a notification being S.O. 327 (E) dat ed
10th April 2001, published in the Gazette of India on 12th April 2001, the
Central Government has delegated the powers vested in i t under the
Environment (Protection) Act, 1986 (EP Act) to the Chairpersons of the
respective State Pollution Control Boards/Committees to issue directions
to any industry or any local or other authority to prevent violation of the
Rules.
3. On or about 25th February 2012, the Respondent No.3 applied
to the Respondent No.1, Karnataka State Pollution Cont rol Board
(hereinafter referred to as “KSPCB”) for consent to establish a Common
Bio-Medical Waste Treatment Facility over the land bearing Survey No.
82 and 38/2 at Gujjegowdanapura village, Jayapura Hobli, Mysore Taluk
and District.
4. By a letter dated 24 th November 2012, the Respondent No.1
KSPCB accorded consent to the Respondent No.3 to est ablish the
Common Bio-Medical Waste Treatment Facility under the provisions of
the Water (Prevention and Control of Pollution) Act, 1974 and the Air
(Prevention and Control of Pollution) Act, 1981 for collection, reception,
transportation, treatment and disposal of Bio-Medical Waste. The said
consent was valid for a period of five years.
5. It appears that M/s Shree Consultant who had been operating
a Common Bio-Medical Waste Treatment Facility at Survey No.25 at
Mysore and had been collecting Bio-Medical Waste from four districts
could not collect Bio-Medical Waste from the district of Hassan because
of the Common Bio-Medical Waste Treatment Facility established by
the Respondent No.3.
6. M/s Shree Consultant filed appeals bearing Nos.48 and 49 of
2012 before the Karnataka State Environment Appellate Au thority,
Bangalore challenging the consent granted to the Respondent No.3 t o
establish the Common Bio-Medical Waste Treatment Fa cility. The
Karnataka State Environment Appellate Authority, Bangalore grant ed
an interim stay of the order granting consent to the Respondent No.3 to
establish the Common Bio-Medical Waste Treatment Facility. Ultimately
however, the appeal was dismissed by a common judgment and orde r
dated 20th April 2013.
7. M/s Shree Consultant filed Appeal Nos. 46-47 of 2013 before
the National Green Tribunal, Southern Zone, Chennai against the common
judgment and order dated 20th April 2013 passed by the Karnataka State
553
Environment Appellate Authority, Bangalore in Appeal Nos.48-49 of
2012.
8. By a judgment and order dated 28 th November 2013, the
Principal Bench of the National Green Tribunal at New Delhi held that
Bio-Medical Waste Treatment Plants were required to obtain an
Environmental Clearance (EC) from the Ministry of Environment and
Forests, Government of India, hereinafter referred to as “MoEF&CC”,
in terms of Entry 7(d) of the Notification dated 14 th September 2006.
The National Green Tribunal had also directed the parties who had been
running Common Bio-Medical Waste Treatment Facilities to apply to
the MoEF&CC for EC.
9. On 26 th February 2014, the Central Pollution Control Board
issued guidelines for Common Bio-Medical Waste Treatment Facilities.
On 14th July 2014, the National Green Tribunal, Southern Zone, Chennai
passed a judgment and order dismissing Appeal Nos. 46-47 of 2013 filed
by M/s Shree Consultant and held that the Respondent No.1 had rightly
given consent to the Respondent No.3 for establishing its Common Bio-
Medical Waste Treatment Facility.
10. On 4th March 2015, the Respondent No.3 applied for grant of
consent to operate the Common Bio-Medical Waste Facility under the
provisions of the relevant Water Pollution and Air Pollution Acts.
11. On 17th April 2015, MoEF&CC amended the Notification dated
14th September 2006, in view of the Judgment dated 28 th November
2013 passed by the National Green Tribunal, Principal Bench, New Delhi
in Appeal No. 63 of 2012. By the amendment Entry 7(da) was inserted
after Entry 7(d) in the Schedule. Entry 7(da) provided that Comm on
Bio-Medical Waste Treatment Facilities would be required to obtain EC
from the Ministry of Environment and Forest.
12. It appears that on 13 th July 2015, the villagers of the
Gujjegowdanapura, Manadalli, Harohalli, Chunchunarayahundi, Kallahalli,
Arinakere, Mahadevpura at Jayapura Hobli, Mysore ma de a
representation to the Respondent No.1 seeking an order banning the
establishment of Common Bio-Medical Waste Treatment Facility by the
Respondent No.3.
13. Thereafter, the Respondent No.1 issued notices to the Common
Bio-Medical Waste Treatment Facility of the Respondent No.3, calling
upon it to submit a report of compliance of pollution norms.
D. SWAMY V. KARNATAKA STATE POLLUTION CONTROL
BOARD AND ORS. [INDIRA BANERJEE, J.]
14. On 1st December 2015, the State Level Environment Impact
Assessment Authority, Karnataka (SEIAA) issued directi ons to the
Respondent No.1 under Section 5 of the Environment (Protection) Act,
1986 to issue consent for operation of the Common Bio-Medical Waste
Treatment Facility and other projects attracting the 2006 EIA Notification
and the amendments thereto.
15. By its letter dated 28th December 2015, the Respondent No.1
instructed all the concerned officers of the KSPCB that application for
consent to establish or operate projects attracting the 2006 EIA
Notification and amendments thereto were to be received by the KSPCB
only if EC was attached to the application.
16. On 19th January 2016, the Respondent No.3 resubmitted its
application for consent to operate the Common Bio-Medical Waste
Treatment Facility, which had earlier been returned by the Respondent
No.1. On 11 th February 2016, the Respondent No.1 granted the
Respondent No.3 consent to operate its Common Bio-Medical Wast e
Treatment Facility at Gujjegowdanapura village, Jayapura Hobli in Mysore
district. The said consent was valid for the period from 1st July 2015 to
30th June 2016.
17. The Appellant filed Appeal No.3 of 2016 before the Karnataka
State Environment Appellate Authority under Section 28 of the Water
(Prevention and Control of Pollution) Act, 1974 challenging the consent
to the Respondent No.3 to operate the Common Bio-Medical Waste
Treatment Facility. Very soon thereafter the MoEF&CC revi sed the
Bio-Medical Waste (Management and Handling) Rules 1998 u nder
Section 6, 8 and 25 of the EP Act.
18. The Appeal No.3 of 2016 filed by the Appellant before the
Karnataka State Environment Appellate Authority, against the consent
order dated 11th February 2016 passed by the Respondent No.1 came to
be withdrawn by the Appellant because the said appeal had be come
infructuous in view of the expiration of the period of consent to operate
granted to the Respondent No.3 on 30th June 2016.
19. By an order dated 17 th August 2016, the National Green
Tribunal, Southern Zone, Chennai directed that the application for renewal
of consent to operate, pending before the Respondent No.1 might be
processed in accordance with law subject to the final ord er passed by
the Tribunal.
555
20. Pursuant to the aforesaid order dated 17 th August 2016, the
Respondent No.1 renewed the consent order to operate the Common
Bio-Medical Waste Treatment Facility in favour of the Respondent No.3
which was valid for the period from 17th August 2016 to 30th June 2021.
21. In exercise of power under Section 3(1) and Section 3(2)(v)
of the EP Act read with Rule 5(3)(d) of the EP Rules, the Central
Government issued a Notification being S.O. 804(E) dated 14 th March
2017 which provides for grant of ex post facto EC for project proponents
who had commenced, continued or completed a project without obtaining
EC under the EP Act/EP Rules or the Environmental Impact Notification
issued thereunder. Paragraphs 3, 4 and 5 of the said notification, read as
hereunder:
“(3) In cases of violation, action will be taken ag ainst the
project proponent by the respective State or State P ollution
Control Board under the provisions of section 19 of the
Environment (Protection) Act, 1986 and further, no c onsent
to operate or occupancy certificate will be issued till the
project is granted the environmental clearance.
(4) The cases of violation will be appraised by respective sector
Expert Appraisal Committees constituted under sub-s ection
(3) of Section 3 of the Environment (Protection) Ac t, 1986
with a view to assess that the project has been construct ed at
a site which under prevailing laws is permissible a nd
expansion has been done which can be run sustainably under
compliance of environmental norms with adequate
environmental safeguards; and in case, where the findi ng of
the Expert Appraisal Committee is negative, closure of the
project will be recommended along with other actions un der
the law.
(5) In case, where the findings of the Expert Appra isal
Committee on point at sub-para(4) above are affirmative, th e
projects under this category will be prescribed the appropr iate
Terms of Reference for undertaking Environment Impa ct
Assessment and preparation of Environment Managemen t
Plan. Further, the Expert Appraisal Committee will prescr ibe
a specific Terms of Reference for the project on ass essment
of ecological damage, remediation plan and natural and
D. SWAMY V. KARNATAKA STATE POLLUTION CONTROL
BOARD AND ORS. [INDIRA BANERJEE, J.]
community resource augmentation plan and it shall be prepared
as an independent chapter in the environment impact
assessment report by the accredited consultants. The collect ion
and analysis of data for assessment of ecological d amage,
preparation of remediation plan and natural and communit y
resource augmentation plan shall be done by an environmental
laboratory duly notified under Environment (Protection) Ac t,
1986, or a environmental laboratory accredited by Nati onal
Accreditation Board for Testing and Calibration Laboratories,
or a laboratory of a Council of Scientific and Indu strial
Research institution working in the field of environ ment.”
22. The Notification of 2017 is a valid statutory notification issued
by the Central Government in exercise of power under Sect ions 3(1)
and 3(2)(v) of the EP Act read with Rule 5(3)(d) of the EP Rules in the
same manner as the EIA Notification dated 27th January 1994 and the
Notification dated 14th September 2006.
23. Section 21 of the General Clauses Act, 1897 provides tha t
where any Central Act or Regulations confer a power to issue
notifications, orders, rules or bye-laws, that power includes the power,
exercisable in the like manner, and subject to like sanction and conditions,
if any, to add to, amend, vary or rescind any notification, order, rule or
bye-law so issued. The authority, which had the pow er to issue
Notifications dated 27 th January 1994 and 14 th September 2006
undoubtedly had, and still has the power to rescind or modify or amend
those notifications in like manner. As held by this Court in Shree Sidhbali
Steels Ltd. & Others v. State of Uttar Pradesh & Ot hers1, power
under Section 21 of the General Clauses Act to amend, vary or rescind
notifications, orders, rules or bye-laws can be exercised f rom time to
time having regard to the exigency.
24. Puducherry Environment Protection Association filed a Writ
Petition being W.P. No.11189 of 2017 in the High Cour t of Madras
assailing the said notification dated 14 th March 2017. By a judgment
and order dated 13th October 2017, a Division Bench of the High Court
refused to interfere with the said notification, holding that the impugned
notification did not compromise with the need to preserve environmental
purity.
1 (2011) 3 SCC 193
557
25. The MoEF&CC issued a draft Notification dated 23rd March
2020 which was duly published in the Gazette of India Extr aordinary
Part II. The Notification was proposed to be issued in exercise of powers
conferred by subsection (1) and clause (v) of sub-section (2) of Section
3 of the EP Act for dealing with cases of violation of the notification with
regard to EC. It was proposed that cases of violation would be appraised
by the Appraisal Committee with a view to assess whether t he project
had been constructed or operated at a site which was permissible under
prevailing laws and could be run sustainably on com pliance of
environmental norms with adequate environmental safeguards. Closure
was to be recommended if the findings of the Appraisal Committee were
in the negative. If the Appraisal Committee found that such unit had
been running sustainably upon compliance of environmental norms with
adequate environment safeguards, the unit would be prescribed
appropriate Terms of Reference (TOR) after which the p rocedure for
grant of EC would follow.
26. The appeal has been opposed by the KSPCB. On behalf of
the KSPCB, it is submitted that the appeal is liable to be dism issed on
the ground of delay of 62 days in filing the appeal. Reasons for the delay,
it is submitted, does not make out sufficient cause for the ino rdinate
delay. It is next contented that there is no substantial question of law of
general importance involved in this appeal. The appeal is l iable to be
dismissed on that ground. It is also contended that the appeal suf fers
from suppression of facts. On behalf of KSPCB, it is contended that the
2015 amendment dated 17 th April 2015 to the EIA Notification is
prospective in the light of the law laid down in Narmada Bachao
Andolan v. Union of India2. The Respondent No.3 had applied to the
KSPCB for consent to operate before the EIA Notification dated 17 th
April 2015, for no prior ECl was required for projects whic h came to
existence after 14th September 2006 but before 17th April 2015.
27. On 21st December 2016, the Central Pollution Control Board,
MoEF&CC, Government of India issued revised guidelines for Common
Bio-Medical Wastes Treatment and Disposal Facility.
28. By final judgment and order dated 10 th May 2017, which is
impugned in this appeal, the National Green Tribunal has dismissed the
appeal filed by the Appellant, with the observation that the Respondent
No.3 could not be directed to be closed down for want of EC.
2 (2000) 10 SCC 664
D. SWAMY V. KARNATAKA STATE POLLUTION CONTROL
BOARD AND ORS. [INDIRA BANERJEE, J.]
29. By an Office Memorandum, being F. No. 22-21/2020-1A III,
dated 7th July 2021, the MoEF&CC issued Standard Operating Procedure
(SoP) for identification and handling of violation cases under 2006 EIA
Notification.
30. The said Office Memorandum, inter alia, reads:
“The Ministry had issued a notification number S.O.804( E),
dated the 14 th March, 2017 detailing the process for grant of
Terms of Reference and Environmental Clearance in respec t
of projects or activities which have started the work on site
and/or expanded the production beyond the limit of Prior EC
or changed the product mix without obtaining Prior EC under
the EIA Notification, 2006.
2. This Notification was applicable for six months fro m the
date of publication i.e. 14.03.2017 to 13.09.2017 and further
based on court direction from 14.03.2018 to 13.04.201 8.
3. Hon’ble NGT in Original Application No.287 of 202 0 in
the matter of Dastak N.G.O. v Synochem Organics Pvt. Ltd.
& Ors. and in applications pertaining to same subject matt er
in Original Application No. 298 of 2020 in Vineet N agar v
Central Ground Water Authority & Ors., vide order d ated
03.06.2021 held that “(...) for past violations, the concerned
authorities are free to take appropriate action in accor dance
with polluter pays principle, following due process”.
4. Further, the Hon’ble National Green Tribunal in O.A. No.
34/2020 WZ in the matter of Tanaji B. Gambhire vs. Chief
Secretary, Government of Maharashtra and Ors., vide order
dated 24.05.2021 has directed that”.... a proper SoP be laid
down for grant of EC in such cases so as to address the gaps
in binding law and practice being currently followed. The
MoEF may also consider circulating such SoP to all SEIAA s
in the country ”.
5. Therefore, in compliance to the directions of the H on’ble
NGT a Standard Operating Procedure (SoP) for dealing with
violation cases is required to be drawn. The Ministry is also
seized of different categories of ‘violation’ cases whic h have
been pending for want of an approved structural/procedu ral
framework based on ‘Polluter Pays Principle’ and ‘Principle
559
of Proportionality’. It is undoubtedly important th at action
under statutory provisions is taken against the def aulters/
violators and a decision on the closure of the proj ect or
activity or otherwise is taken expeditiously.
6. In the light of the above directions of the Hon’ble Tribunal
and the issues involved, the matter has accordingly been
examined in detail in the Ministry. A detailed SoP has
accordingly been framed and is outlined herein. The SoP is
also guided by the observations/decisions of the Ho n’ble
Courts wherein principles of proportionality and po lluters
pay have been outlined.”
31. The SoP formulated by the said Office Memorandum dated
7th July 2021 refers to and gives effect to various judicial pronouncements
including the judgment of this Court in Alembic Pharmaceuticals Ltd.
v. Rohit Prajapati & Others 3.
32. In terms of the SoP, the proposal for grant of EC in cases of
violation are to be considered on merits, with prospective effect, applying
principles of proportionality and the principle that the polluter pays and is
liable for costs of remedial measures.
33. A Public Interest Litigation being W.P. (MD) No. 11757 of
2021 (Fatima v. Union of India) was filed before the Madurai Bench
of the Madras High Court challenging the said Memorandum dated 7th
July 2021. By an interim order dated 15th July 2021 a Division Bench of
the Madras High Court admitted the Writ Petition and stayed t he said
memorandum.
34. The Madurai Bench of the Madras High Court observed and
held:-
“This writ petition has been filed as a public interest li tigation
challenging the validity of the office memorandum d ated
07.07.2021, issued by the respondent.
2. We have heard Mr. A. Yogeshwaran, learned counse l
appearing for the writ petitioner and Mr.L.Victoria Gowri,
learned Assistant Solicitor General of India, accep ts notice
for the respondent.
3 2020 SCC OnLine SC 347
D. SWAMY V. KARNATAKA STATE POLLUTION CONTROL
BOARD AND ORS. [INDIRA BANERJEE, J.]
3. The impugned office memorandum is challenged as be ing
wholly without jurisdiction, contrary to the Enviro nment
Impact Assessment Notification, 2006, ultra vires the powers
of the respondent under the Environment (Protection ) Act,
1986 and violative of the various principles enunci ated by
the Hon’ble Supreme Court, while interpreting Article 21 and
Article 48-A of the Constitution of India.
4. Further, it is submitted that the impugned notification is in
gross violation of the undertaking given before the Hon’ble
Full Bench of this Court in W.P.No.11189 of 2017, wher ein,
the Court took note of the submissions made on behalf of the
Government of India, that the notification impugned ther ein
is only a one-time measure. Further, it is submitted th at the
respondent failed to see that concept of ex-post facto app roval
is alien to environment jurisprudence and it is anathe ma to
the Environment Impact Assessment Notification, 2006.
5. Further, it is submitted that the impugned notification is in
gross violation of the judgment of the Hon’ble Supreme Court
in the case of Alembic Pharmaceuticals Ltd. v Rohit Prajapa ti,
2020 SCC Online SC 347 and the orders passed by the
National Green Tribunal, Principal Bench, New Delhi, in the
case of S.P.Muthuraman v Union of India & Another, 2015
SCC Online NGT 169.
6. Identical grounds were considered by us in a challenge to
an office memorandum dated 19.02.2021, which provide d a
procedure for granting post facto clearance under C oastal
Regulation Zone (CRZ) Notification 2011, on the ground that
despite no such provisions in the notification and being
contrary to the earlier judgments and undertaking. The sa id
writ petition in W.P(MD).No.8866 of 2021 was admitted and
by order dated 30.04.2021, the said office memorandum dated
19.02.2021 has been stayed.
7. The core issue in this writ petition is whether the
Government of India could have issued the office
memorandum and brought about the Standard Operating
Procedure for dealing with violators, who failed to comply
with the mandatory condition of obtaining prior environment
clearance under the Environment Impact Assessment
561
Notification 2006, read with the provisions of Envir onment
(Protection) Act, 1986. This issue was considered b y the
Hon’ble Supreme Court in Alembic Pharmaceuticals Ltd
(supra), and it was held that such office memorandum in the
nature of circular is without jurisdiction. The operative port ion
of the judgment reads as follows:
“...What is sought to be achieved by the administra tive
circular dated 14 May 2002 is contrary to the statu tory
notification dated 27 January 1994. The circular da ted
14 May 2002 does not stipulate how the detrimental effects
on the environment would be taken care of if the projec t
proponent is granted an ex post facto EC. The EIA
notification of 1994 mandates a prior environmental
clearance. The circular substantially amends or alters the
application of the EIA notification of 1994. The mandate
of not commencing a new project or expanding or
modernising an existing one unless an environmental
clearance has been obtained stands diluted and is rendered
ineffective by the issuance of the administrative ci rcular
dated 14 May 2002. This discussion leads us to the
conclusion that the administrative circular is not a measure
protected by Section 3. Hence there was no jurisdiction al
bar on the NGT to enquire into its legitimacy or vi res.
Moreover, the administrative circular is contrary to the EI A
Notification 1994 which has a statutory character. The
circular is unsustainable in law.”
8. Despite the above decision, once again the Government of
India, Ministry of Environment, Forest and Climate Ch ange
have chosen to adopt the route of issuing the offic e
memorandum and virtually setting at naught the provi sions
of the Environment Impact Assessment Notification an d the
Environment (Protection) Act.
9. Before the Hon’ble First Bench, a public interest liti gation
was filed by the Puducherry Environment Protection
Association, challenging the notification dated 14. 03.2017,
on identical grounds and the Hon’ble First Bench by judgment
dated 13.10.2017, recorded the submissions of the l earned
Assistant Solicitor General of India that the said notification
D. SWAMY V. KARNATAKA STATE POLLUTION CONTROL
BOARD AND ORS. [INDIRA BANERJEE, J.]
was a one-time measure and accordingly, disposed of the wr it
petition.
10. Once again, the Ministry of Environment, Forest and
Climate Change have issued the impugned office
memorandum. Thus, from what we have noted above, we are
of the clear view that the petitioner has made out a prima
facie case for entertaining the writ petition. Accordingl y, the
writ petition is admitted and there shall be an order of interim
stay.”
35. It is true that in the case of Puducherry Environment
Protection Association v. Union of India4, the Division Bench of Madras
High Court took note of and recorded the submission made on behalf of
the Union of India that the relaxation was a one time relaxation. In view of
such submission, this Court held that a one time relaxation was permissible.
36. It is, however, well settled that words and phrases and/or
sentences in a judgment cannot be read in the manner of a statute, and
that too out of context. The observation of the Division Bench that a one
time relaxation was permissible, is not to be construed as a finding that
relaxation cannot be made more than once. If power to amend or modify
or relax a notification and/or order exists, the notification and/or order
may be amended and/or modified as many times, as may be necessary.
A statement made by counsel in Court would not prevent the authority
concerned from making amendments and/or modifications provided such
amendments and/or modifications were as per the procedure prescribed
by law.
37. The Division Bench of Madras High Court fell in error in
staying the said office memorandum, by relying on observations made
by this Court in Alembic Pharmaceuticals Ltd. (supra), in the context
of a circular which was contrary to the statutory Environment Im pact
Notification of 1994. The attention of the High Court was perhaps not
drawn to the fact that the notification of 7th July 2021 was in pursuance
of the statutory notification of 2017 which was valid. The judgment of
this Court in Alembic Pharmaceuticals Ltd. (supra), was clearly
distinguishable and could have no application to the office memorandum
dated 7th July 2021 which was issued pursuant to the notification dated
14th March 2017.
4 2017 SCC OnLine Mad 7056
563
38. InElectrosteel Steels Limited v. Union of India 5, this Court
held:-
“82. The question is whether an establishment contributi ng
to the economy of the country and providing livelih ood to
hundreds of people should be closed down for the technic al
irregularity of shifting its site without prior env ironmental
clearance, without opportunity to the establishment to
regularize its operation by obtaining the requisite cle arances
and permissions, even though the establishment may not
otherwise be violating pollution laws, or the pollution, if any,
can conveniently and effectively be checked. The answer has
to be in the negative.
83. The Central Government is well within the scope of its
powers under Section 3 of the 1986 Act to issue directions to
control and/or prevent pollution including directions for pri or
Environmental Clearance before a project is commenced. Suc h
prior Environmental Clearance is necessarily granted upon
examining the impact of the project on the environment. ExPost
facto Environmental Clearance should not ordinarily be
granted, and certainly not for the asking. At the same time ex
post facto clearances and/or approvals and/or remov al of
technical irregularities in terms of Notifications under the 1986
Act cannot be declined with pedantic rigidity, oblivi ous of the
consequences of stopping the operation of a running steel plant.
84. The 1986 Act does not prohibit ex post facto Environmental
Clearance. Some relaxations and even grant of ex post facto
EC in accordance with law, in strict compliance with Rules,
Regulations Notifications and/or applicable orders, in
appropriate cases, where the projects are in complianc e with,
or can be made to comply with environment norms, is in over
view not impermissible. The Court cannot be oblivious to the
economy or the need to protect the livelihood of hundreds of
employees and others employed in the project and ot hers
dependent on the project, if such projects comply w ith
environmental norms.
***
5 2021 SCC OnLine SC 1247
D. SWAMY V. KARNATAKA STATE POLLUTION CONTROL
BOARD AND ORS. [INDIRA BANERJEE, J.]
88. The Notification being SO 804(E) dated 14 th March, 2017
was not an issue in Alembic Pharmaceuticals (supra). This
Court was examining the propriety and/or legality of a 2002
circular which was inconsistent with the EIA Notification dated
27 th January, 1994, which was statutory. Ex post facto
environmental clearance should not however be grant ed
routinely, but in exceptional circumstances taking into acc ount
all relevant environmental factors. Where the adver se
consequences of ex post facto approval outweigh the
consequences of regularization of operation of an i ndustry
by grant of ex post facto approval and the industry or
establishment concerned otherwise conforms to the requis ite
pollution norms, ex post facto approval should be gi ven in
accordance with law, in strict conformity with the applic able
Rules, Regulations and/or Notifications. Ex post facto
approval should not be withheld only as a penal measu re.
The deviant industry may be penalised by an imposit ion of
heavy penalty on the principle of ‘polluter pays’ and the cos t
of restoration of environment may be recovered from it.
***
96. The appeals are allowed. The impugned order is set asi de.
The Respondent No. 1 shall take a decision on the application
of the Appellant for revised EC in accordance with law, within
three months from date. Pending such decision, the operation
of the steel plant shall not be interfered with on the groun d of
want of EC, FC, CTE or CTO. ”
39.The proposition of law enunciated/re-enunciated by this Court
in Electrosteel Steels Limited (supra) was reiterated in Pahwa Plastics
Pvt. Ltd. and Anr. v. Dastak NGO and Ors. 6
40. As held by this Court in Electrosteel Steels Limited (supra)
ex post facto EC should not ordinarily be granted, and certainly not for
the asking. At the same time ex post facto clearances and/or approvals
and/or removal of technical irregularities in terms of a Notification under
the EP Act cannot be declined with pedantic rigidity, oblivio us of the
consequences of stopping the operation of mines, running factories and
plants.
6 2022 SCC Online SC 362
565
41. The EP Act does not prohibit ex post facto Environmental
Clearance. Grant of ex post facto EC in accordance with law, in strict
compliance with Rules, Regulations, Notifications and/or applica ble
orders, in appropriate cases, where the projects are in compliance with,
or can be made to comply with environment norms, is in our view not
impermissible. The Court cannot be oblivious to the economy or the
need to protect the livelihood of hundreds of employees and others
employed in the project and others dependent on the project, if such
projects comply with environmental norms.
42. In Lafarge Umiam Mining Private Limited v. Union of
India7, a three-Judge Bench of this Court held:-
“119. The time has come for us to apply the constit utional
“doctrine of proportionality” to the matters concer ning
environment as a part of the process of judicial re view in
contradistinction to merit review. It cannot be gainsaid that
utilization of the environment and its natural resources has to
be in a way that is consistent with principles of sustai nable
development and intergenerational equity, but balanc ing of
these equities may entail policy choices. In the circumst ances,
barring exceptions, decisions relating to utilisation of n atural
resources have to be tested on the anvil of the well-recogni zed
principles of judicial review. Have all the relevan t factors
been taken into account? Have any extraneous factor s
influenced the decision? Is the decision strictly in accordance
with the legislative policy underlying the law (if any) that
governs the field? Is the decision consistent with the p rinciples
of sustainable development in the sense that has th e
decisionmaker taken into account the said principle and , on
the basis of relevant considerations, arrived at a balanced
decision? Thus, the Court should review the decision-maki ng
process to ensure that the decision of MoEF is fair and full y
informed, based on the correct principles, and free fro m any
bias or restraint. Once this is ensured, then the doctri ne of
“margin of appreciation” in favour of the decision- maker
would come into play.”
7 (2011) 7 SCC 338
D. SWAMY V. KARNATAKA STATE POLLUTION CONTROL
BOARD AND ORS. [INDIRA BANERJEE, J.]
43. In Alembic Pharmaceuticals Ltd .(supra), this Court
observed:-
“27. The concept of an ex post facto EC is in derogatio n of
the fundamental principles of environmental jurispr udence
and is an anathema to the EIA notification dated 27 January
1994. It is, as the judgment in Common Cause holds,
detrimental to the environment and could lead to irreparable
degradation. The reason why a retrospective EC or an ex post
facto clearance is alien to environmental jurisprud ence is
that before the issuance of an EC, the statutory noti fication
warrants a careful application of mind, besides a study i nto
the likely consequences of a proposed activity on t he
environment. An EC can be issued only after various s tages
of the decision making process have been completed.
Requirements such as conducting a public hearing, screening,
scoping and appraisal are components of the decision-making
process which ensure that the likely impacts of the indust rial
activity or the expansion of an existing industrial activ ity are
considered in the decision-making calculus. Allowing for an
ex post facto clearance would essentially condone t he
operation of industrial activities without the grant of a n EC.
In the absence of an EC, there would be no conditions that
would safeguard the environment. Moreover, if the EC was to
be ultimately refused, irreparable harm would have been
caused to the environment. In either view of the ma tter,
environment law cannot countenance the notion of an ex post
facto clearance. This would be contrary to both the
precautionary principle as well as the need for sustainable
development.”
44. Even though this Court deprecated ex post facto clearances,
in Alembic Pharmaceuticals Ltd . (supra), this Court did not direct
closure of the units concerned but explored measures to control the
damage caused by the industrial units. This Court held:-
“However, since the expansion has been undertaken and th e
industry has been functioning, we do not deem it appropria te
to order closure of the entire plant as directed by the High
Court.”
567
45. The Notification being SO. 804(E) dated 14 th March 2017
was not in issue in Alembic Pharmaceuticals Ltd. (supra). In Alembic
Pharmaceuticals Ltd. (supra) this Court was examining the propriety
and/or legality of a 2002 circular which was inconsistent with the EIA
Notification dated 27 th January 1994, which was statutory. The EIA
Notification dated 27th January 1994 has, as stated above, been superseded
by the Notification dated 14th September 2006.
46. There can be no doubt that the need to comply with t he
requirement to obtain EC is non-negotiable. A unit can be se t up or
allowed to expand subject to compliance of the requisite environmental
norms. EC is granted on condition of the suitability of the site to set up
the unit, from the environmental angle, and also existence of necessary
infrastructural facilities and equipment for compliance of environmental
norms. To protect future generations and to ensure sustainable
development, it is imperative that pollution laws be st rictly enforced.
Under no circumstances can industries, which pollute, be allow ed to
operate unchecked and degrade the environment.
47. Ex post facto environmental clearance should ordinarily not
be granted routinely, but in exceptional circumstances taking into account
all relevant environmental factors. Where the adverse consequences of
denial of ex post facto approval outweigh the consequences of
regularization of operations by grant of ex post facto approval, and the
establishment concerned otherwise conforms to the requisite pollution
norms, ex post facto approval should be given in accordance with law,
in strict conformity with the applicable Rules, Regul ations and/or
Notifications. In a given case, the deviant industry may be penalised by
an imposition of heavy penalty on the principle of ‘polluter pays’ and the
cost of restoration of environment may be recovered from it.
48. It is reiterated that the EP Act does not prohibit ex post facto
EC. Some relaxations and even grant of ex post facto EC in accordance
with law, in strict compliance with Rules, Regulations, Notifications and/
or applicable orders, in appropriate cases, where the pr ojects are in
compliance with environment norms, is not impermissible. As observed
by this Court in Electrosteel Steels Limited (supra), this Court cannot
be oblivious to the economy or the need to protect the liveli hood of
hundreds of employees and others employed in the units and dependent
on the units for their survival.
D. SWAMY V. KARNATAKA STATE POLLUTION CONTROL
BOARD AND ORS. [INDIRA BANERJEE, J.]
49. Ex post facto EC should not ordinarily be granted, and certainly
not for the asking. At the same time ex post facto clearances and/or
approvals cannot be declined with pedantic rigidity, regardles s of the
consequences of stopping the operations.
50. In our considered view, the NGT rightly found that when the
Bio-Medical Waste Treatment facility of the Appellant was being operated
with the requisite consent to operate, it could not be closed on the ground
of want of prior Environmental Clearance. The issues raised/involved in
this appeal are squarely covered by the judgment of this C ourt in
Electrosteel Steels Limited (supra)and Pahwa Plastics Pvt. Ltd.
(supra). This Court cannot lose sight of the fact that the operatio n of a
Bio-Medical Waste Treatment Facility is in the interest of prevention of
environmental pollution. The closure of the facility only on the ground of
want of prior Environmental Clearance would be against public interest.
There are no grounds to interfere with the judgment and order of the
NGT in appeal as rightly argued by KSPCB and the Respondent No.3.
The appeal is barred by delay. In any case, the appeal does not raise any
substantial question of law. The appeal is therefore dismissed.
Nidhi Jain Appeal dismissed.
(Assisted by : Shashwat Jain, LCRA)