Ratilal S. Pujara (since Deceased) Thr. His Lrs. v. Municipal Commissioner, Municipal Corporation of Greater Mumbai & Ors.
KRISHNA MURARI, J.
Leave granted.
2. The instant appeal has been filed assailing the judgment a nd
final order dated 16.10.2019, passed by the High Court of Judicature at
Bombay (hereinafter referred to as “High Court”) in Writ Petition No.
2190/2015, whereby the High Court dismissed the writ petition filed by
the Appellants challenging the Demolition Notice dated 19.01.2015 issued
under Section 354 of the Mumbai Municipal Corporation Act, 1888
(hereinafter referred to as “ MMC Act” ) and eviction notice dated
21.02.2015.
3. Brief facts necessary for the disposal of this appea l are as
under:
3.1 The dispute is in respect of Flat No. 9 situated in a Co-operative
Housing Society, namely, Vasudha Co-operative Housing Society Limited
Plot No. D-2/403 Diamond Garden, 7th Cross Road, Chembur, Mumbai.
3.2 Late Shri Ratilal S. Pujara, husband of the appellant no. 1 and
father of the appellants no. 2 and 3 was the owner member of said flat.
He executed a will in favour of three appellants on the basi s of which
they were declared as legal heirs by virtue of letter of administration
dated 30.04.2014, issued by High Court of Bombay. Admittedly, the
building was constructed in 1967 and is about 55 years old.
3.3 As per the provisions of Section 353(B) of the MMC Act, it is
obligatory on the part of the owner and occupier of the building which is
in existence and is in use for more than 30 years, to have it inspected
through the registered structural engineer with Municipal Corporation of
Greater Mumbai. Since the Building in question had completed 55 years
of its existence, a structural audit was conducted on 22.07.2 014 by a
registered structural engineer. The same was submitted to the Respondent
No. 2. The Building in question had been categorised as C-1 i.e., the
most dangerous, in the structural audit report dated 29.07.2014. Further,
203
the building in question was again inspected on 06.12.2014 by the
Respondents and it was observed that the structure was in a dangerous
and dilapidated condition. The inspection report and the structural audit
report were put up by Respondent No. 2 requesting Respondent No. 3
to opine regarding the structure category. Vide opinion dated 15.12.2014,
Respondent No. 3 declared that the building in question is of C-1 category
and required to be pulled down after being vacated by the occupants.
3.4 In view of the aforesaid factual position with respect to the
condition of the building, Respondent No. 4 society entered into a Re-
development agreement dated 19.12.2014 with the Respondent No. 5,
Harita Developers. A draft copy of the said agreement was circulated
among the members of the society and at a special general body meeting
on 10.11.2014, the Re-development agreement was appr oved and
subsequently, the same was duly registered on 22.12.2014. Thereafter,
all the occupants of the flats in the building were put to notice for
demolition of the existing building and to vacate the fla ts in their
occupation.
3.5 Similar notice dated 19.01.2015 under Section 354 of 1988
Act was also issued to the Respondent No. 4 for demolishing the existing
building. An eviction notice dated 21.02.2015 was also issued to the
appellants for eviction from Flat No. 9, occupied by them.
3.6 Being aggrieved, the appellants filed Writ Petition No. 2190/
2015 before the High Court challenging the two notices issued by t he
Municipal Corporation of Greater Mumbai. Vide judgment and o rder
dated 16.10.2019, the High Court upon detail consideration of the facts
and evidence on record came to conclusion that the building in which the
disputed flat exists is ruinous, dilapidated and dangerous and unfit for
human dwelling and also dangerous for the passersby. The High Court
accordingly refused to set aside the two notices dated 19.01.2015 a nd
21.02.2015 issued by the Respondent No. 1 and dismissed the writ
petition.
4. Challenging the judgment of the High Court, the appellants are
before this court by way of the present appeal. Vide order dated
22.10.2019, this Court issued notice and granted stay by directing that
no demolition order will be passed or acted upon in the meanwhile. The
Builder/Developer (Respondent No. 5) was added as Party Respondent
in the proceedings vide order dated 10.12.2019.
RATILAL S. PUJARA (SINCE DECEASED) THR. HIS LRS. v.
MUNICIPAL COMMISSIONER, MCGM [KRISHNA MURARI, J.]
5. The genesis of the present dispute emanates out of an ear lier
dispute between the appellants, on one hand, and the society on the
other hand relating to some unauthorized changes in the structur e of
disputed Flat No. 9. The appellants have not clearly pleaded in detail the
facts about the said dispute but what can be culled out from the pleadings
is that there was a dispute regarding the regularization of the terrace of
Flat No. 9 owned by the appellants in the building in question. Subsequently,
Respondent society got Flat No. 9 approved as an unauthorized flat in
two plans dated 07.07.2005 and 03.05.2006 and the regularization of the
terrace adjoining Flat No. 9 was kept in abeyance by the Respondent
No. 3. It further appears that a civil suit was filed by the appellants in
this regard which was dismissed. Thereafter, First Appeal No. 813/2012
was filed before the High Court wherein, vide order dated 19.12.2013,
the parties were directed to maintain status quo.
6. We have heard the Appellant-in-person and Mrs. Garve sh
Kabra, learned Counsel appearing for the Respondent Nos. 1, 2 and 3
and Mr. Prashant Bhushan, Learned Counsel appearing for the
Respondent No. 4. We have also gone through the pleadings of the
parties, and the written arguments filed by the appellants.
CONTENTIONS ON BEHALF OF THE APPELLANTS
7. It was submitted that the appellants filed First Appeal No. 813/
2012 before the High Court which is pending wherein an order passed
directing the parties to maintain status quo pending appeal is operative
and the impugned notices being in the teeth of the said order, was not
sustainable. It was further submitted that as the appell ants’ flat no. 9
was wrongly shown as unauthorized in the approved plans of 07.07.2005
and 03.05.2006 by the Respondent No. 3 and the Respondent No. 4, and
in case the building is demolished, all evidences and proofs of injustice
that has been caused by the wrongly approved plans of 07.07.2005 and
03.05.2006, would be destroyed, causing serious and irreparable loss to
the appellants.
8. It was further submitted that the act of the Respondent No. 2
issuing the impugned notices amounts to willful disobedience and non-
compliance of the stay orders dated 19.12.2013 and 12.02.2014 passed
by the High Court in Civil Application No. 1745/2012 in FA No. 813/
2012.
205
CONTENTIONS ON BEHALF OF THE RESPONDENTS
9. It was submitted that the impugned order passed by the High
Court in dismissing the writ petition is neither perverse nor suffers from
irregularity.
10. It was further submitted that the High Court has rightly held
that after the redevelopment of the property, the appellants will have a
decent, safe, and stable structure, and their rights in the building in regard
to her flat, are sufficiently and fully protected.
I1. It was vehemently submitted that there is a dispute regarding
regularization of the terrace of the flat owned by the appe llants in the
building in question. The issue of regularization of the terrace is a totally
different and distinct issue and only because that issue is pe nding, the
building which is not safe for human dwelling cannot be allowed to be
inhabited by the appellants more so when all other residents of the building
have vacated the building and no one except the Appell ants have
challenged the notice issued under Section 354 of the MMC Act.
12. We have carefully considered the submissions made at the
bar and perused the materials placed on record.
ANALYSIS
13. Before adverting to the facts of the case, it is impor tant to
notice that the buildings in Mumbai that need repair are classified into
the following categories:
14. In the case at hands, the building in question h ad been
constructed in the year 1967 and is about 55 years old. It is settled law
under the MMC Act that once a building completes the prescribed period
of life under the statute i.e., 30 years, a structural audit is required to be
carried out for certifying its stability and safety for hum an dwelling
RATILAL S. PUJARA (SINCE DECEASED) THR. HIS LRS. v.
MUNICIPAL COMMISSIONER, MCGM [KRISHNA MURARI, J.]
mandatorily under the provisions of Section 353B of the 1888 Act. The
audit has to be carried out in terms of the legal provisions and within the
time specified and if not, then it is the Municipal Commissioner who can
ensure that such an audit is carried out, or if there is no co-operation, he
can come to an independent conclusion. Section 353B of the MMC Act
talks about Structural Stability Certificate which reads as under:
“353B. (1) Every owner or occupier of a building in respe ct
of which a period of thirty years, from the date of, —
(i) issue of its completion certificate by the Corpora tion;
or
(ii) issue of permission to occupy a building under section
353A; or
(iii) its physical occupation of at least 50 per cent., of its
built-up area,
whichever is earlier, has expired, shall cause such bu ilding
to be examined by a Structural Engineer registered wit h the
Corporation for the purposes of certifying that the bu ilding
is fit for human habitation (such certificate herei nafter
referred to as “the Structural Stability Certificate” ). The
Structural Stability Certificate issued by such Struc tural
Engineer shall be submitted to the Commissioner.
(2) The Structural Stability Certificate shall be submitted within
one year from the expiry of a period of thirty years r eferred
to in sub-section (1), and every ten years thereafte r or such
earlier period as the Commissioner may determine ha ving
regard to the condition of the building and the cor rective
repairs carried out by the owner or occupier.
(3) Notwithstanding anything contained in sub-secti on (1),
the Commissioner may, at any time, after having recorded the
reasons, in writing, direct the owner or occupier of a buil ding,
to cause such building to be examined by such Struc tural
Engineer and to submit to the Commissioner, the Stru ctural
Stability Certificate, as required under sub-section (1), wi thin
the period not exceeding thirty days as specified b y the
Commissioner, in such direction.
207
(4) If the Structural Engineer recommends any correc tive
repairs for securing the structural stability of the building,
such corrective repairs shall be carried out by the own er or
occupier of a building to the satisfaction of the Commissi oner.
(5) Any owner or occupier, as the case may be, who f ails to
carry out corrective repairs for securing structural s tability,
within a period of six months from the date of report of the
Structural Engineer, shall be punished with the fin e as
provided in section 471.
(6) Notwithstanding anything contained in sub-secti on (5),
the Commissioner may, after giving the owner or occupie r, a
notice in writing, require him to carry out, within the period
specified in the notice, corrective repairs for sec uring
structural stability of a building. If the owner or occupier
fails to carry out such corrective repairs within t he period
specified in the notice, the Commissioner may carry o ut the
same and the expenses incurred by the Commissioner on such
repairs shall, on demand if not paid within thirty days, be
recovered from the owner or occupier as arrears of proper ty
tax.
(7) If there is any dispute about the amount of expen ses for
which demand is made under sub-section (6), an appeal may
be preferred to the Chief Judge of the Small Causes Court,
but no such appeal shall be entertained by the said Chief
Judge, unless— (i) it is preferred within twenty-one days from
the date of receipt of notice of such demand ; (ii) the amou nt
for which demand is made is deposited with the Corporation
and a true copy of the receipt showing that the amount has
been so deposited accompanies the appeal.
(8) In case the appeal is decided in favour of the appel lants
and the amount of expenses deposited with the Corpora tion
is more than the amount payable by the appellants, the
Commissioner shall adjust the excess amount with interes t at
6.25 per cent, per annum from the date on which the amount
is so deposited by the appellants, towards the prop erty tax
payable by the owner in respect of such building thereafte r.”
RATILAL S. PUJARA (SINCE DECEASED) THR. HIS LRS. v.
MUNICIPAL COMMISSIONER, MCGM [KRISHNA MURARI, J.]
15. In the case at hand, the structure audit report dated 29.07.2014
of the building in question has found it to be dangerous for human dwelling
and also for the passers-by. Relevant concluding part of the structural
audit report dated 29.07.2014 is reproduced here under:
“In view of the above conclusions, we feel that mos t of the
structural elements have lost their strength and hence desig n
load carrying as per the provisions and requirements of I.S
codes. Deterioration in these structural elements a re wide
spread and severe at several locations. Partial collapse of
the brick work has at the side of building occurred at many
places and common passage has sagged at few locations and
heavy cracks seen in the common rear passage slab panels
at many places is imminent, which are likely to cause s evere
injury to occupants and maybe loss of their life. Becau se of
partial collapse of structural audit such as walls and wood en
beams (wooden as well as additional steel elements) of the
building, there is possibility of loss of lateral stif fness and
stability of the entire building and subsequent collapse o f the
entire building in case of earthquake and any natur al
calamities. The said structure is beyond logical repair s and
also unsafe for habitation. In our opinion, the said building is
in C1 category and has to be evacuated immediately to avoid
the mishaps.”
16. A notice under Section 354 of the MMC Act was issued and
it is pertinent to mention that the notice was issued in resp ect of the
whole building which has been identified as dilapidated and dangerous.
The said notice was issued only after the satisfaction of the Munic ipal
Commissioner in accordance with the provisions of Section 354 of the
MMC Act which reads as under:-
“354. (1) If it shall at any time appear to the Commissi oner
that any structure (including under this expression any
building, wall or other structure and anything affixe d to or
projecting from any building, wall or other structure) i s in a
ruinous condition, or likely to fall, or in any way da ngerous
to any person occupying, resorting to or passing by such
structure or any other structure or place in the neighborhood
thereof, the Commissioner may, by written notice, require the
owner or occupier of such structure to pull down, secure or
209
repair such structure 1[subject to the provisions o f section
342], of danger therefrom.
(2) The Commissioner may also if he thinks fit, req uire the
said owner or occupier, by the said notice, either forthwith
or before proceeding to pull down, secure or repair the sai d
structure, to set up a proper and sufficient hoard or fenc e for
the protection of passers-by and other persons, wit h a
convenient platform and hand-rail, if there be room en ough
for the same and the Commissioner shall think the s ame
desirable, to serve as a footway for passengers out side of
such hoard or fence.”
17. It is not disputed that First Appeal No. 812 of 2012 filed by the
appellants herein before the High Court with respect to the dispute with
the society in respect of unauthorized alteration in the dis puted flat is
pending and orders of status quo is in operation. The appellants further
filed a Writ petition challenging the notice under Section 354 of the MMC
Act and the eviction notice issued by the Respondent No. 4. To the utter
dismay of this court, the appellants did not set out anything specific in
the Writ Petition demonstrating any perversity or manifest illegality in
the satisfaction recorded by the Municipal Commissioner to invoke the
powers of the High Court to interfere with the same. The entire emphasis
was on the order dated 19.12.2013, passed in First Appeal No. 812 of
2012 directing the parties to maintain status quo, pending appeal. The
dispute in the First Appeal and the Writ Petition are completely different
having different dimensions and no inter se connection with each other.
Merely because the Municipal Corporation is a party to the proceedings
initiated by the appellants with regard to alterations mad e in the flat
existing in the dilapidated building will not mean that t he Municipal
Corporation cannot carry out an audit of the structure as a whol e, as
mandated by law, to judge the stability and safety.
18. The relentless contention of the appellants is that their right in
the building will not be protected and get further affected after demolition
of the building but the same is not sustainable in our considered view, for
the simple reason that the Re-development agreement dated 19.12.2014,
contains a clause protecting the rights of the appellants in the building
which is reproduced hereunder:
1. Eight new flats each measuring 740 sq. ft. carpet area for flat
owners i.e., flat no. 1 to 8.
RATILAL S. PUJARA (SINCE DECEASED) THR. HIS LRS. v.
MUNICIPAL COMMISSIONER, MCGM [KRISHNA MURARI, J.]
2. Two new flats each measuring 1035 sq. ft. carpet area for 2
flat owners i.e. flat no. 9 and 10 (including an area to be given
in lieu of an open terrace attached to their respective flats.)
19. The appellants herein are the occupiers of Flat No. 9 which
has a attached open terrace, therefore they have been give n a larger
carpet area. Further, the agreement also stated that instead of providing
temporary alternative accommodation during the period of construction
to the appellants and other members, Respondent No. 5 shall pay
displacement compensation @ Rs. 30,000/- per month to each member.
The said amount was later enhanced to Rs. 40,000/- per month to each
member vide letter dated 18.12.2019. To add to this , one-month
displacement compensation was to be paid as a brokerage in addition to
Rs. 20,000 as shifting and transport compensation to each member.
20. As a consequence, the rights of the appellants in the flat owned
by them in the building in question is an independent right and the demolition
of the building nowhere would affect that independent right. In addition
to this, the appellants have also been provided wit h alternate
accommodation and the rights of the appellants will not be affected by
virtue of demolition or evacuation in exercise of the power under Section
354 of the MMC Act. Not only the appellants, but other residents of the
building will have a decent, safe and stable struct ure after the
reconstruction of the building in question.
21. The building in question is in a ruinous condition and needs to
be repaired at the earliest for the simple reason that it is unsafe for
human habitation. The historic buildings in Mumbai are a reminder of
the city’s rich and aesthetic architectural styles. Therefore, in order to
preserve the authenticity of the buildings, it is important that certain legal
measures need to be taken so that the safety and stability can be certified
under Section 353B of the MMC Act, 1888.
22. Once we find that the satisfaction recorded by the Municipal
Commissioner is in accordance with the due procedure prescri bed by
law and is not vitiated by any perversity or any illegality, there exists no
ground to interfere with the impugned notices. Merely becau se the
appellants are senior citizens, does not impel us to take any lenient view
in the matter in larger public interest particularly when the private interests
of the appellants have been amply safeguarded.
211
23. Judicial notice can be taken of various media reports reporting
collapse of many old structures in Mumbai causing serious loss of human
lives and limbs. By making interference of any sort in the matter at the
behest of the appellants, in the existing facts and circumstanc es, we
would not only be putting the life of the appellants and other residents of
the building in jeopardy, but also hazarding the life and limb of the general
public as well.
24. In our considered view, the High Court has rightly dismissed
the challenge laid to the impugned notices of demolition and eviction.
25. As a result, the appeal stands dismissed. All the pen ding
applications as well the contempt petition filed by the appellants also
stand disposed accordingly.
Devika Gujral Appeal dismissed.
(Assisted by : Preetam Bharti, LCRA)
RATILAL S. PUJARA (SINCE DECEASED) THR. HIS LRS. v.