Smt. Katta Sujatha Reddy & Anr. v. Siddamsetty Infra Projects Pvt. LTD.& Ors.
KRISHNA MURARI, J.
1.Leave granted in all the matters.
C.A. NO. 5822 OF 2022 (ARISING OUT OF SLP (C) NO.
13565 OF 2021)
2.The present civil appeal arises out of the impugned judgment
dated 23.04.2021 in A.S. No. 998 of 2010, passed by the High Court
for the State of Telangana at Hyderabad.
3. Siddamsetty Infra Projects Pvt. Ltd., who is the responde nt
herein, had filed a suit for specific performance against the appellants,
Smt. Katta Sujatha Reddy and Smt. Kamireddy Geetha Reddy, who
were respondents 6 & 8 respectively, among others in the suit.
4. A conspectus of the facts necessary for the disposal of t he
appeals is as follows: One late D Narayana, predecessor-i n-interest of
the respondent no. 2 and 3, was the owner of an agricultural land bearing
Sy. No. 300-309, admeasuring 141.05 acres, situated in Budvel Village,
Rajendra Nagar Mandal, Ranga Reddy District, Hyderab ad. The
appellants herein acquired certain extent of the land from the aforesaid
predecessor-in-interest through an agreement dated 19.0 3.1994. In
pursuance to this agreement, two registered Joint G PA’S dated
28.03.1994 were executed in the name of the defendant Nos. 5 and 6
from the above-mentioned owners, for an extent of Acs. 127.27 gts. of
land.
5. The agreement dated 19.03.1994 and the registered GPA, in
favour of the respondent no. 1/ purchaser (Siddamsetty Infra Projects
Pvt. Ltd.) could not materialize. Parties entered i nto two fresh
agreements dated 26.03.1997 and 27.03.1997 inter alia appellant
(hereinafter referred to as ‘ vendors’) herein to purchase an extent of
Acs. 40.08 gts. The agreement dated 26.03.1997 pertained to Acs. 35.15
gts. land for a consideration of Rs.38,37,500/- while the agreement dated
27.03.1997 pertained to Acs 1.33 gts of land for a consideration of
Rs.1,82,500/-.
6. The total suit scheduled property thus consists of Acs. 40.08
gts of land situated in Sy No. 301 (part), 302, 303, 304 (part) of Budvel
Village, Rajendranagar Mandal, R.R. District for wh ich a total
consideration of Rs.40,20,000/- was agreed upon between the parties .
Out of the total agreed consideration, Rs.34,80,850/- was paid by the
423
purchaser to the vendors by way of cash and cheques, which fact is not
disputed.
7. The remaining amount of Rs.5,39,150/- was to be paid within 3
months, as per clause 3 of the agreements. This amount had admittedly
not been paid within the stipulated time. On 31.03.2000, the purchaser
allegedly sent the first notice dated 08.02.2000 to the vendors seeking
specific performance of the agreement. Thereafter, a second notice was
sent by the plaintiff on 06.07.2002. The purchaser, having no other
alternative, filed the present suit, being OS No. 88 of 2002, bef ore the
Additional District Judge, Ranga Reddy District, LB Nagar, Hyderabad,
seeking specific performance. The trial Court framed 5 issues for
consideration which are as under:
1. Whether the purchaser is entitled for Specific Performance of
agreement dt. 27.3.1997 and 26.3.1997 directing the vendors
to execute a registered sale deed in favour of purchaser in
respect of suit land?
2. Whether the time is essence of the contract as pleaded by the
vendors, if so whether the purchaser is not entitled for Specific
Performance of agreement of sale as pleaded by him?
3. Whether the suit filed by the purchaser is barred by limitation?
4. Whether the purchaser is entitled for alternative relie fs of
delivery of possession and for refund of Rs. 34,80,850/- with
interest @36% per annum as pleaded in the plaint?
5. To what relief?
8. In response to issues (1) and (2), taking into consideration the
evidence available on record, the trial Court held that the purchaser was
never put in possession of the property. On the issue of payment, it was
held that the purchaser never made the total payment of Rs.34,70,000/-
under the agreement of sale. It was discovered during the c ourse of
cross and chief examination, that the purchaser had issued a cheque for
Rs. 5,00,000/- which was dishonoured. This information was not shared
by the purchaser and hence the purchaser had suppressed material
evidence.
9. The trial Court further held that the burden of proof lies on the
person who pleads that time is the essence of the contract. It was further
observed that in respect of an immovable property, time is not the essence
SMT. KATTA SUJATHA REDDY v. SIDDAMSETTY
INFRA PROJECTS PVT. LTD. [KRISHNA MURARI, J.]
of the contract unless the same is explicitly mentioned in the agreement
of sale and the parties through their conduct have treated tim e as the
essence of the contract. The lower Court observed that Clause 3 in the
contract stipulates a time bar of 3 months for the payme nt of the sale
consideration and furnishing of necessary certificates by the purchaser
and the vendor respectively. The vendor through their conduct had never
intended to treat time as the essence of the contract. On delay of payments
made by the purchaser, the vendor never issued any notice to them. This
showed that the vendor never intended to treat time as the ess ence of
the contract. The vendor also painted a picture that it did p rocure the
necessary documents as required under clause 3 of the contract , but it
never did the same. The vendor made a false plea about the duty to be
performed by it under clause 3 of the contract.
10. The trial Court further held that while there exists a false
plea on the part of the vendor, the same however does not bene fit the
case of the purchaser because there are grave laches on his p art too.
The purchaser himself having approached the Court with unclean hands,
he cannot get the benefit of the false plea made by the vendor.
11. The trial court also came to the conclusion that the purchaser
was never ready to pay the balance sale consideration, if so, he would
have either issued a notice to the vendor making out his willingness to
pay. Hence, on the basis of all the above mentioned observations, it was
held that the purchaser is not entitled for specific performa nce of the
agreements of sale and that the parties never intended to trea t time as
an essence of the contract.
12. With regard to issue (3), the trial Court held that part one of
Article 54 of the Limitation Act,1963 will come into operation , as per
which the three-year period has to be computed from the date so stipulated,
which comes to on or before 27.06.2000, in the present case. The current
suit however was presented on 09.08.2002, after a lapse of two years .
Even for the recovery of the advance amount, the suit was barre d by
time as provided under Article 47 of the Limitation Act. When the main
suit itself is barred, then alternative relief also cannot be granted. Hence,
the trial Court held that the suit is barred by limitation. In the light of
the above findings, the trial Court dismissed the suit hol ding that the
plaintiff is not entitled for the relief of specific performance.
13.Aggrieved by the aforesaid order of the trial Court, the plaintiff/
purchaser approached the High Court by way of a first appeal, b eing
425
A.S. No. 998/2010. The High Court framed 7 issues for adjudication of
the matter which are as under;-
1. Whether the suit is barred by limitation?
2. Whether the purchaser proved it’s possession over the suit
schedule property?
3. Whether the plaintiff was ready and willing to perform his
part of the contract and paid balance sale consideration within
the stipulated time in the suit agreements?
4. Whether the trial court is right in holding that the time is not
the essence of the contract and whether the same can be
attacked by the defendants without filing cross objections?
5. Whether the trial court is right in not exercising its discretion
for granting relief of specific performance?
6. Whether Section 10 of the Act as substituted by Act 18 of
2018 is prospective or retrospective in nature?
7. To what relief?
14. In response to point (1), the High Court has held that Clause 3
of the agreements did not stipulate time as the essence of the contract.
Moreover, the vendor has not exercised the option of forfeiti ng the
advance amount as per Clause 3 of the agreements. The Hi gh Court
further held that the trial Court has erred in making the distinction between
time fixed for payment of sale consideration and time for performance
of contract.
15. On point (2), the High Court held that the vendors surrendered
almost all their rights over the suit schedule property a nd allowed the
purchaser to exercise his rights over the suit property as per the contract.
It was wrongly held by the trial Court that since the na me of the
purchaser was deleted in Exs. B10 & B11, the purchaser was not in
possession of the property. On the basis of this, the trial Court also held
that the purchaser did not approach the court with clean hands. O ne
more point that came in favour of the purchaser was that one of the
parties to the sale agreement had categorically admitted that the purchaser
was put in possession of the property. This fact was never contested by
any party. The High Court held that just because the possession aspect
is not mentioned in Exs. A2, A3, A4, A5, A29 & A30 or in the first notice,
SMT. KATTA SUJATHA REDDY v. SIDDAMSETTY
INFRA PROJECTS PVT. LTD. [KRISHNA MURARI, J.]
it cannot be said that the purchaser was not in possessi on of the suit
schedule property.
16. On point (3), the High Court observed that the vendors were
at fault for not obtaining the necessary certificates as per Clause 3 of
the contract for completing the sale transaction. Further, to show his
bonafides, the purchaser filed an application for permission to deposit the
balance sale consideration of Rs. 5,39,150/- and the same was ordered
and became final. The High Court further held that no person woul d
drag on the matter for this long for a payment of 10% of t otal sale
consideration. The purchaser was ready and willing to perf orm his
contract, had already paid 90% of the sale consideration within the
stipulated period and had deposited the balance amount in Court. Hence,
the purchaser was ready and willing to perform his contract, and through
his acts, proved his bonafides.
17.On point (4), the High Court held that the trial Court had correctly
assessed the judgments and the fact situation and held that time is not
the essence of the contract in the present case.
18. On point (5), the High Court held that the trial Court s hould
have exercised its discretion and should have granted specific performance
in favour of the purchaser. It was held that the vendors took a false plea
in their written statements as well as in their chief examinations stating
that they did not receive the sale consideration. The vendors f urther
took the false plea that the necessary documents and certificates as per
clause 3 of the contract were obtained from the concerned departments,
and hence the said point was answered in favour of the purchaser.
19. On point (6), the High Court held that when a provision is
replaced by way of substitution, the substituted legislatio n operates
retrospectively and not prospectively. It further held that specific relief
in essence is a part of the law of procedure, and h ence it is a
retrospective law. The High Court then went on to state that an ap peal
is a continuation of the suit, and hence any change in law between the
date of passing of the decree and the decision of the appeal must be
taken into consideration. Based on the above analysis, the High Cour t
held that Section 3 of the Amended Act is retrospective in nature and
applies to pending proceedings.
20. On point (7), the High Court held that since the purchaser
succeeded on all points, it partly allowed the appeal and directed the
427
vendors to register the suit property in favour of the purchaser, to the
extent of the amount paid by the purchaser, i.e., 90% of the total sale
consideration, within a period of 3 months. Further, it was ordered that
the sum of Rs.5,39,150/- deposited by the purchaser, by virtue of the trial
Court order dated 11.07.2005 in IA No. 925/2005, was to be refunded to
the purchaser with interest, if any accrued thereon.
21. Aggrieved by the impugned judgment, both the vendors and
the purchaser are in appeal before this Court.
22. Mr. Dushyant Dave and Mr. Harin P. Raval, learned Seni or
Counsel appearing on behalf of the purchaser, submitted as follows:
i. The High Court was correct in exercising its jurisdicti on
and the impugned judgment is based on both, oral and
documentary evidence. The reasons given for granting the
relief of specific performance are in accordance with the
settled principles of law.
ii. Both the trial Court and the High Court have concurrently
found that time is not the essence of the contract. No time
was fixed for the performance of the contract itself. The
period of 3 months stipulated under Clause 3 of the
agreements to sell, is only for payment of the sale
consideration. As a result, when no date is fixed for the
performance of the contract, the limitation period
commences from the date of specific refusal. In the ca se
at hand, specific refusal of the vendors to perform their
obligations had occurred on 14.04.2000 and 22.07.2002 and
therefore, the suit was filed well within the limitation period.
iii. The purchaser has clearly established that they were always
ready and willing to perform their part of the contract. They
have admittedly paid 90% of the sale consideration within 3
months of the agreements to sell. The purchaser also issued
two legal notices dated 08.02.2000 and 06.07.2002 to the
vendors indicating their readiness to pay the balance amount.
The vendors avoided receiving the sale consideration despite
the purchaser’s repeated requests. Additionally, the vendors
did not procure the requisite permissions.
iv. Defendant No.5 has admitted in her pleadings that the
purchaser was put in possession of the suit property. Such
SMT. KATTA SUJATHA REDDY v. SIDDAMSETTY
INFRA PROJECTS PVT. LTD. [KRISHNA MURARI, J.]
statement was neither challenged by the vendors in the
rejoinder and nor was it mentioned in the evidence led by
the DWs that her statement is incorrect. Moreover,
Defendant No.5 is a proper party to the suit.
v. The stand of the parties on possession cannot be a ground
on which the Court can refuse grant of specific
performance. Delivery of possession is ancillary to the relief
sought and such an issue would be inconsequential.
vi. In the light of the amendment to Section 10 of the Specif ic
Relief Act, the jurisdiction to grant specific performance of
a contract is no longer discretionary and it is mandatory
for Courts to grant such relief, unless the case at hand
falls within the statutorily carved out exceptions.
23. Mr. Mukul Rohatgi and Mr. Harish Salve, learned Senior
Counsel appearing on behalf of the vendors, submitted as follows:
i. The purchaser did not approach the Court with clean hands.
The balance amount was not paid within the stipulated time
period and the trial Court found the purchaser’s statement
regarding possession to be false inter alia, for the following
reasons:
(a) In the suit, there was an alternate prayer seeki ng
possession. If the purchaser was already in possession,
such a prayer would not have been made.
(b) The purchaser has not mentioned any specific date as to
when they were put in possession of the property.
(c) As per the draft sale deed prepared by the purchaser,
there is no mention of the fact that they had already
been granted possession of the property. In fact, the draft
sale deed indicates that the purchaser would be put in
possession on execution of the sale deed.
(d) PW2 (neighbour) deposed that the purchaser had laid
roads, constructed two rooms, put up fencing, etc. on the
property. However, the same is falsified by the documents
on record. The photographs of the property show that
there are no road or rooms on the property. Additionally,
no such pleading is made in the suit.
429
ii. The suit filed by the purchaser is barred by limitati on and the
trial Court held so correctly. The parties executed the
agreements to sell on 26.03.1997 and 27.03.1997 and the
purchaser was to pay the balance amount within 3 months,
i.e., by 27.06.1997. It is the purchaser’s case that the vendors
evaded execution of the sale deed as early as in June 1997.
Therefore, the limitation would start running in June 1997 and
expire in June 2000. The suit, however, was filed only on
09.08.2002 and is, therefore, clearly barred by limitation. The
purchaser’s oral evidence also shows that the right to sue
accrued in the year 1997 itself.
iii. Additionally, the notice purportedly dated 08.02.2000, was
actually despatched on 31.03.2000 and was purposely
backdated.
iv . The purchaser was not ready and willing to perform t he
contract. The evidence on record indicates that the purchaser
not only failed to pay the balance consideration within the
stipulated 3 months, but also failed to pay the same within a
period of 3 years of the agreement.
v. A suit for specific performance cannot be decreed in a
piecemeal manner. The High Court ought to have accepted
the trial Court’s decision and rejected the purchaser’s appeal.
Moreover, grant of specific relief only to the extent of 90 %
itself indicates that the purchaser was not ready and willing to
perform the contract and consequently, is not entitled to the
decree.
vi. The High Court, while overturning the trial Court’s judgement,
stated that the discretion to grant specific performance was
taken away by the 2018 amendment to Section 10 of the
Specific Relief Act. However, both the Delhi High Court and
Karnataka High Court have rightly taken the view that the
amendment, being substantive, would be applicable
prospectively. The impugned judgement erroneously states that
the amendment is merely procedural and would apply
retrospectively.
vii. The High Court has misconstrued Section 12 of the Specific
Relief Act. The section would not be applicable to the present
SMT. KATTA SUJATHA REDDY v. SIDDAMSETTY
INFRA PROJECTS PVT. LTD. [KRISHNA MURARI, J.]
case as the question of ‘inability to perform a contract’ does
not arise.
viii. Reliance on Defendant No.5’s pleadings in support of the
plaintiff is misplaced. She has nothing to do with the agreements
in question and had filed a collusive written state ment.
Moreover, knowing such a statement is collusive, she never
entered the witness box.
24. We have heard the learned Senior counsel appearing on either
side and perused the entire material available on record. In the light of
the arguments advanced, the following issues fall for consideration.
A. Whether the suit for specific performance is barr ed by
limitation?
B. Whether the amended Section 10 of the Specific Relief A ct
is prospective or retrospective in operation?
C. Whether the purchaser is entitled to the relief of spec ific
performance?
D. In any case, whether the purchaser is entitled to take benefit
of Section 12 of the Specific Relief Act in view of the part
payment made in respect of the contract?
Issue A
25.Before dealing with issue “A”, we would like to highlight certain
facts which may be relevant. On 26.03.1997 and 27.03 .1997 two
agreements to sell were executed between the vendors and pur chaser
for two separate parcels of land in survey no. 301(part), 302, 303, 3 04
(part). The sale considerations for the aforesaid l and were
Rs.38,37,500/- and Rs. 1,82,500/- respectively. Out of the above sale
considerations, the vendors received an advance of Rs.34,70,000/- and
Rs.10,850/- in furtherance of the performance of the aforesaid agreement.
26. A notice dated 08.02.2000 was despatched by the purchaser
on 31.03.2000, calling upon the appellants herein to execute t he sale
deed at a convenient date, suitable to the vendors herein.
27. The vendor replied to the aforesaid notice by letter dat ed
14.04.2000 by stating that the purchaser never offered to pay the balance
sale consideration and issuance of the notice dated 08.02.2000, was nothing
but a subterfuge to get over the limitation.
431
28.Thereafter, a suit was filed by the purchaser only on 09.08.2002.
In the suit, the averments made by the purchaser as to the limitation are
as under:
“LIMITATION:The suit is within limitation in continuation
of efforts. Some defendants are agreeing to execute the sale
deed and some defendants are continuing and evading the
execution of the sale deed. Time is not the essence of the
contract. The suit is within limitation in view of reply not ice.”
29. The Defendant No.6-vendors herein filed a written statement
dated 25.10.2002, wherein they replied to the question of limitation as
under:
“8 (Pg NO. 175) .It is submitted that, in reply to Para no. 10
of the plaint that, the plaintiff has got issued legal notice dated
8.02.2000 to the defendant & the defendant no. 8 and posted
the said notice on 31.3.2000 under the registered po st, the
said fact is revealed that, the Plaintiff purposefully made the
notice dated as 8.2.2000 which was posted on 31.03. 2000
with ulterior motive. The Plaintiff to cover up the limit ation
period of 3 years creates the date 8.02.2000. It is not true
that, the defendant and the defendant no. 8 Smt. Ka mreddy
Geetha Reddy are not the joint GPA holder of the vendors. It
is false that, there was no response from defendant no. 6 and
defendant no. 8 to the said notice, in fact the defendant g ot
issued a reply legal notice dated 14.04.2000 to the said alleged
legal notice dated 8.2.2000. After receipt of the r eply legal
notice the Plaintiff kept quiet for nearly 2 ½ years an d got
issued another legal notice dated 6.7.2002. The def endant
had got issued reply legal notice on 22.7.2002 to the notice
dated 6.7.2002 by stating that the agreements are barred by
limitation and the plaintiff never in possession of the suit
property and moreover he has not performed his part
performance in paying the balance sale consideration withi n
the stipulated period and the notice dated 8.02.200 0 was
posted on 31.02.2000 with malafide intention.”
30. In the above light, the first question that this Court needs to
consider pertains to the aspect of limitation. The First Sche dule to the
Limitation Act, 1963 provides for the period of limitation in the following
manner:
SMT. KATTA SUJATHA REDDY v. SIDDAMSETTY
INFRA PROJECTS PVT. LTD. [KRISHNA MURARI, J.]
The High Court, while dealing with the aspect of limitation, has
given a reasoning that Clause 3 of the agreements to sell did not have a
specific calendar date for performance of the contract, but rather, provided
only for payment of the entire sale consideration within 3 months from
the date of the agreements. Further, the High Court construed the obligation
of the vendors to produce requisite certificates and permission as a
condition for the purchaser to complete the sale transaction. In view of
the same, the High Court concluded that the first part of Article 54 was
incorrectly applied by the trial Court and accordingly held that the suit
was not barred by limitation.
31.At the outset, this Court has perused Clause 3 of the agreements,
which is in two parts. The first part provides for the purchaser’s obligation,
while the second part details the obligation of the vendors to provide the
requisite certificates. Although both the obligations were required to be
completed within the stipulated period of three months , there is a
substantive difference between these two sets of obl igations. The
obligation upon the vendors concerned was production of certain
certificates, such as income tax exemption certificate and agriculture
certificate. No consequences were spelt out for non- per formance of
such obligations. Whereas the obligation on the purchaser, was to make
the complete payment of the sale consideration within three months.
The clause further mandates forfeiture of the advance amount i f the
payment obligation is not met within the time period stipulated therein.
In this context, this Court in Chand Rani (dead) by Lrs. v. Kamal
Rani (dead) by Lrs 1., held as under:
“25. From an analysis of the above case law it is clear that in
the case of sale of immovable property there is no presum ption
1 (1993) 1 SCC 519
433
as to time being the essence of the contract. Even if it is not of
the essence of the contract the Court may infer that it is to be
performed in a reasonable time if the conditions are:
1. from the express terms of the contract;
2. from the nature of the property; and
3. from the surrounding circumstances, for example: the
object of making the contract.”
32. Coming to the aforesaid indicators, the language of th e
agreements makes it clear that severe consequences of forfeiture would
ensue if the payment is not made within three months of the date of the
agreements. It may be noted that as per Clause 21, the pa rties had
entered into an earlier agreement to sell dated 19.03.1994, whi ch did
not materialize and accordingly the agreed price therein was no longer
applicable. It is in this context that the fresh agreeme nts were entered
into between the parties, so as to provide a last opportunity for them to
successfully enter into a sale-purchase agreement. The aforesaid intention
of the parties is also made clear through Clause 23 of the agreement to
sell, which reads as under:
“23. The parties of the second part herein undertake on any
pretext they will not make any claim for enhancing the agre ed
sale consideration.”
33. The aforesaid clause clearly freezes any enhancement of the
agreed sale consideration, which cannot be independent of a fixed time
period. A contrary interpretation would render the contract commercially
unreasonable and unworkable. The moratorium on the enhancement of
rates prescribed under Clause 23 should be interpreted to be predicated
on a fixed time and be executable within a reasonable period. The same
should not be utilized to render the commercial wisdom betw een the
parties otiose, which is inherent in drafting such clauses.
34. From the above analysis, it is clear that the cont ract was
strictly conditioned on a time frame. At this stage, it may be relevant to
quote Section 55 of the Contract Act, which reads as under:
“55. Effect of failure to perform at fixed time, in cont ract in
which time is essential When a party to a contract promises
to do a certain thing at or before a specified time, or certain
things at or before specified times, and failsto do any such
SMT. KATTA SUJATHA REDDY v. SIDDAMSETTY
INFRA PROJECTS PVT. LTD. [KRISHNA MURARI, J.]
thing at or before the specified time, the contract, or s o much
of it as has not been performed, becomes voidable at the option
of the promisee, if the intention of the parties was th at time
should be of the essence of the contract.”
35.In view of the aforesaid provisions, the vendors were entitled
to rescind the contract as there was a breach of conditi on, i.e, ‘time
was the essence’. Coming back to the point of limitation, it is clear that
Article 54 of the Limitation Act mandates that in this case at hand, the
date fixed for payment of consideration was three months from the date
of the agreements (i.e. 26.03.1997 and 27.03.1997). In any case, the
time period for filing the suit had commenced from 26/27.6.1997 a nd
would have expired after three years, i.e., in the end of J une 2000.
36. The purchaser has contended that the legal notice issued b y
them on 31.03.2000, would be sufficient to get past the bar of limitation,
as the purchaser has paid the advance amount to a large extent. Although
this argument seems to be very attractive at first blush, the same cannot
be sustained in the eyes of the law for the reason that when a condition
of a contract is breached and the consequences ensue for that breach, a
party cannot claim equity to escape such consequences.
37. In this context, we may note that Article 54 of the Limitation
Act provides for two consequences based on the presence of fixed time
period of performance. It is only in a case where the ti me period for
performance is not fixed that the purchaser can take recourse to the
notices issued and the vendors’ reply thereto. In the case at hand, the
aforesaid circumstances do not come into play as a fixed time period
was clearly mandated by Clause 3 read with Clause 23 of the agreements
to sell, as explained above.
38. In light of the above, we may note that the suit filed by the
purchaser was clearly barred by limitation in view of the first part of
Article 54 of the Limitation Act and no amount of payment of advance
could have remedied such a breach of condition.
39. Having come to the aforesaid conclusion, there would not have
been any reason for this Court to continue the analysis on merits. However,
we feel that even on merits, the purchaser’s case c annot be
countenanced in law and we accordingly adumbrate on the foll owing
aspects.
435
Issue B
40. At the outset, we may notice that this question assumes great
significance as application of the 2018 Amendment Act to the p resent
set of circumstances would determine whether specific perfor mance
ought to be applied mandatorily or the aforesaid decision is a discretion
of the Court to examine whether equity demands such application instead
of granting damages if any.
41. We may note that the Specific Relief Act, 1963 is the second
legislation, replacing the earlier 1877 enactment of the Specific Relief
Act. The 1963 Act was enacted after consideration o f the Law
Commission in its Ninth Report. The 1963 Act more or less followed the
English position on equitable remedy of specific performance. In Common
Law, the remedy of specific performance was unknown in the ini tial
days and courts only granted damages for the value of goods if th ere
was any breach of contract. Accordingly English Courts, in the early
years, granted monetary relief. In order to rectify the har sh stance of
law, Courts of Equity in England started granting relief of specific
performance if the Court of Equity found that granting damages would
be inadequate or some special equitable rights of the plaintif f under a
trust have been breached.
42.In any case, grant of such relief, which emanated from equitable
principles, remained discretionary. This principle is clearly explained by
Swinfen Eady M.R., in Whiteley Limited v. Hilt 2, in the following
manner:
“The power vested in the Court to order the delivery up o f a
particular chattel is discretionary, and ought not to be
exercised when the chattel is an ordinary article of commer ce
and of no special value or interest, and not alleged to be of
any special value to the plaintiff and where the damages woul d
fully compensate.”
43. However, this was not the position under the Civil Law. Under
the Civil Law of contracts, adherence to the sanctity of c ontract is
enforced with greater rigour by inversing the situation. The reason fo r
choice of damages and specific performance range fro m legal to
economic. It is in this context that the Courts cannot engage on the
2 (1918) 2 K.B. 808
SMT. KATTA SUJATHA REDDY v. SIDDAMSETTY
INFRA PROJECTS PVT. LTD. [KRISHNA MURARI, J.]
merits of having damages or specific performance or a hybrid. It is best
left to the legislature to choose the course best-suited to the economy
without sheepishly following the typecast approach in England or Civil
Law systems.
44. The High Court, in the impugned order, has taken a different
approach in categorising the Specific Relief Act, 1963 as procedural and
holding that the 2018 amendment is also a procedural provision which
requires to be given retrospective effect. The High Court places reliance
on an old case of Radheshyam Kamila v. Kiran Bala Dasi 3, wherein
the High Court, while relying upon the commentary of Pollock & Mulla
on Indian Contract Act and Specific Relief Act (4th edition) specifically
observed that “specific relief, as a form of judicial proc ess, belongs to
the law of procedure”. In this context, the Court came to a c onclusion
that such procedural amendment ought to be given retrospective effect.
45. We do not subscribe to the aforesaid reasoning provided by
the High Court for the simple reason that after the 2018 am endment,
specific performance, which stood as a discretionary remedy, is not
codified as an enforceable right which is not dependent anymore on
equitable principles expounded by judges, rather it i s founded on
satisfaction of the requisite ingredients as provided u nder the Specific
Relief Act. For determination of whether a substituted law is procedural
or substantive, reference to the nature of the parent enactment may not
be material. Instead, it is the nature of the amendments which determine
whether they are in the realm of procedural or substantive law.
46. The High Court’s reliance on Adhunik Steels Limitedv. Orissa
Manganese and Minerals (P) ltd. 4, was also misplaced. In that case,
the Court was concerned with the interpretation of Section 9 of the
Arbitration Act, that deals with granting of injunctions. The specific
question before the Court was whether the provisions of the CPC or the
provisions of the Specific Relief Act have a bearing on Section 9 of the
Arbitration and Conciliation Act, 1996.
47. While discussing the nature of the Specific Relief Act, in the
aforesaid case, this Court had observed as under:-
“16. Injunction is a form of specific relief. It is an order of a
court requiring a party either to do a specific act or acts or to
3 AIR 1971 Cal 341
4 (2007) 7 SCC 125
437
refrain from doing a specific act or acts either for a li mited
period or without limit of time. In relation to a b reach of
contract, the proper remedy against a defendant who acts in
breach of his obligations under a contract, is either damage s
or specific relief. The two principal varieties of spec ific relief
are, decree of specific performance and the injunctio n (See
David Bean on Injunctions). The Specific Relief Act , 1963
was intended to be “an Act to define and amend the law
relating to certain kinds of specific reliefs”. Specifi c relief is
relief in specie. It is a remedy which aims at the exact fulfilment
of an obligation. According to Dr. Banerjee in his Tagore
Law Lectures on Specific Relief, the remedy for the
non-performance of a duty are (1) compensatory, (2) specifi c.
In the former, the court awards damages for breach of the
obligation. In the latter, it directs the party in default to do or
forbear from doing the very thing, which he is bound to do or
forbear from doing. The law of specific relief is said to be, in
its essence, a part of the law of procedure, for, specific relief
is a form of judicial redress. Thus, the Specific R elief Act,
1963 purports to define and amend the law relating to certain
kinds of specific reliefs obtainable in civil courts. It does not
deal with the remedies connected with compensatory rel iefs
except as incidental and to a limited extent. The right to relief
of injunctions is contained in Part III of the Specifi c Relief
Act. Section 36 provides that preventive relief may be grante d
at the discretion of the court by injunction, tempo rary or
perpetual. Section 38 indicates when perpetual inju nctions
are granted and Section 39 indicates when mandatory
injunctions are granted. Section 40 provides that d amages
may be awarded either in lieu of or in addition to injunctions.
Section 41 provides for contingencies when an injun ction
cannot be granted. Section 42 enables, notwithstand ing
anything contained in Section 41, particularly Clau se (e)
providing that no injunction can be granted to preve nt the
breach of a contract the performance of which would not be
specifically enforced, the granting of an injunction to perfo rm
a negative covenant. Thus, the power to grant injunctions b y
way of specific relief is covered by the Specific R elief Act,
1963.”
SMT. KATTA SUJATHA REDDY v. SIDDAMSETTY
INFRA PROJECTS PVT. LTD. [KRISHNA MURARI, J.]
However, the conclusion in the above paragraph, taken in isolation,
would not support the final outcome in the aforesaid case, w herein it
was held that an injunction order granted under Sect ion 9 of the
Arbitration and Conciliation Act would involve consideration of settled
principles under the Code of Civil Procedure or the Specific Relief Act.
It was nowhere stated in the aforesaid case that the Specific Relief Act
of 1963 stricto sensu provided for only procedural mechanism. We
find it difficult to read the aforesaid case in the manner alluded to by
the High Court.
48. In any case, the amendment carried out in 2018 was enacted
to further bolster adherence to the sanctity of contract s. This approach
was radical and created new rights and obligations which did not exist
prior to such an amendment. Section 10, after amendment, reads as
under:
10. Specific performance in respect of contracts.—The specific
performance of a contract shall be enforced by the court
subject to the provisions contained in sub-section (2) of
section 11, section 14 and section 16.
49. This provision, which remained in the realm of the Court s’
discretion, was converted into a mandatory provision, prescribing a power
the Courts had to exercise when the ingredients were fulfilled. This was
a significant step in the growth of commercial law as t he sanctity of
contracts was reinforced with parties having to comply wi th contracts
and thereby reducing efficient breaches.
50. Under the pre-amended Specific Relief Act, one of the major
considerations for grant of specific performance was the a dequacy of
damages under Section 14(1)(a). However, this consideration has now
been completely done away with, in order to provide better compensation
to the aggrieved party in the form of specific performance.
51. Having come to the conclusion that the 2018 amendment was
not a mere procedural enactment, rather it had substantive principles
built into its working, this Court cannot hold that such amendments would
apply retrospectively.
52. In Shyam Sunder and others V. Ram Kumar and Another5,
this Court held as under:
5 (2001) 8 SCC 24
439
“28. From the aforesaid decisions the legal position tha t
emerges is that when a repeal of an enactment is followed b y
a fresh legislation, such legislation does not affe ct the
substantive rights of the parties on the date of th e suit or
adjudication of the suit unless such a legislation is
retrospective and a court of appeal cannot take int o
consideration a new law brought into existence afte r the
judgment appealed from has been rendered because the rights
of the parties in an appeal are determined under the law in
force on the date of the suit. However, the positio n in law
would be different in the matters which relate to pro cedural
law but so far as substantive rights of parties are c oncerned,
they remain unaffected by the amendment in the enac tment.
We are, therefore, of the view that where a repeal of provisions
of an enactment is followed by fresh legislation by an
amending Act, such legislation is prospective in operation and
does not affect substantive or vested rights of the parties unless
made retrospective either expressly or by necessary
intendment. We are further of the view that there i s a
presumption against the retrospective operation of a statute
and further a statute is not to be construed to have a greater
retrospective operation than its language renders n ecessary,
but an amending Act which affects the procedure is presume d
to be retrospective, unless the amending Act provides otherwise.
We have carefully looked into the new substituted Section 15
brought in the parent Act by the Amendment Act, 1995 but do
not find it either expressly or by necessary implic ation
retrospective in operation which may affect the rights of the
parties on the date of adjudication of the suit and the same i s
required to be taken into consideration by the appellate cour t.
In Shanti Devi v. Hukum Chand [(1996) 5 SCC 768] this Court
had occasion to interpret the substituted Section 15 with whi ch
we are concerned and held that on a plain reading of Section
15, it is clear that it has been introduced prospectiv ely and
there is no question of such section affecting in any ma nner
the judgment and decree passed in the suit for pre-em ption
affirmed by the High Court in the second appeal. We are
respectfully in agreement with the view expressed in t he said
decision and hold that the substituted Section 15 i n the
SMT. KATTA SUJATHA REDDY v. SIDDAMSETTY
INFRA PROJECTS PVT. LTD. [KRISHNA MURARI, J.]
absence of anything in it to show that it is retrospecti ve, does
not affect the right of the parties which accrued to them on
the date of the suit or on the date of passing of the dec ree by
the court of first instance. We are also of the vie w that the
present appeals are unaffected by change in law ins ofar it
related to determination of the substantive rights of the parties
and the same are required to be decided in the light of the law
of pre-emption as it existed on the date of passing of the
decree.”
53. From the aforesaid decision, it is clear that when a substantive
law is brought about by amendment, there is no assumption that the
same ought to be given retrospective effect. Rather, there is a requirement
for the legislature to expressly clarify whether the aforesaid amendments
ought to be retrospective or not.
54.In the light of the aforesaid discussion, it is clear that ordinarily,
the effect of amendment by substitution would be that the earlier
provisions would be repealed, and amended provisions would be enacted
in place of the earlier provisions from the date of incep tion of that
enactment. However, if the substituted provisions contain any substantive
provisions which create new rights, obligations, or take away any vested
rights, then such substitution cannot automatically be assumed to have
come into force retrospectively. In such cases, the legisla ture has to
expressly provide as to whether such substitution is to be construed
retrospectively or not.
55. In the case at hand, the amendment act contemplates that the
said substituted provisions would come into force on such date a s the
Central Government may appoint, by notification in the Official Gazette,
or different dates may be appointed for different provisions of the Act. It
may be noted that 01.10.2018 was the appointed date on which the
amended provisions would come into effect.
56.In view of the above discussion, we do not have any hesitation
in holding that the 2018 amendment to the Specific Re lief Act is
prospective and cannot apply to those transactions that took place prior
to its coming into force.
ISSUE C
57. From the above, it is clear that the 2018 Amendment Act is
prospective and cannot be applied to the present set of facts. Under the
441
earlier law, grant of specific performance was discretionary. However, it
was mandated that such discretion ought to be used in a principled
manner without leaving scope for any arbitrary appl ication. In
Saradamani Kandappan v. S. Rajalakshmi and other 6, this court
held a under:-
42. Therefore there is an urgent need to revisit the princi ple
that time is not of the essence in contracts relating to immovable
properties and also explain the current position of law with
regard to contracts relating to immovable property made after
1975, in view of the changed circumstances arising from
inflation and steep increase in prices. We do not propo se to
undertake that exercise in this case, nor referring the matter
to a larger Bench as we have held on facts in this case that
time is the essence of the contract, even with reference to the
principles in Chand Rani [(1993) 1 SCC 519] and other cases.
Be that as it may.
43. Till the issue is considered in an appropriate case, we can
only reiterate what has been suggested in K.S. Vidyanadam
[(1997) 3 SCC 1]:
(i) The courts, while exercising discretion in suits for specific
performance, should bear in mind that when the part ies
prescribe a time/period, for taking certain steps o r for
completion of the transaction, that must have some
significance and therefore time/period prescribed cann ot be
ignored.
(ii) The courts will apply greater scrutiny and strictness w hen
considering whether the purchaser was “ready and willin g”
to perform his part of the contract.
(iii) Every suit for specific performance need not be d ecreed
merely because it is filed within the period of lim itation by
ignoring the time-limits stipulated in the agreement. The courts
will also “frown” upon suits which are not filed immediately
after the breach/refusal. The fact that limitation is three years
does not mean that a purchaser can wait for 1 or 2 years to
file a suit and obtain specific performance. The th ree-year
6 (2011) 12 SCC 18
SMT. KATTA SUJATHA REDDY v. SIDDAMSETTY
INFRA PROJECTS PVT. LTD. [KRISHNA MURARI, J.]
period is intended to assist the purchasers in special cases,
as for example, where the major part of the conside ration
has been paid to the vendor and possession has been delivered
in part-performance, where equity shifts in favour of the
purchaser.”
58. From the aforesaid, it is clear that the purchaser ought to have
been vigilant in the case at hand to enforce his right and could not have
been lackadaisical in his approach. From the facts, it is c lear that the
purchaser had entered into an agreement way back on 26/27.03.1997,
which had a clause mandating completion of the contract by payment of
the remaining consideration within three months. The aforesaid clause
was drafted, as alluded to earlier, for providing one last opportunity for
the purchaser to make good their lapse which had happened on th e
earlier occasion. In this context, the time for performance of the contract
including the payment lasted till the month of June 1997.
59. It was necessary that the purchaser should have taken
immediate steps to complete the transaction and if such steps were
immediately completed then the purchaser would have a clear right for
seeking enforcement for 3 years reckoned from the last date decided
for completion of the contract.
60.The notice dated 08.02.2000, issued on behalf of the purchaser
implicitly acknowledges the fact that time was considered as the essence
even by the purchaser themselves and due to breach of the s ame, they
sought novation of the agreement to sell in the following manner:
“However the due efforts by my client’s proved little light hope
when you have strongly urged my clients to come up with the
balance of sale consideration in view of the fact that other
interested parties are not available at that moment and you
asked my clients to renew their efforts by end of Jan’ 2000
and thereafter you have promised to complete the transaction
by executing the sale deed in favour of my client.”
(emphasis supplied )
61. Aforesaid notice, at best reflects an intention by the vendor to
renegotiate the terms, which was not accepted in toto by the vendor.
62. The next aspect which this Court needs to consider is whether
the parties had requisite willingness and readiness to perform the contract.
443
The aforesaid requirement is one of the essential ingredients under Section
16 of the Specific Relief Act, 1963 which reads as under:
16. Personal Bars to relief.- Specific Performance of a contract
cannot be enforced in favour of a person-
…
(c) who fails to aver and prove that he has performed or always
been ready and willing to perform the essential terms of t he
contract which are to be performed by him, other than terms
the performance of which has been prevented or waived by
the defendant.
63. It is clear that in order to prove readiness and willingness, the
burden is on the purchaser to prove that they were always re ady and it
is only the vendor who refused to perform the contract for ext raneous
considerations. In order to support their averments, the purchaser (Sunil
Siddam Setty) entered into the witness box and deposed as PW1.
64. In his cross examination, PW1 deposed as below:
“We have paid a sum Rs. 10,850/- towards advance of sa le
consideration on 27.03.1997, when one of the agreement of
sale was executed. It is true one cheque which was issued by
us for a sum of Rs. 5,00,000/- was bounced. When th e said
fact was brought to our notice, we issued a demand draft for
the sum of Rs. 5,00,000/- within 10 of [sic.] 15 da ys and
obtained a separate receipt for that amount from Deft. No. 6
by name Katta Sujatha Reddy. It is mentioned in the agreement
for sale dt. 26.03.1997 the transaction has to be comp leted
within three months. Witness volunteers and says; th e three
month time was stipulated with some conditions.
It is mentioned in another agreement of sale dated 27.03.1997
that the sale transaction has to be completed within t hree
months with some conditions.
…
Q. How many times you met the Defendant and demanded
for execution in the year 1997?
Ans.- … We did not issue any notice to the defendants in the
year 1997 by demanding them to receive the balance of sale
consideration and execute sale deed in our favour.
SMT. KATTA SUJATHA REDDY v. SIDDAMSETTY
INFRA PROJECTS PVT. LTD. [KRISHNA MURARI, J.]
It is not true to suggest that I was not ready and willing to
perform my part of contract and that I never had balance of
sale consideration and that I did not demand the defendants
within stipulated period to receive the balance of sale
consideration and to execute the sale deed and that due to
it, I am not entitled to get the relief of specific perfo rmance of
agreement of sale as prayed in my suit. …
I did not get issued any written notice to D5 prior to
06.07.2002. Witness volunteers and says: that the e ntire
transaction had taken place in good faith and they never
anticipated court proceedings at that time.
(emphasis supplied)
65.From the above it is clear that the purchaser did not voluntarily
adhere to the time stipulation under the contract. In order to by-pass the
condition of time being the essence, the purchaser invoked the standard
of good faith. Aforesaid standard prescribes a higher duty of c are for
parties entering into a contract. Unless such duty is expressly stipulated,
good faith standard cannot be implicitly read into any contract.
66. This Court does not subscribe to acceptance of a gene ral
standard of good faith to imply broader good faith obligations only to
give a go-by to the explicit conditions for maintaining the sanctity of
contract. Such broad standards will have potentially far reaching
consequences. This Court agrees that such an implicit readi ng would
come into play post the 2018 Amendment to the Specific Relie f Act
which enables specific performance of contracts to uphold their sanctity.
However, from the facts and circumstances of this case, we cannot
accept that such higher standards of good faith was relevant.
67. On the aspect of the vendor’s obligation to provide requisite
and necessary documents, DW1 (Smt. Katta Sujatha Reddy), has averred
that all the documents were available. It is only after the purchaser was
satisfied about the sound title that he entered into the agreement to sell.
68. In the light of the above, it is clear that Section 16(c) of the
Specific Relief Act would only come into force if the purc haser was
ready and willing to perform the contract within the three month period
prescribed under Clause 3 of the agreements. The aforesaid conclusion
445
is also bolstered by the fact that specific performance can only be granted
when essential terms of contract are not violated in term s of Section
16(b).
69. From the above, we can safely conclude that the purchas er
was not ready or willing to perform his part of the contract within the
time stipulated and accordingly, specific performance cannot be granted
for the entire contract.
70. The last aspect which we need to consider in this matt er is
whether possession was with the purchaser after ent ering into
agreements to sell in 1997. On this aspect, the High Court has decided in
favour of the purchaser by relying upon the evidence of PW1 and the
proceedings before the Revenue Authorities. However, we ar e of the
opinion that the High Court has not duly considered the state ment of
PW1 in its proper perspective. PW1 during the cours e of
cross-examination, has not specifically pointed out as to when was the
purchaser put into possession of the property. PW1 has not further proved
that there was any development cost incurred by him for developing the
aforesaid land.
71. The claim of PW2 that the disputed land was developed by
the purchaser, is clearly unacceptable in the light of exhibits A22 to A26
which are the photographs of the property that show that no development
had taken place, as averred by the purchaser. Reliance on the revenue
records concerning mutation may not be of any significance when the
question of possession is to be decided solely on the facts as available on
the records.
72. In this context, we do not propose to burden this judgment
with a detailed discussion of the testimonies of DW2 and DW3 which
clearly go to show that the purchaser was never in possess ion of the
aforesaid land.
73. If the agreement of sale is coupled with possession, it requires
stamp duty and stamp duty has to be paid as per Schedule 1A of Article
47A of the Stamp Act. Further, asking for the relief of r ecovery of
possession also shows that the plaintiff was not in possess ion of the
property. The trial Court has rightly answered this point against the plaintiff
and the Appellate Court, on an erroneous appreciation of the facts and
law, reversed the said findings.
SMT. KATTA SUJATHA REDDY v. SIDDAMSETTY
INFRA PROJECTS PVT. LTD. [KRISHNA MURARI, J.]
ISSUE D-
74. The last aspect which has been argued before us concerns
application of Section 12 of the Specific Relief Act, 1 963. This issue
arises from the fact that the purchaser is said to have paid 90 percent of
the sale consideration and in lieu thereof, the High Court has hel d that
the purchaser is entitled to ninety percent of the scheduled land.
75. Although this argument appears to be attractive in the fi rst
gloss, however a deeper examination of the same would paint a contrary
picture. Section 12 of the Specific Relief Act, 1963 reads as under:
12. Specific performance of part of contract.—
(1) Except as otherwise hereinafter provided in this se ction,
the court shall not direct the specific performance of a part of
a contract.
(2) Where a party to a contract is unable to perform the whole
of his part of it, but the part which must be left unperfor med
by only a small proportion to the whole in value and admits
of compensation in money, the court may, at the suit of eithe r
party, direct the specific performance of so much o f the
contract as can be performed, and award compensatio n in
money for the deficiency.
(3) Where a party to a contract is unable to perform the whole
of his part of it, and the part which must be left unperf ormed
either—
(a) forms a considerable part of the whole, though admitti ng
of compensation in money; or
(b) does not admit of compensation in money, he is not entit led
to obtain a decree for specific performance; but th e court
may, at the suit of other party, direct the party in de fault to
perform specifically so much of his part of the contract a s he
can perform, if the other party—
(i) in a case falling under clause (a), pays or has paid the
agreed consideration for the whole of the contract re duced
by the consideration for the part which must be lef t
unperformed and a case falling under clause (b), 1[pay s or
had paid] the consideration for the whole of the co ntract
without any abatement; and
447
(ii) in either case, relinquishes all claims to the perfo rmance
of the remaining part of the contract and all right to
compensation, either for the deficiency or for the loss or
damage sustained by him through the default of the defendant.
(4) When a part of a contract which, taken by itself, can and
ought to be specifically performed, stands on a separate and
independent footing from another part of the same contr act
which cannot or ought not to be specifically performed , the
court may direct specific performance of the former part.
Explanation.—For the purposes of this section, a party to a
contract shall be deemed to be unable to perform the whole
of his part of it if a portion of its subject matter ex isting at
the date of the contract has ceased to exist at the time of its
performance.
76.The aforesaid provision has been interpreted by this Court on
several occasions. In the case of Jaswinder Kaur v. Gurmeet Singh 7,
this Court held as under:-
“20. Section 12(1) provides that specific performance can be
granted on part of a contract only in the circumsta nces
mentioned in the section. Section 12(2) deals with breach the
contract if a party is unable to perform the whole of its p art
and such part bears a small proportion to the whole in value
and admits compensation in money. The expression “unabl e
to perform” in Section 12(2) for instance would mean that a
part of the property destroyed after contract or act of G od or
an act by which it would cease to exist. In such a case part y
to a contract shall be deemed to be unable to perfo rm the
whole or its part of the contract. Such a person would come
within the words “party in default”. The inability to perform
may arise by deficiency in quantity of subject-matt er or
deficiencies or some legal prohibition or such other causes.
None of such causes is present in the instant case.
21. Section 12 of the Act does not apply where the inability to
perform specific performance on part of contract arises because
of the plaintiff’s own conduct as held in Abdul Rahim v.
Maidhar Gazi [Abdul Rahim v. Maidhar Gazi, 1928 SCC
7 (2017) 12 SCC 810
SMT. KATTA SUJATHA REDDY v. SIDDAMSETTY
INFRA PROJECTS PVT. LTD. [KRISHNA MURARI, J.]
OnLine Cal 20 : AIR 1928 Cal 584] . In Graham v. Krishna
Chunder Dey [Graham v. Krishna Chunder Dey, 1924 SCC
OnLine PC 63 : (1924-25) 52 IA 90 : AIR 1925 PC 45] it
has been laid down that the Explanation in the section exhaust
all the circumstances in which part-performance can be
granted. Section 12(2) deals with the situation where a party
is unable to perform and such part is only a small proportion
in value and capable of compensation in form of money . It
was not a case covered in Section 12(2) at all. Under Section
12(3) party in default is entitled to specific performance on
payment of whole consideration or for the part left unperformed
but here in the instant case the plaintiff being in default could
not be said to be entitled to invoke Section 12(3) also.”
77. From the above, it is clear that there was no inability on part
of the parties to perform the rest of the contract or the remaining part
was waived. In this case, the purchaser breached the essential condition
of the contract, which altogether disentitles him to clai m specific
performance. There is no doubt that the claim of purchaser is hit by
delay and laches on their part as they did not take appropriate measures
within the stipulated time and filing of the suit was delaye d by almost
five years. In this context, in Rachakonda Narayana v. Ponthala
Parvathamma8, this Court held as under:
“8. A perusal of sub-section (3) of Section 12 shows that the
first part of the said provisions mandates refusal of sp ecific
performance of a contract on certain conditions. Ho wever,
the latter part of the provisions permits a court to dir ect the
party in default to perform specifically so much of his part of
the contract as he can perform if the other party pays or has
paid the agreed consideration for the whole of the contra ct
and relinquishes all claims to the performance of the remaining
part of the contract and all the rights to compensation for the
loss sustained by him. If a suit is laid by the other party, the
court may direct the defaulting party to perform that part of
the contract which is performable on satisfying two
preconditions i.e. (i) the plaintiff pays or has alr eady paid
the whole of the consideration amount under the agreem ent,
8 (2001) 8 SCC 173
449
and that (ii) the plaintiff relinquishes all claims to the
performance of the other part of the contract which the
defaulting party is incapable to perform and all ri ghts to
compensation for loss sustained by him. Thus, the ingredients
which would attract specific performance of the part o f the
contract, are: (i) if a party to an agreement is unable to perform
a part of the contract, he is to be treated as defaulting p arty
to that extent, and (ii) the other party to an agreement must,
in a suit for such specific performance, either pay or has
paid the whole of the agreed amount, for that part of the
contract which is capable of being performed by the
defaulting party and also relinquish his claim in res pect of
the other part of the contract which the defaulting p arty is
not capable to perform and relinquishes the claim o f
compensation in respect of loss sustained by him. If such
ingredients are satisfied, the discretionary relief o f specific
performance is ordinarily granted unless there is de lay or
laches or any other disability on the part of the other party.
(emphasis supplied )
78. Therefore, we do not think that it is an appropriate cas e for
granting relief to the purchaser in terms of Section 12 of the Specific
Relief Act, 1963 as the claim of the purchaser is barred by delay, laches
and limitation.
79. We are of the firm opinion that the contract was breached due
to the conduct of the plaintiff/purchaser, who were not willing to perform
the contract after entering into a time sensitive agreement. In any case,
it is an admitted fact that plaintiff had paid only part consideration. Though
there is a forfeiture clause in the agreement, this Court w ith a view of
rendering complete justice between the parties, deems it appropriate to
direct the vendors/appellants to repay the said amount with interes t @
7.5% p.a. from the date such payment was made by the purcha ser to
the vendors, till the entire amount is paid back. We further d irect the
vendors to pay the entire amount to the credit of the suit account within
six months from the date of receipt of a copy of the order.
80. The appeal is allowed on the above terms and the parties are
left to bear their own costs.
SMT. KATTA SUJATHA REDDY v. SIDDAMSETTY
INFRA PROJECTS PVT. LTD. [KRISHNA MURARI, J.]
C.A. NO.5823/2022 (ARISING OUT OF SLP (C) NO.
19920/2021) AND C.A. NO. 5824/2022 (ARISING OUT OF
SLP(C) NO.19286/2021)
81.In light of the above judgment, the present appeals are disposed
of accordingly.
Ankit Gyan and Anurag Bhaskar Appeals disposed of.
(Assisted by : Ajay, LCRA)