Chhattisgarh State Power Distribution Company Ltd v. Chhattisgarh State Electricity Regulatory Commission and Another
B. R. GAVAI, J.
1.These appeals challenge the judgment dated 6th December 2007
passed by the Appellate Tribunal for Electricity (hereinafter referred to
as the “APTEL”), thereby dismissing the appeals filed by the present
appellant.
2. The facts in brief giving rise to the present appeals are as
under:
M/s Shri Bajrang Power and Ispat Ltd. (hereinafter referre d to
as “SBPIL”) has established a Captive Generation Pla nt. M/s Shri
Bajrang Metallics and Power Ltd. (hereinafter referred to as “SBMPL”)
is a sister concern of SBPIL. SBPIL submitted a pet ition to the
Chhattisgarh State Electricity Regulatory Commission (h ereinafter
referred to as “the Commission”) for providing open access and wheeling
of power through the transmission system of the appellant for captive
use by SBMPL. The petition of the SBPIL was for permission to wheel
803
19 lakh units, corresponding to 13 MW, to SBMPL. It was stated in the
said petition that SBMPL holds 27.6% of the equity shares of SBPIL
and that more than 51% of the electricity generated by the captive power
plant would be consumed by them. It was submitted that the generating
capacity of the captive generation plant set up by SBPIL would be 103.68
MU per annum. It was further submitted that out of the said 103.68 MU
per annum power generated, 13.22 MU per annum would be utilized in
its sponge iron plant. It was further submitted that 54 M U per annum
would be supplied to SBMPL through the appellant grid and the balance
would be sold to the appellant.
3. The said petition came to be resisted by the appellant. It was
contended by the appellant that SBPIL holds more than 72% of the
shares of the company. However, its consumption would be limited only
to 14.16% (13.22 MU), whereas the consumption of SBMPL holding
26.67% shares, would be 57.87% (54 MU). It was submitted that t his
was not proportionate to the ownership of the power plant.
4.The Commission, vide its order dated 14th October 2005, rejected
the contention of the appellant and held that SBPIL was entitled to supply
electricity to its sister concern SBMPL and the same would qualify to be
treated as ‘own consumption’ within the ambit of Section 9 re ad with
Section 2(8) of the Electricity Act, 2003 (hereinafter referred to as “the
said Act”) and Rule 3 of the Electricity Rules, 2005 (hereinafter referred
to as “the said Rules”). While allowing the said petition, the Commission
imposed the following conditions:
(i) “The consumption of electricity by the captive users shall
not be less than 51% over a financial year, and in case it is
not so it would be treated as ‘supply of electricity by a
generating company’ in terms of provision of rule 3(2) of
the Rules.
(ii) The CSEB is entitled to charge for wheeling of electr icity
and levy other charges as per their present rates which
shall be subject to revision as per the provisions in regulations
on the charges for open access to be notified by the
Commission shortly.
(iii) The company may enter into necessary agreement with
the CSEB for the sale of balance power under the present
terms and conditions of the CSEB, is subject to revision as
per the directions of the Commission from time to time.”
CSPDCL v. CHHATTISGARH STATE ELECTRICITY
REGULATORY COMMISSION [B. R. GAVAI, J.]
5.Being aggrieved thereby, the appellant preferred appeals before
the APTEL. The said appeals came to be dismissed by the APTEL vide
impugned judgment dated 6th December 2007. Being aggrieved thereby,
the present appeals.
6. We have heard Shri Nikhil Nayyar, learned Senior Counsel
appearing on behalf of the appellant and Shri Naveen R. Nath, learned
Senior Counsel and Smt. Swapna Seshadari, learned counsel appearing
on behalf of the respondents.
7.Shri Nayyar submitted that the order passed by the Commission
and the impugned judgment passed by the APTEL are contrary to the
plain language used in Rule 3 of the said Rules. He submitted that SBMPL
is a sister concern of SBPIL which has established the cap tive power
plant. It is submitted that unless SBPIL consumes 51% of the aggregate
electricity generated by it, it will not be entitled to get the benefit under
Section 9 of the said Act. He submitted that in sub-rule (1) of Rule 3 of
the said Rules, the words used are “Captive Generating Pl ant”. He
submitted that upon a plain and literal interpretation of Rule 3 of the said
Rules, it will be abundantly clear that unless the sister concern establishes
captive generating plant utilization of 51% of the electricity generated, it
will not be entitled to get benefit under Section 9 of the said Act.
8.Shri Nath submitted that the Commission, as well as the APTEL,
has rightly construed the provisions of the said Act and the said Rules.
He submitted, that this Court, in the case of Maharashtra State
Electricity Distribution Company Limited v. JSW Steel L imited and
Others1, has held that no permission is required from the Commission
for supply of electricity for its own use. He further submitt ed that this
Court has also held that insofar as captive users are concerned, they are
not liable to pay the additional surcharge under Section 42(4) of the said
Act.
9. Smt. Seshadari, learned counsel appearing on behalf of the
Commission submitted that if the arguments advanced on behalf of the
appellant are accepted, the same would be contrary to the provisions of
the said Act. She, therefore, submitted that the order passed by the
Commission and the impugned judgment passed by the APTEL warrant
no interference.
1 (2022) 2 SCC 742
805
10. For appreciating the rival contentions, it will be apposite to
refer to Clauses (8) and (49) of Section 2 as well as Section 9 and sub-
sections (1) and (2) of Section 42 of the said Act, which read thus:
“2. Definitions.-
……….
(8) “Captive generating plant” means a power plant set up by any
person to generate electricity primarily for his own use and includes
a power plant set up by any cooperative society or association of
persons for generating electricity primarily for use of members of
such cooperative society or association;
…………
(49) “person” shall include any company or body corporate or
association or body of individuals, whether incorporated or not, or
artificial juridical person;
9. Captive generation.—(1) Notwithstanding anything contained
in this Act, a person may construct, maintain or operate a captive
generating plant and dedicated transmission lines:
Provided that the supply of electricity from the captive
generating plant through the grid shall be regulated in the s ame
manner as the generating station of a generating company:
Provided further that no licence shall be required under this
Act for supply of electricity generated from a captive generating
plan to any licensee in accordance with the provisions of this Act
and the rules and regulations made thereunder and to any consumer
subject to the regulations made under sub-section (2) of Section
42.
(2) Every person, who has constructed a captive generating
plant and maintains and operates such plant, shall have the right
to open access for the purposes of carrying electricity from his
captive generating plant to the destination of his use:
Provided that such open access shall be subject to availability
of adequate transmission facility and such availabi lity of
transmission facility shall be determined by the Ce ntral
Transmission Utility or the State Transmission Utility, as the case
may be:
CSPDCL v. CHHATTISGARH STATE ELECTRICITY
REGULATORY COMMISSION [B. R. GAVAI, J.]
Provided further that any dispute regarding the availability
of transmission facility shall be adjudicated upon by the Appropriate
Commission.
42. Duties of distribution licensee and open access .—(1) It
shall be the duty of a distribution licensee to develop and maintain
an efficient, co-ordinated and economical distribution system in
his area of supply and to supply electricity in accordance with the
provisions contained in this Act.
(2) The State Commission shall introduce open access in
such phases and subject to such conditions, (including the cross
subsidies, and other operational constraints) as may be specified
within one year of the appointed date by it and in specifying the
extent of open access in successive phases and in determining
the charges for wheeling, it shall have due regard to all relevant
factors including such cross-subsidies, and other opera tional
constraints:
Provided that such open access shall be allowed on payment
of a surcharge in addition to the charges for wheeling as may be
determined by the State Commission:
Provided further that such surcharge shall be utilised to
meet the requirements of current level of cross-subsidy wi thin
the area of supply of the distribution licensee:
Provided also that such surcharge and cross-subsidies shall
be progressively reduced in the manner as may be specifie d by
the State Commission:
Provided also that such surcharge shall not be leviable in
case open access is provided to a person who has establ ished a
captive generating plant for carrying the electricity to the destination
of his own use:
Provided also that the State Commission shall, not later than
five years from the date of commencement of the Electr icity
(Amendment) Act, 2003, by regulations, provide such open access
to all consumers who require a supply of electricity wh ere the
maximum power to be made available at any time exceeds one
megawatt.
……….”
807
11.It could thus be seen that in view of Section 9 of the said Act,
any person may construct, maintain or operate a captive generating plant
and dedicated transmission lines. The first proviso to Sect ion 9 of the
said Act provides that the supply of electricity from the captive generating
plant through the grid shall be regulated in the same manner as the
generating station of the generating company. The second provis o to
Section 9 of the said Act provides that no licence shall be required under
the said Act for supply of electricity generated from a captive generating
plant to any licensee in accordance with the provisions of the said Act
and the rules and regulations made thereunder and to any consumer ,
subject to the regulations made under sub-section (2) of Secti on 42 of
the said Act. Sub-section (2) of Section 9 of the said Act provides that
every person, who has constructed a captive generati ng plant and
maintains and operates such plant, shall have the right to ope n access
for the purposes of carrying electricity from his captive generating plant
to the destination of his use. The first proviso to sub-section (2) of Section
9 of the said Act provides that such open access shall be subject to
availability of adequate transmission facility and such avail ability of
transmission facility shall be determined by the Central Transmission
Utility or the State Transmission Utility, as the case may be. The second
proviso to sub-section (2) of Section 9 of the said Act prov ides that if
there is any dispute regarding the availability of transmission facility, it
shall be adjudicated upon by the Appropriate Commission.
12. Clause (8) of Section 2 of the said Act defines “Capt ive
generating plant”. It states that “Captive generating plant” means a power
plant set up by any person to generate electricity primarily for his own
use and includes a power plant set up by any co-operative society or
association of persons for generating electricity primarily for use of
members of such co-operative society or association.
13. Clause (49) of Section 2 of the said Act defines “person”. It
states that “person” shall include any company or body corporate or
association or body of individuals, whether incorporated or not, or artificial
juridical person.
14.A combined reading of Section 9 and Clause (8) of Section 2
of the said Act would reveal that a person is entitled to construct, maintain
or operate a captive generating plant. Such a plant should be primarily
for his own use. Clause (8) of Section 2 of the said Act wo uld further
show that it includes a power plant set up by any co-operative society or
CSPDCL v. CHHATTISGARH STATE ELECTRICITY
REGULATORY COMMISSION [B. R. GAVAI, J.]
association of persons for generating electricity. The requirement is that
it should be primarily for the use of the members of such co-operative
society or association.
15. The definition of “person” is wide enough to include any
company or body corporate or association or body of individuals, whether
incorporated or not, or artificial juridical person.
16.It is thus clear that a person, to get benefit under Section 9 of
the said Act, could be an individual or a body corporate or association or
body of individuals, whether incorporated or not. It could thus be seen
that even an association of corporate bodies can establis h a captive
power plant. The only requirement would be that the said plant must be
established primarily for their own use. The fourth proviso to sub-section
(2) of Section 42 of the said Act would also reveal that surcharge would
not be leviable in case open access is provided to a pers on who has
established a captive generating plant for carrying the electricity to the
destination of his own use.
17. Therefore, the question that would arise is as to whether the
open access for transmitting electricity from SBPIL to SBMPL would
be for own use or not.
18.We find that Rule 3 of the said Rules would clarify the position,
which reads thus:
“3. Requirements of Captive Generating Plant .—(1) No
power plant shall qualify as a ‘captive generating plant’ under
Section 9 read with clause (8) of Section 2 of the Act unless—
(a) in case of a power plant—
(i) not less than twenty-six per cent of the ownership is
held by the captive user(s), and
(ii) not less than fifty-one per cent of the aggregate
electricity generated in such plant, determined on an
annual basis, is consumed for the captive use:
Provided that in case of power plant set up by regist ered
cooperative society, the conditions mentioned under paragraphs
at (i) and ( ii) above shall be satisfied collectively by the
members of the co-operative society:
809
Provided further that in case of association of persons, the
captive user(s) shall hold not less than twenty-six per cent of
the ownership of the plant in aggregate and such captive user(s)
shall consume not less than fifty-one per cent of the electricity
generated, determined on an annual basis, in proportion to their
shares in ownership of the power plant within a variation not
exceeding ten per cent;
(b) in case of a generating station owned by a company formed
as special purpose vehicle for such generating station, a unit or
units of such generating station identified for captive use and
not the entire generating station satisfy(ies) the conditions
contained in paragraphs ( i) and (ii) of sub-clause ( a) above
including—
Explanation.—(1) The electricity required to be consumed by
captive users shall be determined with reference to such generating
unit or units in aggregate identified for captive use and not with
reference to generating station as a whole; and
(2) The equity shares to be held by the captive user(s ) in the
generating station shall not be less than twenty-six per cent of the
proportionate of the equity of the company related to the generating
unit or units identified as the captive generating plant.”
19. The provisions made in Rule 3 of the said Rules are clear.
Sub-rule (1) of Rule 3 of the said Rules provides that no power plant
shall qualify as a “Captive Generating Plant” under Section 9 read with
Clause (8) of Section 2 of the said Act unless the conditions stated therein
are fulfilled. The first requirement is that not less tha n 26% of the
ownership is held by the captive user(s). The second requirement is that
not less than 51% of the aggregate electricity generated in such plant,
determined on an annual basis, is consumed for the captive use. The
second proviso to Rule 3(1)(a)(ii) of the said Rules provides that in case
of association of persons, the captive user(s) shall hold not less than
26% of the ownership of the plant in aggregate and such captive user(s)
shall consume not less than 51% of the electricity generated, determined
on an annual basis, in proportion to their shares in ownership of the
power plant within a variation not exceeding 10%.
20.Admittedly, SBMPL holds 27.6% equity shares in SBPIL. As
such, the requirement of not less than 26% of shares is fulfil led by
CSPDCL v. CHHATTISGARH STATE ELECTRICITY
REGULATORY COMMISSION [B. R. GAVAI, J.]
SBMPL. As already discussed hereinabove, even an associat ion of
corporate bodies can establish a power plant. Since SBMPL holds 27.6%
of the ownership, the use of electricity by it would be for captive use
under the provisions of the said Act. The other requirement w ould be
that the consumption of SBIPL and SBMPL together should not be less
than 51% of the power generated. Admittedly, the joint consumption by
SBIPL and SBMPL is more than 51%. As such, both the conditions as
provided under Rule 3 of the said Rules are satisfied.
21.We find that it will also be appropriate to refer to the National
Electricity Policy, 2005 (hereinafter referred to as “the said Policy”) as
notified by the Government of India, in exercise of its powers under
Section 3 of the said Act, on 12 th February 2005. Clauses 5.2.24 to
5.2.26 deal with the “Captive Generation”, which read thus:
“Captive Generation
5.2.24 The liberal provision in the Electricity Act, 2003 with
respect to setting up of captive power plant has been mad e
with a view to not only securing reliable, quality and cost -
effective power but also to facilitate creation of employment
opportunities through speedy and efficient growth o f
industry.
5.2.25 The provision relating to captive power plants to be
set up by group of consumers is primarily aimed at enabling
small and medium industries or other consumers that may
not individually be in a position to set up plant of opt imal
size in a cost-effective manner. It needs to be not ed that
efficient expansion of small and medium industries acr oss
the country would lead to creation of enormous employment
opportunities.
5.2.26 A large number of captive and standby generating
stations in India have surplus capacity that could be supplied
to the grid continuously or during certain time per iods.
These plants offer a sizeable and potentially compet itive
capacity that could be harnessed for meeting demand for
power. Under the Act, captive generators have access to
licensees and would get access to consumers who are
allowed open access. Grind inter-connections for capt ive
811
generators shall be facilitated as per Section 30 of the A ct.
This should be done on priority basis to enable captive generation
to become available as distributed generation along the gr id.
Towards this end, non-conventional energy sources including co-
generation could also play a role. Appropriate comme rcial
arrangements would need to be instituted between licensees and
the captive generators for harnessing of spare capacity ene rgy
from captive power plants. The appropriate Regulato ry
Commission shall exercise regulatory oversight on s uch
commercial arrangements between captive generators and
licensees and determine tariffs when a licensee is the off-taker of
power from captive plant.”
[emphasis supplied]
22. It could thus be seen that the provision with res pect to
establishing captive power plant has been made with a view to not only
securing reliable, quality and cost-effective power but also to facilitate
creation of employment opportunities through speedy and efficient growth
of industry. The said Policy further states that the provision relating to
captive power plants to be set up by a group of consumer s has been
made primarily for enabling small and medium industrie s or other
consumers that may not individually be in a position to set up plant of
optimal size, in a cost-effective manner. It also states that the efficient
expansion of small and medium industries across the country would lead
to creation of enormous employment opportunities. Clause 5.2.26 of the
said Policy further states that the captive and standby generating stations
in India have surplus capacity that could be supplied to the grid continuously
or during certain time periods.
23. The said Policy is issued under Section 3 of the said Act and
as such, has a statutory flavour. In any case, the said Policy is in tune
with the provisions as contained in Section 9 and Clause (8) of Section 2
of the said Act. A liberal provision has been made in Section 9 of the said
Act so as to promote establishment of captive power plants.
24. It is a settled position of law that the interpretation which
advances the object and purpose of the Act, has to be preferr ed. A
reliance in this respect can be placed on the judgments of this Court in
the cases of Administrator, Municipal Corporation, Bilaspur v.
CSPDCL v. CHHATTISGARH STATE ELECTRICITY
REGULATORY COMMISSION [B. R. GAVAI, J.]
Dattatraya Dahankar, Advocate and Another 2, S. Gopal Reddy v.
State of A.P.3 and Ahmedabad Municipal Corporation and Another
v. Nilaybhai R. Thakore and Another 4.
25. We are, therefore, of the considered view that no cas e is
made out for interfering with the order dated 14th October 2005 passed
by the Commission and the impugned judgment dated 6 th December
2007 passed by the APTEL.
26.In the result, the present appeals are found without merit and
as such, are dismissed.
27. Pending application(s), if any, shall stand disposed of in the
above terms. No order as to costs.
Nidhi Jain Appeals dismissed.
2 (1992) 1 SCC 361
3 (1996) 4 SCC 596
4 (1999) 8 SCC 139