M/S Il&fs Tamil Nadu Power Company Limited v. T. Muruganandam & Others
M. R. SHAH, J.
1. Feeling aggrieved and dissatisfied with the impugned judgment
and order dated 23.05.2012 in Appeal No. 17/2011 and judgment and
order dated 10.11.2014 in Appeal No. 50/2012 passed by the National
Green Tribunal (Principal Bench), New Delhi (hereinafter re ferred to
as the ‘NGT’), M/s IL&FS Tamil Nadu Power Company Limi ted has
preferred the present appeals.
2. The facts leading to the present appeals in nutshell are as under:
The appellant herein has been incorporated in the year 2006 to
implement the Project for establishing a 2x600 MW and 3x800 MW
(aggregating to 3600 MW) imported coal based thermal power plant at
village Kottatai, Ariyagoshti, Villianallur and Silamb imangalam in
Chidambram Taluk, District Cuddalore, Tamil Nadu. Now the appellant
company is under the control of Government of India. The appellan t
submitted Form I under EIA Notification, 2006 to obtain Terms of
Reference for the EIA study on 5.2.2008. The Terms of Re ference
approval letter was issued by the Ministry of Environment, Forest and
Climate Change (hereinafter referred to as the ‘MoEF’) on 9.7.2008.
Public hearing was carried out for the project on 5.2.2010. The appellant
completed the EIA study in accordance with EIA Notificati on, 2006.
That thereafter the Expert Appraisal Committee (for short, ‘EAC’)
considered the EIA study and directed the appellant to undertake certain
additional submissions to address specific points and direct ed that an
M/S IL&FS TAMIL NADU POWER COMPANY LIMITED v. T.
MURUGANANDAM & OTHERS
updated Form I be submitted. That thereafter the appell ant submitted
updated Form I reflecting recommendations of EAC meet ing dated
19.03.2010 to MoEF. The EAC meeting considered the project and
recommended the project for Environment Clearance (for short, ‘EC’),
subject to stipulation of specific conditions including project to keep space
for providing Flue Gas De-sulfurization (for short, ‘FGD’) system with
all the five units of the power plant to enable the system to be installed
whenever required. The appellant herein was granted the EC in
accordance with the recommendations of the EAC unde r EIA
Notification, 2006.
2.1 The original petitioners claiming to be fishermen and persons
acting for welfare of fishermen filed appeals against the EC before
National Environment Appellate Authority being NEAA Appeal Nos. 19
& 20 of 2010. On the constitution of the NGT, Appeal No. 20/2010 filed
before the National Environment Appellate Authority came to be
transferred to the NGT, which was re-numbered as Appeal No s. 16/
2011 & 17/2011.
2.2 Vide order dated 23.05.2012 in Appeal No. 17/2011, the NGT
upheld the validity of the EC but directed the MoEF to revi ew the EC
based on the cumulative impact assessment study and stipulat e any
additional conditions, if required and directed that till then the EC shall
remain suspended. Instead of the cumulative impact assessment study,
the appellant completed the Rapid Cumulative Impact Assessment (for
short, ‘RCIA’) study and submitted a copy thereof to the MoE F. That
thereafter the EAC, after extensive deliberations on the RCIA and after
hearing the representative of the original petitioners and the appellant/
project proponent, recommended certain additional conditions to be added
to the EC including the requirement of installing a FGD system as part
of the power plant. At this stage, it is required to be noted that as su ch
neither the original petitioners nor even the appellant challenged the first
judgment and order dated 23.05.2012 passed in Appeal No. 17/2011 by
which the NGT upheld the validity of the EC but directed MoE F to
review the EC based on the cumulative impact assessment st udy and
stipulate any additional conditions, if required. That thereafter, on
14.08.2012, MoEF based on the recommendations of the EAC, issued a
corrigendum to the EC imposing additional conditions to the EC. That
thereafter the original petitioners who filed the earlier appeal against the
grant of EC, filed Appeal No. 50/2012 against the corrigendum dated
14.08.2012 issued by the MoEF. By the impugned judgment and order
dated 10.11.2014, the NGT has disposed of Appeal No. 50/2012, quashing
197
the corrigendum dated 14.08.2012. The judgment and order dated
23.05.2012 in Appeal No. 17/2011 and subsequent judgment and order
dated 10.11.2014 in Appeal No. 50/2012 passed by the NGT are the
subject matter of present appeals.
3. By an interim order dated 10.02.2015, this Court stayed the
impugned order dated 10.11.2014 passed in Appeal No. 50/2012, which
has been continued till date. Pursuant to the interim order passed by this
Court, the appellant-company had commenced two power plant s in
Phase-I, which are in operation since 2015.
4. Dr. Abhishek Manu Singhvi, learned Senior Advocate appearing
on behalf of the appellant-company has submitted that to close the power
plant now would not be in public interest. It is submitted that the appellant’s
power plant is running since September 2015 in power deficit Sta te of
Tamil Nadu. Appellant operates two units of 600MW e ach since
September, 2015 and April, 2016, which presently supply power to
approximately 40 lakhs households. The power plant is situate d in an
energy deficient State (Tamil Nadu) and therefore closing the p ower
plant would adversely affect power sector of the State.
4.1 In support of his submission that to close the power plant now
would not be in public interest, it is submitted as under:
(i) That Appellant’s power plant is running since September 2015
in power-deficit state of Tamil Nadu: Appellant operates two unit
of 600MW each since September 2015 and April 2016, which
presently supply power to approximately 40 lakhs households. The
power plant is situated in an energy deficient State (Tamil Nadu),
and closing the plant would adversely affect power section of the
State;
(ii) Plant running in compliance with EC and Corrigendum: That
the plant is in compliance with clearance conditions, and s ix-
monthly reports being submitted to Ministry of Environment, Forest
& Climate Change, latest report of April-September;
(iii) Plant uses imported coal with low sulphur and uses FG D
system: That Appellant uses imported coal from Indonesia for its
thermal power plant, which already has low sulphur cont ent.
Pursuant to MoEF Corrigendum, has spent Rs. 775 crores to install
Flue Gas De- sulphurisation (FGD) system. Report of Centre for
Science and Environment identifies Appellant’s plant as compliant
with SO2 standards. All over India only 20 power plants have
FDGs, of which two units are the Appellant’s power plant;
M/S IL&FS TAMIL NADU POWER COMPANY LIMITED v. T.
MURUGANANDAM & OTHERS [M. R. SHAH, J.]
(iv) Appellant part of IL&FS Group and value to be maximized:
That ITPCL/ Appellant is a group company of IL&FS which is
under control of Govt. of India and is undergoing restructuring.
Larger public interest is to realize value and recover PSU debt.
Appellant’s restructuring plan has been approved by Hon’bl e
NCLAT on 01.12.2021. Appellant incurred expense of Rs. 11,000
crores (approx.) to build 2 x 600 MW units, which are operational
since September 2015 and April 2016. Of this, Rs. 6,080 crore
was through loans from public sector banks (Punjab National Bank,
Bank of Baroda, LIC, SBM Bank, SBI) and Rs. 4,560 crores in
equity by IL&FS Energy Development (another IL&FS group
entity); and
(v) Appellant’s CSR initiatives: That till date approx. Rs. 30 crores
spent on CSR activities, including adopting several villages in the
surrounding areas. As of February, 2022, the Appellant has 1466
employees of which 87% are from Tamil Nadu. Overall, 69%
(1005 persons) are from Cuddalore District itself.
4.2 It is further submitted that instead of cumulativ e impact
assessment study, the appellant bonafidely and taking into consideration
the order passed by the NGT in Application No. 25/201 conducted/
completed RCIA, a copy of which was submitted to MoEF a nd after
undertaking extensive deliberations on the RCIA and after hearing the
representative of the original petitioners and the ap pellant/project
proponent, the EAC recommended certain additional conditions t o be
added to the EC including the requirement of installing FGD system and
pursuant to which and based on the recommendations of the EAC, MoEF
issued a corrigendum to the EC imposing additional conditions to t he
EC.
4.3 It is further submitted that taking into considera tion the
additional conditions imposed vide corrigendum dated 14.08.2012, the
appellant- company had installed FGD system at a cost of Rs. 775 crores,
the only thermal power plant in the country to commence op erations
with FGD system.
4.4 Dr. Abhishek Manu Singhvi, learned senior counsel appearing
on behalf of the appellant has also made an elaborate submission on the
maintainability of Appeal No. 50/2012 before the NGT, filed by the original
petitioners against the corrigendum dated 14.08.2012 issued by the MoEF.
It is submitted that as such the first judgment dated 23.05.2012 passed in
Appeal No. 17/2011, by which the NGT specifically upheld the validity
of the EC but directed MoEF to deal with the EC based on cumulative
199
impact assessment study and stipulate any additional conditions, was not
challenged by the original petitioners. It is submitted tha t the original
petitioners had no locus and therefore the original petitioners could not
have challenged the subsequent corrigendum dated 14.08.2012 by which
certain additional conditions were imposed to the original EC by the
MoEF.
4.5 Dr. Abhishek Manu Singhvi, learned senior counsel has taken
us to the additional affidavits dated 20.09.2022 and 28.11.2022. He has
also taken us to the EC & CRZ Compliance Report dated 12.01.2022 as
well as the subsequent Compliance Report dated 20.09.2022 and the
copy of the response of the project proponent. He has stated at the Bar
that by and large all the conditions of the original EC as well as
corrigendum to the EC have been complied with by the appellant/project
proponent and few conditions are under continuous compliance. He has
stated that the conditions imposed while issuing th e EC and the
corrigendum have been substantially complied with and the re are no
fundamental breaches and/or non-compliance. He has stated at the Bar
that whichever conditions are not complied with and not complied with
fully and/or there are continuous compliance, the same shall be complied
with within the time stipulated in the response of the project proponent.
4.6 Making above submissions and praying for keeping the question
of law , if any, namely, “Whether for the project like this, a cumulative
impact assessment study is required or not” open and also the question,
“whether an appeal before the NGT against the corrigendum to the EC
and the additional conditions imposed as per the corrigendum to the EC
would be maintainable or not” and keeping the aforesaid questions(s) of
law open, it is prayed to dispose of the present appeals by permitting the
appellant to continue the power plants which are in operation since 2015.
5. Shri Shiv Mangal Sharma, learned counsel appearing on behalf
of the MoEF has submitted that as such the appellan t had never
challenged earlier conditions imposed while issuing the EC and the first
judgment and order passed by the NGT dated 23.05.2012 and even the
corrigendum dated 14.08.2012 issued by the MoEF imposing additional
conditions and therefore the appellant is bound by the conditions imposed
while issuing the EC and corrigendum to the EC dated 14.08.2012 and
the appellant has to comply with all the conditions imposed while issuing
EC as well as additional conditions imposed vide corrigendum da ted
14.08.2012. He has pointed out certain non- compliances/part compliances
of certain conditions and the response by the appellant. The refore, he
has submitted that if this Court is inclined to permit the appellant to
M/S IL&FS TAMIL NADU POWER COMPANY LIMITED v. T.
MURUGANANDAM & OTHERS [M. R. SHAH, J.]
continue with the power plants in the public interest, i n that case, the
appellant may be directed to comply with all the condition s imposed
while issuing EC as well as additional conditions imposed while issuing
corrigendum dated 14.08.2012.
6. Ms. Srishti Agnihotri, learned counsel appearing on behalf of
the original petitioners has prayed that in case this Cour t is inclined to
permit the appellant to continue with the power plants as per the EC and
the corrigendum dated 14.08.2012 which are in operation since 2015, in
that case, the question of law, namely, “whether for the project like this
conducting a cumulative environment impact assessment study is must
or not”, may be kept open as so many other such projects m ay come
and that on conducting cumulative environment impact assessment study,
the Tribunal may consider the said issue in detail.
6.1 Insofar as maintainability of appeal before the NGT aga inst
the order of corrigendum is concerned, it is submitted that aga inst the
additional conditions imposed vide corrigendum dated 14.08.2012, an
appeal would be maintainable before the NGT against the corrigendum
to the EC.
7. Having heard Dr. Abhishek Manu Singhvi, learned Senior
Counsel appearing on behalf of the appellant and the learned cou nsel
appearing on behalf of the MoEF and original petitioners and the facts
narrated hereinabove, it is to be noted that pursuant to the interim order
passed by this Court, the appellant has commenced two power plants in
Phase- I, which are in operation since September, 2015. The appellant is
operating two units of 600MW since September, 2015 and April, 2016,
which presently supply power to approximately 40 lakhs hous eholds.
The power plants are situated in an energy deficit State (Ta mil Nadu).
Thus, closing the power plants/units would adversely affect power sector
of the State and which shall not be in the larger public intere st, more
particularly the power deficient State of Tamil Nadu.
7.1 However, at the same time, the appellant has to comply with
all the conditions imposed while issuing EC as well as the add itional
conditions imposed vide corrigendum to the EC dated 14.08.2012. From
the compliance report dated 20.09.2022 (latest compliance report) and
the response of the project proponent, it appears that by and large there
is a substantial compliance of the conditions imposed while issuing EC
as well as the additional conditions imposed vide corrigendum to the EC
dated 14.08.2012. There do not appear to be any fundamental breaches
or non-compliance of the conditions imposed while issuing EC as well as
additional conditions imposed vide corrigendum to t he EC dated
201
14.08.2012. However, some conditions are still partly complied wit h,
which have been responded by the appellant and has agreed to comply
with the same. The particulars of the specific conditions, part compliances
and the response to the same are as under:
M/S IL&FS TAMIL NADU POWER COMPANY LIMITED v. T.
MURUGANANDAM & OTHERS [M. R. SHAH, J.]
203
M/S IL&FS TAMIL NADU POWER COMPANY LIMITED v. T.
MURUGANANDAM & OTHERS [M. R. SHAH, J.]
205
M/S IL&FS TAMIL NADU POWER COMPANY LIMITED v. T.
MURUGANANDAM & OTHERS [M. R. SHAH, J.]
8. Considering the aforesaid facts and circumstances and subject
to compliance of the conditions imposed while issuing EC a nd the
additional conditions imposed vide corrigendum to t he EC dated
14.08.2012 and subject to the conditions/additional conditions which are
partly complied with, to be complied with within the time suggested in
the response of the appellant/project proponent, reproduced hereinabove
and keeping the larger question of law, namely, “whether for the project
like this, a cumulative impact assessment study is required or not”, open
and to be decided in an appropriate case, we dispose of t he present
appeals by permitting/allowing the appellant/project proponent to continue
with the power plants which are in operation since September, 2015 and
April, 2016 on the conditions as above, i.e., subject to compliance of all
the conditions mentioned in the EC as well as additional condi tions
imposed vide corrigendum to the EC dated 14.08.2012 and to fully comply
with the conditions which are partly complied with within the stipulated
time as suggested and prayed by the appellant company, pra yed in
response to the compliance report dated 20.09.2022, reproduced
hereinabove.
9. Now so far as the issue, “whether against the corrigendum to
the EC along with additional conditions, an appeal before the NGT would
be maintainable or not” is concerned, having heard learned couns el
appearing on behalf of the respective parties, we are of the opinion that
an aggrieved person may always challenge the corrigendum to the EC,
however, the appeal will be restricted to the corrigendum to the EC on
additional conditions only, if the original EC is not under challenge and/or
the original EC has been confirmed by the NGT earlie r on certain
conditions which have not been challenged.
10. The present appeals stand disposed of in the aforesaid terms.
We make it clear that the present order shall not be cited as a precedent
in any other matter.
Divya Pandey Appeals disposed of.
(Assisted by : Abhishek Pratap Singh and Roopanshi Virang, LCRAs)