M/S Indian Oil Corporation Limited v. v. B. R. Menon & Others
J. B. PARDIWALA, J.
Since the issues raised in all the captioned appeals are the sam e
and the challenge is also to the self same order passed by the National
Green Tribunal, Southern Zone, Chennai, (for short, “NGT, Chennai”),
those were taken up for hearing analogously and are being disposed of
by this common judgment and order.
2. For the sake of convenience, the Civil Appeal No. 2039 of
2022 is treated as the lead matter.
3. This appeal is filed by an oil marketing company viz. the Reliance
BP Mobility Limited incorporated under the Companies Act, 2013 and is
directed against the judgment and order dated 23.12.2021 passed by the
NGT, Chennai in the Original Application No. 138 of 2020 (SZ) insofar
as the impugned order directs the Central Pollution Control Board (CPCB)
as well as the State Pollution Control Boards to issue directions to make
it mandatory to obtain Consent to Establish (“CTE”) and the Consent to
Operate (“CTO”) for new retail petroleum outlets as well as the existing
retail petroleum outlets.
FACTUAL MATRIX:
4. It appears from the materials on record that the resp ondent
No. 2 herein Mr. V.B.R. Menon, a resident of Chennai, filed the Original
Application No. 138 of 2020 (SZ) before the NGT, Chennai raising the
issue in regard to the non-installation of Vapour Recovery Systems (VRS)
in the petroleum outlets by the oil marketing companies (OMCs). In the
Original Application No. 138 of 2020, the applicant (respondent No. 2
herein) prayed for the following reliefs:-
“Reliefs:
A. Injunct the respondents 5 to 9 from commissioning and operating
any new petroleum retail outlets in Tamil Nadu without installing
Vapour Recovery Systems, Stage 1 and 2 in good worki ng
condition, pending disposal of this application and
B. Pass such further order or orders as may fit pro per and
necessary in the facts and circumstances of the case
M/S INDIAN OIL CORPORATION LIMITED v. V. B. R. MENON
& OTHERS
Prayer
A. Direct the respondent oil marketing companies R-5 to R-9 to
install and operate Vapour Recovery Systems, Stage 1 and 2, in
good working condition before opening and commissioning of any
new petroleum retail outlets in Tamil Nadu.
B. Direct the respondent oil marketing companies R-5 to R-9 to
install and operate Vapour Recovery Systems Stage 1 and 2, in all
the existing petroleum outlets in Tamil Nadu within a time schedule
to be prescribed by this Hon’ble Tribunal for each city, town and
rural area situated in Tamil Nadu.
C. Pass such further order or orders as may be fit proper and
necessary in the facts and circumstances of the case and th us
render justice.”
5. The basis for filing of the original application as aforesaid before
the NGT, Chennai was the order passed by the Principal Benc h of the
NGT in the Original Application No. 147 of 2016 wherein the Principal
Bench of the NGT issued directions to install Stage-I and Stage-II vapour
recovery devices (VRD) at all fuel stations, distribution centers, terminals,
railway loading/unloading facilities and airports in the National Capital
Territory of Delhi. Vide order dated 28.09.2018 passed in the O.A. No.
147 of 2016 by the Principal Bench of the National Green Tribunal, the
time line of installation of VRD was extended.
6. The NGT, Chennai adjudicated the O.A. No. 138 of 2020 (SZ)
and disposed of the same vide order dated 23.12.2021 by issuing the
following directions:-
“69. In the result, this application is disposed of as follows:-
i. We made it clear that all the Retail Petroleum Outlets which are
located in cities having more than 10 Lakh population should have
installed the VRS mechanism which are having turnover of more
than 300 KL/Month and above, as insisted by the Central Pollution
Control Board in consultation with the Ministry of Petroleum and
Natural Gas as per circular dated 12.12.2016. If any of the Retail
Petroleum Outlets had not installed the same within the time frame
fixed by the CPCB or extended by the Hon’ble Apex Court in this
regard, then CPCB is directed to take appropriate action against
those petroleum outlets/storage depot which have not complied
221
with the same by imposing environmental compensation as directed
by the Principal Bench of National Green Tribunal, New Delhi in
O.A. No.147 of 2016 (Aditya N. Prasad & Ors. Vs. Union of
India & Ors.).
ii. As regards the new petroleum outlets of Stage 1 and Stag e 2
(having 100 KL/Month to 300 KL/Month) and for Stage 1A
(Storage depots) are concerned, the same will have to be installed
within the extended time fixed by the CPCB both by public sector
undertaking and private sector undertaking and if there is a ny
violation found, then they are directed to take appropriate action
for such violation as directed by the Principal Bench of National
Green Tribunal, New Delhi in O.A. No.147 of 2016 (Aditya N.
Prasad & Ors. Vs. Union of India & Ors.).
iii. The Central Pollution Control Board (CPCB) as well as t he
State Pollution Control Boards are directed to issue direction under
Section 5 of the Environment (Protection) Act, 1986 and Section
18 of the Water (Prevention and Control of Pollution) Act, 1974
and Air (Prevention and Control of Pollution) Act, 1981 to make it
mandatory to obtain Consent to Establish and Consent to Operate
for new petroleum outlets to be established in future and even to
those which are under the preparation of establishment, b ut not
started construction as has been done by the State Pollution Control
Board, Kerala and such a direction should be issued within a period
of 3 (Three) months and till then, all the new Retail Petroleum
Outlets are directed to apply for Consent to Establish and Consent
to Operate before its establishment.
iv. We also direct all the existing Retail Petroleu m Outlets
irrespective of its turnover to obtain Consent to Opera te for the
existing outlets within a period of 6 (Six) Months. If it is not
obtained, then the concerned State Pollution Control Board is
directed to take appropriate action against such petrol pu mps in
accordance with law.
v. Considering the circumstances, parties are directed to bear their
respective cost in the application.
vi. The Registry is directed to communicate this orde r to the
Ministry of Environment, Forests & Climate Change (MoEF&CC),
Central Pollution Control Board, New Delhi, Integrated Regional
M/S INDIAN OIL CORPORATION LIMITED v. V. B. R. MENON
& OTHERS [J. B. PARDIWALA, J.]
Office of the Central Pollution Control Board, Bangalore and
Chennai, State Pollution Control Boards of Tamil Nadu, Kerala,
Andhra Pradesh, Telangana, Karnataka and also to the Pollution
Control Committee of Union Territory of Puducherry for their
information and compliance of the direction.”
7. Being dissatisfied with the aforesaid directions issued by the
NGT, Chennai, the appellant is here before this Court.
8. The other oil marketing companies (OMCs) before this Court
seeking to challenge the very self same order passed by the NGT are :
(1) M/s Indian Oil Corporation Limited, (2) M/s Hindustan Petroleum
Corporation Limited; (3) M/s Bharat Petroleum Corporation Lim ited,
(4) M/s Nayara Energy Limited, and (5) M/s Shell India Markets Private
Ltd.
Submissions on behalf of the appellant:
9. At the outset, the learned counsel appearing on behalf of the
appellant herein submitted that it does not seek to challenge the directions
contained in para 69(i) and 69(ii) resply of the impugned or der i.e.
regarding the installation of the VRS/VRD. The learned counsel would
like to confine his challenge only to the direction issued in para 69(iii)
and para 69(iv) resply referred to above i.e. in regard to the Consent to
Establish (CTE) and Consent to Operate (CTO).
10. The learned counsel submitted that the present appeal g ives
rise to three substantial questions of law which read thus:-
A. Whether the NGT can issue directions which are in the nature
of legislative functions?
B. Whether the public sector and private sector OMC s and/or
ROs (Retail Outlets) are required to obtain Consent to Establish
and/or Consent to Operate for operation, establishment and
carrying on the business of ROs?
C. Whether the NGT can impose requirement of obtaining an
additional approval merely to provide for a regulating mechanism
to supervise compliance of the existing guidelines issued by the
CPCB?
11. The learned counsel submitted that the directions issued in
para 69(iii) and 69(iv) resply of the impugned order are legis lative in
223
nature and therefore beyond the jurisdiction of the NGT. He would submit
that the directions issued by the NGT, Chennai to the CPCB making it
mandatory to obtain CTE and CTO for ROs would amount to enacting
a law under the guise of judicial order. It was further sub mitted that
there is no rational basis to issue the directions making it mandatory for
the ROs to obtain CTE and/or CTO. According to the learned counsel,
the only basis for the NGT to issue such directions is to ensure proper
regulatory mechanism and/or to secure compliance of the guideline s
issued by the CPCB regarding installation of VRS, etc. It was also
submitted that the impugned directions are directly in conflict with the
object with which the reclassification of industries has been done by the
CPCB. It was pointed out that the petroleum retail outlets fall within the
green zone and for any industry falling within the green zone, it is not
mandatory to obtain CTO and/or CTE. It was further submitted that the
process of setting up of a RO requires obtaining of numerous approvals
and the same takes a considerable period of time. For inst ance, even
prior to the construction of ROs, the OMCs are require d to obtain
approvals from inter alia (1) Petroleum & Explosives Safety
Organisation (PESO), (2) Town and Country Planning Officers, (3)
National Highway Authority of India, (4) District/Division al Forest
Officer/Regional Forest Officer, (5) approvals from the State Cabinet,
etc. Furthermore, the OMCs are also required to obtain No -Objection
Certificate from the concerned District Magistrate. Such N OC from
the District Magistrate comprises of approvals from various authorities,
such as – the fire department, Police Department, PWD, H ealth and
Safety, concerned Municipality and/or any other authority that the District
Magistrate may consider necessary. Thereafter, upon const ruction of
the ROs, the OMCs are required to obtain final approvals from inter alia
PESO, National Highway Authority of India, Legal Me trology
Department Labour Department and the concerned Municipality. The
timelines for some of the aforesaid approvals range over 120 to 2 40
days. In such circumstances, according to the learned counsel, by making
it mandatory to obtain the CTO and CTE for setting up/operating a RO
would cause lot of hardship and also delay the setting of ROs.
12. The learned counsel laid much stress on the fact that the
CPCB its vide Office Memorandum dated 07.01.2020 ha d issued
guidelines for setting up of new petroleum pumps in compliance of the
order passed by the NGT dated 18.01.2019 in O.A. No. 86 of 2019 titled
Gyanprakhash @ Pappu Singh v. GoI & Ors . The guidelines are
M/S INDIAN OIL CORPORATION LIMITED v. V. B. R. MENON
& OTHERS [J. B. PARDIWALA, J.]
very exhaustive and they take care of the apprehension expre ssed by
the NGT in its impugned order. Once these guidelines are scrupulously
observed and followed, there is no need thereafter to obtain CTO and/or
CTE.
13. In such circumstances referred to above, the learned counsel
appearing for the appellant prayed that there being merit in his appeal,
the same may be allowed and the directions issued in para 6 9(iii) and
para 69(iv) of the impugned order passed by the NGT, Chennai be se t
aside.
Submissions on behalf of the respondent No. 2 – the original
applicant before the NGT:
14. The learned counsel appearing for the respondent No. 2 (the
original applicant) vehemently submitted that no error, not to speak of
any error of law, could be said to have been committed by the NGT in
issuing the impugned directions. It was submitted that no interference is
warranted at the hands of this Court in an appeal filed under Section 22
of the National Green Tribunal Act, 2010 (for short, ‘the NGT Ac t’).
According to the learned counsel, an appeal under Section 22 of t he
NGT Act is restricted to substantial questions of law . There is no
substantial question of law involved in the present appeal . In such
circumstances referred to above, the learned counsel prays that there
being no merit in the present appeal, the same may be dismissed.
Submissions on behalf of the respondent No. 1- CPCB:
15. Mr. Tushar Mehta, the learned Solicitor General submitte d
that there was no need for the NGT to issue the impugned directions as
contained in para 69(iii) and para 69(iv) resply, more particularly in view
of the detailed guidelines issued by the CPCB vide the Office
Memorandum dated 07.01.2020. According to Mr. Mehta, what is sought
to be achieved by asking the ROs to obtain CTE and/or CTO can very
well be taken care of by ensuring that all the existing ROs and the ROs
that may come up in future scrupulously abide by the guidelines issued
by the CPCB. The CPCB has ensured that all the State Pollution Control
Boards keep a very strong vigil on the ROs across the country so as to
ensure that the guidelines issued by it are scrupulously followed. Even,
according to Mr. Mehta, to ask all the existing ROs to obtain CTO is
something very unreasonable. According to Mr. Mehta, the same requires
a lot of paper work and is very time consuming.
225
16. Mr. Mehta would submit that it is highly debatable that the
NGT could have directed the CPCB that it should in exercise of powers
under Section 5 of the Environment (Protection) Act, 1986 (for s hort,
‘the Act 1986’) make it mandatory to obtain CTE and/or CTO.
17. Mr. Mehta in the last submitted that so far as di rections
contained in para 69(i) & 69(ii) resply are concerned, the same shall be
complied with in its true perspective and the State Pollution Control Boards
shall ensure due compliance of the same. He would submit tha t the
CPCB shall also ensure that the guidelines issued by it referred to above
are strictly adhered to by the all State Pollution Control Boards and, if
there is any lapse at the end of any retail outlet, th en necessary action
shall be taken in accordance with law.
18. In such circumstances referred to above, Mr. Mehta prays
that the directions contained in para 69(iii) and 69(iv) may be set aside
or modified appropriately.
Analysis:
19. Having heard the learned counsel appearing for the partie s
and having gone through the materials on record, the only question that
falls for our consideration is : (i) whether the NGT has the jurisdiction to
direct the CPCB that it should in exercise of its powers under Section 5
of the Act 1986 make obtaining of the CTE and CTO resply mandatory
for all the petroleum retail outlets across the country?
20. This Court, while issuing notice vide order dated 07.02.2022
in one of the connected appeals i.e. Civil Appeal 494 of 2022, observed
thus:-
“Issue notice, returnable in six weeks.
Meanwhile, the directions issued vide impugned order of t he
National Green Tribunal dated 23.12.2021 shall remain stayed
provided the petitioner complies with the directions issued by the
Central Pollution Control Board (CPCB) dated 04.06. 2021
prescribing fresh timeline for completion of installation of Vapor
Recovery Devises (VRD).
Mr. Sanjay Kapur, learned counsel appearing for the appellant
has stated that in terms of the said directions of CPCB da ted
04.06.2021, Vapor Recovery Devises have already been installed
M/S INDIAN OIL CORPORATION LIMITED v. V. B. R. MENON
& OTHERS [J. B. PARDIWALA, J.]
in 50% retail outlets by December, 2021 in the specified category
and the remaining timeline shall also be complied with.”
21. As the principal argument of all the learned counsel appearing
for the respective oil marketing companies in the present litigation is in
regard to the jurisdiction of the NGT to issue the impugned directions, it
is necessary to first understand the entire scheme of the N GT Act.
Scheme of the NGT Act, 2010:
22. The preamble to the NGT Act reads as follows:-
“An Act to provide for the establishment of a National G reen
Tribunal for the effective and expeditious disposal of cases relating
to environmental protection and conservation of forests and other
natural resources including enforcement of any legal right relating
to environment and giving relief and compensation for damages
to persons and property and for matters connected therewith or
incidental thereto.
AND WHEREAS India is a party to the decisions taken at the
United Nations Conference on the Human Environment held at
Stockholm in June, 1992, in which India participated, calling upon
the States to provide effective access to judicial and administrative
proceedings, including redress and remedy and to develop national
laws regarding liability and compensation for the victim s of
population and other environmental damage;
AND WHEREAS in the judicial pronouncement in India, the right
to healthy environment has been construed as a part of the right
to life under article 21 of the Constitution.
AND WHEREAS it is considered expedient to implement the
decisions taken at the aforesaid conference and to have a National
Green Tribunal in view of the involvement of multi-disciplinary
issues relating to the environment.”
23. The jurisdiction and powers of the NGT are to be found in
Sections 14 to 20 resply. A close look at these provisions would show
that the NGT has both original as well as appellate jurisdic tion. The
range of powers that the NGT has include:-
(i) the power to adjudicate upon civil cases where a s ubstantial
question relating to environment is involved (Section 14(1));
227
(ii) the power to grant relief and compensation to the victims of
pollution (Section 15(1)(a); and
(iii) the power to order restitution of either property damaged or
of the environment (Section 15(1)(b).
24. A person in whose favour the NGT passes an award or order,
is entitled to two types of remedies, if the award or order or the decision
of the NGT is not complied with. The first is a right to seek execution of
the award under Section 25 and the second is to seek the prosecution of
the offenders before a criminal court under Section 26.
25. Apart from the bar of jurisdiction of civil courts under Section
29, the NGT Act is also conferred the overriding effect upon any other
law under Section 33, which reads as follows:
“Section 33. Act to have overriding effect:— The provisions
of this Act, shall have effect notwithstanding anything inconsistent
contained in any other law for the time being in force or i n any
instrument having effect by virtue of any law other than this Act.”
26. Sub-section (1) of Section 38 of the NGT Act repeals the
following enactments:-
(i) The National Environment Tribunal Act, 1995
(ii) The National Environment Appellate Authority Act, 1997
27. Apart from repealing the above two enactments expressly
under sub-section (1) of Section 38, the NGT Act also contains a provision
in sub-Section (8) of Section 38 which deals with implied repeal. Sub-
Section (8) of Section 38 reads as follows:-
“(8) The mention of the particular matters referred to in sub-
sections (2) to (7) shall not be held to prejudice or affec t the
general application of section 6 of the General Clauses Act, 1897
(10 of 1897) with regard to the effect of repeal.”
28. In so far as the execution of the orders of NGT are concerned,
Section 25 confers two types of powers as noted below:-
(a) The power to execute the award by itself, as if the award is a
decree of a civil court and
(b) The power to transmit the award to a civil court for its
execution.
M/S INDIAN OIL CORPORATION LIMITED v. V. B. R. MENON
& OTHERS [J. B. PARDIWALA, J.]
29. As stated earlier, the failure of any person to comply with the
award of the NGT is also made punishable under Section 26 , with
imprisonment for a term that may extend to three years or with fine
which may extend to ten crore rupees or with both. Section 27 make s
every company and every person directly in charge of the affairs of the
company liable to prosecution. Section 28 makes even the Government
Departments liable to be prosecuted and punished. Such powers are not
available for the Loss of Ecology Authority.
30. Though Sub-Section (2) of Section 26 makes offences under
the AGT Act known cognizable, Section 30(1)(b) entitles any pe rson
who has given notice of not less than sixty days in the prescribed manner,
of the alleged offences and of his intention to prosecute, to file a complaint
before the competent court. Interestingly, Section 30(1)(b) does not even
use the expression “aggrieved person”. It uses only an expression “any
person”.
31. The 186th Report of the Law Commission, submitted in 2003,
eventually paved the way for the enactment of the NGT Act. This can
be seen from the relevant portion of the Statement of Ob jects and
Reasons of the NGT Act which read as follows:-
“4. The National Environment Tribunal Act, 1995 was enacted to
provide for strict liability for damages arising out of any accident
occurring while handling any hazardous substance and for the
establishment of a National Environment Tribunal for effecti ve
and expeditious disposal of cases arising from such accident, with
a view to giving relief and compensation for damages to persons,
property and the environment. However, the National Environment
Tribunal, which had a very limited mandate, was not established.
The National Environment Appellate Authority Act, 1997 was
enacted to establish the National Environment Appellate Authority
to hear appeals with respect to restriction of areas in whi ch any
industries, operations or processes or class of industries, operations
or processes shall not be carried out or shall be carried out subject
to certain safeguards under the Environment (Protection) Act ,
1986. The National Environment Appellate Authority has a limited
workload because of the narrow scope of its jurisdiction.
5. Taking into account the large number of environmental cases
pending in higher courts and the involvement of multidisciplinary
229
issues in such cases, the Supreme Court requested th e Law
Commission of India to consider the need for constitution of
specialised environmental courts. Pursuant to the same, the Law
Commission has recommended the setting up of environmental
courts having both original and appellate jurisdiction relating to
environmental laws.
6. In view of the foregoing paragraphs, a need has been f elt to
establish a specialised tribunal to handle the multidisciplinary issues
involved in environmental cases. Accordingly, it has been decided
to enact a law to provide for the establishment of th e National
Green Tribunal for effective and expeditious disposal of civil cases
relating to environmental protection and conservation of forests
and other natural resources including enforcement of any legal
right relating to environment.”
32. From the 186th Report of the Law Commission and the salient
features of the Act, the following could be deduced:
(1) The creation of the National Green Tribunal, was in pursuance
of the repeated directions issued by this Court in at least four cases
namely, M.C. Mehta v. Union of India [(1986) 2 SCC 176], Indian
Council for Enviro Legal Action v. Union of India [(1996) 3 SCC
212], A.P. Pollution Control Board v. M. V.Nayudu [(1999) 2 SCC
718], A.P. Pollution Control Board v. M.V. Nayudu [(2001) 2 SCC
62].
(2) The object of creation of the National Green Tribunal was to
provide, what could be called a one-stop-shop solution, for all types
of issues such as Environmental clearances, settlement of disputes
relating to environment, relief and compensation for victims of
pollution and environmental damage, restitution of pro perty,
restitution of environment etc.
(3) The Tribunal was to have both original and Appellate jurisdiction,
with enormous powers not only to execute its orders as decrees
of civil courts, but also to punish those who fail to comply with its
orders.
(4) The Tribunal was to collect a court fee and entertain clai ms
preferred within a period of limitation.
M/S INDIAN OIL CORPORATION LIMITED v. V. B. R. MENON
& OTHERS [J. B. PARDIWALA, J.]
33. Under the NGT Act, the Act 1986 was also amended. By
Section 36 of the NGT Act, Section 5A was inserted in the Ac t 1986.
Under this Section, any direction issued by the Central Government under
Section 5, either for the closure, prohibition or regulation of any industry,
operation or process or the stoppage or regulation of the supply of
electricity or water or any other service, was made appeal able to the
National Green Tribunal.
34. The legal effect of Section 5A of the Act 1986, if juxtaposed
in to Section 5 read with Section 3(3) will be:—
(1) that Central Government is competent to issue certain directions
under Section 5;
(2) that the power under Section 5 can also be exercised by t he
Authority constituted under Section 3(3); and
(3) that the directions issued under Section 5, either by the Central
Government itself or by the Authority constituted under Section
3(3) are amenable to the appellate jurisdiction of the Nat ional
Green Tribunal.
35. We now proceed to consider whether the NGT has the power
& jurisdiction to issue directions to the CPCB/its delegates to take all
such measures if in a given case the NGT finds that such directions are
necessary in the interest of justice.
36. Section 3 of the Act 1986 expressly empowers the Central
Government or its delegate, as the case may be, to “take all such measures
as it deems necessary or expedient for the purpose of protect ing and
improving the quality of environment.........”. Section 5 clothes the Central
Government or its delegate with the power to issue directions for achieving
the objects of the Act. Read with the wide definition of “environment” in
Section 2(a) , Sections 3 and 5 resply clothe the Central Government
with all such powers as are “necessary or expedient for the purpose of
protecting and improving the quality of the environment”. The Central
Government is empowered to take all measures and issue all such
directions as are called for the above purpose.
37. We take notice of the fact that the Central Government has
framed the National Green Tribunal (Practices and Procedures) Rules,
2011 (for short, ‘the NGT Rules’). For our purpose, Rule 24 is important
which reads thus:-
231
“Rule 24. Order and directions in certain cases.— The
Tribunal may make such orders or give such directions as may be
necessary or expedient to give effect to its order or to prevent
abuse of its process or to secure the ends of justice.”
38. The aforesaid Rule 24 fell for the consideration of this Court
in Municipal Corporation of Greater Mumbai v.Ankita Sinha ,2021
SCC OnLine SC 897. We quote the few relevant observations made
by this Court in Ankita Sinha (supra) as regards the powers of the
National GreenTribunal:-
“16.3 The said Rules make it clear that the NGT has been given
wide discretionary powers to secure the ends of justice. This power
is coupled with the duty to be exercised for achiev ing the
objectives. The intention understandably being to preserve a nd
protect the environment and the matters connected thereto.
16.4 By choosing to employ a phrase of wide import, i.e. secure
the ends of justice, the legislature has nudged towards a libe ral
interpretation. Securing justice is a term of wide amplit ude and
does not simply mean adjudicating disputes between two ri val
entities. It also encompasses inter alia, advancing c auses of
environmental rights, granting compensation to vict ims of
calamities, creating schemes for giving effect to the environmental
principles and even hauling up authorities for inaction, when need
be.
16.5 Moreover, unlike the civil courts which cannot travel beyond
the relief sought by the parties, the NGT is conferred with power
of moulding any relief. The provisions show that the NGT is vested
with the widest power to appropriate relief as may be justified in
the facts and circumstances of the case, even though such relief
may not be specifically prayed for by the parties.
21.6 … The above would show that from the very inception, the
role of the NGT was not simply adjudicatory in the nature of a lis
but to perform equally vital roles which are preven tative,
ameliorative or remedial in 17 (1999) 2 SCC 718 nature. The
functional capacity of the NGT was intended to leverage wide
powers to do full justice in its environmental mandate.
M/S INDIAN OIL CORPORATION LIMITED v. V. B. R. MENON
& OTHERS [J. B. PARDIWALA, J.]
IX. AUTHORITY WITH SELF-ACTIVATING CAPABILITY
25.1 Given the multifarious role envisaged for the NGT and the
purposive interpretation which ought to be given to the statutory
provisions, it would be fitting to regard the NGT as having the
mechanism to set in motion all necessary functions within its
domain and this, as would follow from the discussion below, should
necessarily clothe it with the authority to take suo motu cognizance
of matters, for effective discharge of its mandate.
25.7 The duty to safeguard Article 21 rights cannot stand on a
narrow compass of interpretation. Procedural provisions must be
allowed to fall in step with the substantive rights that are invoked
in the environmental domain, in larger public interes t. The
specialized forum is bestowed with the responsibility to ens ure
protection of the environment. To be effective in its domain, we
need to ascribe to the NGT a public responsibility to initiate action
when required, to protect the substantive right of a clean
environment and the procedural law should not be obstructive in
its application.
26.3 As earlier seen, S.20 of the NGT Act which includes t he
term “decision”, in addition to “order” and “award”, also require
the Tribunal to apply the ‘Precautionary Principle’ and the statutory
mandate being relevant is extracted:-
“20. Tribunal to apply certain principles.
- The Tribunal shall, while passing any order or decisions or
award, apply the principles of sustainable development, the
precautionary principle and the polluter pays principle.”
26.4 The principle set out above must apply in the widest amplitude
to ensure that it is not only resorted to for adjudicatory purposes
but also for other ‘decisions’ or ‘orders’ to governmental authorities
or polluters, when they fail to “to anticipate, prevent and attack
the causes of environmental degradation”. Two aspects mu st
therefore be emphasized i.e. that the Tribunal is itself required to
carry out preventive and protective measures, as well as hold
governmental and private authorities accountable for failing to
uphold environmental interests. Thus, a narrow interpretation for
NGT’s powers should be eschewed to adopt one which allows
for full flow of the forum’s power within the environmental domain.”
233
CONSENT TO ESTABLISH & CONSENT TO
OPERATE:
39. What is “Consent to Establish” (CTE) and what is “Consent
to Operate” (CTO)? Consent to Establish (CTE) means the prior
permission of the pollution control board to begin the work of construction
of petrol retailing outlet at any place. At this stage, the g round water
level in the proposed site, nature of the ground water, i ts corrosive
properties, availability of residential premises, schools, probable danger
to environment from the proposed outlet, etc. would be considered by
the Pollution Control Board. In case consent to establish its given, the
conditions to be complied with would be prescribed in order to safeguard
the air ambience and ground water quality and also the soil. The power
in this regard is available under Section 25 of the Water (Prevention and
Control of Pollution) Act,1974.
40. Consent to Operate (CTO) means after the establishment of
the retail petroleum outlets, a certificate is issued permitting to commence
operation. At this stage, the actual compliance of the conditions imposed
while issuing the “consent to establish” are ascertained. In case, any
additional measures are required to be undertaken, further orders would
be issued. After satisfying about the complete safeguard to environment
such certificate is issued. In case of a new outlet, the company will first
get the consent to establish and after establishmen t and before
operationalizing the petrol bank, the consent to operate is to be obtained.
In existing outlets, the safeguards available in their units will have to be
shown, thereby indicating & assuring the pollution control board that the
unit would not cause damage to the environment. After such satisfaction,
the pollution control board would issue a certificate permitting them to
operate continuously. The object of the last direction is to ensure that the
existing outlets are safe not only regarding air pollution but also against
seepage to the ground water and soil. NGT has inherent power to issue
this direction since it is only to ensure the safety of the existing units.
41. The fundamental documents required for seeking CTE and
CTO are as under:-
Consent to Establish :
• Site plan of the production unit/project
• Brief project report which covers the details of raw material,
proposed product, the capital cost of the establishment (land and
M/S INDIAN OIL CORPORATION LIMITED v. V. B. R. MENON
& OTHERS [J. B. PARDIWALA, J.]
plant machinery), water-balance, water source, and its proposed
quantity
• Land documentation such as rend deed/ Registration deed/ Lease
deed
• Details of air pollution control/ Water Pollution control equipment
• MOA /Partnership Deed
Consent to Operate :
• Copy of the last Consent granted by competent Authority
• Layout schematics manifesting the detail of manufac turing
processes
• Latest analysis report of effluent, solid wastes, fuel gases, and
hazardous wastes.
• Balance sheet copy attested by CA
• Detail relating to land in case trade effluent is dischar ged on
land for percolation
• Occupation registration accorded by Town & Country Planning
Department in case of area development projects/ Building &
construction projects
• MOA /Partnership Deed
42. It will be in the fitness of things to incorporate in this judgment
the guidelines issued by the CPCB vide its Office Memorandum dated
07.01.2020 for setting up new petroleum pumps. The guidelines are as
follows:-
“GUIDELINES FOR SETTING UP OF NEW PETROL
PUMPS
A. Containment and treatment of spillages from fuel filling
operations at petrol pumps:
1. Petrol pumps located in areas with high groundwater table
i.e. groundwater levels less than 04 meters shall have
secondary containment by way of double walled tanks or
concrete protection wails so as to minimize groundwater
and soil contamination. It shall be the responsibility of OMC
to properly get measured groundwater level at the site of
235
proposed petrol pump and ensure implementation of these
adequate protection measures for such sites. Details of
measures taken by Oil Marketing Company shall be placed
in public domain and in case of contradictory view, view of
State/ Central Ground Water Board/ Authority wild prevail.
2. All new retail outlets shall have underground tanks/ above
ground tank and its ancillary components such as pipes,
flexible connectors, pumps fittings etc( protected from leaks
due to corrosion by adopting materials (HDPE/ Mild Steel
etc.) with required protective coating, as applicable, duly
approved by PESO.
3. Any major leakage/ spillage of Petrol, Diesel, Lube Oil (more
than barrel-165 litres) occurs at fueling station, concerned
OMC shall report to State Pollution Control Board, PESO
and District Administration under intimation to CPCB within
24 hours of occurrence.
Operation of concerned underground storage tank (UST)
and its ancillary components shall be stopped immediately
and not be resumed till corrective measures to contain and
stop leakage/ spillages are implemented to the satisfaction
of PESO and concerned SPCB.
OMCs will be held liable for Environmental Compensation
(imposed by SPCBs/PCCs) and assessment of
environmental damage (depending on extent of
contamination in soil and groundwater) and site remediation.
Consultant/ Expert agency appointed by OMCs for damage
assessment and site remediation shall have minimum
national/ international experience of 5 years in this fie ld.
Various approved methods shall be considered for cleaning
underground contaminants.
4. All DUs shall have Auto Cut off Nozzles which shuts
dispensation of fuel if its level in customer fuel tank reaches
full capacity.
5. Breakaways to be installed for all the hoses of dispensing
units to reduce spillage in the event of customer vehicles
moves away with nozzle still in the fueling position.
M/S INDIAN OIL CORPORATION LIMITED v. V. B. R. MENON
& OTHERS [J. B. PARDIWALA, J.]
6. Single/double plane swivel with breakaway coupling shall
be installed for all the dispensing units for better positioning
of nozzle while refueling does not fall off accidently.
7. In pressurized dispensation, all dispensing units shal l be
installed with shear valves to cut the fuel flow from pi pe
line immediately upon accidental knocking of dispensing
units from its position.
8. In pressurized system all Submersible Turbine Pump s
(STPs) are to installed with line leak detectors and in the
event of pipeline leaks STPs shall stop pumping fuel from
underground tanks.
9. Emergency stop button switch shall be provided on the Multi-
Product Dispenser (MPD) to stop the dispensation in case
of emergency.
10. Automation system shall be installed at all new retail outlets
to alert in case of tank leak by way of auto gauging system
approved by PESO.
11. All Retail Outlets shall provide overfill alarm t hrough
automation.
12. Measures for spill containment in fill point chambers and
forecourt area shall be implemented as prescribed by PESO.
B. Check on leakages (Leakage Detection System) from
underground storage tanks so as to prevent groundwater
and soil contamination:
1. All new retail outlets will have automation system installed
which will provide reports on volume balance after every
day operation and records shall be maintained.
2. Manual gauging shall be done once in a month and compare
the same with Automatic Tank Gauging for accuracy.
3. Daily MS and HSD loss shall not exceed MoPNG prescribed
limits. In case of leakage beyond such limits, matter shall
be got analyzed by OMCs and further action shall be taken
for ascertaining the reasons of losses. In case of leakag e
resulting in soil/groundwater contamination:
237
a. Concerned OMC shall report to State Pollution Control
Board, PESO and District Administration under intimation
to CPCB within 24 hours of occurrence. Operation of such
underground storage tank (UST) and its ancillary
components shall be stopped immediately.
b. Fuel shall be removed immediately from underground storage
tank to prevent further release to environment. Measures
to prevent explosion due to vapors released due to leakage
as recommended by PESO shall be implemented
immediately.
c. OMCs will be held liable for Environmental compensation
(imposed by SPCBs/PCCS) and assessment of
environmental damage (depending on extent of
contamination in soil and groundwater) and site remediation.
Consultant/ Expert agency appointed by OMCs for damage
assessment and site remediation shall have minimum
national/ international experience of 05 years in this field.
Various approved methods shall be considered for cleaning
underground contaminants.
d. Operation of Underground tank and its ancillary components
shall not be resumed till corrective measures to contain and
stop leakages are implemented to the satisfaction of PESO
and concerned SPCB.
4. All underground tanks and pipelines shall be subjected to
test for leaks every 7 years.
C. Policy towards Treatment and disposal of sludge removed
from underground tanks during cleaning:
D. Installation, Operation and maintenance of Vapour
Recovery System:
1. All new retail outlets set up with sale potential of 300KL
MS per month and setting up in cities with population more
than 1 lakh will be provided with YRS. YRS should be
functional by the time of sale of MS touch 300 KL. In case
of failure of installation of VRS, Environment Compensation
will be levied by SPCBs/ PCCs equivalent to the cost of
M/S INDIAN OIL CORPORATION LIMITED v. V. B. R. MENON
& OTHERS [J. B. PARDIWALA, J.]
VRS and this will further increase proportionate to the period
of non-compliance.
2. Any new retail outlet set up in cities having population more
than 10 Iakh and having sale potential of 100 KL MS per
month will be provided with YRS. YRS should be installed
within a period 03 months from the day of sale of MS touch
100 KL. In case of failure of installation of VRS,
Environment Compensation will be levied by SPCBs/ PCCs
equivalent to the cost of VRS and this will further increase
proportionate to the period of non-compliance.
3. In case of Stage II VRS, nozzle shall be provided with
flexible cover flap or other alternative system for prop er
covering of filling tank and therefore proper recovery of
vapors.
4. OMCs are responsible for maintaining installed VRS. They
have to maintain periodic inspections for AJL regulator as
prescribed by Legal Metrology. Proper record shall be
maintained,
5. Working of dispenser shall be interlinked with VRS
functioning. Online system shall be developed within 06
months to monitor status of operation of VRS. In case of
non-operation of YRS, the same shall be automatically
reported to concerned OMC. YRS shall be brought into
operation immediately within 24 hrs and in any case within
72 hrs failing which sale of MS shall be stopped from the
fueling station. Proper records of operation of YRS shall
be maintained.
6. Work zone monitoring for Total VOC and Benzene shall be
conducted by OMCs for petrol pumps selling more than
300 KL/ month and more than IO lakh population (in first
phase) by E(P)Act, 1986 approved labs once in a year to
check compliance with OSHA norms (Time-Weighted
Average) and report shall be submitted to SPCB. In addition,
pilot study shall be conducted by OMCs through expert
institutions for online monitoring of VOCs.
E. Ground water and soil quality monitoring within petrol pump
selling more than 300 KL/ month and more than 10 lakh
239
population shall be conducted by OMCs once in two years
through E(P)Act, 1986 approved labs for the following
parameters from the nearest source and report submitted
to SPCB:
Permissible Limit
Enforcement agencies including SPCB can collect samples m and
around petrol pump to check contamination
F. Measures for protection of Worker’s Health
1. All workers engaged at retail outlets may be covered
under ESI, OMC dealers shall implement the personal
protective equipment (PPE) m par labor laws.
2. IEC (Information Education Communication)
activities should be organized by OMC dealers for
workers at regular intervals in order to sensitize them
about harmful impacts of VOC emissions,
G. Audit of all protection measures and monitoring
system implemented at petrol pumps:
PESO shall conduct audit of tanks and fuel equipment
including pipes, overfill protection equipment and alarm
system on annual basis and maintain records.
H. Siting criteria of Retail Outlets:
In case of siting criteria for petrol pumps new Retail Outlets
shall not be located within a radial distance of 50 meters
(from fill point/ dispensing units/vent pipe whichever is
nearest) from schools, hospitals (10 beds and above) and
M/S INDIAN OIL CORPORATION LIMITED v. V. B. R. MENON
& OTHERS [J. B. PARDIWALA, J.]
residential areas designated as per local laws. In case of
constraints in providing 50 meters distance, the retail outlet
shall implement additional safety measures as prescribed
by PESO. In no case the distance between new retail outlet
from schools, hospitals (10 beds and above) and residential
area designated as per local laws shall be less than 3 0
meters. No high tension line shall pass over the retail outlet.”
43. Section 21 of the Air (Prevention and Control of Pollution)
Act, 1981 places restrictions, both on establishment and oper ation of
any industrial plant located in an air pollution control area without previous
consent of the Board. The legislative intent behind this provision would
lead to decipher two concepts - one, the consent for the purpose of
establishing an industrial plant while the other for operation of that plant.
The purpose of this Section is to ensure that when a unit or an industrial
plant is given consent to operate, the unit ought to have satisfied all the
conditions stated in the order of consent to establish and would have
installed the requisite effluent treatment plants and other anti-pollution
devices to ensure that it causes no pollution.
44. The upshot of our aforesaid discussion is that the NGT wa s
well within its powers and jurisdiction to issue the directions which have
been impugned before us. However, we would like to address on t he
question — whether the impugned directions are reasonable and whether
the same may lead to unnecessary harassment and cause immense
hardships to the retail outlets?
45. We take notice of the fact that all the appellants befo re us
have installed VRS and VRD at their sites and retail out lets. We also
take notice of the fact that the respondent No. 2 (original applicant) had
not prayed before the NGT, Chennai to make CTE and CTO mandatory.
The prayers in O.A. No. 138 of 2020 (SZ) were limited to the State of
Tamil Nadu only. However, the NGT, Chennai by its impugned order
has directed all the petroleum ROs in cities having more th an 10 lakh
population to install VRS mechanism which are having turnover of more
than 300 KL/Month. We also take notice of the fact that the CPC B in
consultation with the Ministry of Petroleum and Natural Gas has issued
circulars/guidelines from time to time for installation of VRS (also known
as Vapour Recovery Device circular). We are not inclined to disturb the
impugned directions issued by the NGT, Chennai in regard to installation
241
of the VRS. The CPCB shall ensure that these directions are scrupulously
followed and complied with.
46. What is important for us to note is that in the directi ons/
guidelines issued by the CPCB dated 30.04.2020 and 07.03.2016 resply
the automobile fuel outlets have been classified as “green” which may
be exempted from consent management. The learned Solicitor General
submitted that it is only after due consideration and deliberations that the
CPCB issued the said directions. The NGT itself in pa ra 66 of its
impugned order has noted that the oil industry is characterized as “green
category” and the CTE and CTO was not required. It appears to us that
the apprehension on the part of the NGT that the installat ion of VRS
may not be strictly monitored by the State Pollution Control Boards, led
the NGT to issue directions to the CPCB & State Pollution C ontrol
Boards to issue a circular making it mandatory for obtai ning the CTE
and CTO as a condition precedent for establishing new petroleum outlets.
What has been argued before us and also on the basis of the materials
on record, we are convinced that it is not necessary to make obtaining of
CTE and CTO mandatory. We would like to impress upon the CPCB to
ensure that its guidelines referred to above are scrupulous ly followed
and once the guidelines are scrupulously adhered to, no direction to obtain
CTE and CTO for starting/operating a RO is warranted. We are at one
with the learned counsel appearing for the respective appellants that
asking the existing ROs to obtain CTO is something very unreasonable
and may lead to various difficulties. Even directing the ROs th at may
come up in future to obtain the CTE and CTO would be cumbe rsome
and time consuming and thus we do not find it reasonable.
47. In such circumstances, while holding that the National Green
Tribunal has the power to direct the CPCB that it should exer cise its
powers under Section 5 of the Act 1986 for the purpose of pro tecting
the environment, we are inclined to modify the impugned directions issued
by the NGT, Chennai as contained in para 69(iii) and 69(iv) resply of the
impugned order.
48. In view of the aforesaid, we dispose of the Civil Appeal No.
2039 of 2022 in the following terms:-
(a) The CPCB shall ensure that all the retail petroleum o utlets
located in different cities having population of more than 10 lakh
and having turn over of more than 300 KL/Month shall install the
M/S INDIAN OIL CORPORATION LIMITED v. V. B. R. MENON
& OTHERS [J. B. PARDIWALA, J.]
VRS mechanism within the fresh timeline as prescribed in its
Circular dated 04.06.2021. To put it in other words, the CPCB
shall ensure that the directions issued by the NGT as contained in
para 69(i) and (ii) of the impugned order is fully complied with. It
shall be the legal obligation of all the State Pollution Control Boards
to ensure that the directions issued by the NGT in regard to t he
installation of the VRS mechanism is complied with within the
fresh timeline as prescribed by the CPCB.
(b) We set aside the directions issued by the NGT in the impugned
order as contained in para 69(iii) and (iv). Instead, we direct the
CPCB to instruct all the State Pollution Control Boards to ensure
that the guidelines issued by it vide the Office Memorandum dated
07.01.2020 are strictly adhered to. If there is breach of any of the
guidelines issued by the CPCB vide Office Memorandum dated
07.01.2020, then the concerned State Pollution Control Board shall
proceed against the erring outlet in accordance with law at the
earliest.
49. The connected Appeals are also disposed of in the aforesaid
terms.
50. There shall be no order as to costs.
51. Pending application, if any, stands disposed of.
Ankit Gyan Appeals disposed of.
(Assisted by : Adityaraj Patodia and Mahendra Yadav , LCRAs)