Tata Motors Limited v. the Brihan Mumbai Electric Supply & Transport Undertaking (best) and Others
J. B. PARDIWALA, J.
1. Leave granted.
2. As the issues raised in all the captioned appeals are com mon
and the challenge is also to the self-same order passed by the High
Court of Judicature at Bombay dated 05.07.2022 in the Writ Petition (L)
No. 15548 of 2022, those were taken up for hearing analogously and are
being disposed of by this common judgment and order.
3. The Appeal arising out of SLP(C) No. 15708 of 2022 is at the
instance of TATA Motors Limited (for short, “TATA Motors”) (Original
Writ Petitioner before the High Court).
4. The Appeal arising out of SLP(C) No. 11871 of 2022 is at the
instance of EVEY Trans Pvt. Ltd. (for short, “EVEY” ) (Original
respondent No. 2 before the High Court).
5. The Appeal arising out of SLP(C) No. 11933 of 2022 is at the
instance of the Brihan Mumbai Electric Supply & Transport Undertaking
(for short, “BEST”) (Original respondent No. 1 before the High Court),
a statutory corporation operating under the provisions of the Mumbai
Municipal Corporation Act, 1888.
FACTUAL MATRIX
6. BEST floated a tender bearing No. DMM(T-II)/08/TCU/73169/
2021-2022/Advt. dated 26.02.2022 for the supply, op eration and
maintenance of 1400 (+50% variation) Single Decker AC Electric Buses
with driver, for the purpose of public transport service within the city of
Mumbai along with other civil infrastructure development at the BEST
depots for a period of 12 years (hereinafter referred to as,‘the Tender’).
7. The Tender document provided for Technical specifications as
stipulated under Clause 3.5(e) and Clause 12 of Section 2 of Schedule
IX, under which the bidders were required to provide Single Decker
Buses which can run 200 Kms in single charge without interruption in
actual conditions for the relevant Gross Vehicle Weight (GVW) with air
conditioning with not more than 80% battery being consumed. Clause
3.5(e) and Clause 12 respectively are reproduced hereunder:
“SCHEDULE IX
TECHNICAL SPECIFICATIONS
699
….
Section 2: Technical specifications of SD AC Electri c Buses
under Wet Lease Scheme
….
Sr.
No.
Description Specifications
3.5 Electric Propulsion
System
Electric propulsion system motor rating/power sufficient to
provide:
(e) Minimum Operation
Range per bus per
day
The minimum operating Km of the buses offered in si ngle charge
will be 200 Km, for SD buses respectively with (80% SoC). These
offered buses should run above mentioned minimum Km w ithout
any interruption.
xxx xxx xxx
12 Operating range Presently the BEST buses operate for around an averag e of 200
km. per day (mostly uninterrupted). Keeping the above in mind, the
EV manufacturers have to provide vehicles which can run 200 km.
in single charge for SD AC Buses in actual conditions for the
relevant GVW with Air Conditioning. The Operating s chedule
shall be provided by BEST and the successful bidder has to ensure
the uninterrupted operation of the schedules through adequate
spare buses.
In case the successful bidder is unable to maintain un interrupted
operation of schedules for want of charging, then BEST sh all take
suitable action by levying additional penalty by non-p ayment
towards assured kms for that entire day per instance and if the
instance keeps on recurring for a long period of tim e then the
BEST may resort to even termination of Contract.”
8. In all, eight market players participated in the Tender process,
including EVEY and TATA Motors. In the pre-bid meeting held on
11.03.2022, TATA Motors submitted its pre-bid points, wherein under
Point 1, it requested BEST to consider its bid for 200 Kms per day with
75-minutes of opportunity charging time during the day operations and
range testing conditions as per AIS 040/FAME II.
9. On 15.03.2022, BEST published the minutes of the pre-bid
meeting. BEST revised certain specifications, however, the modifications
as requested by TATA Motors were rejected. BEST opted for a specific
reference to “in actual conditions” and excluded any reference to “AIS
040” or “Standard Conditions” in the Tender specifications. It is pertinent
to note that the AIS 040 certification would be upon standard t esting
conditions and not on the actual road conditions, which would account
for passenger load, temperature, traffic conditions, etc.
TATA MOTORS LTD. v. THE BRIHAN MUMBAI ELECTRIC SUPPLY
& TRANSPORT UNDERTAKING (BEST) [J. B. PARDIWALA, J.]
10. On 27.04.2022, BEST issued Corrigendum No. 8 specifying
the end of submission of bids for the Tender as 02.05.2022 and the date
of opening the technical bid as 04.05.2022.
11. TATA Motors submitted its bid on 25.04.2022, wherein it
guaranteed operating range of 200 Kms with 80% State of Cha rge,
“SoC” (i.e. 20% reserve left upon running 200 Kms in single ch arge),
however, the same was achieved “in standard test conditions as per AIS
040”. This was a deviation from the Tender specifications.
12. EVEY submitted its bid on 02.05.2022, claiming that the same
was submitted without any deviation from the Tender conditions including
the condition of minimum operating range of 200 Kms in a single charge.
EVEY claimed that the TATA Motors was the only bidd er which,
referenced “standard test conditions” instead of “actual road conditions”,
while stating that it complied with the Tender requirement of minimum
operating range.
13. Under Clause 5.1.1 of the Schedule II (Definiti ons and
Instructions to Bidders) of the Tender, the mode and manner of submission
of the bid proposal has been provided. The said clause also provided for
certain annexures to be submitted along with the bid. Pertinently, Annexure
Y, which is an undertaking to be given by the Operational Equi pment
Manufacturer (OEM) for the operating range of the buses, was not
required to be submitted along with the bid but was only required to be
submitted by the successful bidder. The purpose of the undertakin gs
under Clause 3.5 (e) and Clause 12 of Section 2 of Schedule IX
(Technical Specifications) and Annexure Y is to con firm that the
requirement of meeting the 200 Kms range in single charge is satisfied.
14. EVEY along with its bid dated 02.05.2022 submitted Annexure
Y, wherein the OEM gave an undertaking for the operating range which
included a table that mentioned that the operating range for a single
decker bus would be 200 Kms with the opportunity charging time of 1
hour. The same was done in accordance with the specifications of the
earlier tender dated 20.08.2021, which allowed for an opportunity time
of 60 minutes.
15. EVEY vide email dated 06.05.2022, provided a revised
Annexure Y as per the Single Charge Requirements mentioned in t he
Tender along with an explanation for the same holding it to be a mere
“clerical error”.
701
16. The Tender bids were opened on 04.05.2022 and the technical
suitability evaluation was announced on 06.05.2022. BEST in its technical
suitability evaluation dated 06.05.2022, held TATA Motors along with
four other bidders, to be “technically non-responsive”. TATA Motor’s
bid was rejected on account of technical deviation with respec t to the
operating range in its Annexure F and Annexure Y, respectively. The bid
offered by EVEY in the said report was deemed to be “techn ically
responsive”.
17. Thereafter, on 06.05.2022, the price bids of the eligible bidders
were opened, and EVEY was declared to be the L1 bidder. The p rice
bid of TATA Motors was not opened in accordance with Sr. No. 7 of the
Schedule I (Invitation for Proposal) and Sr. No. 15 of the Schedul e II
(Definitions and Instructions to Tenderers) of the Tender document. Sr.
No. 7 of Schedule I reads as under:
“7. The Bidders/Tenderers who meet the mandatory technical
and commercial eligibility criteria as mentioned in Sc hedule
III of Tender Document shall only be held eligible for opening
of price bids.”
18. Sr. No. 15 of Schedule II (Definitions and Instructions to
Tenderers) of the Tender document, reads as under:
“15. The Bidders shall accept unconditionally BEST’ s
‘Conditions of Tender & Conditions of Supply’ in TO TO,
failing which their financial bids shall not be considered for
·opening. Bidders are requested to go through the s ame
carefully.”
19. Aggrieved by the technical suitability evaluation issued by BEST
by which it rejected the bid of TATA Motors, the latter approached the
High Court of Judicature at Bombay by way of a writ petition beari ng
WP(L) No. 15548 of 2022 dated 10.05.2022. TATA Motors prayed for
the following reliefs:
“18. The Petitioners therefore pray that this Hon’b le Court
may be pleased to:
(a) Issue a writ of Certiorari or any other writ, o rder or
direction in the nature of Certiorari to call for the records of
the case and quash and set aside the decision dated
06.05.2022 taken by the Respondent No. 1 declaring the bid
TATA MOTORS LTD. v. THE BRIHAN MUMBAI ELECTRIC SUPPLY
& TRANSPORT UNDERTAKING (BEST) [J. B. PARDIWALA, J.]
submitted by the Petitioner No. 1 as “technically n on-
responsive”;
(b) Issue a writ of mandamus or writ in the nature of mandamus
or any appropriate writ, order or direction under Article 226
of the Constitution of India directing Respondent N o. 1 to
reconsider the bid submitted by the Petitioner No. 1 for the
purposes of the Tender;
(c) In the alternative to prayer (b) issue a writ of mandam us
or writ in the nature of mandamus or any appropriate writ,
order or direction under Article 226 of the Constit ution of
India directing Respondent Nos. 1 to cancel the Ten der and
float a fresh tender;
(d) During the pendency of the Petition, restrain Respon dent
No. 1 from taking any steps towards award of contract under
the Tender;
(e) ad-interim reliefs in terms of prayers in clause (d) abov e;
(f) Cost of the present Petition; and
(g) such further and other reliefs as the nature an d the
circumstances of the case may require be granted to the
Petitioner.”
20. During the pendency of the aforesaid writ petition BEST
awarded the Tender in favour of EVEY with the Letter of Accep tance
dated 20.05.2022. EVEY accordingly submitted the re quired
Performance Bank Guarantee on 23.05.2022. An agreement for operation
of Stage Carriage Services for public transport of Single Decker AC
Electric Buses with Driver in the city of Mumbai and its extended suburbs
on Gross Contract Cost (GCC) model for 12 years was entered into
between the EVEY and BEST on 26.05.2022.
21. A subsidy bank guarantee dated 02.06.2022 was submitted by
EVEY and BEST released the requisite amount to the EVEY’s account
towards subsidy on 10.06.2022. The EVEY even provided the BEST
with 8 buses between 04.07.2022 and 05.07.2022.
22. The High Court vide its impugned order and judgment dated
05.07.2022, took the view that the requirement for the operating range
to be more than 200 Kms in a single charge in “actual conditions” was
unambiguous. Accordingly, the High Court upheld the disqualification of
703
TATA Motors and rejected their claim from being considered as an eligible
bidder as they failed to comply with the technical requirem ents of the
Tender. The High Court in paragraphs 9 and 13 respectively of the
impugned order observed thus:
“9. Reading the aforesaid, it is unambiguous that oper ating
range provided in the tender document is that the e lectric
vehicles manufacturers have to provide the vehicles which
can run 200 kms in single charge for SD air conditi oning
buses in actual conditions for relevant GVW air conditioning.
The prima donna requirement of the tender document it
appears is that the electric vehicle offered should run 200
Kms in a single charge for Single Decker air condit ioning
bus in actual conditions with 80% SoC without any
interruption.
Xxx xxx xxx
13. Petitioner No.1 did not submit its bid for 200 Kms@ 80%
SoC in single charge on actual condition but at standard test
conditions as per AIS 040. As per the tender condit ion if a
person to whom the contract is awarded i.e. lessee does not
comply with the condition of achieving range of 200 Kms at
80% SoC in single charge then he is penalized for the same.
Meaning thereby, Respondent No.1 was conscious that the
standard test conditions as per AIS 040 is different than the
actual condition . The tender of the Petitioner certainly was
not compliant with the said clause. The Petitioner has deviated
from the material and the substantial term of the tender. The
Petitioner, as such, is rightly disqualified for deviating from
the material requirements stipulated in the tender .”
(Emphasis supplied)
23. The High Court, after holding as above proceeded further to
discuss as to why the bid of EVEY also should have been rejected. The
High Court noted EVEY’s contention that Annexure Y submitted along
with the technical bid was an incidental document, however, reje cted
such contention. The High Court while referring to Clause 16 of Schedule
I held that once the final date for the submission of the bid expires, there
can be no additions/corrections/ submissions of documents by the bidders.
Clause 16 of Schedule I of the Tender is produced hereinbelow:
TATA MOTORS LTD. v. THE BRIHAN MUMBAI ELECTRIC SUPPLY
& TRANSPORT UNDERTAKING (BEST) [J. B. PARDIWALA, J.]
“SCHEDULE I
Invitation for Proposal
…
16. Interested Bidders are advised to study this Tender docum ent
carefully before submitting their proposal in response to this Tender
document. Submission of a proposal in response to this tender shall
be deemed to have been after careful study and examinati on of this
document with full understanding of its terms, conditions and
implications. No addition / correction, submission of docum ents will
be allowed after opening of technical bid”
24. The High Court as a result, held that the email dated 06.05.2022
ought not to have been entertained, and the technical bid evaluat ion,
which was released on the same day did not depict fairness in the actions
of BEST. The High Court in paragraphs 20 – 22 respectively held as
under:
“20.It has been contended by Respondent No.1 that lette r
issued by Respondent No.2 on 6th morning did not influence
the decision to hold the bid of Respondent No.2 responsive in
the afternoon of 6th May 2022. The same is not born e-out
from the facts and circumstances of the case. Clause -16, as
stated above specifically and categorically prohibits additio ns
/ corrections / submission of documents after openi ng of
technical bid. Technical bids have been opened on 4 th May
2022. Thereafter no such letter could have been entertaine d.
The proximity of the time i.e. 6th May at 11.35 am. the letter
issued by Respondent No. 2 along with the modified Annexure-
Y and after two hours, the bid of Respondent No.2 h eld
responsive, does not support the contention of Resp ondent
No.1 that the said revised Annexure-Y and the lette r written
on 6th May morning did not weigh in holding Respond ent
No.2’s bid responsive. First of all, accepting the letter from
Respondent No.2 by Respondent No.1 on 6 May morning itself
was against the specific terms of the tender (clause 16). It is
further the case of Respondent No.1 that on 6 thmorning
revised Annexure-Y forwarded by Respondent No.2 was sou
705
motu and not at the instance of Respondent No.1, may not be
relevant here. The fact remains that Respondent No. 2 was
allowed to submit the letter and revised Annexure-Y after two
days of the opening of technical bids. It is also the fact that
on 28th April Respondent No.2 had submitted the bid and on
2nd May it had submitted the revised bid, however, with the
same Annexure-Y clearly stating that it would requi re
opportunity charging tune of one hour. The same would not
be in tune with the tender conditions.
21. From the aforesaid facts, it is clear that; (i) t he tender
documents submitted by the Petitioner contained deviation in
Annexure-Y i.e. the undertaking from OEM stating that o ne
hour charging time would be required for achieving operating
range of 200 Kms.; and (ii) Respondent No.2 submitted the
revised Annexure-Y on 6th morning i.e. two days afte r the
opening of technical bids and after acceptance of r evised
Annexure-Y on 6tb May morning, the technical bid of
Respondent No.2 was accepted in the afternoon of the same
day.
22. The aforesaid does not depict fair play in action. The
facts create doubt about, whether the decision was a fair one
or was the decision reached fairly? The same does not appear
to be so in view of the facts discussed above while accepting
the bid of Respondent No.2 as responsive.”
(Emphasis supplied)
25. In view of the aforesaid, the High Court thought fit to declare
EVEY also as an unsuccessful bidder. The High Court in paragraphs 23
and 24 respectively held as under:
“23. We are aware that the principle of equity and natu ral
justice stay at a distance and no judicial interfer ence is
warranted in case of an error in assessment. Howeve r, the
same holds good, if the decision is bona fide. We a re also
aware that interference of the Court would lead to some delay.
It would be seen that earlier also the tenders were issued.
However, because of non-sanction of subsidy, the ea rlier
tender process was scrapped and fresh tender proces s was
issued. For accepting the bid of Respondent No.2, 9 0 days’
TATA MOTORS LTD. v. THE BRIHAN MUMBAI ELECTRIC SUPPLY
& TRANSPORT UNDERTAKING (BEST) [J. B. PARDIWALA, J.]
time is provided to it for getting the prototype ve hicle. The
said period is not over. It is not even one month. The
Respondent No.2’s tender is accepted. The Courts up on
coming to the conclusion that the decision making p rocess
was not fair. The same lacked fair play in action and arbitrary,
will have to step in.
24. In the light of the above, we set aside the decision of the
Respondents of acceptance of tender of Respondent N o.2.
Respondent No.1, if it so desires, may proceed with a fresh
tender process. ”
(Emphasis supplied)
26. In such circumstances referred to above, all the three parties
are here before this Court with their respective petitions.
27. It is pertinent to note that during the pendenc y of the
proceedings before the High Court and after submitting the sub sidy
guarantee, EVEY had already supplied total 8 buses between 04.07.2022
to 05.07.2022. However, this Court by an interim order dated 14.07.2022
granted an interim stay of the impugned judgment insofar as EVEY is
concerned. This Court observed that, the supply of the buses, if any, by
EVEY would be subject to the result of these petitions and EVEY shall
not claim any equity at a later stage.
SUBMISSIONS ON BEHALF OF THE “EVEY”
28. Mr. Rohatgi, the learned Senior counsel appearing for EVEY
placed strong reliance on the decision of this Court in W.B. State
Electricity Board v. Patel Engineering Co. Ltd. & Ors ., reported in
(2001) 2 SCC 451 to submit that the equitable relief can be grante d to
the bidder where it has made a material mistake of fact i n the bid and
upon discovery of that mistake he has acted promptly and rectified his
mistake. He submitted that, Clause 16 of Schedule I of the Tender would
not apply to a document, like Annexure Y, which was originally required
to be submitted by the “Successful Bidder’’ after the evaluation of the
bid. Furthermore, the learned Senior counsel proceeded to submit that,
even in the original Annexure Y as submitted on 02.05.2022, his client
had mentioned that, “ These offered buses will run above mentioned
minimum Kms without any interruption”.
29. He submitted that, Annexure F specifies that “If the variations
specified herein, are found to be in nature of contradiction t o BEST’s
requirements/specifications then such Bids will be tr eated as Non-
707
responsive” and therefore, the bidder would have to essentially comply
with the specifications mentioned in Annexure F otherwise the bid would
be treated as “technically non-responsive”. He submitted that Annexure
F can be rightly termed as an essential condition of Tender. He placed
strong reliance on the decision of this Court in the case of Kanhaiya
Lal Agrawal v. Union of India and Others, reported in (2002) 6 SCC
315, to submit that whether a condition is essential, or collateral could be
ascertained by reference to the consequence of non-compliance thereto.
It was submitted that if non-fulfilment of the requireme nt results in
rejection of the tender, then it would be an essential part of the tender
otherwise it is only a collateral term. He further submit ted that, non-
compliance of the conditions mentioned in Annexure Y would lead to
levy of penalty and if the instance keeps on recurring, it may l ead to
termination of contract and therefore, Annexure Y should be treated as
a collateral term of the Tender. Under Clause 5.1.1 of Schedule II
(Definitions and Instructions to Bidders) of the Te nder document
Annexure Y was not required to be submitted along with the bid documents
but the same was to be submitted by the “Successful Bidde r’’.
30. He submitted that, in view of the decision of this Court in,
N.G . Projects Limited v. Vinod Kumar Jain and Others, reported in
(2022) 6 SCC 127,the writ court should refrain itself from imposing its
decision over the decision of the employer as to whether to accep t the
bid of a tenderer and that contract of public service should not be interfered
with lightly. The injunction or interference in the Tender leads to additional
costs on the State and is also against public interest.
31. He submitted that the allegations of favouritism levelle d by
TATA Motors by pointing towards the fact that apart from EVEY, there
were two more parties who were technically qualified and were L2 and
L3 viz., Switch Mobility Automotive Limited and PMI Electro Mobility
Solutions Private Limited respectively, EVEY was declar ed L1 and
awarded the Tender only after opening of the price bids at a later stage
are reckless and baseless.
32. Relying on the decisions of this Court in Raunaq International
Ltd. v. I.V .R. Construction Ltd. and Othersreported in (1999) 1 SCC
492 and S.S. & Company v. Orrisa Mining Corporation Limited
reported in (2008) 5 SCC 772, he submitted that once the High Court
found TATA Motors to be technically non-compliant, it ought not to have
entertained a challenge to the tendering process at the instance of an
unsuccessful party. The writ petition was filed against the t echnical
TATA MOTORS LTD. v. THE BRIHAN MUMBAI ELECTRIC SUPPLY
& TRANSPORT UNDERTAKING (BEST) [J. B. PARDIWALA, J.]
evaluation, whereas, the contract is now well underway at the stage of
performance. He submitted that interfering with the technical evaluation
at this stage would make the contract redundant and ca use loss of
exchequer’s money.
33. In the last, the learned Senior counsel submitted that till date
EVEY has supplied 20 tailor-made buses and the civil infrastructure for
these buses has also been put in place.
SUBMISSIONS ON BEHALF OF THE “TATA MOTORS”
34. Dr. Abhishek Manu Singhvi, the learned Senior counsel,
appearing for TATA Motors vehemently submitted that the contract
awarded by BEST to EVEY is per se illegal. The learned Senior counsel
argued that the acceptance of the EVEY’s revised Annexure Y after
the expiry of the bid submission end date and technical bid opening date
is contrary to the Tender conditions. Clause 16 of Schedule I (Invitation
for Proposal) of the Tender prohibits any addition, correction or submission
of document after the technical bid opening. However, the s ame was
not followed and by allowing a bidder to correct errors at a l ater stage
may lead to unequal treatment of bidders. The decisions of this Court in
Poddar Steel Corporation v. Ganesh Engineering Works and Others,
reported in (1991) 3 SCC 273 (Para 6) ; W.B. State Electricity Board
(supra) (Paras 27 and 28), were relied upon to substantiate the aforesaid
contention.
35. He submitted that the actions of BEST could be termed as
arbitrary, discriminatory, unfair, and that his client has locus to challenge
the same as no legitimacy should be granted to tender processes tainted
with malice. The learned Senior counsel relied upon the decision of this
Court in Monarch Infrastructure (P) Ltd v. Commissioner,
Ulhasnagar Municipal Corporation and Others, reported in (2000) 5
SCC 287 (Paras 10 and 14); Meerut Development Authority v.
Association of Management Studies and Another, reported in (2009)
6 SCC 171 (Paras 27, 28, 45 and 76);Maa Binda Express Carrier and
Another v. North-East Frontier Railway and Others, reported in (2014)
3 SCC 760 (Paras 8, 9 and 12)to fortify the submission.
36. He argued that the High Court in paragraph 19 of the impugned
judgment has rightly observed that the battery range guarantee can be
given only by the OEM from whom the bidder is purchasing the battery,
and in such circumstances, the same cannot be said to be incid ental.
The same was considered as an important part of the technical evaluation
by BEST.
709
37. He vociferously submitted that Annexure Y was a part of the
bid document and once submitted, could not have been permitted to be
altered after the bid submission end date i.e., 02.05.2022. The argument
that Annexure Y was optional and not required at the time of submission
of the bid is an afterthought, and the same being a question of fact or at
the most a mixed question of fact and law cannot be raised for the first
time in a Special Leave Petition. He relied on the decision of this Court
in Jagannath Behera & Ors. v. Raja Harihar Singh Marda raj
Bhramarbara Roy , reported in 1958 SCR 1067 (Paras 17 and
19);Karanpura Development Co. Ltd v. Raja Kamakshya Nar ain
Singh Etc. , reported in 1956 SCR 325 (Para 24); Vasantkumar
Radhakisan V ora v. Board of Trustees of Port of Bombay,reported in
(1991) 1 SCC 761 (Para 24); Steel Authority of India Ltd v. Gupta
Brother Steel Tubes Ltd, reported in (2009) 10 SCC 63 (Paras 32 and
34).
38. He submitted that the High Court was justified in saying that
a fresh tender in the present matter is warranted more pa rticularly in
view of the arbitrary tender process and delay in supply of the buses as
per the timeline prescribed under the Tender. He submitted that a fresh
tender would be in public interest as there has been a breach of delivery
timeline by EVEY as prescribed under the Tender. It is alleg ed that
there is a deficit in the supply of 1,030 buses till date. BEST has failed to
take necessary steps against EVEY for the delay, an d the same
showcases that the two contracting parties have colluded with eac h
other. The fresh tender would allow for more competitive price bids and
there would not be any financial burden on BEST in the event of
termination, as the Tender provides for forfeiture of Earnest Mon ey
Deposit (EMD) and encashment of performance guarantee.
39. In the last, the learned Senior counsel submitted that the High
Court while upholding the disqualification of his client on the sole basis
that it guaranteed the operating range in ‘standard test conditions as per
AIS 040’ committed an error. It was submitted that TATA Motors had
complied with the essential conditions and certain departures under the
Tender were permissible.
SUBMISSIONS ON BEHALF OF THE “BEST”
40. Mr. Tushar Mehta, the learned Solicitor General, appearing
for BEST submitted that the Tender document provided for mandatory
eligibility conditions for being declared as a qualified bidder at the stage
of technical bid, and the said eligibility conditions were stipulated in sub
TATA MOTORS LTD. v. THE BRIHAN MUMBAI ELECTRIC SUPPLY
& TRANSPORT UNDERTAKING (BEST) [J. B. PARDIWALA, J.]
– clauses (iv) and (v) of Clause 5.1.1 respectively of the Tender
Document.
41. He further submitted that Clause 5.1.1 (v), providing fo r
Annexure F was a mandatory condition for being qualified as a bidder at
the Technical Bidding stage. The mandatory requirement reads as under:
“5.1.1 The Proposal should be submitted in the following manner:
Bid 1: Technical Submissions, which would include:
i) Schedule of Guaranteed Performance & Other Technical
Particulars as shown in the prescribed format in Annexure-A
incorporated in the Tender document (in case of a consortium that of
a lead member),
ii) Schedule of Performance of the Bidder (in case of con sortium
experience of any member) as in Annexure C,
iii) Proforma for certification for Minimum Average Annual Turnover
(“MAAT”) from Chartered Accountant as in Annexure D. (in case of
consortium for lead member and in case of Aggregator, Networth
certificate or Investible fund certificate),
iv) Aggregator have to submit back-to-back agreement with OEM for
complete contract period for the maintenance of buses. Agg regator
have also to submit Manufacturer Authorization Form (if aggreg ator
is a sole bidder or lead bidder then such bidder shall submit
Manufacturer Authorization Form) from OEM,
v) Schedule of Departures from technical specification a s in
Annexure F,
vi) General details of Bidder with registration proof and credentials
(in case of Consortium, this would need to be provided by t he lead
members) as in Annexure G & H,
vii) Bid Security/EMD as in Annexure I,
viii) The Annexure-L. (undertaking of the Bidder not being
involved/engaged in any corrupt or fraudulent malpractices or not
being black-listed with any Government or Public Sector Unit s in
India or outside India)
ix) In case of Consortium, proforma of Consortium Agree ment to be
entered into between members as in Annexure N,
x) Covering Letter cum Project Undertaking as per Annexu re Q
stating the Proposal Validity Period,
xi) Power of Attorney for Signing of the Proposal (in cas e of
Consortium, this would need to be provided by all the members) as in
Annexure R.”
711
42. He submitted that TATA Motors deviated from the mandatory
requirement while filing the said Annexure F. He highlighted the portion
of the Annexure which states that if variations are found contradicting
BEST’s requirements then such bids would be treated as non-responsive.
The non-compliant deviation was as under:
“Shall meet the operating range requirement of 200 KMS @
80% SOC in single charge as certified per AIS 040.”
43. He submitted that none of the bidders including EVEY
(successful bidder) deviated from this mandatory condition. Hence, TATA
Motors was declared a non-responsive bidder at the technical stage
itself. On 06.05.2022, BEST undertook the technical evaluation and took
a decision that of all the bidders found eligible and responsive , EVEY
had quoted the lowest rates and accordingly the contract was awarde d
in its favour.
44. The learned SG further submitted that the successful bidde r
was required to fill up Annexure Y. However, Annexure Y was neither a
condition precedent for being a responsive bidder nor a m andatory
condition for awarding the contract.
45. EVEY rectified its mistake, explaining that the Annexure Y
submitted by it was inadvertently placed after doing a cut-and-paste job
from the previous tender. EVEY filed a revised/fresh Annexure Y strictly
in accordance with the Tender.
46. The learned SG vehemently submitted that to ask BEST t o
issue a fresh tender notice would be against public interest. In the contract
given to EVEY in May 2022, BEST was to pay Rs. 46.81/KM to EVEY.
BEST examined the possibility of re-tendering and found that in the
recent past, one similar tender was issued by the Convergency Energy
Services Limited (CESL), a Government of India undertaking. As per
the recent contract awarded by CESL, it ended up paying Rs. 1,200
Crore more than the present rate at which “BEST” awarded the instant
contract. Therefore, it would be commercially imprudent to opt for re-
tendering.
ANALYSIS
47. Having heard the learned counsel appearing for the parties
and having gone through the materials on record, the only question that
falls for our consideration is : Whether the High Court after upholding
TATA MOTORS LTD. v. THE BRIHAN MUMBAI ELECTRIC SUPPLY
& TRANSPORT UNDERTAKING (BEST) [J. B. PARDIWALA, J.]
the disqualification of TATA Motors from the Tender was justif ied in
undertaking further exercise to ascertain whether EVEY also stood
disqualified and that BEST in its discretion may undertake a fresh tender
process?
48. This Court being the guardian of fundamental rights is duty-
bound to interfere when there is arbitrariness, irrationali ty, mala fides
and bias. However, this Court has cautioned time and again that courts
should exercise a lot of restraint while exercising their powers of judicial
review in contractual or commercial matters. This Court is norma lly
loathe to interfere in contractual matters unless a clear-cut case of
arbitrariness or mala fides or bias or irrationality is made out. One must
remember that today many public sector undertakings compete with the
private industry. The contracts entered into between private parties are
not subject to scrutiny under writ jurisdiction. No doubt, the bodies which
are State within the meaning of Article 12 of the Constitution are bound
to act fairly and are amenable to the writ jurisdiction of superior courts
but this discretionary power must be exercised with a great deal of restraint
and caution. The courts must realise their limitations and the havoc which
needless interference in commercial matters can cause. In contracts
involving technical issues the courts should be even more re luctant
because most of us in Judges’ robes do not have the necessary expertise
to adjudicate upon technical issues beyond our domain. The courts should
not use a magnifying glass while scanning the tenders and make every
small mistake appear like a big blunder. In fact, the courts must give
“fair play in the joints” to the government and public sector undertakings
in matters of contract. Courts must also not interf ere where such
interference will cause unnecessary loss to the public exchequer. (See:
Silppi Constructions Contractors v. Union of India , (2020) 16 SCC
489)
49. It is not in dispute that the first and the foremost requirement
of the Tender was the prescribed operating range of the single decker
buses which would operate for around and average of 200 Kms in a
single charge in “actual conditions” with 80% SoC w ithout any
interruption. Then materials on record would indicate that the T ATA
Motors in its bid deviated from this requirement and had informed BEST
that it could carry the operating range in the “standard test conditions”
which was not in accordance with the Tender conditions. The High Court
has rightly observed in its impugned judgment that the bid of the TATA
713
Motors failed to comply with the said clause. TATA Motors deviated
from the material and the essential term of the Tender. It may not be out
of place to state at this stage that it is only TATA Motors who deviated
from the condition referred to above. However, we are of the view that
the High Court having once declared TATA Motors as “non-responsive”
and having stood disqualified from the Tender process should not have
entered into the fray of investigating into the decision of BEST to declare
EVEY as the eligible bidder. We are saying so because the High Court
was not exercising its writ jurisdiction in public interest. The High Court
looked into a petition filed by a party trying to assert its own rights. As
held by this Court in Raunaq International Ltd. (supra), that grant of
judicial relief at the instance of a party which does not fulfil the requisite
criteria is something which could be termed as misplace d. In Raunaq
International Ltd. (supra), this Court observed as under:
“27. In the present case, however, the relaxation was
permissible under the terms of the tender. The relaxation which
the Board has granted to M/s Raunaq International Ltd. is on
valid principles looking to the expertise of the te nderer and
his past experience although it does not exactly tally wi th the
prescribed criteria. What is more relevant, M/s I.V.R.
Construction Ltd. who have challenged this award of tender
themselves do not fulfil the requisite criteria. Th ey do not
possess the prescribed experience qualification. The refore,
any judicial relief at the instance of a party which does not
fulfil the requisite criteria seems to be misplaced . Even if the
criteria can be relaxed both for M/s Raunaq Interna tional
Ltd. and M/s I.V.R. Construction Ltd., it is clear that the off er
of M/s Raunaq International Ltd. is lower and it is on this
ground that the Board has accepted the offer of M/s Raunaq
International Ltd. We fail to see how the award of tender can
be stayed at the instance of a party which does not fulfil the
requisite criteria itself and whose offer is higher than the
offer which has been accepted. It is also obvious t hat by
stopping the performance of the contract so awarded , there
is a major detriment to the public because the constructio n of
two thermal power units, each of 210 MW, is held up on
account of this dispute. Shortages of power have be come
notorious. They also seriously affect industrial de velopment
and the resulting job opportunities for a large num ber of
TATA MOTORS LTD. v. THE BRIHAN MUMBAI ELECTRIC SUPPLY
& TRANSPORT UNDERTAKING (BEST) [J. B. PARDIWALA, J.]
people. In the present case, there is no overwhelming public
interest in stopping the project. There is no alleg ation
whatsoever of any mala fides or collateral reasons for
granting the contract to M/s. Raunaq International L td.”
(Emphasis supplied)
50. We take notice of the fact that Annexure Y was original ly
required to be submitted by the “Successful Bidder” after the evaluation
of the bid and the same did not figure in the list of documents a nd
annexures to be included in the technical submissions, as provided under
Clause 5.1.1 of Schedule II of the Tender. Further the format provided
for Annexure Y in the Tender documents in its heading stat es that the
“Successful Bidders shall upload a Letter of Undert aking on their
letter head as below”. Therefore, we are of the view that the restriction
on revision of documents under Clause 16 of Schedule I, which states,
“No addition/correction, submission of documents will be allowed
after opening of technical bid,” is only limited to the documents
necessary to be included in the technical bid and would not be applicable
to any such document which does not form a part of the technical bid.
51. We are of the view that the High Court should have been a bit
slow and circumspect in reversing the action of BEST permitting EVEY
to submit a revised Annexure Y. We are of the view that the B EST
committed no error or cannot be held guilty of favoritism, etc. in allowing
EVEY to submit a revised Annexure Y as the earlier one was incorrect
on account of a clerical error. This exercise itself was not suffici ent to
declare the entire bid offered by EVEY as unlawful or illegal.
52. Ordinarily, a writ court should refrain itself from imposing its
decision over the decision of the employer as to whether or not to accept
the bid of a tenderer unless something very gross or palpable is pointed
out. The court ordinarily should not interfere in matters relating to tender
or contract. To set at naught the entire tender process at the stage when
the contract is well underway, would not be in public interest. Initiating a
fresh tender process at this stage may consume lot of time and also loss
to the public exchequer to the tune of crores of rupees. The financial
burden/implications on the public exchequer that the State may have to
meet with if the Court directs issue of a fresh tender noti ce, should be
one of the guiding factors that the Court should keep in mind. Thi s is
evident from a three-Judge Bench decision of this Court in Association
715
of Registration Plates v. Union of India and Others, reported in (2005)
1 SCC 679.
53. The law relating to award of contract by the State and public
sector corporations was reviewed in Air India Ltd. v. Cochin
International Airport Ltd., reported in (2000) 2 SCC 617 and it was
held that the award of a contract, whether by a private party or by a
State, is essentially a commercial transaction. It can choos e its own
method to arrive at a decision and it is free to grant any relaxation for
bona fide reasons, if the tender conditions permit such a relaxation. It
was further held that the State, its corporations, instru mentalities and
agencies have the public duty to be fair to all concerned. Even when
some defect is found in the decision-making process, the court m ust
exercise its discretionary powers under Article 226 with grea t caution
and should exercise it only in furtherance of public interest and not merely
on the making out of a legal point. The court should always keep the
larger public interest in mind in order to decide whether its intervention
is called for or not. Only when it comes to a conclusion that overwhelming
public interest requires interference, the court should interfere.
54. As observed by this Court in Jagdish Mandal v. State of
Orissa and Others, reported in (2007) 14 SCC 517, that while invoking
power of judicial review in matters as to tenders or award of contracts,
certain special features should be borne in mind that evaluations of tenders
and awarding of contracts are essentially commercial function s and
principles of equity and natural justice stay at a distance in such matters.
If the decision relating to award of contract is bona fide and is in public
interest, courts will not interfere by exercising powers of judicial review
even if a procedural aberration or error in assessment or prejudice to a
tenderer, is made out. Power of judicial review will not be i nvoked to
protect private interest at the cost of public inter est, or to decide
contractual disputes.
55. In such circumstances referred to above, we set aside that
part of the judgment and order passed by the High Court by which the
decision of BEST to accept the tender of EVEY was set aside a nd it
was left to the discretion of BEST to undertake a fresh tender process.
56. The Appeal filed by TATA Motors accordingly fails and is
hereby dismissed. Whereas the Appeals filed by EVEY and BEST are
allowed to the aforesaid extent.
TATA MOTORS LTD. v. THE BRIHAN MUMBAI ELECTRIC SUPPLY
& TRANSPORT UNDERTAKING (BEST) [J. B. PARDIWALA, J.]
57. There shall be no order as to costs.
58. Pending application, if any, stands disposed of accordingly.
Divya Pandey Appeals disposed of.