State of U.P. v. Allied Constructions
Cited by 8 judgments in this corpus
- Bharat Petroleum Corporation Limited vs Haldia Petrochemicals Ltd · 2025 SCC OnLine Cal 4968
- Damodar Valley Corporation vs Reliance Infrastructure Limited · 2023 SCC OnLine Cal 3307
- M/S HINDUSTAN CONSTRUCTION COMPANY LIMITED v. M/S NATIONAL HIGHWAYS AUTHORITY OF INDIA · 2023 INSC 768
- M/S COCHIN SHIPYARD LTD. v. M/S APEEJAY SHIPPING LTD. · 2015 INSC 837
- MCDERMOTT INTERNTIONAL INC. v. BURN STANDARD CO. LTD. AND ORS. · 2006 INSC 326
- Hari Om Maheshwari vs Vinitkumar Parikh · (2005) 1 SCC 379
- M/S. CONTINENTAL CONSTRUCTION LTD. v. STATE OF U.P. · 2003 INSC 500
- PURE HELIUM INDIA PVT. LTD. v. OIL AND NATURAL GAS COMMISSION · 2003 INSC 538
These judgments mention this one. Whether each followed, distinguished or doubted it is not recorded here — read them before relying on any of it.
Under a contract entered into by and between the appellant and the
respondent, the respondent undertook construction of bridge-cum-fall at Munda
Khera Scape at the estimated cost of Rs. 37.2 lakhs. While the work was in
D progress, the work area was flooded in the night of August 25 and 26, I 99 I.
The respondent-contractor herein filed a claim on account of loss
sustained by him due to flooding of the work area. Ultimately, the matter was
referred to an arbitrator. The arbitrator gave an award for payment of a sum
of Rs. 12,55,365 together with interest at the rate of 18 per cent from 1.11.1991
E till the date of the award and 6 per cent thereafter. The respondent filed the
award for being made rule of the Court. The appellant herein filed a petition,
inter alia, on the ground that the arbitrator has misconducted the proceeding3,
inasmuch as the force majeure contained in Clause 47 disentitled the
respondent from making any claim which was on account of unprecedented
F rain. The said objection was rejected and the award was made rule of the
Court. The appellant thereafter filed a first appeal from order before the High
Court and the same was dismissed. It is against the said judgment, the appellant
is in appeal before us.
Learned counsel appearing for the appellant reiterated his argument
G raised before the High Court. In fact, his argument based on force majeure
is that because of unprecendented rain the liability of loss cannot be thrust
upon the appellant. We do not find any merit in this contention. Clause 47
of the Agreement runs as under:
"Neither party shall be liable to the other for any loss or damage
H occasioned by or arising out of act of God, such as unprecedented
\.
ST A TE v. ALLIED CONSTRUCTIONS 57
flood, volcanic eruption, earthquake or other convulsion of nature A
and other acts such as but not restricted to general strikes, invasion,
the act of foreign countries; hostilities or warlike operations before or
after declaration of war; rebellion, military Of usurped power which
prevent performance of the contract and which could not have been
foreseen or avoided by a prudent person."
A perusal of Clause 47 reproduced above shows that it protected the Stat~
I
from liability and damage occasioned by unprecedented flood which could
not have been foreseen or avoided as a prudent person. The appellant herein
did not lead any evidence before the arbitrator that the rain as a result of
which the loss was sustained by the respondent was unprecedented and in C
fact it was an act of God. In absence of such an evidence, the arbitrator as
well as the High Court has recorded a finding of fact that the flood which has
caused loss to the respondent was not due to the unprecedented rain an(!,
therefore, Clause 47 of the Agreement was not attracted.
Any award made by an arbitrator can be set aside only if one or the D
other term specified in Sections 30 and 33 of the Arbitration Act, 1940 is
attracted. It is not a case where it can be said that the arbitrator has
misconducted the proceedings. It was within his jurisdiction to interpret Clause
47 of the Agreement having regard to the fact-situation obtaining therein. It
is submitted that an award made by an arbitrator may be wrong either on law
or on fact and error of law on the face of it could not nullify an award. The E
award is a speaking one. The arbitrator has assigned sufficient and cogent
reasons in support thereof. Interpretation of a contract, it is trite, is a matter
for arbitrator to determine (see Mis. Sudarsan Trading Co. v. The Government
of Kera/a, AIR (1989) SC 890). Section 30 of the Arbitration Act, 1940
providing for setting aside an award is restrictive in its operation. Unless oqe p
or the other condition contained in Section 30 is satisfied, an award cannot
be set aside. The arbitrator is a Judge chosen by the parties and his decision
is final. The Court is precluded from reappraising the evidence. Even in a
case where the award contains reasons, the. interference therewith would stilI
be not available within the jurisdiction of the Court unless, of course, the
reasons are totally perverse or the judgment is based on a wrong proposition G
of law. An error apparent on the face of the records would not imply closer
scrutiny of the merits of documents and materials on record. Once it is found
that the view of the arbitrator is a plausible one, the Court will refrain itself
from interfering [see U.P. State Electricity Board v. Searsole Chemicals Ltd.,
[2001) 3 SCC 397 and !SPAT Engineering & Foundry Works, B.S. City, H
A Bokaro v. Steel Authority of India Ltd, B.S. City, Bokaro, [2001] 6 SCC
347].
For that reason, we are of the view that the appeal has no merit and
must fail. However, the parties are agreed that from the date of filing of the
B claim till the date of award the interest chargeable would be at the rate of 12
per cent in place of 18 per cent. For that reason, the award and judgment
under challenge stand modified to that extent.
The appeal is disposed of in the aforesaid terms. There shall be no
order as to costs.
R.P. Appeal disposed of